Professional Documents
Culture Documents
PT. Bumi Alam Raya: Minimum Maximum Average Record D C B BL1 BL2 A1 A2
PT. Bumi Alam Raya: Minimum Maximum Average Record D C B BL1 BL2 A1 A2
Located in Kutai Karta Negara regency, approximately 27km to S. Belayan where the barging
could be done or approximately 395km to Makasar strait. The working area is 4657 Ha.
The area has been well explored. There are 123 coal out crops found. There are 204 bore holes
data, 134 holes were cored and 62 open holes. 196 holes have been tied geodetically.
The drilling show that there are at least 4 main coal seams namely from the bottom to the top
A, B, C and D seams. The A seam is the thickest seam and separated by app. 30 m inter burden to the
B seam. B, C and D seam is only separated by few m inter-burden.
The measured coal resources were calculated and the show approximately 87.5 million ton from all
the seams. Or in the term of JORC standard is approximately 48 million ton.
The mineable coal reserve with Loose Factor 13% = 72,638,762.39 ton, with Over Burden
494,173,309.4 BCM. The Stripping Ratio 5.65 for Reserve category or Stripping Ratio 6.8 for Mineable
Resources.
Coal quality is categorized as lignitic to sub bituminous coal, the resume of the coal quality is shown
in the following table:
OC1-1 DH12 DHH1/B
SAMPLE
highest modes lowest