Professional Documents
Culture Documents
B.08 Supjmf 12
B.08 Supjmf 12
SECTION A
Project Identification Information
Contract No.: Highway: Region: Contractor:
Pit Name and Location: Blend Sand Pit Name and Location:
Marshall Design No.: Specified Mix Type: Date Submitted: (dd-mmm-year) RAP Source and Location:
SECTION B
Mix Design Properties
SECTION C
Job Mix Formula
Email completed copy to the Project Sponsor and to the Technical Standards Branch at "trans.constructqa@gov.ab.ca"
SUPJMF/12
SECTION A
Project Identification Information
Contract No.: Highway: Region: Contractor:
12345 Hwy XX:xx Southern ABC
Project From: Project To: Mix Design Consultant: QA Review Consultant:
Jct. Hwy. XX Jct. Hwy. XXX XYZ DBC
Pit Name and Location: Blend Sand Pit Name and Location:
Rocky Pit 1 NE-29-025-02-05 Rocky Pit 2 SW-04-028-26-04
Marshall Design No.: Specified Mix Type: Date Submitted: (dd-mmm-year) RAP Source and Location:
12345-S1 20-F-12.5 29-Sep-2013 N/A
E
SECTION B
Mix Design Properties
L
Bulk Specific Gravity 2.384 Total Asphalt Content (%) 5.3
Clay Content, % 64.10 Gyratory Density (kg/m3) 2383
Fine Aggregate Angularity, % 45.7 % Asphalt Absorption 0.75
P
% Two Face Fractures 97.0 Gmm 2.500
% One Face Fractures 99.0 Cini (%) @Nini Gyrations 88.2
% Elongated Particles 2.40 Cdes (%) @Ndes Gyrations 96.0
M
% Detrimental Matter Content 1.40 Cmax(%) @Nmax Gyrations 97.40
Plasticity Index NP VMA (%) 14.0
Flow (%) 71.4
Asphalt Properties
Fines / Asphalt Ratio 1.00
A
Asphalt Grade PG 64-34 Tensile Strength Ratio (no anti-strip) 60.0
Supplier Husky T.S.R. (with anti-strip) (if applicable) 90.0
S
Specific Gravity 1.0240 Liquid Anti-Strip Additive (%) 0.4%
SECTION C
Change in Job Mix Formula
Email completed copy to the Project Sponsor and to the Technical Standards Branch at "trans.constructqa@gov.ab.ca"
SUPJMF/12