PUNCH

LIST
Project: From (A/E):

Site Visit Date:

To (Contractor): A/E Project Number:

Contract For:

The following items require the attention of the Contractor for completion or correction. This list may not be all-inclusive, and the failure to include any items on this list does not alter the
responsibility of the Contractor to complete all Work in accordance with the Contract Documents.

Item Room Location Correction/Completion Verification


Number Number (Area) Description Date A/E Check

☐ Attachments

Signed by: Date:

Copies: ☐ Owner ☐ Consultants ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ File

© Copyright 2013, CSI, Page ___ of ___ Form Version: January 2013
110 South Union St., Suite 100, Alexandria, VA 22314 CSI Form 14.1A