Professional Documents
Culture Documents
ITP - Fencing and Gates Installation Works - MAB1
ITP - Fencing and Gates Installation Works - MAB1
C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. JI-2025
RESPONSE SHEET
Sub-contractor / Vendor Document No: P6012MAB.000.10.03.433 Rev No.: OB Status Code : R
2. On Sec 1 , use the company approved forms and documents with their correct numbers Noted and complied to the comments A
Noted and complied to the comments
3. On Sec 2, Replace KNPC with company , PSCJ with contractor and CCC with Sub-contractor A
Noted and complied to the comments
4. On each item write the reference documents number in and use the company approved forms A
Noted and complied to the comments
5. Remove the item num 1 and num 2 and use the same terminology as earthwork ITP A
SN 1 : fence materials receipt at site : Noted and complied to the comments
Add (approved MAR & certificates for posts, chain link wire ,fence accessories ,nuts ,bolts and
6. washers, bracings ,gates) A
2.
3.
1 Punch List P6012MAB.000.10.03.002.QCF.019-GPL
2 Record of concrete pour P6012MAB.000.10.03.002.QCF.030-CX
3 Site preparation and earthwork inspection report P6012MAB.000.10.03.002.QCF.159-CX
4 Earthwork survey report P6012MAB.000.10.03.002.QCF.160-CX
5 Reinforced concrete post pour inspection record P6012MAB.000.10.03.002.QCF.164-CX
Foundation completion and release to the next
6 P6012MAB.000.10.03.002.QCF.168-CA
construction discipline
7 Concrete precast unit installation check list P6012MAB.000.10.03.002.QCF.169-CX
8 Concrete batching plant inspection check sheet P6012MAB.000.10.03.002.QCF.170-CX
9 Concrete Pouring Inspection record P6012MAB.000.10.03.002.QCF.171-CX
10 Fencing and gates inspection records P6012MAB.000.10.03.002.QCF.186-CX
Fencing and gates installation completion
11 P6012MAB.000.10.03.002.QCF.187-CA
certificate
12 Field concrete pouring record P6012MAB.000.10.03.002.QCF.390-CX
Page 2 of 7
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. JI-2025
Document Title: ITP for Fencing and Gates Installation Works
Document No#: P6012MAB.000.10.03.433; Rev OB
Page 3 of 7
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. JI-2025
Document Title: ITP for Fencing and Gates Installation Works
Document No#: P6012MAB.000.10.03. 433; Rev OB
Page 4 of 7
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. JI-2025
Document Title: ITP for Fencing and Gates Installation Works
Document No#: P6012MAB.000.10.03. 433; Rev OB
Page 5 of 7
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. JI-2025
Document Title: ITP for Fencing and Gates Installation Works
Document No#: P6012MAB.000.10.03. 433; Rev OB
Page 6 of 7
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. JI-2025
Document Title: ITP for Fencing and Gates Installation Works
Document No#: P6012MAB.000.10.03. 433; Rev OB
`
Page 7 of 7
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. JI-2025
PUNCH LIST
Client Name : Project Name :
Contractor : Project No :
Sub-contractor : Punch List No :
Unit No : Date
Facility Description :
CONCERNED AREAS
□ Operations □ Machinery including static equipment etc.
□ Electrical □ HVAC
□ Instrumentation including process control systems □ Computer Application and Advanced Control System
□ Telecommunication system including paging system □ Inspection & Corrosion Division
□ Fire protection and Fire fighting facilities □ Safety Items
□ Mechanical □ Piping including protective coating, painting & Isolation
□ Civil and Structural □ Others
CONFIRMATION FOR CLEARANCE
Sr. DWG. No. DESCRIPTION ORIGINATOR CATEGORY Company
No. / DATE (A) or (B) CONTRACTOR PD MAA / MAB / SHU
Name Date Name Date Name Date
CATEGORY (A): Punch list items which shall be completed before pre-commissioning CATEGORY (B): Punch list items which can be done during and beyond commissioning
P6012MAB.000.10.03.002.QCF.019-GPL, Rev O2
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
KNPC Contract No. CFP/EPC/0054-MAB1
PSCJ Job No. JI-2025
CHECKLIST : Signature
OK Not OK NA Inspection Date Reinspection Date
Formwork
Reinforcement
Concreat Cover
Mechanical Inserts/Sleeves
Electrical Inserts/Sleeves
Unistruts
Bolts
Other
POURING RECORDS
Actual Date of Pour : Mixing Time : Sampling Time
Truck No. : Slump: Start & Compl. Time :
Additives Added : Concrete Temp
REMARKS:
P6012MAB.000.10.03.002.QCF.030-GX, Rev O2
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
Name
Signature
Date
Page 1 of 1 P6012MAB.000.10.03.002.QCF.159-CX Rev O2
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
1
2
3
4
5
7
8
10
11
12
13
14
15
16
17
18
Name
Signature
Date
Page 1 of 1 6012MAB.000.10.03.002.QCF.160-CX Rev O2
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
Name
Signature
Date
Page 1 of 1 P6012MAB.000.10.03.002.QCF.164-CX, Rev O2
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
1 Confirm the plan and concrete finished elevation of the foundation is as per IFC
drawing (verify survey report).
2 Confirm the shim plates are fixed and survey report for top of shim plates is
verified.
3 Confirm that position of Anchor Bolts in plan and elevation is as per IFC
drawing (verify survey report).
4 Confirm that the anchor bolt and threads are in satisfactory condition.
5 Confirm that scabbling /roughening has been carried out for grouting work.
6 Confirm that the Anchor Bolt pockets to receive grout are cleaned.
8 Confirm that surrounding area has been back filled and compacted to correct
elevation.
9 Confirm that all Quality Records have been completed and accepted.
10 Confirm that all construction debris have been removed prior to release to next
discipline.
11 Confirm that grouting work is complete and is accepted by next discipline.
12 Confirm that all quality records for grouting work is complete and accepted.
13 Confirm that trench excavation for underground piping / E&I cable laying work is
complete and accepted.
14 Confirm that all quality records for trench excavation for underground piping /
E&I cable laying work is complete and accepted.
15 Confirm that fire proofing work is completed and next discipline accepted.
16 Confirm that all quality records for fire proofing work is complete and accepted.
Remarks:
Name
Signature
Date
Page 1 of 1 P6012MAB.000.10.03.002.QCF.168-CA, Rev O2
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
Name
Signature
Date
Page 1 of 1 P6012MAB.000.10.03.002.QCF.169-CX, Rev O2
Kuwait National Petroleum Company
(K.S.C)
Clean Fuels Project (CFP)
Contractor/Supplier’s Name :
Survey Date :
Location :
Assessor/Job Title :
Plant Phone No :
Plant Fax No :
Proposed for :
Contact No :
Project Title :
Location :
GENERAL INFORMATION
Structural 3
3 Non-structural (m )
What is the approximate volume (cubic meters) of concrete required for (m )
A
this project?
What is the approximate distance (in kilometers) from the proposed batch
B
plant to the jobsite?
What is the approximate travel time (in minutes) of transit mixer from the
C
proposed batch plant to the jobsite?
D Is the batch plant central mixing or dry batching?
1. GENERAL
2.3 Plant Quality Control Laboratory test results on raw materials available?
2.4 Independent Testing Laboratory test results on raw materials available? Attach raw
materials test reports from approved civil testing laboratory.
2.5 Name of Independent Testing Laboratory.
3. PLANT SCALES CALIBRATION (Attach valid calibration certificates from approved calibration agency.
4. AGGREGATES HOPPER
1.
2.
6. AGGREGATES SOURCE
Coarse and Fine Aggregate Stock Bays
3
Size No. Quantity(m ) Source (Name and Location of Crusher)
c Are coarse and fine aggregates placed on hard, properly compacted and well
drained surface?
TDS
pH
Source
8. CEMENT STORAGE
Capacity Identification at Inlet
Type Source No. of Silos Condition
(tons) Pipe (Y/N)
9. CENTRAL MIXER
CHEMICAL ADMIXTURE DISPENSERS (Attach valid calibration certificates from approved calibration agency).
Current Next
No. of
Admixtures Identification Calibration Calibration Calibration Agency
Dispensers
date Date
3 Water Meter
Truck No. Capacity (m ) Condition of Blades Condition of Drum
(Y/N)
Based on our actual plant survey, we confirm that the subject batch plant meets the requirements of project
specification. In addition, we will perform the required QA/QC tests in the batch plant during concrete production
and on-site during placement, per our contract requirements.
---------------------------------
Print Name and Signature
( Petrofac QC Engg)
---------------------------------
Print Name and Signature
( Client representative in charge)
Sl. Verified by
Description of Inspection Activity
No. Sub Contractor QC Contractor QC
Check concrete mix design approvals for
1
blinding and structural concrete.
Check concrete pouring arrangements made at
2
site and ensure it is satisfactory.
Ensure the fresh concrete is not poured from
4 height more than 1.5m or as per project
specification.
Ensure the formwork is clean prior to pouring
5
concrete.
In case of new concrete is placed over the old
concrete, ensure the old concrete surface is
6
clean, saturated and bonding agent is applied (if
applicable).
Ensure the concrete is placed in layers in
7
accordance with project specification.
Ensure the concrete poured is vibrated using
8
right size of vibrator needle.
Ensure the concrete finishing is in accordance
9 with IFC drawing or project specification
requirements.
Ensure the finished concrete is covered with
10
polythene sheet.
Check fresh concrete sampling and testing is
11 carried out and field concrete pouring record is
updated.
Remarks:
Name
Signature
Date
Page 1 of 1 P6012MAB.000.10.03.002.QCF.171-CX, Rev O2
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
Name
Signature
Date
Page 1 of 1 P6012MAB.000.10.03.002.QCF.186-CX, Rev O2
Kuwait National Petroleum Company (K.S.C)
Clean Fuels Project (CFP)
Sl.
Description of check Result
No.
Check that the chain link fence is secure and correctly installed as
5
per IFC drawing.
Confirm that all gates operate smoothly and the bolts operate
7
correctly.
Remarks:
Remarks :
Name:
Signature:
Date: