ITEM: Power Transformers (Three Phase) : Manufacturing Quality Plan Rev No.: Date
ITEM: Power Transformers (Three Phase) : Manufacturing Quality Plan Rev No.: Date
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
RAW MATERIAL
1.0 I) CRGO Coils a) Dimensions Major Measurement 100% - IS:3024:1997 IS:3024:1997 QC Record P - -
b) Specfic Losses " Measurement " - " " " V - -
c) Thickness &Finish " " sampling - " " " P - -
d) Surface Resistivity " Test " - " " " V - -
e) Stacking Factor " " " - " " " V - -
f) Permeability " " " - " " " V - -
g) Bend Test / Ductility " " " - " " " V - -
h) Transit Damages " Visual 100% - " " Supplier TC V - -
i) Waviness & Camber " Visual 100% - " " " V - -
2.0 Copper wire rods a) Tensile Strength Major Measurement 1Sample / lot - IS 12444 / ASTM B 49 IS 12444 / ASTM B 49 QC Record V - -
b) Elongation " Measurement " - " " " V - -
c) Dimensions " Measurement " - " " " P - -
d) Visual " Visual " - " " " V - -
e) Resistivity " Measurement " - " " " P - -
f) Chemical Analysis " Measurement " - " " " V - -
Transit Damages & Packing
3.0 Kraft Paper a) Major Visual 100% IEC 554 IEC 554 QC Record V - -
Condition -
b) Dimensions " Measurement 1Sample / lot - " " " P - -
c) Density " " " - " " " V - -
d) Elongation " " " - " " " V - -
e) Moisture content " " " - " " " V - -
f) Ash Content " " " - " " " V - -
g) Dielectric strength " " " - " " " V - -
h) Tensile strength " Test " - " " Supplier TC V - -
i) Water Absorption " " " " " " " V - -
j) pH value & Conductivity aqueous " " " " " " " V - -
k) Electrical strength " " " " " " " V - -
l) Air Permeability " " " " " " " V - -
m) Tear Index " " " " " " " V - -
n) Heat Stability (>3 mil) " " " " " " " V - -
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Manufacturer/ Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
and "V" Verification.
Sub Supplier Main- Supplier
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
2 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
LEGEND: * Records, Identified with tick shall be essentially included by
NO. OPERATIONS CHECK
contractor in QA documentation. CHECK / Sub Contractor.
** M: Manufacturer DOCUMENT
C: NORMS RECORD **
Contractor / Nominated Inspection Agency
M . Indicate "P"
C/NPerform "W" Witness M C
and "V" Verification.
1 2 3 4 5 6 7 8 9 D* 10 11
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
3 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
Sample from
4.0 Insulating Oil a) Appearance Major Visual each tanker IS 335 IS 335 QC Record
- P - -
b) Density at 27 C 0 " Measurement " - " " " V - -
c) Viscosity at 270C " " " - " " " V - -
d) Interfacial Tension at 270C " " " - " " " V - -
e) Flash point " " " - " " " V - -
f) Pour point " " " - " " " V - -
g) Neutralisation value - - -
I) Total Stability " " " - " " " V - -
ii) Inorganic Acidity " " " - " " " V - -
h) Corrosion Sulphur Copper strip Sample from
19 hrs @ 1400C " " each Batch " " " V
- - -
Sample from
I) BDV " " each tanker " " " V
- - -
j) Dielectric dissipation factor @ 90°C
" " " - " " " V - -
k) Specific resistance - - -
i) at 27°C " " '
- " " " V - -
ii) at 90°C " " " - " " " V - -
l) Oxidation Stability Sample from
" " each Batch - " " " V - -
m) Accelerated aging test Sample from
" Test each Batch - " " " V - -
Sample from
n) Presence of oxidation inhibitor " Measurement each tanker - " " " V - -
o) Water content " " " - " " " V - -
IEC: 641
IEC: 641
5.0 Insulating Press a) Finish Appearance Major Visual 10 % of lot IS - QC Record V
- IS - 1576 - -
1576
Boards b) Dimensions " Measurement 10 % of lot - “ “ " P - -
c) Density " " Sample/lot - “ “ " V - -
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
4 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
d) Tensile Strength Test Sample/lot IEC: 641
IEC: 641
Major IS - QC Record
- IS - 1576 V - -
1576
e) Electric Strength in air & oil " " “ - " " " V - -
f) Ash content " " “ - " " " V - -
g) Moisture content " " “ - " " " V - -
h) Shrinkage in Air & Oil " " “ - " " " V - -
i) Flexibility " " “ - " " " V - -
j) pH value / Conductivity of water
" " “ - " " " V
extract - -
k) Compressibility " " “ - " " " V - -
l) Oil absorption " " “ - " " " V - -
m) Cohesion between piles " " “ - " " " V - -
Plant Std. Plant Std.
Finish Appearance Visual 10 % of lot
6.0 a)
Perma Wood Major - QC Record V - -
IS - 3513 IS - 3513
b) Dimensions " Measurement 10 % of lot - " " " P - -
c) Electric Strength in oil & air " " Sampling - " " " V - -
d) Density " " " - " " " V - -
e) Tensile Strength " " " - " " " V - -
f) Cross breaking strength " " " - " " " V - -
g) Compressive strength " " " - " " " V - -
h) Shear strength " " " - " " " V - -
I) Oil absorption " " " - " " " V - -
k) Moisture content " Test " - " " " V - -
l) Specfic gravity " " " - " " " V - -
7 Paper Covered a) Finish Appearance Major Visual 100% - IS 13730 IS 13730 QC Record V
Conductor - -
b) Dimensions (Bare & Covered)
Major Measurement Each bobbin - " " " P
- -
c) Resistivity Major Electrical test Sample /lot - " " " P - -
d) Tensile Strength Major Physical test " - " " " V - -
e) Elongation Major Physical test " - " " " V - -
f) Covering Thickness Major Measurement Each bobbin - " " " V - -
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
and "V" Verification.
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
5 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 LEGEND:
4 * Records, Identified
5 with tick shall be
6 essentially included by7 8 9 D* 10 11
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
6 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
8.0 MS material (Plates, a) Finish Appearance Major Visual 100% - IS 2062 IS 2062 QC Record V - -
Channels) b) Dimension " Measurement Sampling - " " " P - -
c) Chemical composition " " " - " " " V - -
d) Tensile strength " " " - " " " V - -
e) Yield strength " " " - " " " V - -
f) Elongation " " " - " " " V - -
9.0 Hardware a) Dimensions Major Measurement Sampling - CS / AD IS 1367 CS / AD IS 1367 QC Record P - -
b) Appearance " Visual " - " " " V - -
c) Tensile Strength Test " Test " - " " " V - -
10.0 Gaskets a) Finish Appearance Major Visual Sampling - IS4253 IS 4253 QC Record V - -
b) Dimensions " Measurement " - " " " P - -
c) Compressibility " " “ - " " " V - -
d) Tensile Strength " " “ - " " " V - -
e) Recovery % " Measurement “ - " " " V - -
f) Hardness " Test " - " " " V - -
g) Compression Set " " " - " " " V - -
h) Flexibility " " " - " " " V - -
I) Chloride/ Sulphat content of
" " " " " " V
water extract - - -
11.0 Insulators a) Finish appearance Major Visual 100% - IS 5621, IS 7421 IS 5621, IS 7421 QC Record V - -
b) Dimensions " Measurement 10% of lot - " " " P - -
c) Temperature cycle test " " 5 Nos / lot - " " " V - -
d) Porosity test " Test " - " " " V - -
e) Electrical routine Tests " " " - " " " V V V
b) Metal parts a) Finish Appearance Major Visual Sampling - IS 3347/ AD IS 3347/ AD QC Record V - -
b) Dimensions " Measurement " - " " " P - -
12.0 Plating a) Finish appearance Major Visual Sampling - IS 1572 / IS IS 1572 / IS 1573/ QC Record V - -
b) Thickness of coating " Measurement " - 1573/ IS 4759 IS 4759 " P - -
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
7 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
13.0 Paints
a) Primer a) Appearance Major Visual 100% - SDS SDS QC Record V - -
b) Hot oil resistance
paint b) Viscosity " Measurement Sampling " " " V
- - -
c) Enamel Paint a) Appearance " Visual 100% - " " " V - -
b) Viscosity " Measurement Sampling - " " " V - -
c Shade " Visual 100% - " IS 5 " P - -
d) Drying time " Measurement Sampling - " SDS " V - -
e) Finish " Visual 100% - " " " V - -
14.0 HV & LV a) Finish appearance Major Visual 100% - CS / AD/ IS 5561 CS / AD/ IS 5561 QC Record V - -
connectors b) Dimensions " Measurement Sampling - “ “ " P - -
c) Acceptance Test " Measurement " - " " " V - -
15.0 Pressure Relief a) Type, Size & Make Major Measurement Sampling - Plant Std. Plant Std. QC Record P - -
devices b) Operation pressure & Flag " Test Sampling " " "
indication) - V - -
c) Switch contact " " " - " " " V - -
d) HV test " " " - " " " V - -
e) Pressure Test " " " - " " " V - -
16.0 Bucholz Relay a) Type, Size & Make Major Visual Sampling - IS 3637 IS 3637 QC Record P - -
b) Contunity for Alaram & trip " Test " - " " " V - -
c) Porosity test " " " - " " " V - -
d) High Voltage tests " " " - " " " V - -
e) Element Test " " " - " " " V - -
f) Gas Volume test " " " - " " " V - -
g) Loss of oil & surge test " " " - " " " V - -
17.0 Off- Circuit Tap a) Dimensions Major Measurement 10% - Manufacturer Drg. Manufacturer Drg. QC Record P - -
changer b) Physical Condition " Visual 100% - " " " P - -
c) Operation of Switch " Test " - " " " P - -
d) Insulation Resistance test " Test " - " " Supplier TC V - -
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
8 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
18.0 Magnetic Oil Level a) Type, Size & Make Major Visual Sampling - Supplier TC Supplier TC QC Record P - -
Gauge b) Dial Marking " " " - " " " V - -
c) Switch Contunity " " " - " " " V - -
d) HV Test " Tset " - " " " V - -
e) Operational Test " " " - " " " V - -
19.0 OTI & WTI a) Type, Size & Make Major Visual Sampling - Supplier TC Supplier TC QC record P - -
b) HV Tset " Test " - " " " v - -
c) Temperature Calibration " " " - " " " V - -
d) Switch setting & switch
" " " - " " " V - -
Deferential
e) Calibration & Operation of
" " " - " " " V - -
Switch
20.0 Silicagel Breather a) Type, Size & Model Major Visual Sampling - Supplier TC Supplier TC QC Record P - -
b) Pressure / Leakage Test - " " Supplier TC V - -
c) Colour of Silica Gel - " " " V - -
21.0 Radiators & a) Dimensions & No. of Elements Major Meassure sampling - Apd. Drg / IEEMA 9 Apd. Drg / IEEMA 10 QC Record P - -
radiators welding
requirement b) Paint shade, Finish, & Film Visual /
" - " " " P
Thickness Measure - -
c) Pressure test " test " - " " " V - -
d) Adhension test on paint " " " - " " " P - -
e) Fitup for weld joints " Visual " - " " " V - -
22.0 Roller Assembly a) Dimensions Major Measure One/Lot/Size - Apd. Drg Apd. Drg QC Record P - -
23.0 Valves a) Dimensional Check Major Measure Sampling - Apd. Drg Apd. Drg QC Record P - -
(Gate/ Globe/ b) Type, Size & Make " Visual " - " " " P - -
Butterfly) c) Leakage Test " Test " - " " Supplier TC V - -
d) Operational test " " " - " " " V - -
24.0 Marshling Box a) Visual Check Major Visual Sampling - Apd. Drg Apd. Drg PS V - -
b) Dimensional Check " Measure " - " " " P - -
c) Terminal arrangement / ferruling /
labeling " Visual " - " " " V - -
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
9 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
IN PROCESS CHECKS
Fabrication of Tank, a) Cutting of material as per given
1.0 Cover, convservator drawing Major Measurement Sampling - PS PS PS P - -
& Welding
Requirements b) Finish dimensions & completeness as " " " - " " " P - -
per drawing
c) Fitup for Butt weld joints of tank and
cover " Visual " - " " " V - -
v) Paint film adhesion test " Tset " - " " " P - -
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
10 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
11 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
2.0 Core assembly / a) Formation of core section Major Measurement Sampling - PS PS PS P - -
Core Building b) Core dia " " " - " " " P - -
c) Stack thickness " " " - " " " P - -
d) Burr & Bow " " " - " " " P - -
e) Leg length " " " - " " " P - -
f) Window width " " " - " " " P - -
g) Leaning of core (i.e. verticality) " Visual " - " " " P - -
i) Rectungalirity of core Assembly " " " " " " " P - -
j) Limb clamping & Binding " " " " " " " P - -
Freedom from overlaps, air gaps " " " " " " "
k) at joints P - -
l) Earthing of core " " " - " " " P - -
m) Pre core loss measurementy " " 100% - " " " P - -
Insulation test at 2KV for 1
min between core end and end
n) " " " - " " " P - -
frame to yoke bolts, core
clamp to yoke bolt
3.0 Winding a) Conductor Size Major Measurement Sampling
- PS PS PS P - -
b) Coil dimensions ( ID, OD, AH,
RD) " " “ " " " P
- - -
c) Insulation arrangement " Visual “ - " " " V - -
d) Turns arrangement " " “ - " " " V - -
e) Transposition " " “ - " " " V - -
f) Contunity Test for leads " Test 100% - " " " P - -
Brazing Procedure & Brazer
g) " Review One time - Apd. Drg Apd. Drg PS P - -
Qualification
h) Radial depth of winding " Measure Sampling - " " " P - -
j) No Of turns " " " - " " " P - -
k) Brazing joints " Visual " - " " " P - -
l) Free from Damages " " " - " " " P - -
m) Anchoring & Binding at start & " Measure "
" " " P - -
finish -
n) Lead & coil identification " Visual " - " " " P - -
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
and "V" Verification.
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
12 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 LEGEND:
4 * Records, Identified
5 with tick shall be
6 essentially included by7 8 9 D* 10 11
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
13 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
4.0 Core & Coil a) Dimensions Major Measurement 100% - PS PS PS P - -
Assembly b) Axial and Radial Insulation " " " - " " " P - -
arrangement
c) Electrical clearances " " " - " " " P - -
5.0 Connection and Tap a) Ratio test on all taps Major Test 100% - Apd. Drg/ PS Apd. Drg/ PS PS P - -
switch Assembly
b) Lead dispiation " Visual " - " " " P - -
c) Brazing of joints " " " - " " " P - -
d) Crimping of joints " " " - " " " P - -
e) Insulation over joints " " " - " " " P - -
f) Vector group " Test " - " " " P - -
Drying of core coil a) Temperature Major Measurement Every one
6.0 PS PS PS - -
Assembly hour - P
b) Time duration Major Measurement “ - " " " P - -
7.0 a) Cleanliness of tank Major Visual 100% - PS PS PS P - -
Ovening, Tanking & -
b) Insulation Resistance " " " " " " P - -
Oil filling
c) Clamping of CCA " " " - " " " P - -
d) Job locking " Mechanical " - " " " P - -
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
15 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
4.0 FINAL TESTING
IS 2026 / Appd. IS 2026 / Appd.
1.0 Routine Test a) Dimensional checks Critical Measure 100% 1 job Test Sheet √ P -
Drgs Drgs
Measurement of Windings
Resistance of HV at normal,
b) Critical Test 100% 10% IS 2026 IS 2026 Test Sheet √ P -
extreme taps & full winding of
LV
Measurement of impedance
voltage / short circuit impedance
f) " " " " " " " √ P -
at principal tap & two extreme
taps.
Measurement of insulation
g) " " " " " " " √ P -
resistance of winding
Induced over Voltage test on HV
h) " " " " " " " √ P -
& LV Terminals
Separate source Voltage with
i) " " " " " " " √ P -
stand Tests
j) Measurement of Load losses " " " " " " " √ P -
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 01 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
PROJECT:
MANUFACTURING QUALITY PLAN
QP No.:
16 of 17
ITEM: Power Transformers (Three Phase) Rev No.: PACKAGE:
Date : CONTRACT NO.
SL. COMPONENT & CHARACTERSTICS CLASS TYPE OF QUANTUM OF REFERENCE ACCEPTANCE FORMAT OF AGENCY REMARKS
NO. OPERATIONS CHECK CHECK DOCUMENT NORMS RECORD **
M C/N M C
1 2 3 4 5 6 7 8 9 D* 10 11
k) 2kV core isolation test for 1 min. Critical Test 100% 10% IS 2026 IS 2026 Test Sheet √ P -
One
One
n) Oil Sample Test (BDV test) " " Sample/ IS 1866 IS 1866 " √ P -
Sample/ Lot
Lot
TYPE TEST
2.0 As per Technical Specifications
Despatch Packing of loose items and main Plant Std Packing Plant Std
3.0 a) Major Physical 100% - QC Record P -
unit list Packing list
LEGEND: * Records, Identified with tick shall be essentially included by Doc No: REV: 00 CAT: 0
contractor in QA documentation. ** M: Manufacturer / Sub Contractor. C:
Contractor / Nominated Inspection Agency . Indicate "P" Perform "W" Witness
Manufacturer/ and "V" Verification.
Subcontractor Contractor
Reviewed By: Approved By Approval Seal
Annexure - 1