District Technical Office Earth Work Calculation Sheet

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 18

Government of Nepal

Ministry of Federal Affairs And Local Development


Office of District Development Committee
District Technical Office
Dhading
Earth Work Calculation Sheet
Name of Work: Maajhgaun-Felele-Madhankharka-Belgaira-Raniban Road Work. Page No:-
Site: Neelkantha Municipality-11 & 13 Date:- 11/11/2073
F / Y:- 073/074
Length CUT(M) Area Av. Area TotalQuantity Classification % Quantity m3
Chainage (M) NO Breath Height m2 m2 m3 OS HS OR MR HR OS HS OR MR HR Remarks
Ree (Latap Gaun )
0+000 0.00 1.00 2.70 OS=Odinary Soil
0+030 30.00 1.00 3.10 2.90 87.00 50 50 0.00 0.00 43.50 43.50 0.00 HS=Hard Soil
0+060 30.00 1.00 3.40 3.25 97.50 50 50 0.00 0.00 48.75 48.75 0.00 OR=Ordinary Rock
0+090 30.00 1.00 2.90 3.15 94.50 50 50 0.00 0.00 47.25 47.25 0.00 MR=Medium Rock
0+120 30.00 1.00 3.00 2.95 88.50 50 50 0.00 0.00 44.25 44.25 0.00
0+150 30.00 1.00 10.60 6.80 204.00 50 50 0.00 0.00 102.00 102.00 0.00
0+180 30.00 1.00 2.50 6.55 196.50 50 50 0.00 0.00 98.25 98.25 0.00
0+210 30.00 1.00 1.50 2.00 60.00 50 50 0.00 0.00 30.00 30.00 0.00
0+240 30.00 1.00 2.50 2.00 60.00 30 70 0.00 0.00 0.00 18.00 42.00
0+270 30.00 1.00 4.60 3.55 106.50 100 106.50 0.00 0.00 0.00 0.00
0+300 30.00 1.00 2.50 3.55 106.50 100 106.50 0.00 0.00 0.00 0.00
0+330 30.00 1.00 2.50 2.50 75.00 100 75.00 0.00 0.00 0.00 0.00
0+360 30.00 1.00 1.50 2.00 60.00 100 60.00 0.00 0.00 0.00 0.00
0+390 30.00 1.00 4.60 3.05 91.50 100 91.50 0.00 0.00 0.00 0.00
0+420 30.00 1.00 2.50 3.55 106.50 100 106.50 0.00 0.00 0.00 0.00
0+450 30.00 1.00 1.50 2.00 60.00 100 60.00 0.00 0.00 0.00 0.00
0+480 30.00 1.00 3.10 2.30 69.00 100 69.00 0.00 0.00 0.00 0.00
0+510 30.00 1.00 2.90 3.00 90.00 100 90.00 0.00 0.00 0.00 0.00
0+540 30.00 1.00 6.50 4.70 141.00 100 141.00 0.00 0.00 0.00 0.00
0+570 30.00 1.00 2.50 4.50 135.00 100 135.00 0.00 0.00 0.00 0.00
0+600 30.00 1.00 2.50 2.50 75.00 100 75.00 0.00 0.00 0.00 0.00
0+630 30.00 1.00 0.80 1.65 49.50 100 49.50 0.00 0.00 0.00 0.00
0+660 30.00 1.00 2.50 1.65 49.50 100 49.50 0.00 0.00 0.00 0.00
0+690 30.00 1.00 2.50 2.50 75.00 100 75.00 0.00 0.00 0.00 0.00
0+720 30.00 1.00 2.50 2.50 75.00 100 75.00 0.00 0.00 0.00 0.00
0+750 30.00 1.00 1.50 2.00 60.00 100 60.00 0.00 0.00 0.00 0.00
0+780 30.00 1.00 3.10 2.30 69.00 100 69.00 0.00 0.00 0.00 0.00
0+810 30.00 1.00 1.50 2.30 69.00 100 69.00 0.00 0.00 0.00 0.00
0+840 30.00 1.00 2.50 2.00 60.00 100 60.00 0.00 0.00 0.00 0.00
0+870 30.00 1.00 1.40 1.95 58.50 100 58.50 0.00 0.00 0.00 0.00
0+900 30.00 1.00 0.80 1.10 33.00 100 33.00 0.00 0.00 0.00 0.00
0+930 30.00 1.00 0.20 0.50 15.00 100 15.00 0.00 0.00 0.00 0.00
0+960 30.00 1.00 1.70 0.95 28.50 100 28.50 0.00 0.00 0.00 0.00
0+990 30.00 1.00 0.00 1.40 1.55 46.50 100 46.50 0.00 0.00 0.00 0.00
1+020 30.00 1.00 1.20 1.30 39.00 100 39.00 0.00 0.00 0.00 0.00
1+050 30.00 1.00 1.40 1.30 39.00 100 39.00 0.00 0.00 0.00 0.00
TotalQuantity 1794.00 Total 1882.50 0.00 414.00 432.00 42.00
Government of Nepal
Ministry of Federal Affairs And Local Development
Office of District Development Committee
District Technical Office
Dhading
DETAILED ESTIMATE /ABSTRACT OF COST

Name of Work: Maajhgaun-Felele-Madhankharka-Belgaira-Raniban Road Work. 11/11/2073

Site: Neelkantha Municipality-11 & 13 F / Y:- 073/074


Sn Description of items No Length Breath Height Quantity Unit Rate Total Cost Remarks
Earth Work in excavation for New
Track Cutting ,widening & Road
1
surface Properly Grading by Machine
all Complete Work On
i Ordinary Soil total 1 3765.00 m3 91.53 344610.45
ii Hard Soil total 1 0.00 m3
91.53 0.00
iii Ordinary Rock total 1 828.00 m3 91.53 75786.84
iv Medium Rock total 1 864.00 m3 548.05 473515.20
v. Hard Rock 1 84.00 m3
824.09 69223.56
Total 963136.05
Earthen Drain Construction Work On
2 Cutting & Filling all Complete from
chainage 0+000 to 1+050
Hard Soil total 1 1050.00 1.00 0.30 315.00 m3
Total 315.00 m3 355.35 111935.25
Dry Stone Soling Work For Stone
3 collection & Transportation all
Complete Works
1 50.0 3.5 0.2 35.00 m3
Total 35.00 m3 2321.36 81247.60

Gabion Work For Fabrication,cutting


weaving,& Assembling of Hexagonal
4 Mesh Size 100mm*120mm, Mesh
Wire 10SWG, Selvedge Wire 7 SWG ,
Binding Wire 12 SWG, Gabion box
size of (2*1*1)m all Complete Work 12 2 1 1 24.00 m3 1532.21 36773.04
5 Gabion Filling with Rubble Stones 12 2 1 1 24.00 m3 2416.11 57986.64
Total 1251078.58
Allocated Budget 1000000.00
Contingency @ 3 % 30000.00
Payment Amount 970000.00
User's Contribution 251078.58

Estimated By Checked By Approved By


lansf] qmd ;+=M Final lan cg';"lr – !!# e'QmgLsf] ef}r/ g+=M
of]hgfsf] gfd MMaajhgaun-Felele-Madhankharka-Belgaira-Raniban
(lgod %!
Road sf] pklgod -!_ sf] v08 -e_ ;+u ;DjGwLt _
Work gfkL lstfasf] k[i6 g+= M
pkef]Qmf ;ldltsf] cWoIfsf] gfd M g]kfn ;/sf/ cfO6djfOh sfo{ clen]v vftfsf] k[i6 g+= M
7]Ssf–k°fsf] ;+Vof M ;+3Lo dfldnf tyf :yfgLo ljsf; dGqfno 7]Ssf ;DjGwL nfut g+= M
cl3Nnf] e'QmfgL lansf] qm=;+= M lhNnf ;dGjo ;ldltsf] sfof{no 7]s]bf/sf] JolQmut vftf g+= M

cl3Nnf] e'QmfgL lansf] ef}=g+= M lhNnf k|fljlws sfof{no


sfd ;'? ug{ cfb]z lbPsf] ldlt M wflbª cfly{s jif{ M 2073 ⁄ 074

sfd ;DkGg ePsf] ldlt M 2074/02/31 of]hgf ;DjGwL lan


cBfjlw sfd ePsf] cl3Nnf] landf r9]sf] xfn ePsf] sfd
qm=;+= sfdsf] ljj/0f PsfO{ s}lkmot
kl/df0f b/ hDdf kl/df0fhDdf d"No kl/df0f hDdf d"No
Earth Work in excavation for New Track Cutting
1 ,widening & Road surface Properly Grading by
Machine all Complete Work On
i Ordinary Soil total m3 1418.24 91.53 129811.51 1418.24 129811.51
ii Hard Soil total m3 827.24 91.53 75717.28 827.24 75717.28
iii Ordinary Rock total m3 94.87 91.53 8683.45 94.87 8683.45
iv Medium Rock total m3 311.76 548.05 170860.07 311.76 170860.07
v. Hard Rock m3 790.35 824.09 651319.53 790.35 651319.53

2 Earthen Drain Construction Work On Cutting & Filling


all Complete
Hard Soil total
m3 111.60 355.35 39657.06 111.60 39657.06
Dry Stone Soling Work For Stone collection &
3
Transportation all Complete Works
m3 35.00 2321.36 81247.60 35.00 81247.60
24.00 1532.21 36773.04 24.00 36773.04
Gabion Work For Fabrication,cutting weaving,&
Assembling of Hexagonal Mesh Size 100mm*120mm,
4 Mesh Wire 10SWG, Selvedge Wire 7 SWG , Binding
Wire 12 SWG, Gabion box size of (2*1*1)m all
Complete Work m3
5 Gabion Filling with Rubble Stones m3 24.00 2416.11 57986.64 24.00 57986.64
s"n hDdf M 1252056.18 1252056.18
pko'{Qm adf]lhd 7Ls 5 egL k|dfl0ft ug{]sf] ;xL M
of] adf]lhd hDdf ?=M 1252056.18
cl3Nnf] lanaf6 e'QmfgL ePsf] ? M v'b lng'kg{] M 970000
afFsL lbg'kg{] ?= M
s°f ug'kg{] ?= M
s_ k]ZsL
v_ dfn;fdfgsf] df]n
u_ d]lzg cf}hf/sf] !)%
3_ 7]Ssf s/
ª_ w/f]}6L ÷ cfos/ 1.5%
r_ cGo ÷hg>dbfg 252056.15
,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,
pkef]Qmf ;ldltsf] cWoIfsf] ;xL gfkhfFr ug{]sf] ;xL r]s hfFr ug{]sf] ;xL l;kmfl/; ug{]sf] ;xLlx;fa hfFr ug{]sf] ;xL :jLs[t ug{]sf] ;xL
;a OlGhgLo/ OlGhgLo/ k|d'v lhNnf OlGhgLo/ cflys k|zf;g zfvf k|d'v clwsf/ k|fKt clwsf/L
sfof{nosf] gfd M lhNnf ;dGjo ;ldltsf] sfof{no, wflbª g]kfn ;/sf/
of]hgfsf] gfd M Maajhgaun-Felele-Madhankharka-Belgaira-Raniban Road Work ;+3Lo dfldnf tyf :yfgLo ljsf; dGqfno
Oli6d]6sf] s"n cÍ M 1251078.58 lhNnf ;dGjo ;ldltsf] sfof{no sfd ;'? ePsf] ldlt
vr{ ePsf]] s"n cÍ M 1252056.18 lhNnf k|fljlws sfof{no sfd ;DkGg ug{'kg
Oli6d]6 eGbf 36L a9L M 977.59 wflbª sfd ;DkGg ePsf] ldlt M2074/02/3
36L a9Lsf] k|ltzt M
0.08 sfo{ ;DkGg k|ltj]bg {s jif{ M 2073 ⁄ 074
Oli6d]6 adf]lhdsf] v"b ePsf] sfdsf] km/s
qm=;+= sfdsf] ljj/0f kl/df0f b/ hDdf kl/df0f b/ hDdf kl/df0f b/ hDdf
Earth Work in excavation for New Track Cutting ,widening & Road
1
surface Properly Grading by Machine all Complete Work On
i Ordinary Soil total 3765.00 91.53 344610.45 1418.24 91.53 129811.51 -2346.76 -214798.94
ii Hard Soil total 0.00 91.53 0.00 827.24 91.53 75717.28 827.24 75717.28
iii Ordinary Rock total 828.00 91.53 75786.84 94.87 91.53 8683.45 -733.13 -67103.39
iv Medium Rock total 864.00 548.05 473515.20 311.76 548.05 170860.07 -552.24 -302655.13
v. Hard Rock 84.00 824.09 69223.56 790.35 824.09 651319.53 706.35 582095.97

2
Earthen Drain Construction Work On Cutting & Filling all Complete
315.00 355.35 111935.25 111.60 355.35 39657.06 -203.40 -72278.19
Hard Soil total
Dry Stone Soling Work For Stone collection & Transportation all 35.00 2321.36 81247.60 35.00 2321.36 81247.60 0.00 0.00
3
Complete Works
0.00 0.00 0.00
24.00 1532.21 36773.04 24.00 1532.21 36773.04 0.00 0.00
Gabion Work For Fabrication,cutting weaving,& Assembling of
4 Hexagonal Mesh Size 100mm*120mm, Mesh Wire 10SWG,
Selvedge Wire 7 SWG , Binding Wire 12 SWG, Gabion box size of
(2*1*1)m all Complete Work
5 Gabion Filling with Rubble Stones 24.00 2416.11 57986.64 24.00 2416.11 57986.64 0.00 0.00
s"n hDdf M ### s"n hDdf M 1252056.18 s"n hDdf M 977.60
a9L ePdf (+) 36L ePdf (-) lrGx c+lst ug{] .
Oli6d]6 eGbf 36L a9L vr{ ePsf] d'Vo sf/0f M
:jLs[t l8hfOg / :k]lzlkms]zg adf]lhd sfd ePsf] 5 dgL k|dfl0ft ug{] .

,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,


pkef]Qmf ;ldltsf] cWoIfsf] ;xL gfkhfFr ug{]sf] ;xL r]s hfFr ug{]sf] ;xL l;kmfl/; ug{]sf] ;xL lx;fa hfFr ug{]sf] ;xL
;a OlGhgLo/ OlGhgLo/ k|d'v lhNnf OlGhgLo/cflys k|zf;g zfvf k|d'v
74/02/31

s}lkmot

,,,,,,,,,,,,,,,,,,,,,
:jLs[t ug{]sf] ;xL
clwsf/ k|fKt clwsf/L
Government of Nepal
Ministry of Federal Affairs And Local Development
Office of District Coordination Committee
District Technical Office
Dhading
Earth Work Calculation Sheet
Name of Work: Maajhgaun-Felele-Madhankharka-Belgaira-Raniban Road Work. Page No:-
Site: Neelkantha Municipality-11 & 13 Date:- 11/11/2073
F / Y:- 073/074
Length CUT(M) Area Av. Area TotalQuantity Classification % Quantity m3
Chainage (M) NO Breath Height m2 m2 m3 OS HS OR MR HR OS HS OR MR HR Remarks
Starting point Felele
0+000 0.00 0.50 3.00 3.50 5.25 OS=Odinary Soil
0+030 30.00 0.50 3.70 4.00 7.40 6.33 189.75 50 50 0.00 0.00 94.87 94.87 0.00 HS=Hard Soil
0+060 30.00 0.50 2.50 3.50 4.38 5.89 176.63 20 80 0.00 0.00 0.00 35.32 141.30 OR=Ordinary Rock
0+090 30.00 0.50 3.00 3.20 4.80 4.59 137.63 20 80 0.00 0.00 0.00 27.52 110.10 MR=Medium Rock
0+120 30.00 0.50 3.00 3.50 5.25 5.03 150.75 20 80 0.00 0.00 0.00 30.15 120.60
0+150 30.00 0.50 3.00 3.20 4.80 5.03 150.75 20 80 0.00 0.00 0.00 30.15 120.60
0+180 30.00 0.50 2.50 3.00 3.75 4.28 128.25 20 80 0.00 0.00 0.00 25.65 102.60
0+210 30.00 0.50 2.00 3.50 3.50 3.63 108.75 20 80 0.00 0.00 0.00 21.75 87.00
0+240 30.00 0.50 4.00 3.40 6.80 5.15 154.50 30 70 0.00 0.00 0.00 46.35 108.15
0+270 30.00 0.50 2.50 2.00 2.50 4.65 139.50 100 139.50 0.00 0.00 0.00 0.00
0+300 30.00 0.50 3.00 2.50 3.75 3.13 93.75 100 93.75 0.00 0.00 0.00 0.00
0+330 30.00 0.50 3.00 2.50 3.75 3.75 112.50 100 112.50 0.00 0.00 0.00 0.00
0+360 30.00 0.50 3.50 2.00 3.50 3.63 108.75 100 108.75 0.00 0.00 0.00 0.00
0+390 30.00 0.50 3.00 2.00 3.00 3.25 97.50 100 97.50 0.00 0.00 0.00 0.00
0+420 30.00 0.50 3.00 2.00 3.00 3.00 90.00 100 90.00 0.00 0.00 0.00 0.00
0+450 30.00 0.50 3.00 2.00 3.00 3.00 90.00 100 90.00 0.00 0.00 0.00 0.00
0+480 30.00 0.50 3.00 1.50 2.25 2.63 78.75 100 78.75 0.00 0.00 0.00 0.00
0+510 30.00 0.50 3.00 2.00 3.00 2.63 78.75 100 78.75 0.00 0.00 0.00 0.00
0+540 30.00 0.50 3.00 2.50 3.75 3.38 101.25 100 101.25 0.00 0.00 0.00 0.00
0+570 30.00 0.50 3.50 2.00 3.50 3.63 108.75 100 108.75 0.00 0.00 0.00 0.00
0+600 30.00 0.50 3.00 2.00 3.00 3.25 97.50 100 97.50 0.00 0.00 0.00 0.00
0+630 30.00 0.50 3.50 2.50 4.38 3.69 110.63 100 110.62 0.00 0.00 0.00 0.00
0+660 30.00 0.50 3.00 2.00 3.00 3.69 110.63 100 110.62 0.00 0.00 0.00 0.00
Starting point Belgaira
0+000 30.00 0.50 3.00 2.00 3.00 1.50 45.00 100 0.00 45.00 0.00 0.00 0.00
0+030 30.00 0.50 2.80 1.80 2.52 2.76 82.80 100 0.00 82.80 0.00 0.00 0.00
0+060 30.00 0.50 3.20 2.50 4.00 3.26 97.80 100 0.00 97.80 0.00 0.00 0.00
0+090 30.00 0.50 3.50 2.00 3.50 3.75 112.50 100 0.00 112.50 0.00 0.00 0.00
0+120 30.00 0.50 3.50 1.50 2.63 3.06 91.88 100 0.00 91.87 0.00 0.00 0.00
0+150 30.00 0.50 3.20 1.80 2.88 2.75 82.58 100 0.00 82.57 0.00 0.00 0.00
0+180 30.00 0.50 3.20 2.00 3.20 3.04 91.20 100 0.00 91.20 0.00 0.00 0.00
0+210 30.00 0.50 3.00 1.50 2.25 2.73 81.75 100 0.00 81.75 0.00 0.00 0.00
0+240 30.00 0.50 3.00 1.50 2.25 2.25 67.50 100 0.00 67.50 0.00 0.00 0.00
0+270 30.00 0.50 3.00 1.80 2.70 2.48 74.25 100 0.00 74.25 0.00 0.00 0.00
TotalQuantity 2187.75 Total 1418.24 827.24 94.87 311.76 790.35
Government of Nepal
Ministry of Federal Affairs And Local Development
Office Of District Coordination Committee
District Technical Office
Dhading
DETAILED MEASUREMENT OF COST

Name of Work: Maajhgaun-Felele-Madhankharka-Belgaira-Raniban Road Work. 31/2/2074

Site: Neelkantha Municipality-11 & 13 F / Y:- 073/074


Sn Description of items No Length Breath Height Quantity Unit Rate Total Cost Remarks
Earth Work in excavation for New
Track Cutting ,widening & Road
1
surface Properly Grading by Machine
all Complete Work On
i Ordinary Soil total 1 1418.24 m3 91.53 129811.50
ii Hard Soil total 1 827.24 m3
91.53 75717.27
iii Ordinary Rock total 1 94.87 m3 91.53 8683.45
iv Medium Rock total 1 311.76 m3
548.05 170860.06
v. Hard Rock 1 790.35 m3
824.09 651319.53
Total 1036391.81

2 Earthen Drain Construction Work On


Cutting & Filling all Complete
Hard Soil total 1 930.00 0.40 0.30 111.60 m3
Total 111.60 m3 355.35 39657.06
Dry Stone Soling Work For Stone
3 collection & Transportation all
Complete Works
1 50.0 3.5 0.2 35.00 m3
Total 35.00 m3 2321.36 81247.60

Gabion Work For Fabrication,cutting


weaving,& Assembling of Hexagonal
4 Mesh Size 100mm*120mm, Mesh
Wire 10SWG, Selvedge Wire 7 SWG ,
Binding Wire 12 SWG, Gabion box
size of (2*1*1)m all Complete Work 12 2 1 1 24.00 m3 1532.21 36773.04
5 Gabion Filling with Rubble Stones 12 2 1 1 24.00 m3 2416.11 57986.64
Total 1252056.15
Allocated Budget 1000000.00
Contingency @ 3 % 30000.00
Payment Amount 970000.00
User's Contribution 252056.15

Estimated By Checked By Approved By


2836.48
189.74
623.52
1580.7

400000
200000
Government of Nepal
Ministry of Federal Affairs And Local Development
Office of District Coordination Committee
District Technical Office
Dhading
Earth Work Calculation Sheet
Name of Work: Maajhgaun-Felele-Madhankharka-Belgaira-Raniban Road Work.
Site: Neelkantha Municipality-11 & 13

Length CUT(M) Area Av. Area TotalQuantity Classification %


Chainage (M) NO Breath Height m2 m2 m3 OS HS OR MR HR
Starting point Felele
0+000 0.00 0.50 3.00 3.50 5.25
0+030 30.00 0.50 3.70 4.00 7.40 6.33 189.75 50 50
0+060 30.00 0.50 2.50 3.50 4.38 5.89 176.63 20 80
0+090 30.00 0.50 3.00 3.20 4.80 4.59 137.63 20 80
0+120 30.00 0.50 3.00 3.50 5.25 5.03 150.75 20 80
0+150 30.00 0.50 3.00 3.20 4.80 5.03 150.75 20 80
0+180 30.00 0.50 2.50 3.00 3.75 4.28 128.25 20 80
0+210 30.00 0.50 2.00 3.50 3.50 3.63 108.75 20 80
0+240 30.00 0.50 4.00 3.40 6.80 5.15 154.50 30 70
0+270 30.00 0.50 2.50 2.00 2.50 4.65 139.50 100
0+300 30.00 0.50 3.00 2.50 3.75 3.13 93.75 100
0+330 30.00 0.50 3.00 2.50 3.75 3.75 112.50 100
0+360 30.00 0.50 3.50 2.00 3.50 3.63 108.75 100
0+390 30.00 0.50 3.00 2.00 3.00 3.25 97.50 100
0+420 30.00 0.50 3.00 2.00 3.00 3.00 90.00 100
0+450 30.00 0.50 3.00 2.00 3.00 3.00 90.00 100
0+480 30.00 0.50 3.00 1.50 2.25 2.63 78.75 100
0+510 30.00 0.50 3.00 2.00 3.00 2.63 78.75 100
0+540 30.00 0.50 3.00 2.50 3.75 3.38 101.25 100
0+570 30.00 0.50 3.50 2.00 3.50 3.63 108.75 100
0+600 30.00 0.50 3.00 2.00 3.00 3.25 97.50 100
0+630 30.00 0.50 3.50 2.50 4.38 3.69 110.63 100
0+660 30.00 0.50 3.00 2.00 3.00 3.69 110.63 100
Starting point Belgaira
0+000 30.00 0.50 3.00 2.00 3.00 1.50 45.00 100
0+030 30.00 0.50 2.80 1.80 2.52 2.76 82.80 100
0+060 30.00 0.50 3.20 2.50 4.00 3.26 97.80 100
0+090 30.00 0.50 3.50 2.00 3.50 3.75 112.50 100
0+120 30.00 0.50 3.50 1.50 2.63 3.06 91.88 100
0+150 30.00 0.50 3.20 1.80 2.88 2.75 82.58 100
0+180 30.00 0.50 3.20 2.00 3.20 3.04 91.20 100
0+210 30.00 0.50 3.00 1.50 2.25 2.73 81.75 100
0+240 30.00 0.50 3.00 1.50 2.25 2.25 67.50 100
0+270 30.00 0.50 3.00 1.80 2.70 2.48 74.25 100
TotalQuantity 2187.75 Total
al
al Development
n Committee
Office

on Sheet
Page No:-
Date:- 11/11/2073
F / Y:- 073/074
Quantity m3
OS HS OR MR HR Remarks

OS=Odinary Soil
0.00 0.00 94.87 94.87 0.00 HS=Hard Soil
0.00 0.00 0.00 35.32 141.30 OR=Ordinary Rock
0.00 0.00 0.00 27.52 110.10 MR=Medium Rock
0.00 0.00 0.00 30.15 120.60
0.00 0.00 0.00 30.15 120.60
0.00 0.00 0.00 25.65 102.60
0.00 0.00 0.00 21.75 87.00
0.00 0.00 0.00 46.35 108.15
139.50 0.00 0.00 0.00 0.00
93.75 0.00 0.00 0.00 0.00
112.50 0.00 0.00 0.00 0.00
108.75 0.00 0.00 0.00 0.00
97.50 0.00 0.00 0.00 0.00
90.00 0.00 0.00 0.00 0.00
90.00 0.00 0.00 0.00 0.00
78.75 0.00 0.00 0.00 0.00
78.75 0.00 0.00 0.00 0.00
101.25 0.00 0.00 0.00 0.00
108.75 0.00 0.00 0.00 0.00
97.50 0.00 0.00 0.00 0.00
110.62 0.00 0.00 0.00 0.00
110.62 0.00 0.00 0.00 0.00

0.00 45.00 0.00 0.00 0.00


0.00 82.80 0.00 0.00 0.00
0.00 97.80 0.00 0.00 0.00
0.00 112.50 0.00 0.00 0.00
0.00 91.87 0.00 0.00 0.00
0.00 82.57 0.00 0.00 0.00
0.00 91.20 0.00 0.00 0.00
0.00 81.75 0.00 0.00 0.00
0.00 67.50 0.00 0.00 0.00
0.00 74.25 0.00 0.00 0.00
1418.24 827.24 94.87 311.76 790.35
Government of Nepal
Ministry of Federal Affairs And Local Development
Office Of District Coordination Committee
District Technical Office
Dhading
DETAILED MEASUREMENT OF COST

Name of Work: Maajhgaun-Felele-Madhankharka-Belgaira-Raniban Road Work. 31/2/2074

Site: Neelkantha Municipality-11 & 13 F / Y:- 073/074


Sn Description of items No Length Breath Height Quantity Unit Rate Total Cost
Earth Work in excavation for New
Track Cutting ,widening & Road
1
surface Properly Grading by Machine
all Complete Work On
i Ordinary Soil total 1 1418.24 m3 91.53 129811.50
ii Hard Soil total 1 827.24 m3
91.53 75717.27
iii Ordinary Rock total 1 94.87 m3
91.53 8683.45
iv Medium Rock total 1 311.76 m3
548.05 170860.06
v. Hard Rock 1 790.35 m3
824.09 651319.53
Total 1036391.81

2 Earthen Drain Construction Work On


Cutting & Filling all Complete
Hard Soil total 1 930.00 0.40 0.30 111.60 m3
Total 111.60 m3 355.35 39657.06
Dry Stone Soling Work For Stone
3 collection & Transportation all
Complete Works
1 50.0 3.5 0.2 35.00 m3
Total 35.00 m3 2321.36 81247.60

Gabion Work For Fabrication,cutting


weaving,& Assembling of Hexagonal
4 Mesh Size 100mm*120mm, Mesh
Wire 10SWG, Selvedge Wire 7 SWG ,
Binding Wire 12 SWG, Gabion box
size of (2*1*1)m all Complete Work 12 2 1 1 24.00 m3 1532.21 36773.04
5 Gabion Filling with Rubble Stones 12 2 1 1 24.00 m3
2416.11 57986.64
Total 1252056.15
Allocated Budget 1000000.00
Contingency @ 3 % 30000.00
Payment Amount 970000.00
User's Contribution 252056.15
Estimated By Checked By Approved By
Remarks

2836.48
189.74
623.52
1580.7

400000
200000