Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

TWQI6

TWQI

25-Dec-2018 Events

Sequence of Events

Co. Representative :
SLB Representative :

Report : 2001-123-LEZ-12 Events Page No: 9


TWQI6
TWQI

25-Dec-2018 Events

Sequence of Events
Seq. # Date Time Description
1 25-Dec-2018 20:52 Start Sample #01 with Bottomhole sample, bottle number #
2 20:52 Change choke size

Report : 2001-123-LEZ-12 Events Page No: 10


TWQI6
TWQI

25-Dec-2018 Nomenclature

Nomenclature and Calculations

Co. Representative :
SLB Representative :

Report : 2001-123-LEZ-12 Nomenclature Page No: 18


TWQI6
TWQI

25-Dec-2018 Nomenclature

Nomenclature
BHP Bottomhole Pressure
BSW Basic sediments and water in percent
CHOKE Well Head Choke diameter
GASDP Gas Differential Pressure
GASGR Separator Gas Gravity (air =1)
GASP Downstream Orifice Gas Pressure
GAST Orifice Meter Gas Temperature
GASQ Average Gas Volume Flow Rate at standard conditions
GASV Gas Volume at standard conditions
GOR Gas Oil Ratio
OILQ Oil Flow Rate at standard conditions
OILSG Oil Specific Gravity at standard conditions
OILSG60 Oil Specific Gravity at 60 degF
OILT Oil temperature
OILV Oil Volume
ORMD Orifice Diameter
SHR Shrinkage of the oil going from Separator Pressure to Standard Pressure
SHRK Shrinkage of the oil going from Temperature of the Shrinkage Tester to 60 degF
when shrinkage (SHR) is determined using a shrinkage tester or tank.
WATERQ Water Flow Rate
WATERV Water Volume
WHDCP Well Head Down Choke Pressure
WHP Well head Pressure
WHT Well head Temperature

Report : 2001-123-LEZ-12 Nomenclature Page No: 19


TWQI6
TWQI

25-Dec-2018 Nomenclature

Calculations References

Report : 2001-123-LEZ-12 Nomenclature Page No: 20


TWQI6
TWQI

25-Dec-2018 Appendixes

Appendixes

Report : 2001-123-LEZ-12 Appendixes Page No: 21

You might also like