2 Project Description 4 Customer

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

0 1 2 3 4 5 6 7 8 9

25 25
25 / 2.6

AIR PRESSURE GAS PRESSURE GAS PRESSURE


X2 2 X2 2 X2 2
SWITCH (NORMAL) (HIGH)

1Q2 3APS P 3GPS1 P 3GPS2 P


/1.2

30
X2 3 X2 4 X2 5
COMBUSTION AIR FAN
STOP
3S1
RED
39 313 317

53 1 1
1K2 3R1 3R3
/1.3 54 /3.5 3 /3.8 4
31
314

6
3R1
COMBUSTION AIR FAN /3.5 7
13 15
Start
3S2 1K1 3TD2
GREEN /1.2 14 /3.4 16 18
315

32 310 311 312


MAIN GAS VALVE
3S3

15 17 53 13
3TD1 3TD1 1K1 1K3
/3.1 16 /3.1 18 /1.2 54 /1.4 14

316
33 34 36 38
X2 6
21 61
1K2 1K3
/1.3 22 /1.4 62

35 37

A1
3TD1 1K3 1K2 3H1 1K1 3H2 3TD2 3H4 3R1 3H3 3R2 3SV1 3R3
6 SEC A2 STAR DELTA B COM B 2 MIN Y Y ALARM

0 / 2.9 0 / 4.0

COM 220V MAIN GAS VALVE COM 220V


15 16 /3.1 13 14 /3.3 21 22 /3.1 ON 13 14 /3.1 18 15 /3.4 PURGE TIMER 1 3 /3.5 GAS PRESSURE 1 3 /2.8 1 4 /3.7
61 62 /3.2 53 54 /3.4 53 54 /3.2 16 6 7 /3.7 6 7 /11.4
17 18 /3.2 FLASHER 11 9 /12.3

AIR PRESSURE
STAR / DELTA
TIMER PURGE TIMER

2 4
disigner 97/07/21 nikfar Date 10/28/2018 Project description CUSTOMER =
TITEL : ELECTRICAL WIRING
drawing 97/07/21 nikfar Ed. Standard +
approve Appr ‫ﮐﻮره ﻋﻤﻠﯿﺎت ﺣﺮارﺗﯽ ﻓﻮﻻد‬ ‫ﺻـــﻨﻌﺖ ﺳـــﻨﮓ ﺷـــﮑﻦ‬ DWG NO. : 97/07/ELEC Page 3
Modification Date Name Original Replacement of Replaced by Page 12

You might also like