REPUBLIC OF THE PHILIPPINES

OBO
MUNICIPALITY OF SAN FRANCISCO

RECOMMENDING APPROVAL :

0.25

HEAD, ARCHITECTURAL SECTION DATE

100mm THICK CHB APPROVED BY :


@ 100mm, REST @ 250mm O.C.

SPACED BOTHWAYS
BUILDING OFFICIAL DATE

NATURAL GRADE LINE FINISH FLOOR LINE

0.30
250

OR EVERY 3-LAYERS OF CHB

0.90
1.0 250

LATERAL TIES SPACED @ 0.25m. O.C.

1.20
BEAM SCHEDULE
BOTHWAYS

0.20
BEAM NO. WIDTH(mm) DEPTH(mm) LEFT SUPPORT REINF. MIDSPAN SUPPORT REINF. RIGHT SUPPORT REINF.

0.075
G1 250 400 3 @ 50mm, 5 @ 100mm, REST @
2 BARS @BOTTOM

0.30
2 BARS @BOTTOM 200mm O.C.
1.0

0.10
G2 250 400 3 @ 50mm, 5 @ 100mm, REST @

0.07
2 BARS @BOTTOM 2 BARS @BOTTOM
200mm O.C.
BASECOURSE

0.10
BASECOURSE B1 250 400 3 @ 50mm, 5 @ 100mm, REST @
2 BARS @BOTTOM 4 BARS @BOTTOM 2 BARS @BOTTOM
200mm O.C.
0.40 CB 1 250 400 3 @ 50mm, 5 @ 100mm, REST @
2 BARS @BOTTOM 2 BARS @BOTTOM 2 BARS @BOTTOM
200mm O.C.
RG 1 150 300 3 @ 50mm, 5 @ 100mm, REST @

F1 - C1 DETAILS WF1 DETAILS RB 1 150 300


2 BARS @BOTTOM

2 BARS @BOTTOM 2 BARS @BOTTOM


2 BARS @BOTTOM

2 BARS @BOTTOM
200mm O.C.

3 @ 50mm, 5 @ 100mm, REST @


200mm O.C.

L L
L/4 L/4 L/4 L/4
Extra Top Bars Extra Top Bars
Extra Bottom Bars Extra Bottom Bars

PRE FAB GUTTER

0.25 DEFORMED BARS EQUALLY SPACED ALONG


LONG SIDE C - PURLIN 2"X3" @ 0.6m SPACING
L/5 L/5 L/5 L/5

Stirrups

TEKSCREW 2'' LENGTH


Column Ties

LONG SPAN COLOROOF BEAM-COLUMN DETAIL


@ 100mm, REST @ 250mm O.C.
10 mm 0 ROUND BAR SAG ROD
250

TRUSS TOP CHORD


250
NATURAL GRADE LINE
TRUSS BOTTOM CHORD

FASCIA BOARD (1" x 12")

PLYWOOD CEILING

2.0
0.90

CEILING JOIST

ADDITIONAL TOP BARS CUT 2 BARS STRAIGHT


1.20

3" 0 PVC PIPE DOWNSPOUT


L/4 L/2 L/4
3" 0 x 90 deg ELBOW
250
LEFT SUPPORT MIDSPAN RIGHT SUPPORT
DEFORMED BARS EQUALLY SPACED ALONG
LONG SIDE
250
0.30
0.07

L/5 L/5

GUTTER DETAIL
0.10

BASECOURSE STIRRUPS SPACING ADDITION BOTTOM BARS CUT

Scale NTS
1.0 BEAM DETAILS

CF1 - C1 DETAILS

FROM THE OFFICE OF : SEAL : FROM THE OFFICE OF : REG. NO. : PROJECT TITLE : APPROVED BY : SHEET NO. :

DATE :
MR. AND MRS. MARQUEZ
ENGR. JEREMIAS Y. MARQUEZ JR. ENGR. Ma. CARMEN L. POLANCOS PTR NO. : PROPOSED TWO STOREY RESIDENTIAL BUILDING OWNER

ADDRESS: BRGY. CABONGA - AN SAN FRANCISCO, CEBU DATE :


ADDRESS : TRES DE ABRIL ST., CEBU CITY ADDRESS: BRGY. CABONGA - AN SAN FRANCISCO, CEBU
ADDRESS: BRGY. CABONGA - AN SAN FRANCISCO, CEBU
TIN :

You might also like