Sample: HVAC Project and System Summary
Sample: HVAC Project and System Summary
Sample: HVAC Project and System Summary
Project Description
1 floors • approx. 3,000 square feet
Building Description
e
R-0 Slab floor
R-19 above grade walls (spray foam)
R-21 encapsulated attic (spray foam)
Infiltration Semi-Tight
ERV for ventilation
pl
Windows & Glazed doors Low-E - U-value 0.32 SHGC 0.30 – no internal shade/insect screens
Glazing shaded per elevations
Ducts located in the encapsulated attic
Round Metal trunks (R-6) and flexible branches (R-6)
Calculated loads
am
Heating Btuh Cooling Btuh
Entire House 46,362 39,083
Recommended Equipment
Summary: A 4-ton heat pump is a good choice for this project. Two stage or variable capacity
compressors will provide better low temperature operation in the winter and are
recommended. The software indicates the ideal equipment would be able to satisfy demand to
24°F in heat pump mode. This should be verified with actual equipment under consideration.
S
Page 2 of 4