Professional Documents
Culture Documents
CFCD 002-019 Daikin Steel
CFCD 002-019 Daikin Steel
With reference to the above matter, we are pleased to submit herewith our consultancy
fee proposal for your kind consideration.
SCOPE OF WORKS
1. Architectural Plans
- To establish the renovation drawings as per owner design c/w professional
endorsement. The said plans only use for Fire Certificate Purpose.
- To follow up and liason with the fire authority on the submitted plan status.
- To follow up and liason with the fire authority on the submitted plan status.
Total: RM 8000.00
Trusting the above is in order, we look forward to work with your company.
Thank you.
Yours Faithfully,
Caliph Fire Consult & Design
………………………………….
Muhammad Ali Hydar
I, as the authorized signatory for and on behalf of INNOXIS ENGINEERING SDN BHD hereby
confirmed your company consultancy appointment in accordance to the scope of works, terms
and conditions as stated in your above proposal dated 31st January 2019 (Reference:
CFCD/Quotation/002-19/ALI)