Implementing waste management

The waste minimisation is: Reduce, Reuse, and Recycle.

Specifically:
 Reduce – produce less waste
 Reuse – reuse existing building materials wherever possible
 Recycle – recycle materials that have reached the end of their useful life wherever possible.

Applying the three Rs in this hierarchy will lower the amount of waste that goes to landfills and
reduce the demand for new building materials to be produced

Category of Wastes from plumbing, drainage, firefighting & LPG works:

1.0 PVC
2.0 PPR
3.0 Metal

Waste Production progress report contains the following details:

1.0 Materials
2.0 Generation point of waste
3.0 Total waste quantity in kg
4.0 Total quantity of waste reused in kg
5.0 Total quantity of waste recycled in kg

The waste from respective category will be stored separately and will be recycled / reused by end of
every month. The record for the same will be produced to “Main Contractor”.