HVAC Application Overview: Solutions For Heating, Ventilation and Air Conditioning

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 44

HVAC Application Overview

Solutions for Heating, Ventilation


and Air Conditioning
2
TABLE OF CONTENTS

WAGO Building Application Solutions 04

Energy-Efficient Systems 06

HVAC Primary System Solutions 08

System Macros 12

System Macros Overview 16

Generation 18

Distribution 22

Consumption 26

Utilization 38


WAGO Services 40

Applications 42

3
WAGO BUILDING APPLICATION SOLUTIONS
Variety – Open Source – Cost Efficiency

WINSTA® – The Pluggable Connection System High-Current, Rail-Mounted Terminal Blocks

Installation Connectors

TOPJOB® S – The Rail-Mounted Terminal


Block System Distribution Boxes

Lighting
Connectors

4
Interface Electronic and System components

System Components EPSITRON® Power Supplies Relays and Optocouplers

Current Measurement Interface Modules JUMPFLEX® Signal Conditioners

WAGO-I/O-SYSTEM

Digital Input/Output Modules Libraries


Analog Input/Output Modules System Macros
Communication and
Specialty Modules

5
ENERGY-EFFICIENT SYSTEMS
Potential Energy Savings via HVAC Automation

Leveraging Potential Energy-Savings

Efficient energy consumption, optimal system potential for savings through modernizing outda-
operation and continuous improvement are just ted heating technology. *
a few requirements that buildings must continue European nations have begun enacting policies to
to meet – even after construction or renovation. promote conservation, such as the new German
Beyond rental prices, potential tenants must factor Energy Saving Regulation (EnEV) that was enacted
operating costs for energy and maintenance into on May 1, 2014. Building contractors starting new
the bottom line. Therefore, it pays to look closely construction projects must comply with this re-
at the main factors behind building energy costs. gulation. These new energy-saving guidelines are
Take for example the German market, in which he- also applicable to building technology systems:
ating and cooling applications account for 57.3 % heating, cooling, ventilation and lighting, as well as
of total energy consumption. hot water supply.
And of that, 51.7 % is devoted to room heating –
making it the country’s largest energy consumer.
With these unsustainable energy consumption The following parameters are used for determining
levels driving the transition to renewable energy, energy efficiency:
savvy system planners are looking closely at the
boiler room. Approximately 20 % of Europe’s final • Annual primary energy demand for systems
energy consumption could be saved by doubling engineering
boiler room energy efficiency via system-specific • Thermal insulation of the outer shell
measures or by improving the energy efficiency • Heat protection/summer thermal insulation
of the building envelope. A key part of the solution • Air-tightness of the outer shell
lies in system-related applications. The measure • Minimum air exchange in residential buildings
of success here depends on leveraging the huge

*Source: “Green Paper on Energy Efficiency or Doing More with Less" (March 2006)

6
Hot water
Room heating
9.4 %
51.8 %

Heating applications
55.2 %
Other
9.4 %

Information and
communication
technology
2.3 %
Cooling applications
2.1 %
Lighting
3.4 %
Source: Working Group on Air conditioning
Energy Balances (AGEB):
Application balances for Ger- Mechanical
17 %
Other
man energy sectors, 11/2013 energy
37 % 83 %

One basic requirement for planning a building’s timer program to mirror room occupancy. These
technical systems: Everyone who participates in automated control functions enable you to fully
the construction shares a common and clear lan- exploit – and benefit from – potential savings.
guage. To accomplish this, the DIN EN ISO 16484- Therefore, combining HVAC macros with other
3 Standard, which outlines building automation CODESYS function blocks enables users to merge
and control systems, is a core component of the virtually every building system into one cohesive
initiative. plan that effectively economizes the entire build-
Furthermore, the DIN EN 15232:2012 Standard ing.
(Energy Performance of Buildings – Impact of
Building Automation, Controls and Building Ma-
nagement) involves extensive calculations and
simulations to assess the potential savings that
could stem from modernization through automati-
on. In offices, this standard allows up to 25 % hea-
ting-energy savings to be economically generated INFO
through building and room automation – without
eu.bac is the European Building
changing the building envelope.
Automation and Controls Association
Users and system operators can have a major
and represents the European manufacturers for Home
influence on energy consumption through
and Building Automation and Energy Service Companies.
automation. Examples include integrating an au-
WAGO’s eu.bac membership demonstrates its commit-
tomated system switch-off (when not needed), or
ment and expertise in automation and controls.
by intelligently adapting a room temperature and

7
© sssss1gmel /panthermedia.net

HVAC PRIMARY SYSTEM


SOLUTIONS
An Efficient Process: Step-by-Step
Energy efficiency hinges on sensibly planning of a The WAGO-I/O-SYSTEM 750 is the ideal hardware
building’s technical systems. Modern automation package for this challenge. The controller, which
systems conveniently combine all possible proto- takes on control tasks for building automation,
cols and interfaces into one system – as opposed can be easily expanded using bus modules from a
to the requirements of larger properties with mixed variety of systems — virtually any device can be
forms. connected to the system. Configuration, program-
ming and visualization are easily performed using
WAGO’s available software packages.
In addition to building automation, WAGO has a
well-established track record in building installa-
NOTE tions. This experience is reflected in WAGO’s inte-
WAGO-I/O-SYSTEM: grated approach that cost-effectively combines
• Modular design these two worlds..
• Fieldbus-independent
• Planning freedom via flexible solutions
• Future-ready, scalable solution

8
Universal, Compact, Economical
– WAGO-I/O-SYSTEM

Optimized for process-oriented communica- interlinked using open, standardized bus protocols
tion, the WAGO-I/O-SYSTEM offers scalable for building automation (e.g., BACnet IP, KNX IP or
performance and high integration density with Modbus/TCP). Standardized protocols and fast
an unbeatable price/performance ratio. ETHERNET data transmission provide interoper-
able and future-ready interfaces between indivi-
At the management level, building automation is dual building technologies and levels.
an integral part of both cost and facility manage- Depending on the application, building automation
ment; it’s also a key component in overall building systems can vary greatly from one building level
control. Open protocols link higher-level functions to the next, requiring different transmission media
and building automation. To make the most of (wired or wireless) and interfaces. Thus, flexible
these protocols, WAGO offers software tools and easy-to-install media are required on the field
for commissioning and diagnostics to optimally level (room level).
support both system engineering and monitoring. This is why WAGO offers a wide variety of solu-
Access to the Web visualization of each individual tions ranging from the direct control of standard
control unit is also performed at this management sensors and actuators via interfaces to two-wire
level. subsystems (e.g., DALI, BACnet MS/TP, KNX TP1
ETHERNET has long-established itself as the do- or LonWorks®), on through to radio-based solu-
minant medium at the automation level. As such, tions such as, such as EnOcean or Bluetooth®.
WAGO’s control units can be easily and efficiently

Level 2

20.0°C
22.0°C
Sensorwerte übersteuern

Level 2

15.0°C 18.0°C
28.0°C
31.0°C

12.0°C
100 % 0%

Statusmeldungen
Störung
Sammelstörung: Ok Abluftklappe: geöffnet
Quit Vorspülen: Vorspülen beendet Zuluftventilator: Ok
Zuluftklappe: geöffnet Abluftventilator: Ok

Startseite Konfiguration

ETHERNET

IP

MS/TP

flexROOM®

BACnet/IP LINK
ACT
LINK
ACT
MS
NS
21,0 °C Termination+BIAS
ON/OFF
I/O
USR
Default IP
750-829

X1
▸ ▸


Actuator
X2

For more information on BACnet, visit: www.wago.com/bacnet

9
HVAC PRIMARY SYSTEM SOLUTIONS
Universal, Compact, Economical – The WAGO-I/O-SYSTEM

Analog Input Modules Analog Output Modules Digital Input Modules Digital Output Modules

°C

Alarm switch Relay

Temperature Actuator

Humidity
Setting values for electronic Magnetic contacts
motor Schütze

Wind speed Measured value output Actuator


Signal contacts
– potential-free

Transformer
Control of frequency converters

Communication Module Specialty Modules


RS-232 C/RS-485

RS-232 C/
RS-485 Display

Romutec manual operation interface

M-Bus level converter

ÑÅ

Modbus RTU / RS-485

Level converter for SMI

Electronic ballasts

10
Basic WAGO Software

WAGO-I/O-CHECK WAGO-I/O-PRO V 2.3 HVAC System Macros

WAGO-I/O-CHECK is an easy-to-use Using WAGO-I/O-PRO, programs can With system macros, WAGO provides
Windows® application for checking be individually created. In addition, comprehensive modules with
inputs and outputs, as well as dis- pre-designed function blocks can pre-configured functions to its cus-
playing a WAGO-I/O-SYSTEM 750 also be accessed from software tomers; this dramatically streamlines
node. libraries. Graphically structured pro- project design and deployment by
grams, such as those created with making most programming unnec-
the Function Block Diagram (FBD) essary.
programming language, are very
easy to create.

Web Visualization

Project-specific visualizations are


generated in the WAGO-I/O-PRO
V 2.3 Software’s editor. The Web vi-
sualization can also be accessed on
a tablet or smartphone using an app.

BENEFITS
BACnet and MODBUS Configurator
• Ready-to-use applications
• Economize system commis-
WAGO also offers tools specifically
sioning
engineered for select technologies,
• Reuse standardized solutions
applications and products. Among these
• Customize via open source
is WAGO’s BACnet and MODBUS Confi-
macros
gurator, which allows devices connected
• No extensive programming
to a specific network to be easily and effi-
required
ciently addressed and parameterized.

11
SYSTEM MACROS
Parameter Setting – Not Programming

System Macros

WAGO provides comprehensive templates, which To simplify programming, there are a multitude of
include readymade system macros for many com- pre-configured function blocks and applications
mon applications. This timesaving convenience available free of charge in the download area. In
minimizes HVAC configuration for users. After addition, there are templates for creating pro-
rapidly configuring the application – via simple grams. These comprehensive examples of com-
data point and system parameter assignment – the plex tasks – including functional system macros
ready-made application can be directly commissi- with the appropriate documentation – are available
oned. in PDF format.
The manual override function within the system
macros allows the operator to override individual
system parts using the visualization screens.

All current libraries and application notes


can be downloaded at:
www.wago.com/hvacdownload

12
A system macro consists of various function
blocks that are linked to other to enable the cont-
rol of an entire ventilation system, for example. The
function blocks consist of sub-functions that are
combined to allow control of a larger task, such as
a heating circuit.
Using a system macro, you can also display and
configure the entire system in a visualization
interface.

NOTE

Open Source! System macros are available as “open source” and


can be tailored to meet individual system demands.

13
SYSTEM MACROS
Parameter Setting – Not Programming

System Diagram

Matching the applications, standardized system


diagrams for CAD and TRIC are available for easy
integration into current plans.

Ventilation macro 01
diagrams

Ventilation macro
Ventilation 01 01
macro 01
Control diagrams

Ventilation macro
Ventilation 01
macro
diagrams
Control diagrams

Control diagrams
Control Control

SSM/QUIT
Manual
SYSTEM
Auto
Off
Room

Room

Room
Room Room
Room
System System
System

System
System

SYSTEM
Auto
Off
SYSTEM
SYSTEMSYSTEM
SYSTEM
Manual
Auto Auto
SSM/QUIT
Auto
Off
Off Auto
Off
Off
Manual
Manual
Manual Manual

SSM/QUIT
SSM/QUIT
SSM/QUIT
SSM/QUIT
structure
Control structure

structure
Control structure

Control structure
Control Control

Graphical Function
Block Representa-
tion

Using the graphical


function block repre-
sentation, a macro’s
functions can be clearly
displayed to simplify
assembly.
Ventilation macro 01

Control diagrams System Control structure

14
System Macro Components

Configuration Visualization

In addition to a visuali-
zation of the selected
application, macros
allow the user to easily
adjust all relevant
parameters through
an online graphical
interface.

System Visualization

Furthermore, the macros


6.35 g/m3
contain complete
Y = 100.0 %
7.50 g/m3 visualization interfaces
for each completed
Manual
22.0°C 50 % 20.0°C application that allow
22.0°C
Overriding sensor values
1800 mBar you to monitor and
2000 mBar
control functions via the
Y = 100.0 % controller’s embedded
Webserver.
30 %
12.0°C 15.0°C 18.0°C 50 %
25.4°C 6.35 g/m3
31.0°C 9.44 g/m3
8%

39 % 0% 0%

Error Status messages


Collective malfunction: Ok
Quit
Preflushing: Preflushing: Completed Incoming air fan: OK
Mixed air damper: ON Exhaust air fan: OK
Exhaust air damper: Open Humidifier: OFF

Start page Configuration

APPLICATION NOTE

In addition to these graphical representations, the application


note also includes a comprehensive function description, hardware
information and a detailed tabular function block description.

15
SYSTEM MACROS OVERVIEW
Parameter Setting – Not Programming
Page 18-19

5.0°C
0.0°C
District Heating Transfer Station Macros
45.0°C

Manual
63.0°C
57.3°C
• District heating transfer station with supply
temperature control and return temperature
Manual
0%
Overriding sensor values limitation

Quit

Ramp

Overheating protection

Page 20-21
GENERATION

Manual Lead
boiler: 1
Manual Boiler Macros
Chimney sweep Chimney sweep

55.0°C
• Boiler strategy with two dual-stage boilers
• Boiler strategy with one dual-stage
73.0°C 71.0°C
63.0°C
68.0°C 66.0°C
60.0°C 60.0°C
and one modulating boiler

Safety chain Safety chain


55.0°C 45.0°C Manual
Boiler pump: ON
Admixing pump: ON
60 % Stage 0
Valve 0%

Status: OK Status: OK
Quit Overriding sensor values Quit

Page 22-25

Manual
Heating Circuit Macros
DISTRIBUTION

20.0°C
20.0°C 5.0°C
12.0°C
• Heating circuit with circulation pump
5.0°C
• Heating circuit with heat exchanger, supply
Quit temperature control and return temperature
Manual
ON Heating period limitation
Optimization
• Heating circuit with supply temperature control
and return temperature limitation
Support mode

Overheating protection

50.6°C

Overriding sensor values

16
Page 26-29

Domestic Water
Manual

Heating Macros
Manual
ON

50.0°C
Anti-Legionella alarm
• Domestic water heating
45.0°C
Antifreeze protection with charging pump
45.0°C
• Domestic hot water production
Water heating

Hot water priority


Manual
Anti-Legionella function with heat exchanger
ON
• Domestic hot water production

CONSUMPTION
with supply temperature monitoring
Overriding sensor values
Page 30-37

Level 1
Ventilation Macros
Manual Manual

Up Overriding sensor values


Manual • Supply air temperature
ON
control or cascade control
Level 2 • Single-stage fan
15.0°C 18.0°C
• Dual-stage fan
31.0°C
10.0°C 22.0°C
• Mixed air fan with frequency converter
12.0°C
Manual
• Plate-type heat exchanger
100 % 0% 0%

Status messages
• Run-around coil system
• Rotary heat exchanger
Error
Collective malfunction: OK Exhaust air damper: Open
Quit Preflushing: Preflushing: Completed Incoming air fan: OK
Air damper: Open Exhaust air fan: OK

• Full air-conditioning system


• Fan with frequency converter
• Mixed air humidification and
dehumidification
Page 38-39

Single-Room Control
UTILIZATION

• PID single-room controller

© Rawpixel.com/fotolia.com

17
© kodda/panthermedia.net

18
GENERATION
District Heat Macro

Heating Transfer Station with Supply Temperature Control


and Return Temperature Limitation

District heating transfer station macro 01


Control diagrams

(Limit controller)
System

SYSTEM
Auto
Off
Manual

SSM/QUIT

Limit

The following requirements are met:


Control structure

controller

Setpoint
adjustment

• Supply temperature setpoint with ramp function


(crack protection)
• Adjustable offset to the reference supply temperature
• PI supply temperature control
• Anti-jamming function for valve
• Return flow temperature limit based on outside temperature
• Overheating protection using maximum thermostat

5.0°C
0.0°C

45.0°C

Manual
63.0°C
57.3°C

Manual
Overriding sensor values
0%

Quit

Ramp

Overheating protection

19
GENERATION
Boiler Macros

Boiler macro 01
Control diagrams

Level 2 Level 2 Boiler 2 (or 1)


Level 1 Level 1 Boiler 1 (or 2)
Manual Lead Manual
Chimney sweep boiler: 1 Chimney sweep

55.0°C
73.0°C 71.0°C
63.0°C
Boiler 1 Boiler 2
68.0°C 66.0°C
Auto
Off
Auto
Off 60.0°C 60.0°C
Manual Manual

Safety Safety
chain chain
Acknow- Acknow-
ledgement ledgement
Level 1/2 Level 1/2
Safety chain Safety chain
System

55.0°C 45.0°C Manual


Boiler pump: ON
Admixing pump: ON
60 % Stage 0
Valve 0%

Status: OK Status: OK
Quit Overriding sensor values Quit

Switching
sequence control
Control structure

Boiler 1/2

Boiler Strategy with Two Dual-Stage Boilers

BOILER STRATEGY BOILER CONTROL

• Boiler strategy for two boilers • Maximum limit of the boiler supply temperature
• Demand-dependent connection to the second boiler • Minimum return flow temperature monitoring
• Dynamic switching of the lead boiler • Maximum return flow temperature limit
• Automatic switching of the lead boiler in the event of a • Unrestricted selection between mixing pump,
fault 3-way valve and boiler damper
• Boiler anti-condensation protection
• Anti-jamming function for pumps and valve
• Differing parameters for lead boiler and lag boiler
• Different start-up processes based on the com-
ponents used

20
Boiler macro 02
Control diagrams

Level 2 Boiler 2 (or 1)


Level 1 Boiler 1 (or 2) Manual Manual
Chimney sweep Chimney sweep

55.0°C
66.0°C 73.0°C
63.0°C
55.0°C 68.0°C
Boiler 1 Boiler 2
Auto Auto 60.0°C
Off Off
Manual Manual

Safety Safety
chain chain
Acknow- Acknow-
P = 87 %
ledgement ledgement
Module Level 1/2
Safety chain Safety chain
System

60.0°C 60.0°C Manual


Boiler pump: ON
Admixing pump: ON
100 % 100 % Stage 0
Valve 0%

Status: OK Status: OK
Quit Overriding sensor values Quit

Switching
sequence control
Control structure

Boiler 1/2

Boiler Strategy with One Dual-Stage and One Modulating Boiler

BOILER STRATEGY BOILER CONTROL

• Boiler strategy for two boilers • Maximum limit of the boiler supply temperature
• Demand-dependent connection to the second boiler • Constant maximum limit of the boiler supply
• During normal operation, the modulating boiler temperature for the modulating boiler
is always the lead boiler • Minimum return flow temperature monitoring
• Automatic switching of the lead boiler in the event of • Maximum return flow temperature limit
fault • Unrestricted selection between mixing pump,
3-way valve and boiler damper
• Boiler anti-condensation protection
• Anti-jamming function for pumps and valve
• Differing parameters for lead boiler and lag boiler
• Different start-up processes based on the com-
ponents used

21
© AP/fotolia.com

22
DISTRIBUTION
Heating Circuit Macros

Heating Circuit with Circulation Pump

Heating Heating
circuit macro
circuit02macro 02
Control diagrams

Control diagrams

Room Room
System

System

SYSTEM
SYSTEM
Auto Auto
Off Off
Manual Manual

SSM/QUIT
SSM/QUIT
Control structure

Control structure

Weather- Weather-
controlled controlled
heating curve
heating curve

The following requirements are met:


Manual

20.0°C
20.0°C 5.0°C
• Heating limit dependent on outside temperature 12.0°C

to determine heating periods 5.0°C

• Selection between overnight economy mode


(parallel shift of the heating curve) and
Quit
Manual
ON Heating period
overnight shutdown (support mode) Optimization

• Self-regulating start optimization Support mode

• Heating curve Overheating protection

• Mandatory override (e.g., overheating 50.6°C

protection of the primary system)


• Anti-jamming function for the pump Overriding sensor values

23
DISTRIBUTION
Heating Circuit Macros

Heating circuit macro 03


Control diagrams

(Limit controller)
Manual

18.0°C
20.0°C 5.0°C
Room
12.0°C
5.0°C

35.0°C

Quit
System

Heating period
SYSTEM
Auto
Off
Manual
Optimization
SSM/QUIT
Support mode

55 % Heating curve ramp

40.5°C
Limit
controller
Control structure

Weather-
controlled
heating curve
Overriding sensor values
Setpoint
adjustment

Heating Circuit with Heat Exchanger, Supply Tempe-


rature Control and Return Temperature Limitation

The following requirements are met:

• Heating limit dependent on outside temperature


to determine heating periods
• Selection between overnight economy mode
(parallel shift of the heating curve) and
overnight shutdown (support mode)
• Self-regulating start optimization
• Heating curve
• Supply temperature setpoint with ramp function
(crack protection)
• PI supply temperature controller
• Return flow temperature limit based on outside temperature
• Antifreeze controller
• Pump switch-on is demand-dependent
• Anti-jamming function for pump and valve

24
Heating circuit macro 01
Control diagrams

(Limit controller)

Manual
Chimney sweep 5.0°C
12.0°C
20.0°C 5.0°C
Room
20.0°C

42.0°C Quit

Heating period
System

Optimization

SYSTEM Support mode


Auto
Off
Manual Heating curve ramp
SSM/QUIT

90 % Overheating/Condensation protection

Override ramp
50.6°C

Limit
controller
Control structure

Weather-
controlled
heating curve
Overriding sensor values
Setpoint
adjustment

Heating Circuit with Supply Temperature Control


and Return Temperature Limitation

The following requirements are met:

• Heating limit dependent on outside temperature


to determine heating periods
• Selection between overnight economy mode
(parallel shift of the heating curve) and
overnight shutdown (support mode)
• Self-regulating start optimization
• heating curve
• Supply temperature setpoint with ramp function
(crack protection)
• PI supply temperature controller
• Chimney sweep function with time limit
• Mandatory override (e.g., domestic water heating
or overheating protection of the primary system)
• Return flow temperature limit based on outside temperature
• Antifreeze controller
• Pump switch-on is demand-dependent
• Anti-jamming function for pump and valve

25
26
CONSUMPTION
Domestic Water Heating Macros

Domestic Water Heating with Charging Pump

The following requirements are met:

• Two-point temperature control, corresponding to the


upper and lower storage tank temperature sensors
• Anti-Legionella function
• Hot water priority function request
• Charging and circulation pump control
• Anti-jamming function for the pumps
• Supply temperature setpoint

Manual

Manual
ON

50.0°C
Anti-Legionella alarm
45.0°C
Antifreeze protection

45.0°C Water heating


NOTE
Hot water priority
Manual
ON
Anti-Legionella function Water tanks are prone to the formation of Legionella
bacteria. To ensure the highest levels of safety and
hygiene, WAGO domestic water heating macros are
Overriding sensor values equipped with an anti-Legionella function. This man-
datory function (heating to 70 °C) is activated by a timer
program.

27
CONSUMPTION
Domestic Water Heating Macros

Heating circuit macro 03


Control diagrams

(Limit controller)

Manual

Room

Manual
ON
Anti-Legionella alarm

Antifreeze protection

Water heating
System

55.0°C
60.0°C Hot water priority
65.0°C
53.0°C
SYSTEM Anti-Legionella function
Auto
Off
Manual

SSM/QUIT

68 %

Limit
controller
Control structure

Weather-
controlled
heating curve
Overriding sensor values
Setpoint
adjustment

Domestic Water Heating with Heat Exchanger

The following requirements are met:

• Storage tank control using a two-point controller


• PI supply temperature control
• Anti-Legionella function
• Hot water priority function request
• Charging and circulation pump control
• Charging pump switch-on is demand-dependent
• Anti-jamming function for pumps and valve
• Supply temperature setpoint

28
Domestic hot water macro 01
Control diagrams

WBB requirement
T1 and T2
Manual

Supply alarm

Anti-Legionella alarm
50.0°C
Antifreeze protection
46.0°C
Water heating
47.0°C
45.0°C Hot water priority
60.0°C
Anti-Legionella function

Cooling protection
System

Manual
65.0°C ON Overheating protection
63 % Valve
SYSTEM
0% Override ramp
Auto
Off
Manual

SSM/QUIT

Overriding sensor values

Cooling protection WBB


requirement
Control structure

Domestic Water Heating with


Supply Temperature Monitoring

The following requirements are met:

• Two-point temperature control, corresponding to the upper


and lower storage tank temperature sensors
• Anti-Legionella function
• Cooling protection
• Mandatory override
(e.g., overheating protection of the primary system)
• Hot water priority function request
• Charging and circulation pump control
• Charging pump switch-on is demand-dependent
• Anti-jamming function for pumps and valve
• Supply temperature setpoint

29
CONSUMPTION
Ventilation Macros

Ventilation macro 01
Control diagrams

Level 1

Manual Manual

Up Manual
Overriding sensor values
ON
Room

Level 2
System

15.0°C 18.0°C
10.0°C 22.0°C
31.0°C
SYSTEM
Auto
Off Manual
Manual
12.0°C
SSM/QUIT 100 % 0% 0%

Status messages
Error
Collective malfunction: OK Exhaust air damper: Open
Quit Preflushing: Preflushing: Completed Incoming air fan: OK
Air damper: Open Exhaust air fan: OK
Control structure

Supply Air Temperature Control with


Single-Stage Fan

The following requirements are met:

• Single-stage fan with contactor and operational monitoring


• Upstream and downstream frost protection
• Switching-on the pumps is demand-dependent
• Anti-jamming function for pumps and valves
• Control of outside air and exhaust air dampers
• Monitoring the outside air filter
• Supply air temperature control with cooling/heating
sequences
• Optimized setpoint supply temperature measurement

NOTE

Our ventilation macros meet the DIN EN


13779 standard – ventilation for non-resi-
dential buildings.

30
Ventilation macro 02
Control diagrams

Level 2

Manual Manual
20.0°C
Up 22.0°C
Overriding sensor values
Room

Level 2
System

15.0°C 18.0°C
10.0°C Manual 20.7°C
31.0°C
SYSTEM
Auto
Level 1
Off
Manual Level 2
12.0°C
SSM/QUIT
34 % 0%

Status messages
Error
Collective malfunction: OK Exhaust air damper: Open
Quit Preflushing: Preflushing completed Incoming air fan: OK
Air damper: Open Exhaust air fan: OK
Control structure

Cascade
EXH/SUP temp.
Summer
compensation

Cascade Control with Dual-Stage Fan

The following requirements are met:

• Dual-stage fan with contactor and operational monitoring


• Upstream and downstream frost protection
• Switching-on the pumps is demand-dependent
• Anti-jamming function for pumps and valves
• Control of outside air and exhaust air dampers
• Monitoring the outside air filter
• Energy-optimized room/exhaust temperature control
with summer increase per DIN 1946
• Supply air temperature control with cooling/heating
sequences
• Optimized setpoint supply temperature measurement

31
CONSUMPTION
Ventilation Macros

Ventilation macro 03
Control diagrams

Y = 30.8 %

18.0°C 200 Pa
Manual Manual
200 Pa
Up
Overriding sensor values 200 Pa
200 Pa
Room

Y = 17.6 %
System

30 %
12.0°C 15.0°C 18.0°C
10.0°C Manual 22.0°C
31.0°C
SYSTEM ON
Auto
Off
Manual 0%
SSM/QUIT 25 % 0%

Status messages
Error Collective malfunction: OK Exhaust air damper: Open
Quit Preflushing: Preflushing completed Incoming air fan: OK
Mixed air damper: ON Exhaust air fan: OK
Control structure

Supply Air Temperature Control with Mixed Air and


Fan with Frequency Converter

The following requirements are met:

• Continuous fan with contactor and operational monitoring


• Pressure control in supply and exhaust air duct
• Upstream and downstream frost protection
• Switching-on the pumps is demand-dependent
• Anti-jamming function for pumps and valves
• Control of mixed air and exhaust air dampers
• Monitoring the outside air filter
• Supply air temperature control in
cooling/circulating/heating sequences
• Optimized setpoint supply temperature measurement

32
Ventilation macro 04
Control diagrams

Y = 36.8 %

18.0°C 200 Pa 20.0°C


Manual Manual
200 Pa 22.0°C
Up
Overriding sensor values 200 Pa
Room 200 Pa

Y = 20.3 %
System

30 %
12.0°C 19.0°C 19.0°C
10.0°C Manual 23.1°C
SYSTEM 31.0°C
Auto
Off
ON
Manual
0%
SSM/QUIT
25 % 0%

Status messages
Error Collective malfunction: OK Exhaust air damper: Open
Quit Preflushing: Preflushing completed Incoming air fan: OK
Mixed air damper: ON Exhaust air fan: OK
Control structure

Cascade
EXH/SUP temp.
Summer
compensation

Cascade Control with Mixed Air


and Fan with Frequency Converter

The following requirements are met:

• Continuous fan with contactor and operational monitoring


• Pressure control in supply and exhaust air duct
• Upstream and downstream frost protection
• Switching-on the pumps is demand-dependent
• Anti-jamming function for pumps and valves
• Control of mixed air and exhaust air dampers
• Monitoring the outside air filter
• Energy-optimized room/exhaust temperature control
with summer increase per DIN 1946
• Supply air temperature control in
cooling/mixed air/heating sequences
• Summer night ventilation
• Optimized setpoint supply temperature measurement

33
CONSUMPTION
Ventilation Macros

Ventilation macro 05
Control diagrams

2.0 Pa
Y = 34.0 %

200 Pa 21.0°C
Manual Manual 200 Pa 22.0°C
Up
Overriding sensor values 200 Pa
Room 100 % 200 Pa

Y ==17.4
79.4 %
System

15.0°C 17.0°C
10.0°C Manual 23.5°C
SYSTEM 31.0°C
Auto
Off ON
Manual Manual
0%
SSM/QUIT 12.0°C 0%
78 % 0%

Status messages
Error Collective malfunction: OK
Quit Preflushing: Preflushing completed Heat exchanger: OK
Air damper: ON Incoming air fan: OK
Exhaust air damper: Open Exhaust air fan: OK
Control structure

Cascade
EXH/SUP temp.
Summer
compensation

Cascade Control with Plate-Type Heat Exchanger


and Fan with Frequency Converter

The following requirements are met:

• Continuous fan with contactor and operational monitoring


• Pressure control in supply and exhaust air duct
• Upstream and downstream frost protection
• Switching-on the pumps is demand-dependent
• Anti-jamming function for pumps and valves
• Control of outside air and exhaust air dampers
• Monitoring the outside air and exhaust air filters
• Energy reclamation using plate heat exchanger
(cross-flow heat exchanger)
• Energy-optimized room/exhaust temperature control
with summer increase per DIN 1946
• Supply air temperature control in
cooling/energy reclamation/heating sequence
• Summer night ventilation
• Optimized setpoint supply temperature measurement

34
Ventilation macro 06
Control diagrams

Y = 29.6 %

Manual 3.0 Pa 200 Pa 21.0°C


Manual
200 Pa 22.0°C
ON
Overriding sensor values 200 Pa
Room
0% 100 %
200 Pa

Y ==18.4
79.4%%
System

15.0°C 18.0°C
10.0°C Manual 21,0°C
SYSTEM
Auto 31.0°C ON
Off
Manual 12.0°C
SSM/QUIT
0%
12 % 0%

Status messages
Error Collective malfunction: OK
Preflushing: Preflushing completed Outside air damper: Open
Quit
Heat exchanger: ON Exhaust air damper: Open
Outside air bypass: Open Incoming air fan: OK
Exhaust air bypass: Open Exhaust air fan: OK
Control structure

Cascade
EXH/SUP temp.
Summer
compensation

Cascade Control with Run-Around Coil System and


Fan with Frequency Converter

The following requirements are met:

• Continuous fan with contactor and operational monitoring


• Pressure control in supply and exhaust air duct
• Upstream and downstream frost protection
• Switching-on the pumps is demand-dependent
• Anti-jamming function for pumps and valves
• Control of outside air and exhaust air dampers
• Monitoring the outside air and exhaust air filters
• Energy reclamation using closed-loop system (CLS)
• Energy-optimized room/exhaust temperature control
with summer increase per DIN 1946
• Supply air temperature control in
cooling/energy reclamation/heating sequence
• Summer night ventilation
• Optimized setpoint supply temperature measurement

35
CONSUMPTION
Ventilation Macros

Ventilation macro 07
Control diagrams

Y = 33.9 %

15.0°C
10.0°C
Manual 200 Pa 20.0°C
Manual 200 Pa 22.0°C
Overriding sensor values 200 Pa
Pump
Room
Valve 200 Pa
100 %
0%
Y ==16.3
79.4%%
System

15.0°C 18.0°C
10.0°C Manual 22.8°C
31.0°C
SYSTEM
Auto
ON
Off
Manual 0%
12.0°C
SSM/QUIT 27 % 0%

Status messages
Error
Collective malfunction: OK Preflushing: Preflushing completed
Quit Outside air damper: Open Incoming air fan: OK
Exhaust air damper: Open Exhaust air fan: OK
Control structure

Setpoint
adjustment

Cascade
EXH/SUP temp.
Summer
compensation

Cascade Control with Rotary Heat Exchanger and


Fan with Frequency Converter

The following requirements are met:

• Continuous fan with contactor and operational monitoring


• Pressure control in supply and exhaust air duct
• Upstream and downstream frost protection
• Switching-on the pumps is demand-dependent
• Anti-jamming function for pumps and valves
• Control of outside air and exhaust air dampers
• Monitoring the outside air and exhaust air filters
• Energy recovery using rotary hea t exchanger
• Energy-optimized room/exhaust temperature control
with summer increase per DIN 1946
• Supply air temperature control in
cooling/energy reclamation/heating sequence
• Summer night ventilation
• Optimized setpoint supply temperature measurement

36
Ventilation macro 08
Control diagrams

8.93 g/kg
7.50 g/kg
Y = 76.8 %

Manual
Manual 18.0°C 200 Pa 70 % 21.0°C
Up 200 Pa 22.0°C
Overriding sensor values
200 Pa
200 Pa
Room

Manual Y = 62.4 %
0% Manual
30 % ON
12.0°C 15.0°C
System

21.0°C 70 %
10.0°C 0% 26.4°C
Manual 10.78 g/kg
31.0°C 0%
ON 5.00 g/kg
SYSTEM 0%
Auto
Off 0% 5% 18 %
Manual

SSM/QUIT Error Status messages


Collective malfunction: OK
Quit
Preflushing: Preflushing completed Incoming air fan: OK
Mixed air damper: ON Exhaust air fan: OK
Exhaust air damper: Open Humidifier: OFF
Control structure

Cascade
EXH/SUP humidity

Summer
compensation
Cascade
EXH/SUP temp.

Full Air-Conditioning System with Mixed Air


and Fan with Frequency Converter

The following requirements are met:

• Continuous fan with contactor and operational monitoring


• Pressure control in supply and exhaust air duct
• Upstream and downstream frost protection
• Switching-on the pumps is demand-dependent
• Anti-jamming function for pumps and valves
• Control of mixed air and exhaust air dampers
• Monitoring the outside air filter
• Energy-optimized room/exhaust temperature control
with summer increase per DIN 1946
• Supply air temperature control in
cooling/mixed air/heating sequences
• Room/exhaust air humidity control
• Supply air humidity control with
dehumidification/humidification sequences
• Humidification via steam humidifier
• Summer night ventilation
• Optimized setpoint supply temperature measurement

37
© Rawpixel.com/fotolia.com

38
UTILIZATION
Single-Room Control

PID Single-Room Controller

This function block permits single-room temperature


control while accounting for external factors.

• Separate PID controllers for heating and cooling


• Three different operating modes
(comfort, standby and night)
• Adjustable dead zone between heating and cooling
• Setpoint correction via room operating panel
• Window contact analysis to determine switch
to frost/heat protection (support mode)
• Dew point detector monitoring

Operating mode Heating Cooling


setpoint setpoint

Comfort mode 21 °C 23 °C

Standby mode 19 °C 25 °C

Night mode 17 °C 27 °C

Frost/heat Antifreeze Heat


protection 7 °C 35 °C
protection protection

Dead
zone

Operating Mode Heating Setpoint Cooling Setpoint

Basic setpoint
Comfort mode Basic setpoint: 21 °C
+ Dead zone: 2 K

Basic setpoint
Basic setpoint,
+ Dead zone
Standby mode temperature decrease
+ Temperature increase,
– Standby mode
standby mode

Basic setpoint
Basic setpoint,
+ Dead zone
Night mode temperature decrease
+ Temperature increase,
− Night mode
night mode

Frost/heat Frost protection Heat protection


protection setpoint: 7 °C setpoint: 35 °C

Setting value: 0 (heating


Dew point alarm Setting value: 0 (cooling off )
off )

39
WAGO SERVICES
Technical Support Project Support

WAGO’s technical support staff is ready to assist WAGO’s technical support offers consultation and
every customer with advice and guidance: from project planning services to help devise the best
selecting the right product, through telephone possible solutions for your custom building auto-
support during commissioning, all the way up to mation and installation projects.
on-site troubleshooting. Customers directly ben- Our experienced team of professionals will gladly
efit from knowledgeable WAGO experts, allowing help you implement your projects with WAGO
them to implement their projects faster. products.

WAGO provides advice and support with: Large-scale applications Planning and project
• Product selection include: engineering:
• Product commissioning • Production facilities and • Conceptual design
• Troubleshooting warehouses • Network planning
• Technical questions about WAGO’s wide product • Office buildings • Application design
range • Shops and display areas • Component selection
• Schools • Quote generation
You can reach our support team by: • Hospitals
Phone: +49 571 887 555 • Airports
Email: support@wago.com
Contact form: www.wago.com > SERVICES
> SUPPORT HOTLINES > Technical Support AUTO- WAGO helps customers with:
MATION • Advice while planning construction projects
from experts with years of project experience
• Customizing solutions to ensure the technical
and financial success of large projects
• Technical support for implementing building
projects

40
WAGO Seminars

Innovative ideas and advanced technology are the Custom, On-Site Training
driving forces behind the development and creati-
on of WAGO’s market-leading products. Attending In addition to these open-forum seminars, WAGO
WAGO training seminars provides the application also offers sessions that are specifically tailored
insight that enables you to maximize the benefits to your organization and its particular needs. Upon
of WAGO products. The skills and expertise gained request, we can conduct these seminars at your
in our effective, useroriented sessions will ultima- location.
tely save you time and enable you to get the most
from our products.

Professional Environment – Effective Learning


• Small groups in which all questions will be ad-
dressed.
• Collaborative learning, because education in a
group setting is more effective and encourages
an exchange of experiences.
• Highly practical – we believe your experiences form
the ideal base to build upon with product information
that’s uniquely tailored to you.
NOTE
WAGO Building Automation Seminars Technical Support
• Building automation using WAGO KNX compo- www.wago.com/support
nents
• Building automation using WAGO BACnet com- Project Support
ponents Do not hesitate to contact our support team:
• Building automation using WAGO LON® compo- www.wago.com/project support
nents
• HVAC applications WAGO-Seminars
• DALI applications www.wago.com/seminars
• EnOcean applications
• flexROOM®

41
Volker Wiciok/vor-ort-foto.de

42
APPLICATIONS
Local Tests and Control of Technical
Systems

43
0888-0598/0301-6901 – HEATING/VENTILATION/AIRCON 3.1 US – 02/2016-00 – Printed in Germany - Subject to design changes

WAGO Kontakttechnik GmbH & Co. KG


Postfach 2880 · 32385 Minden Headquarters +49 571/ 887 - 0
Hansastraße 27 · 32423 Minden Sales +49 571/ 887 - 222
info@wago.com Order Service +49 571/ 887 - 44 333
www.wago.com Fax +49 571/ 887 - 844 169

WAGO is a registered trademark of WAGO Verwaltungsgesellschaft mbH.


”Copyright – WAGO Kontakttechnik GmbH & Co. KG – all rights reserved. The content and structure of the WAGO websites, catalogs, videos, and other WAGO media are subject to
copyright. Distribution or modification to the contents of these pages and videos is prohibited. Furthermore, the content may neither be copied nor made available to third parties for
commercial purposes. Also subject to copyright are the images and videos that were made available to WAGO Kontakttechnik GmbH & Co. KG by third parties.”

You might also like