Telecom Reve

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

3W Project Reference List - Rev L

3W TELECOM PROJECTS - UNITED ARAB EMIRATES Main Contractor


1

Main Contractor:
Atlas Telecom

Project Name:
Indoor Coverage at DP HQ
Project Code: AKJ Location: United Arab Emirates

3W NETWORKS SCOPE OF WORK


Procurement

SYSTEM USED
• SCS, OSP

Project Award Date: May 2006 Date Completed: May 2006

Main Contractor
2

End Customer:
Dubai Electricity & Water Authority

Project Name:
Cable Assembly for Operation Room
Project Code: AKI Location: United Arab Emirates

3W NETWORKS SCOPE OF WORK


Procurement

SYSTEM USED

• SCS, OSP

Project Award Date: April 2006 Date Completed:

www.3wnetworks.com | www.3ctonline.com | www.3wtechnomatic.net | www.3wlinks.net


3W Project Reference List - Rev L
End Customer

End Customer:
QTEL

Project Name:
Two Microwave Links in Two Mobile TERs
Project Code: AHT Location: Qatar

3W NETWORKS SCOPE OF WORK


3W TELECOM PROJECTS - QATAR

Project Management, Detailed Engineering & Design, Procurement, Integration, Factory


Acceptance Testing, Installation & Commissioning.

SYSTEM USED
• PTP MW Radio

Project Award Date: May 2008 Date Completed:

End Customer

End Customer:
QTEL
Project Name:
Expansion of QTEL DXC
Project Code: ANT Location: Qatar

3W NETWORKS SCOPE OF WORK


Project Management, Detailed Engineering & Design, Procurement, Commissioning &
Training.

SYSTEM USED

• SDH/PDH, OTN

Project Award Date: May 2008 Date Completed:

www.3wnetworks.com | www.3ctonline.com | www.3wtechnomatic.net | www.3wlinks.net


3W Project Reference List - Rev L
End Customer

End Customer:
QTEL

Project Name:
Expansion of DXC to STM-1 and DS3
Project Code: ANT Location: Qatar

3W NETWORKS SCOPE OF WORK


3W TELECOM PROJECTS - QATAR

Project Management, Detailed Engineering & Design, Procurement, Commissioning &


Training.

SYSTEM USED
• SDH/PDH, OTN

Project Award Date: May 2008 Date Completed: August 2008

End Customer

End Customer:
BATELCO

Project Name:
Microwave Links for WCDMA for 10 Radio Sites
Location: Bahrain

3W NETWORKS SCOPE OF WORK


Project Management, Detailed Engineering & Design, Procurement, Integration, Factory
Acceptance Testing, Installation, Commissioning & Site Acceptance Testing.

SYSTEM USED

• PTP MW Radio
• Network Monitoring & Management

Project Award Date: March 2007 Date Completed: June 2008

www.3wnetworks.com | www.3ctonline.com | www.3wtechnomatic.net | www.3wlinks.net


3W Project Reference List - Rev L
End Customer

End Customer:
BATELCO

Project Name:
PO 4500017839
Project Code: JX Location:Bahrain
3W TELECOM PROJECTS - BAHRAIN

3W NETWORKS SCOPE OF WORK


Project Management, Detailed Engineering & Design, Procurement, Integration, Factory
Acceptance Testing, Installation Supervision & Training.

SYSTEM USED
• SDH/PDH, OTN

Project Award Date: February 2006 Date Completed:

www.3wnetworks.com | www.3ctonline.com | www.3wtechnomatic.net | www.3wlinks.net


3W Project Reference List - Rev L

Main Contractor End Customer

Main Contractor: 8
Elsewedy Electric

End Customer:
SONITEL

Project Name:
Niger Fiber Optic Backbone Project
Project Code: TAA Location: Niger
3W TELECOM PROJECTS - AFRICA

3W NETWORKS SCOPE OF WORK


Project Management, Detailed Engineering & Design, Material Supplying, Installation, Site
Survey Assembly, Commissioning, Factory Acceptance Testing & SAT

SYSTEM USED
• SDH/PDH
• DWDM
• Network Management System
• Synchronisation System (GPS Clock)

Project Award Date: April 2013 Date Completed: On-giong

www.3wnetworks.com | www.3ctonline.com | www.3wtechnomatic.net | www.3wlinks.net

You might also like