PREPARATION EXECUTION MONITORING

NETWORK
NETWORK
PROJECT INTEGRATION- ATP CLOSE
OPTIMIZATION
DESIGN

1. Project to request Design File 1. Network Design to Serve 1. Network Optimization to open


to ND. Design Request. up Ticket for configuration site
2. Project to request 2. Network Design to issue to Network Integration. 
Configuration Files & Upload/Attach Design File 2. Network Integration to open up
Troubleshooting to NI.  3. Network Integration to Serve Ticket for Physical or On Site
3. ASP to Request Integration & Script Request, Integration & activity issue to ASP.
Troubleshooting via IXT Troubleshooting Request. 3. Project Team to generate
Mobile. 4. Network Integration to do Integration, Troubleshoot/CR
4. RSA Team to validate ASP Consistency Check Report
Request 5. Network Integration to Create
5. ASP To Close inbox Request. Report