4th Session National Assembly Secretariat
4th Session National Assembly Secretariat
4th Session
—————
Minister for Water and Power (Raja Pervaiz Ashraf): (a) The total
pilferage cases of electricity; registered against domestic and industrial consumers
during last year (2006-07) is Domestic = 26404 & Industrial = 125.
(c) the location and total land acquired for the said project?
(c) A site measuring 315' x 280' (2.2 acres) has been earmarked for
construction of permanent offices for the Chairmen Standing Committees on the
South of Parliament Lodges in Sector G-5/2, Islamabad.
(b) if so, the procedure adopted for award of the said contract;
(d) the names of the Chief Executive and Board of Directors of the
Company/Firm; and
Minister for Water and Power (Raja Pervaiz Ashraf): (a) Yes, the
contract for “Raising of Mangla Darn” was awarded by WAPDA to the Contractors
M/s. CWE Joint Venture on June 28, 2004.
(c) The contact was awarded to CWE Joint Venture, the main Contractor,
comprising following firms:
Annex-I
MANGLA DAM RAISING PROJECT
PAST EXPERIENCE OF COMPANIES/FIRMS
Miranl Dam.
Moenjodare Airport
Site Grading and Access Roads
Roads in Sindh
Overpass and River Bridge (S/C)
Rawal Dam
Construction of Swat Canal
Pehur High Level Canal
(c) the monthly rent charged in each case, separately, during the
year 2005-2006, 2006-2007 and 2007-2008?
(c) The monthly rent/license fee charged in each case during the year
2005-06, 2006-07 and 2007-08 is at Annex “B”.
Annex “A”
Annex”B”
(b) whether the cost of the dam has been increased; if so, the reasons
thereof?
8
Minister for Water and Power (Raja Pervaiz Ashraf): (a) The Kurram
Tangi Dam Project has been approved by ECNEC on 25-3-2005 at a cost of
Rs. 17205.267 million.
(b) The cost of the dam has been increased from Rs.17205 million to
Rs. 19445 million (increase of Rs.2240 million).
The original design by WAPDA envisaged 295 feet high dam with a storage
capacity of 0.914 MAF and 83 MW power generation. Owing to reservations of
Government of NWFP, it was decided in a meeting under the chairmanship of
Minister for Water and Power on 7-2-2007 to increase the height of the dam from
295 to 322 ft to increase the water storage capacity from 0.914 MAF to 1.2 MAF,
to arrest the flood flows in wet year.
(a) the daily inflow and outflow of water from Tarbela and Mangla
reservoirs during the period from 15th to 20th March, 2008;
and
Minister for Water and Power (Raja Pervaiz Ashraf): (a) The daily
inflow and outflow of water from Tarbela and Mangla reservoirs during the period
15th to 20th March, 2008 as under:—
————————————————————————————————
Date Tarbela Mangla
———————————————————————
Inflow Out flow Inflow Outflow
————————————————————————————————
March 15 19800 19800 23384 24000
16 19500 19500 25975 24000
17 20600 20600 29815 24000
18 22100 22100 29887 24000
19 22200 22200 31088 24000
————————————————————————————————
Total 104200 104200 140149 120000
————————————————————————————————
9
————————————————————————————————
Date Guddu U/s Guddu D/s
————————————————————————————————
March 25 20588 17818
26 19780 17010
27 19780 17010
28 20648 17878
29 20648 17878
————————————————————————————————
Total:- 101444 87594
————————————————————————————————
Will the Minister for Water and Power be pleased to state the reasons
of loadshading/load management in the country at present?
Minister for Water and Power (Raja Pervaiz Ashraf): There is gap
between the system demand and power available due to following reasons:—
(d) As per Government policy, Public sector barred from installing new
generating units.
(e) Private sector unable to deliver their promises and resultantly no new
power plant was added to the system from 1999 todate.
(a) the total hydel electricity, in mega watt, generated in the country
during the year 2007-08;
(b) the total thermal and nuclear electricity, in mega watt, generated
during the above said period;
Minister for Water and Power (Raja Pervaiz Ashraf): (a) As informed
by PEPCO : 20.31 million MWh (WAPDA & Jagran).
For achieving the targets set by the GoP, AEDB has initiated the Wind
Power Generation Project through private sector.
of power houses throughout the country in the private sector. These proposals are
being processed by the Private Power & Infrastructure Board (PPIB), under the
Ministry of Water & Power.
Will the Minister for Water and Power be pleased to state the expected
life span of Tarbela Dam?
Minister for Water and Power (Raja Pervaiz Ashraf): The expected
life span of Tarbela Dam is 83 years from the year of its completion (1974). It has
been estimated on the basis of annual sediment inflow @ 5,50,000 tonnes.
Will the Minister for Water and Power be pleased to state whether
there is any proposal to build Kalabagh Dam; if so, the time by which
it will be implemented?
Minister for Water and Power (Raja Pervaiz Ashraf): The Cabinet in
its meeting held on 17-1-2006 decided that all the five projects namely Akhori,
Basha, Kalabagh, Kurram Tangi and Munda Dam should be built by 2016.
Construction of Basha and Munda Dam projects be started immediately. Work on
arrangements for financing of Basha (Dam be undertaken simultaneously. The
Kalabagh Dam be constructed after further projection of its benefits and features
to enhance understanding about the project.
Minister for Water and Power (Raja Pervaiz Ashraf): (a) As per
National Power Plan 127 Power Generation Units were planned during 1994. to
2018. Only 02-Nos Uch & Ghazi Barotha Power Houses have been added during
1999-2007.
(c) the action taken so far, against those companies which are not
performing well?
(iii) M/s Pakistan Mobile Company Ltd. (Mobilink) 6 July 1992, renewed
on 6 July 2007.
Action Taken:-
So far five comprehensive, two special and four district level QoS
surveys of all GSM cellular mobile companies have been conducted
to gauge the performance/QoS being provided to consumers. There
is an overall improvement in QoS being provided to consumers;
however companies falling short of desired standards have been
issued with notices/imposed fines.
(b) the demand of electricity, in mega watt, and its supply made
throughout the country during the said period?
(a) the line losses suffered by WAPDA during the years 2004-05
and 2005-06;
(b) the value of one percent of those losses into rupees; and
Minister for Water and Power (Raja Pervaiz Ashraf): (a) Transmissin
and Distribution Losses for the year 2004-05 and 2005-06 were 22.9% and
22.4%.
PCPPI—444(08) NA—13-4-2008—700.
1
4th Session
————
Will the Minister for Water and Power be pleased to state the total
number of industrial and domestic consumers of electricity in Tehsil
Kot Addu, District Muzafargarh at present?
Minister for Water and Power (Raja Pervaiz Ashraf): The total
number of consumers of electricity in Tehsil Kot Addu are as under:—
Industrial: 840
Domestic: 76061
Total: 76901
(b) the steps taken to supply potable water in the said area on regular
basis?
(b) the salary, package and other perks and privileges of those
officers; and
(a) whether it is a fact that CDA has affixed new grill wooden doors
and white washed all the “A” type Quarters in Sector G-7/4,
Islamabad during the year, 2007-08; and
(b) whether it is also a fact that quarters of the said areas were white
washed without treatment of water leakage from the roof; if so,
the number of those quarters and reasons thereof?
3
(b) No. The quarters of said area have not been white washed during
2007-08 due to non-availability of funds.
Will the Minister for Water and Power be pleased to state the time by
which the power plant installed at Shahpur, Sargodha will become
functional?
PCPPI—444(08) NA—13-04-2008—700.