00 18.05.2017 GG SS G.N
Consultants:
Snyder Energo Pvt. Ltd.,
No. 306, VITC Model Export Park, #488, 14th Cross, 4th Phase,
Peenya Industrial Area, Bangalore – 560 058, India.
E-mail: engg@snyderenergo.com
INDEX
1.0 INTENT 2
2.0 GENERAL 2
conditions.
any, such as loose/soft strata that would affect the design and construction
2.0 GENERAL
M/s. Thirumalai Chemicals Ltd, client has planned for the proposal of new
Reactor, turbo blower and boiler plant and extension of substation in Ranipet,
TamilNadu. In this regard, geotechnical Investigation has to be carried out for
the proposed construction and extension works.
Latitude 12.95
Longitude 79.31
Mukundarayapuram
Nearest Railway Station
(<5Km)
Climatological details:
Seismic data
Zone III
Meteorological data
Rainfall
Wind velocity
Relative humidity
M e a n R e l a t i v e H u m i d i t y (2012-2016) 51.2 %
3.1.1 Drilling of bore-holes (BH) shall be done wherever specified as per IS 1892-
1979.
3.1.2 The Standard Penetration Tests (SPT) shall be performed in accordance with
Indian Standard Codes of Practice and the following details registered for
carrying out SPT shall be furnished by the agency.
Core recovery data, level of bore hole termination and core box sample
etc.,
3.1.3 Trial pits shall be excavated so as to permit easy access for visual examination
of walls of the pit and to facilitate sampling and in-situ testing operations.
3.1.4 Collection of disturbed and undisturbed soil samples, rock cores for conducting
laboratory tests
3.2.1 Soil Electrical resistivity test shall be performed in accordance with the related
Indian Code of Practice.
Conducting all the following laboratory tests on the soil and rock samples
collected from the Site.
Ph value
Reports covering the detailed test results for Field and Laboratory tests shall
be submitted covering the following:
The planning of the work, choice of the method of boring, selection of the type
of samples and procedure for sampling is indicated in the Tender. However,
Tenderer shall furnish his tentative programme regarding the above along with
his offer which, necessarily, should take into account the site conditions and
time schedule for completing the work, comprising subsurface features,
The Tenderer shall have on site all required survey instruments to carry out the
work accurately according to specifications and drawings. All the specified
locations for boreholes and field tests shall be set out at site by the Tenderer
from two established reference grid lines. If required, the Tenderer shall set out
the base lines and the locations of boreholes and field tests with reference to
the property line as guided by the Engineer. At each location of boreholes and
other field tests, the Tenderer shall establish the ground level prior to
commencing the operations. The ground level shall be related to an established
benchmark or as directed by the Engineer.
The Tenderer, before submitting his tender, shall familiar himself about the site
and ascertain the local conditions, labour rules, availability of approach
roads/paths, traffic restrictions, and all obstructions in the area and also
ascertain all site conditions and shall allow for any extras likely to be incurred
due to all such conditions in his quoted prices. After the award of work, no
additional claims will be entertained on these accounts under any
circumstances, whatsoever.
The Tenderer shall take adequate precautions to ensure complete safety and
precaution to avoid any accident at site. The safety precautions shall conform
to the safety regulations prescribed by the safety code for constructions and
relevant Indian Standard Codes.
4.1 Mobilisation
The Tenderer shall mobilise adequate plants and equipment, instruments and
personnel (skilled and unskilled) required carrying out the soil investigation
work.
5 TEST PROCEDURES
The Tenderer shall follow the procedures for all the soil investigation tests
(Field and laboratory) as per relevant IS codes, except for the specific points
listed below:
5.1 Boring
Drilling in rock and collection of rock core samples shall be in accordance with
IS: 6926 and IS: 4464.
Bore hole test shall be conducted at site in the following Three nos. of location
& these locations are indicated in layout Drg. No. 2-3673-600-001.
CO-0RDINATE CO-0RDINATE
S.NO. POINT SOUTH WES T
Standard penetration tests (SPT) shall be carried out at intervals of 1.5 meters
and at every change of strata in accordance with IS: 2131.
A note on the visual examination of soil strata shall be prepared. This should
include the nature, colour, consistency and visual classification of the soil,
thickness of soil strata, thickness of expansive soil & ground water table if any
etc. Undisturbed samples shall be collected at 1m depth and at the termination
depth in all the pits.
Trial Pits shall be conducted at three locations & the locations are indicated in
layout Drg. No. 2-3673-600-001.
CO-ORDINATE CO-ORDINATE
S.NO. POINT
SOUTH WEST
1. Trial Pit (TR –01) 20.00m 168.71m
Where,
Electrical Resistivity test shall be conducted at one location & the location is
indicated in layout Drg. No. 2-3673-600-001.
CO-ORDINATE CO-ORDINATE
S.NO. POINT
SOUTH WEST
Electric al
Electrical Resistivity test report shall be submitted as per the format attached
as Annexure-1.
a. This schedule Of B.O.Q for Soil Investigation is based on the drawing title
“Test Locations for Soil Investigation”, dwg no: 2-3673-600-001.
b. The depth of each bore hole proposed is 15m from NGL (natural ground
level), or till hard rock is encountered.
c. Payment shall be made for the actual depth of boring as per actual site
condition
I Field Investigation
50).
7 LIST OF ANNEXURES
8 LIST OF DRAWINGS