Professional Documents
Culture Documents
Tracing 3
Tracing 3
Tracing 3
OBO
MUNICIPALITY OF SAN FRANCISCO
RECOMMENDING APPROVAL :
0.25
SPACED BOTHWAYS
BUILDING OFFICIAL DATE
0.30
250
0.90
1.0 250
1.20
BEAM SCHEDULE
BOTHWAYS
0.20
BEAM NO. WIDTH(mm) DEPTH(mm) LEFT SUPPORT REINF. MIDSPAN SUPPORT REINF. RIGHT SUPPORT REINF.
0.075
G1 250 400 3 @ 50mm, 5 @ 100mm, REST @
2 BARS @BOTTOM
0.30
2 BARS @BOTTOM 200mm O.C.
1.0
0.10
G2 250 400 3 @ 50mm, 5 @ 100mm, REST @
0.07
2 BARS @BOTTOM 2 BARS @BOTTOM
200mm O.C.
BASECOURSE
0.10
BASECOURSE B1 250 400 3 @ 50mm, 5 @ 100mm, REST @
2 BARS @BOTTOM 4 BARS @BOTTOM 2 BARS @BOTTOM
200mm O.C.
0.40 CB 1 250 400 3 @ 50mm, 5 @ 100mm, REST @
2 BARS @BOTTOM 2 BARS @BOTTOM 2 BARS @BOTTOM
200mm O.C.
RG 1 150 300 3 @ 50mm, 5 @ 100mm, REST @
2 BARS @BOTTOM
200mm O.C.
L L
L/4 L/4 L/4 L/4
Extra Top Bars Extra Top Bars
Extra Bottom Bars Extra Bottom Bars
Stirrups
PLYWOOD CEILING
2.0
0.90
CEILING JOIST
L/5 L/5
GUTTER DETAIL
0.10
Scale NTS
1.0 BEAM DETAILS
CF1 - C1 DETAILS
FROM THE OFFICE OF : SEAL : FROM THE OFFICE OF : REG. NO. : PROJECT TITLE : APPROVED BY : SHEET NO. :
DATE :
MR. AND MRS. MARQUEZ
ENGR. JEREMIAS Y. MARQUEZ JR. ENGR. Ma. CARMEN L. POLANCOS PTR NO. : PROPOSED TWO STOREY RESIDENTIAL BUILDING OWNER