Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

FM-SOM-D-07-01-R00

Rev 0
NOV 2017

MONTHLY MACHINERY RUNNING HOURS


Laporan Bulanan Jam Kerja Mesin

VESSEL : MONTH :
Kapal Bulan

Port Main Center Main Stbd. Main Port Center Stbd. No. 1 Air No. 2 Air
Engine Engine Engine Generator Generator Generator Compressor Compressor

Engine Engine Engine Engine Engine Engine Engine Engine Engine Engine Engine Engine Engine Engine Engine Engine
Tachome Tachome Tachome Tachome Tachome Tachome Tachome Tachome
Logbook Logbook Logbook Logbook Logbook Logbook Logbook Logbook
ter ter ter ter ter ter ter ter

Total Running
Hours Since
Beginning
Total Jam Kerja
Mesin Sejak
Awal

Total Hours
Since Last
Overhaul
Total Jam Kerja
Setelah
Bongkar
Terakhir

Running Hours
Since Last Oil
Change
Jam Kerja
Mesin Sejak
Penggantian Oli
Terakhir

Total Monthly
Running Hours
Total Jam Kerja
Mesin per
Bulan

BUNKERS, LUBRICANTS AND CHEMICALS / Bunker, Minyak Pelumas dan Bahan Kimia
Brought Forward Since Last End of Month Remain
Fuel Oil / Lubricants Type Month Total Utilized Monthly Total Bunker Received Onboard (ROB)

Bahan Bakar / Minyak Jenis Dibawa Sejak Bulan Lalu Total Pemakaian Bulanan Total Bunker Diterima ROB Pada Akhir Bulan
Pelumas

Marine Diesel Oil (ltr)

Main Engine Lube (ltr)

Auxiliary Engine Lube (ltr)

AQM / Schottel Thruster


Lube (ltr)

Gearbox Lube (ltr)

Hydraulic Oil (ltr)

Grease (kg)

Other Lube Oil (ltr)

Prepared by Chief Engineer / Approved by Master / Disetujui oleh Nahkoda Acknowledged by Shore Personnel /
Disiapkan oleh KKM Diketahui oleh Petugas Darat
FM-SOM-D-07-01-R00
Rev 0
NOV 2017

Date / Tgl : Date / Tgl : Date / Tgl :

You might also like