M-Sec-08 - Rev-A

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SHOP DRAWING

(P=1188 kg@8m)

CWR-DN200

MIN-DN25
FF-DN100

PW-DN50
CA-DN80
520 188 260 185 185 185

1020
TOS EL.+6500

WWCC-DN50

WWDC-DN50
WWAL-DN80
CWS-DN200

LPG-DN150
1000

520 188 250 160 140 200

2859
TOS EL.+5500
150

1300

MWS-DN80 (PPR)
CWR-DN100

CWS-DN100
(P=1217 kg@8m)

FF-DN100

PW-DN80
CA-DN80
A 05 OCT 2018 CHANGE SECTION LOCATION
1200

0 10 APR 2018 FOR CONSTRUCTION

REV. DATE DESCRIPTION


1700
PROJECT NAME:
97

115
16

515 130 185 160 140 470


PROJECT RUBY
TOS EL.+15000
CLIENT NAME:

JFE MERANTI MYANMAR CO.,LTD.

CONTRACTOR:
(P=328 kg@3m)
2-2-8, KORAKU, BUNKYO-KU TOKYO (112-8576) JAPAN
TEL: +81-338177182 FAX: +81-338177642

PREPARED BY CHECKED BY APPROVED BY

SECTION OF G.L S1 @ 64 to 50 SECTION OF G.L S1 @ 40 to 34

DRAWING TITLE:

SECTION DRAWING

DWG No: M-SEC-08


SIZE: A-3 SCALE: 1/20 REV: A

SIZE: A-1 SCALE: 1/10 SHEET: 008

You might also like