Professional Documents
Culture Documents
Rickmers Standard For Stowage and Securing of Project Cargo PDF
Rickmers Standard For Stowage and Securing of Project Cargo PDF
R ICK M E R S
This edition published 2003 by
Rickmers-Linie GmbH & Cie. KG
Hamburg, Germany
All rights reserved; no part of this publication may be reproduced, stored in a retrieval system or transmitted
in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the
prior written permission of the Publishers.
First Edition 1999 by Prof. Hermann Kaps, Director of Research, Gesellschaft für Angewandten Um-
weltschutz und Sicherheit im Seeverkehr / GAUSS (Institute for Environmental Protection and Safety in
Shipping), Bremen, Germany
Second Edition 2002, revised and updated by Prof. Hermann Kaps (GAUSS)
Third Edition 2003, reviewed and amended by Prof. Hermann Kaps (GAUSS), Peter Heimstaedt and Peter
van den Berg (Rickmers-Linie)
Notice to readers:
In the event that reader feels not familiar with a description, specification, diagram and/or
calculation scheme given in this Standard Manual, please consult Rickmers-Linie GmbH & Cie. KG,
Operations Center Hamburg, Neumuehlen 19, D-22763 Hamburg (Germany),
phone no.: +49 (0)40 – 38 91 77- 200/-215, email: info@rickmers.net
Notes
R ICK M E R S
R ICK M E R S