District Technical Office Earth Work Calculation Sheet
District Technical Office Earth Work Calculation Sheet
District Technical Office Earth Work Calculation Sheet
2
Earthen Drain Construction Work On Cutting & Filling all Complete
315.00 355.35 111935.25 111.60 355.35 39657.06 -203.40 -72278.19
Hard Soil total
Dry Stone Soling Work For Stone collection & Transportation all 35.00 2321.36 81247.60 35.00 2321.36 81247.60 0.00 0.00
3
Complete Works
0.00 0.00 0.00
24.00 1532.21 36773.04 24.00 1532.21 36773.04 0.00 0.00
Gabion Work For Fabrication,cutting weaving,& Assembling of
4 Hexagonal Mesh Size 100mm*120mm, Mesh Wire 10SWG,
Selvedge Wire 7 SWG , Binding Wire 12 SWG, Gabion box size of
(2*1*1)m all Complete Work
5 Gabion Filling with Rubble Stones 24.00 2416.11 57986.64 24.00 2416.11 57986.64 0.00 0.00
s"n hDdf M ### s"n hDdf M 1252056.18 s"n hDdf M 977.60
a9L ePdf (+) 36L ePdf (-) lrGx c+lst ug{] .
Oli6d]6 eGbf 36L a9L vr{ ePsf] d'Vo sf/0f M
:jLs[t l8hfOg / :k]lzlkms]zg adf]lhd sfd ePsf] 5 dgL k|dfl0ft ug{] .
s}lkmot
,,,,,,,,,,,,,,,,,,,,,
:jLs[t ug{]sf] ;xL
clwsf/ k|fKt clwsf/L
Government of Nepal
Ministry of Federal Affairs And Local Development
Office of District Coordination Committee
District Technical Office
Dhading
Earth Work Calculation Sheet
Name of Work: Maajhgaun-Felele-Madhankharka-Belgaira-Raniban Road Work. Page No:-
Site: Neelkantha Municipality-11 & 13 Date:- 11/11/2073
F / Y:- 073/074
Length CUT(M) Area Av. Area TotalQuantity Classification % Quantity m3
Chainage (M) NO Breath Height m2 m2 m3 OS HS OR MR HR OS HS OR MR HR Remarks
Starting point Felele
0+000 0.00 0.50 3.00 3.50 5.25 OS=Odinary Soil
0+030 30.00 0.50 3.70 4.00 7.40 6.33 189.75 50 50 0.00 0.00 94.87 94.87 0.00 HS=Hard Soil
0+060 30.00 0.50 2.50 3.50 4.38 5.89 176.63 20 80 0.00 0.00 0.00 35.32 141.30 OR=Ordinary Rock
0+090 30.00 0.50 3.00 3.20 4.80 4.59 137.63 20 80 0.00 0.00 0.00 27.52 110.10 MR=Medium Rock
0+120 30.00 0.50 3.00 3.50 5.25 5.03 150.75 20 80 0.00 0.00 0.00 30.15 120.60
0+150 30.00 0.50 3.00 3.20 4.80 5.03 150.75 20 80 0.00 0.00 0.00 30.15 120.60
0+180 30.00 0.50 2.50 3.00 3.75 4.28 128.25 20 80 0.00 0.00 0.00 25.65 102.60
0+210 30.00 0.50 2.00 3.50 3.50 3.63 108.75 20 80 0.00 0.00 0.00 21.75 87.00
0+240 30.00 0.50 4.00 3.40 6.80 5.15 154.50 30 70 0.00 0.00 0.00 46.35 108.15
0+270 30.00 0.50 2.50 2.00 2.50 4.65 139.50 100 139.50 0.00 0.00 0.00 0.00
0+300 30.00 0.50 3.00 2.50 3.75 3.13 93.75 100 93.75 0.00 0.00 0.00 0.00
0+330 30.00 0.50 3.00 2.50 3.75 3.75 112.50 100 112.50 0.00 0.00 0.00 0.00
0+360 30.00 0.50 3.50 2.00 3.50 3.63 108.75 100 108.75 0.00 0.00 0.00 0.00
0+390 30.00 0.50 3.00 2.00 3.00 3.25 97.50 100 97.50 0.00 0.00 0.00 0.00
0+420 30.00 0.50 3.00 2.00 3.00 3.00 90.00 100 90.00 0.00 0.00 0.00 0.00
0+450 30.00 0.50 3.00 2.00 3.00 3.00 90.00 100 90.00 0.00 0.00 0.00 0.00
0+480 30.00 0.50 3.00 1.50 2.25 2.63 78.75 100 78.75 0.00 0.00 0.00 0.00
0+510 30.00 0.50 3.00 2.00 3.00 2.63 78.75 100 78.75 0.00 0.00 0.00 0.00
0+540 30.00 0.50 3.00 2.50 3.75 3.38 101.25 100 101.25 0.00 0.00 0.00 0.00
0+570 30.00 0.50 3.50 2.00 3.50 3.63 108.75 100 108.75 0.00 0.00 0.00 0.00
0+600 30.00 0.50 3.00 2.00 3.00 3.25 97.50 100 97.50 0.00 0.00 0.00 0.00
0+630 30.00 0.50 3.50 2.50 4.38 3.69 110.63 100 110.62 0.00 0.00 0.00 0.00
0+660 30.00 0.50 3.00 2.00 3.00 3.69 110.63 100 110.62 0.00 0.00 0.00 0.00
Starting point Belgaira
0+000 30.00 0.50 3.00 2.00 3.00 1.50 45.00 100 0.00 45.00 0.00 0.00 0.00
0+030 30.00 0.50 2.80 1.80 2.52 2.76 82.80 100 0.00 82.80 0.00 0.00 0.00
0+060 30.00 0.50 3.20 2.50 4.00 3.26 97.80 100 0.00 97.80 0.00 0.00 0.00
0+090 30.00 0.50 3.50 2.00 3.50 3.75 112.50 100 0.00 112.50 0.00 0.00 0.00
0+120 30.00 0.50 3.50 1.50 2.63 3.06 91.88 100 0.00 91.87 0.00 0.00 0.00
0+150 30.00 0.50 3.20 1.80 2.88 2.75 82.58 100 0.00 82.57 0.00 0.00 0.00
0+180 30.00 0.50 3.20 2.00 3.20 3.04 91.20 100 0.00 91.20 0.00 0.00 0.00
0+210 30.00 0.50 3.00 1.50 2.25 2.73 81.75 100 0.00 81.75 0.00 0.00 0.00
0+240 30.00 0.50 3.00 1.50 2.25 2.25 67.50 100 0.00 67.50 0.00 0.00 0.00
0+270 30.00 0.50 3.00 1.80 2.70 2.48 74.25 100 0.00 74.25 0.00 0.00 0.00
TotalQuantity 2187.75 Total 1418.24 827.24 94.87 311.76 790.35
Government of Nepal
Ministry of Federal Affairs And Local Development
Office Of District Coordination Committee
District Technical Office
Dhading
DETAILED MEASUREMENT OF COST
400000
200000
Government of Nepal
Ministry of Federal Affairs And Local Development
Office of District Coordination Committee
District Technical Office
Dhading
Earth Work Calculation Sheet
Name of Work: Maajhgaun-Felele-Madhankharka-Belgaira-Raniban Road Work.
Site: Neelkantha Municipality-11 & 13
on Sheet
Page No:-
Date:- 11/11/2073
F / Y:- 073/074
Quantity m3
OS HS OR MR HR Remarks
OS=Odinary Soil
0.00 0.00 94.87 94.87 0.00 HS=Hard Soil
0.00 0.00 0.00 35.32 141.30 OR=Ordinary Rock
0.00 0.00 0.00 27.52 110.10 MR=Medium Rock
0.00 0.00 0.00 30.15 120.60
0.00 0.00 0.00 30.15 120.60
0.00 0.00 0.00 25.65 102.60
0.00 0.00 0.00 21.75 87.00
0.00 0.00 0.00 46.35 108.15
139.50 0.00 0.00 0.00 0.00
93.75 0.00 0.00 0.00 0.00
112.50 0.00 0.00 0.00 0.00
108.75 0.00 0.00 0.00 0.00
97.50 0.00 0.00 0.00 0.00
90.00 0.00 0.00 0.00 0.00
90.00 0.00 0.00 0.00 0.00
78.75 0.00 0.00 0.00 0.00
78.75 0.00 0.00 0.00 0.00
101.25 0.00 0.00 0.00 0.00
108.75 0.00 0.00 0.00 0.00
97.50 0.00 0.00 0.00 0.00
110.62 0.00 0.00 0.00 0.00
110.62 0.00 0.00 0.00 0.00
2836.48
189.74
623.52
1580.7
400000