PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 260

1

JHARKHAND : AN OVERVIEW
1.1 INTRODUCTION

Jharkhand emerged as 28th State on the political map of India on 15


November 2000. Chotanagpur plateau and Santhal Paragna regions, once
the part of Bihar, now form the State of Jharkhand. The State is covered by
forest lands and hills varying from 300 to 1000 mtrs in altitude. The State
has sizeable tribal population and rich in vegetation and mineral
resources.
Presently it has been organised into 24 districts. The State covers about
2.42% of the country's land area ( 79,710 Sq. Km) and about 2.62 % of the
country's population (2.69 crores as per Census 2001).
The State has basically rural economy as 70 - 80% of the population are
engaged in agriculture and allied activities. The economy presents a
paradox of poverty in plenty. The State lacks infrastructure facilities. The
incidence of poverty is very high more particularly among tribes and
Schedule Castes. Tribal constitute around 26.3% and Scheduled Caste
around 11.8% of the total population. The economic development of the
ST and SC population is one of the prime concerns of the State.
2. STATE PROFILE
2.1 ADMINISTRATIVE SETUP

Revenue Divisions : 5
Districts : 24
Developmental Blocks : 212
Panchayats : 3,702
Villages : 32,615
Towns : 152
Corporations : 2
Municipalities and Nagar : 37
Panchayant

2.2 DEMOGRAPHY
A. Population (Census 2001) in lakhs

Male Female Total


State 138.85 130.60 269.45
Urban 32.06 27.88 59.94
2

Rural 108.79 102.73 209.52


ST 35.66 35.21 70.87
SC 16.40 15.48 31.88

B. Population Mix (in %age)

Jharkhand National Avg.


Urban 22.24 27.8
Rural 77.76 72.2
ST 26.3 8.1
SC 11.8 16.2

C. Sex Ratio

Jharkhand : 941 [ National Avg. : 933 ]


ST : 987
SC : 944

D. Economic Activity Jharkhand


( in lakhs ) %age
No. of Workers : 101.09 37.5
Main Workers : 64.46
Marginal Workers : 36.63
Male : 66.59
Female : 34.50
Cultivators : 38.89 38.5
Agricultural Labourers : 28.51 28.2
House Hold Industries Workers : 4.81 4.3

2.3. Land Use


Total Geographical area : 79.71 lakh ha (2.42% of country’s area)
Cultivable Area : 38.44 lakh ha (48.22%)
Forest Area : 23.61 lakh ha (29.61%)
Barren land : 5.76 lakh ha
Land put to Non-Agricultural use : 6.88 lakh ha
Cultivable Waste land : 2.83 lakh ha
3

Other Land : 7.51 lakh ha


Soils Type : Red, Laterite, Gray, Yellow, Sandy
[ Source : Directorate of Statistics & Evaluation, Agriculture year 2004-05 ]

2.4 AGRICULTURE & ALLIED ACTIVITIES


2.4.1 Agriculture
i. About 70 - 80% of the population depends on agriculture.
ii. Cereal crops like paddy and maize occupy a major portion of the
agricultural area in the state with pulses like black gram and red
gram coming next to it. Other important crops grown are wheat,
oilseeds and minor millets. Vegetable production is high in certain
pockets of the State placing it at a comfortable position compared to
neighbouring States.
iii. Agricultural economy of the state is characterized by the existence
of large number of small and marginal farmers. About 72% of the
land holdings belong to small and marginal farmers. Only 0.69%
operational holdings are above 10 hectares covering about 9% of
area. Agriculture operations are primarily of subsistence type due
to the adverse land : man ratio and lack of adequate irrigation
facility.
iv. Another important factor for under developed character of
agriculture is predominance of cereal crops in the state. About 92%
cropped area is covered under food grains and hardly 3-5% area is
under cash crops. 40% of the total cropped area remains largely
mono-cropped under rice. The lack of diversity in the cropping
pattern makes the farmers more vulnerable against any downward
deviation in rainfall.
v. Land utilization: Of the total cultivable land 38.44 lakh ha (48.22%),
12.04 lakh ha (15.10%) is current fallow, 8.45 lakh ha (10.60%) is
other fallow and 17.95 lakh ha (22.53%) is the sown area. These
figures indicate that an area of 24.4 lakh ha is under agricultural
wasteland and should be attempted to be beneficially utilized to a
great extent.
vi. Crop Coverage Area (As in 2005-06)

Crop Coverage
Rice 57%
Wheat 2.45%
4

Maze 7.66%
Pulses 12.02%
Fruit 0.28 lakh ha.
Vegetables 2.25 lakh ha.

vii. Cropping Intensity is 114%


vii. Per capita net sown area (0.064 hectare) is quite low in relation to
the per capita land holding (0.4 ha approx.) in the State.
viii. Large tracts of land are left uncultivated by poor farmers due to
lack of capital. They have little or no resources of their own to
provide for high cost inputs needed to increase the agricultural
productivity. The institutional credit flow to the agriculture sector
is negligible and agricultural extension activities are minimal. All
these factors converge into a vicious circle of low agricultural
productivity, low farm income, low investment, low capital
formation & subsequently stagnant rural economy. Contribution of
Agriculture to GSDP is 20% while huge population (70 – 80%)
depends on it for livelihood.

2.4.2 Animal Husbandry & Dairy

Sl.No. Species Census 2003 (In lakh)


1. Cattle 76.59
2. Buffalo 13.43
3. Sheep 6.80
4. Goat 50.31
5. Pig 11.08
6. Poultry 144.29

Š Breedable population of milch cattle : 1.90 M


Š Breedable buffalo population ( in lakh ) : 0.39
Š Productivity (kg./day/animal) : 1.59
Š Per capita availability of milk( in gms.) : 140
Š Milk production (million ton) : 1.33
Š Marketable surplus (million ton) : 0.34
(30% of total milk production.)
Š Total Nos. of milk producers Co-op. Societies : 1490
5

Š Total producer members (in thousand) : 48.75


Š Average milk collection per Day through : 20.65
societies (in thousand litres)
Š Processing and Chilling Capacity (in thousand : 45
litres) (Managed by District Co-op. Milk
Union)
Š Processing and Chilling capacity (in thousand : 185
litres) (Managed by COMPFED)
Š Per day milk marketing through dairies & : 230.45
chilling centres (in thousand litres)

Recognized breeds of cattle represent a small fraction of the total cattle


population in Jharkhand. The local indigenous breeds are mostly draft
purpose breed. The local breeds do not produce adequate milk due to
poor nutrition, poor management, tropical heat and diseases. Per cattle
productivity is 1.59 Kg. per cattle per day against the National Avg. of
3 Kg. per cattle per day. Per capita availability of milk is just 140 gm. as
against the National Avg. of 235 gm per capita.

2.4.3 Fisheries
i. The State has a total water area of 1.32 lakh ha. in the form of
Ponds, Bandhs, Reservoirs and Lakes in the rural area. It has
suitable agro-climatic condition for fish production. Yet the present
level of fish production in Jharkhand is 1435 Kg. /Ha./Year lower
than the National Avg. 2150 Kg./Ha./Year.
ii. The low fish production is because of most of tanks are old and
unsuitable for fish culture due to siltation and weed infestation.

2.5 Water Resources


A. Rainfall
Jharkhand has an average yearly rainfall of 1300 - 1400 mm against the
national average of 1000 mm. The rainfall is generally uniform with little
variation.

Distribution of Rainfall in mm
Dhanbad, 1238.8
Giridih, 1190.3
Deoghar, 1280.6 Dumka, 1368.1
Singhbhum, 1372.3

Sahebganj, 1472

Ranchi, 1337.9
Godda, 1102.7
Palamau, 1279.9
Lohardaga, 1288 Gumla, 1434
Hazaribagh, 1199.8
6

B. Rivers & River basins.


The State has following main rivers and river basins.
Rivers : Subernarekha, Damodar, Barakar & Koel Karo
River Basins : Gumani, Mayurakshi, Ajay, Sankh, South Koel,
North Koel, Barakar, Damodar, Kharkai,
Subarnarekha
C. Ground / Surface Water
Surface water availability in Jharkhand is 35,497.4 MCM and Ground
water availability in Jharkhand is 9,057.8 MCM.
D. Water availability
Š Total availability of water : 44,555.2 MCM.
o Ground Water : 9057.80 MCM.
o Surface Water : 35497.40 MCM.

E. Use of Water
o Irrigation purpose : 53%
o Industry & Drinking : 7,329.8 MCM
Municipal use : 15-22%
Industrial use : 20-29%

F. Irrigation Potential
Š Total irrigation potential : 6.83 lakh ha.
o through Major & Medium irrigation Schemes : 2.20 lakh ha.
o through Minor irrigation Schemes : 4.63 lakh ha.
Š The existing irrigation coverage is only 22% of the available arable
land as against national coverage of 40%. The agriculture is largely
rain dependent.
Š The State does not have perennial river system. All rivers in the
State are seasonal. They receive water during monsoon. 80% of the
rainfall is received during four monsoon months (June – Sept.). Due
to undulating topography, the water run off rate is very high.
Š Only 50-60% of created irrigation potential is being utilized. More
than 50% of the irrigation potential generated over the years has
got eroded and would require massive resources and time to
restore.
7

Š Ponds and wells irrigate one fourth of the fields and the rest are
irrigated by other sources.
2.6 Forest and Wildlife
As per Forest Survey of India 2003 report, the forest and tree cover area
of the State is 27,724 sq. km. (34.78%).

Š Total forest cover : 23,605 sq. kms (29.61% of total geographical


area of the State and 3.7% of the national forest area)
Š Protected forests : 81.27% (19,185 sq. kms)
Š Reserve forests : 18.58% (4,387 sq. kms)
Š Unclassified forests : 0.15% (33 sq. kms)
Š Dense forests : 2544 sq. kms
Š Open forests : 9.137 sq. kms
Š Important Plants : Bamboo, Chakundi, Ganhar, Harre, Imli,
Jamuar, Karanj, Khair, Kanod, Kend, Kusum,
Kadam, Karwa, Mahulan, Mahua, Neem,
Pier, Palas, Semal, Salai, Sissoo, Sal, Sagwan.
Š Wild life : Tiger, Leopard, Elephant, Cheetal, Barking
Deer, Sambhar, Neelgai, Wild Deer, Wolf,
Langur, Wild Dog, Sloth Bear, Phesus
Minkey, Black Buck, Hyena, Porcupine, Gaur
Š There are 10 Wildlife Sanctuaries and one National Park in the State.

Š Forest resource of the State suffers biotic pressure due to following


reasons-
z Increasing population pressure, encroachment.
z Rural poverty and lack of employment opportunities elsewhere.
z Increasing pressure due to grazing.
z Poor infrastructure for utilization and selling of non-timber
forest produce.
z Illicit cutting and fires resulting in loss of green cover, top soil
and ecological balance.
2.7. NATURAL RESOURCES
8

Jharkhand is rich in mineral resources and has almost all types of major &
minor minerals :
Mineral Wealth
Percentage
Reserves/M.T. share of
Sl.No. Minerals
Jharkhand India's
reserves
1 Coal 71143.00 29.55%
2 Haematite 3281.08 26.63%
3 Magnetite 7.54 0.13%
4 Limestone 662.47 0.38%
5 Copper Ore 178.82 25.09%
6 Bauxite 117.35 3.81%
7 Kyanite 1.16 14.30%
8 Fire Clay 68.19 9.65%
9 Graphite 5.63 35.18%
10 Quartz & Silica 170.44 5.56%
11 Kaolin 210.48 8.94%
12 Dolomite 57.83 0.78%
13 Bentonite 1.01 0.26%
14 Talk/Soap Stone 0.404 0.12%
15 Black Granite 8847.36 20.61%
16 Coloured Granite Million M3
Source-( India Mineral Year Book- 2003)
Source-( Annual Report 2002-03 Ministry of
Coal)

The freight equalization policy for steel and coal has denied Jharkhand of
its comparative advantage. Coal produced here is transported and used
elsewhere. Natural resources have not been able to lead the development
of the State substantially.

2.8 INFRASTRUCTURE

2.8.1. Road Net work

Total road length (surfaced and un-surfaced) in Jharkhand is 17,056 kms.


Road Break-up is as under :-
National Highways - 1,844.07 kms
State Highways - 1,886.40 kms
9

PWD Roads - 4,991.75 kms


Rural and Village Roads - 6,323 kms

Š About 26% villages are connected by road. The State has hilly
terrain and roads which cross number of valleys over major drains
and rivers, necessitate construction of bridges.
Š Many districts like Dhanbad, Garhwa, Palamu and West
Singhbhum have poor accessibility.

2.8.2. Rail Net work


The state has a railway system that provides links to the mining industry.
It has goods handling facilities at Ranchi, Bokaro, Dhanbad & Jamshedpur
as well as ore loading facilities at Kiriburu, Lohardaga & all CCL coal
mines.
10

2.8.3. Power
2.8.3.1 Rural Electrification

Š No. of villages electrified : 9,618 (32.66%)


No. of Villages Electrified
Year Connectivity Connectivity from
from Grid Solar System
2007 - 08 (upto July'07) 9273 345

Š BPL houses electrified : 73,676


Š Solar Home Lights through SPV System : 27,056
Š Solar Street Lights through SPV System : 1,919
Š One 16 KWp SPV Power Plant installed in one village of W.
Singhbhum which is giving power to 349 households.

2.8.3.2 Power Generation


Š Thermal Power Stations
The State has two Thermal Power Stations -
a. Patratu Thermal Power Station (PTPS)
11

Installed Capacity : 840 MW


b. Tenughat Thermal Power Station (TVNL)
Installed Capacity : 420 MW
Š Hydel Power Project
The State has one Hydel Power Project at Sikidri.
Š Solar Photo Voltaic (SPV) Power Plant
The State has one 16 KWp SPV Power Plant in West
Singhbhum.
Š At the time of creation of the State the demand for power was
around 700-750 MW which has increased to 1100 MW. As against
this, the power generation in the State is nearly 700 MW & the
rest we get from Central allocation.
Š The Station plant load factor is as low as 14.93 - 20.12%.
Š The units of Thermal Power Stations are very old and have
outlived their lives. Many units are damaged and shutdown.
2.8.3.2 Transmission and Distribution
Energy Energy
T&D
Received Sold
Year losses
(Million (Million
(in %)
Units.) Units.)
2005-06 6580.36 3446.82 47.62%
2006-07 6991.04 3871.13 44.63%
2007-08 2515.60 1400.03 44.35%
(Up to
July)

Š According to MoP, GOI guidelines T&D loss should not be more


than 15%.

2.9 HUMAN RESOURCE


12

Literacy Rate Male Female Total


( %age)
State 67.3 38.9 53.6*
ST 54.0 27.2 40.7
SC 51.6 22.5 29.1
* National average is 64.8%.
a. Primary & Secondary Education
Primary Schools : 30,041
Middle Schools : 10,259
High Schools : 1,235
Model Clusters : 2,975 ( under NPEGEL)
No. of Para Teachers : 70,965
Pupil - Teacher Ratio : 1 : 49 ( at elementary level )
Drop out rate
Class I - V : 15.80%
Class VIII : 61.71%
b. Higher Education
Constituent Colleges: 66
Training Colleges
Primary Teacher's : 24 (Govt. )
B.Ed Colleges : 13
Universities : 3
c. Technical Education
Medical Colleges : 03 (Govt.)
ANM Schools : 10
Engineering Colleges : 01 ( Govt.) & 05 (Pvt.)
Polytechnics: 13 ( Govt.) & 01 (Pvt.)
d. Other Facilities ( Libraries )
Libraries at
State level :1
Divisional level :4
Sub Divisional level : 1
District level : 12
13

2.10. HEALTH CARE & SANITATION


i. Health indicators

Decadal Growth Rate : 23.1


Birth rate : 26.8 per 1000 population
Death rate : 7.9 per 1000 population
IMR : 49 per 1000 live births
(National Avg. : 58 per
1000 live births)
MMR : 371 per 1 lakh live births
(National Avg. : 301 per 1
lakh live births)
Sex Ratio : 941 females per 1000 males
Total Fertility rate : 2.71 ( National Avg. : 2.68)
Safe Delivery : 27.80%
Institutional delivery : 22.40 %
Rate of Blindness : 1.40 %
Leprosy Prevalence : 1.69 per 10000 population
Rate
TB Detection Rate : 113 per 1 lakh population
Malaria SFR : 2.31
Malaria SPR : 9.25
Malaria PF : 24.96 %
Anaemia among : 77.7%( Age : upto 3 yrs)
Children
Anaemia among : 37.4%
Pregnant Women
[ Source : DHLS RCH - 3 & UNICEF ]

ii. Family Planning & Maternal Care

State National
Women married by age 18 yrs 61.2% 44.5%
Men married by age 21 yrs 47.1% 29.3%
Women using family planning 35.7% 56.3%
devices
Female Sterilization 23.4% 37.3%
Male Sterilization 0.4% 1.0%
Mothers with at least 3 ANC 36.1% 50.7%
14

Mothers consumed IFA 90 days 14.6% 22.3%


[ Source : NSHF Data ]

iii. Child Health Care State National

Immunization (Age : 12-23 months)


Full Immunization 51.90% 43.5%
BCG vaccine 72.9% 78.2%
Polio vaccine 79.6% 78.2%
DPT vaccine 40.3% 55.3%
Measles vaccine 48.0% 58.8%
Vitamin A Doses 23.3% 21.0%
Nutrition
Children ( Age : upto 3 yrs) 10.9% 23.4%
breastfed
Children ( 0-5 months) exclusively 57.8% 46.3%
breastfed
Children ( 6-9 months) receiving 65.3% 55.8%
solid food and breast milk
Children upto 3 yrs stunted below 41.0% 38.4%
avg. height
Children upto 3 yrs underweight 41.0% 38.4%
[ Source : NSHF Data ]

iv. Health Care Infrastructure

Existing Shortage
Sub Centre 3958 3130
Addl. PHC 330 796
PHC - 1126
Referral Hospitals 32

v. Medical Staffs Availability

Existing Strength Shortage


Doctors 2468
Nurses Gr.-A 206
Lab Technicians 202
Pharmacists 300
ANMs 1418
15

vi. Communicable Diseases


Communicable diseases like Tuberculosis, Malaria and Leprosy are
prevalent in the State. Tuberculosis contributes most to the
mortality rate.

Tuberculosis :
Case Detection Rate : 113 per 1 lakh population
New Sputum Smear : 48 per 1 lakh population
Positive T.B. Case
Malaria
Slide Falciparum Rate : 2.31
Slide Positive Ratio : 9.25
Plasomodium Falciparum : 24.96%
[ Source : State RNTCP Office / State Malaria office Jharkhand Report 2006 ]

vii. Drinking Water & Sanitation

In Jharkhand entire population does not have access to safe


drinking water & sanitation. Rural sanitation coverage is very low.
About 30% of habitations have partial facility with drinking water.
All habitations do not have safe drinking water as source contains
Fluoride, Arsenic & Iron.

Slipped back Habitations : 20,912


PC (Partially covered) : 5,555
NC (Not Covered) : 15,357
Water Quality Problems
Type of water Problem : Fluoride, Arsenic & Iron
content in water
Habitations Affected : 1,348

2.11. INDUSTRIALIZATION
Industries in Jharkhand are located only in certain pockets. Much of the
investment in industrial sector has traditionally been only in the public
sector. In the absence of industrial growth majority of the population is
dependent upon agriculture for their livelihood. Of late private
16

entrepreneurs have shown interest in power generation and in setting up


of mineral based plants. But infrastructure in terms of Roads and Power is
a prerequisite for these to materialise on ground.

2.12. URBAN FACILITIES:


Jharkhand has an urban population of 22.24%. There are at present 152
medium & small towns. Our towns & cities are unable to meet the
growing demand and supply of the urban infrastructural services. The
major factors responsible for deficiencies and constraints are:-
• Inadequate infrastructure and service facilities. The
Government is the sole provider of facilities except in the
industrial towns of Bokaro and Jamshedpur.
• Limited financial resources of the urban local bodies for
operation and maintenance of civic facilities.
• Poor economic base and little scope for income generation in
most of the small and medium towns.
• Lack of professionalism and absence of institutional framework
for greater involvement of Private Sector, NGOs Communities
& bottlenecks in the mobilization of institutional finance.

• It is estimated that about one-third of the total urban


population of Jharkhand State, lives below the poverty line
in informal settlements / slums.

3. GROWTH PERFORMANCE

3.1. Growth Rate

The average growth rate of Net State Domestic Product (NSDP) at


1993-94 prices in respect of Jharkhand was 3.8% in 2004-05 as against the
growth rate of 3.1% in 2003-04. The table below gives the percentage growth
rate of NSDP over the previous year and the per capita NSDP at 1993-94
prices during the last six years.

Year Growth Rate (%age) of per capita Per Capita NSDP


NSDP over previous year (Rupees)
Jharkhand All India Jharkhand All India
1993-94 - - 5897 7690
17

1999-2000 (-) 6.7 4.6 7238 10071


2000-01 (-) 9.2 2.4 6569 10308
2001-02 0.3 4.3 6587 10754
2002-03 13.9 2.4 7500 11013
2003-04 3.1 7.1 7732 11799
2004-05 3.8 5.2 8025 12416
2005-06 3.3 8294

The share of the primary sector has declined marginally from


36.89% in 2002-03 to 35.52% in 2005-06. The share of the secondary sector has
increased slightly from 35.22% in 2002-03 to 36.48% in 2005-06. There has
been a negligible increase in tertiary sector from 27.89% to 28.00% in the
corresponding period.
(Rs. Crore)
Sector GSDP at constant 1993-94 prices
1993-94 2002-03 2003-04 2004-05 2005-06
1 2 3 4 5 6
Primary 6517.86 9002.34 9231.47 9607.31 10006.26
(40.24%) (36.89%) (36.28%) (35.86%) (35.52%)
Secondary 5105.92 8592.69 9118.41 9679.02 10276.88
(31.54%) (35.22%) (24.05%) (36.14%) (36.48%)
Tertiary 4570.64 6805.75 7092.05 7501.27 7885.65
(28.22%) (27.89%) (27.86%) (28.00%) (28.00%)
Total GSDP 16194.42 24400.78 25441.93 26787.60 28168.79
(100%) (100%) (100) (100) (100)

3.2 Credit Deposit Ratio

Year Credit Deposit C.D. Ratio


(Rs. in Cr.) (Rs. in Cr.) %age
31st March 2005 8632.77 26903.47 32.09
31st March 2006 12036.35 32017.80 37.59
31st March 2007 15387.06 37687.80 40.83
18

The Credit deposit ratio of the State has increased over the year. The poor
credit consumption in the initial years was attributed to poor
infrastructure base and poor support under different sectors of the
economy. In the financial year 2007-08 a concrete effort has been made to
sensitize the officers of development departments and branch managers of
different financial institutions.

3.3 Growth Target for the Eleventh Five Year Plan (2007-12)

The Planning Commission has fixed Growth Rate at 9.8% p.a. Sector-wise
Growth Target is as under:

Agriculture : 6.3%
Industry : 12.3%
Service : 8.0%

The 11th plan size has been approved at Rs.40,240 Crores. The State has
approved Annual Plan size at Rs.8,015 Crores during 2008-09. The State
will meet Rs. 4,698.20 Crores from State own resource, the gross
borrowings would be around Rs.1,937.00 Crores and the Central
Assistance would be Rs. 1379.80

4. PERFORMANCE DURING PLAN PERIOD (2002-07 & 2007-08)

4.1. Agriculture and Allied Sector

4.1.1 Agriculture
The growth in this sector has a strong bearing on the growth of the other
sectors of the economy and consequently the GSDP. The plan strategies
for the socio-economic development of the state should be such as will
facilitate faster growth and development of agriculture and allied sectors.
Keeping this in view various programmes were implemented in this
sector:-
Š HYV Seed Distribution to Farmers
Year Quantity ( Q)
2002-03 9585
2003-04 8552
2004-05 21127
2005-06 22366
2006-07 38258
2007-08 64336
19

Total 164224
Š 10 seeds villages have been developed which have produced about
33000 Q seed of high yielding varieties of paddy. 17 seeds villages for
cereals and 24 seeds villages for vegetables have been developed.
Š Farmers' groups were given subsidy for purchase of 150 tractors /
mini tractors and 2430 other agricultural implements.
Š 22 farms, one each in every district have been developed as model
agricultural farms.
Š 55 block nurseries and 1 progeny orchard have been rejuvenated.
Š “Soil Profile Cards” are being provided to the farmers on the basis of
soil sample collected from their fields.
Š A State level Soil Conservation Training Centre at Hehal and Soil
Conservation Training Centre, Demotand, Hazaribagh have been
developed and strengthened.
Š The establishment of KVKs in 22 districts of the state has been
facilitated by State Agriculture Farms for the purpose of transfer of
new technology to the farmers at village level.
Š Agricultural Technology Management Agency (ATMA) have been
Strengthened in 22 districts to make the farmers aware of agriculture
technology.
Š Coverage area under pulses and oilseeds has increased from 2.70 lakh
ha. in 1999-2000 to 4.13 lakh ha. in 2007-08.
Š Cover area of vegetables and spices has increased from 1.88 lakh ha. to
2.24 ha.
Š Cover area of fruit crops has increased from 32685 ha. to 41838 ha.
Š A Biotechnology Centre has been established at Birsa Agricultural
University. Funds have also been provided to BIT, Mesra for the
development of Biotechnology Centre.
During the Tenth Plan period ( 2002-07), there has been marked increase in
crop coverage, crop productivity and crop intensity. The launch of NHM
has caused impact on precision farming and commercial venture in
Horticulture. Consequently, there have been 19% increase in the coverage
area of vegetables and spices and 28% in fruit crops. The coverage area of
pulses & oil seeds increased from 2.78 ha. to 4.13 Lakh ha.
Our target is to increase 14% coverage area of vegetables and spices and
122% coverage of fruit crops during 11th Plan Period.

4.1.2 Animal Husbandry


Š Animal Wealth Pasu Chikitsa Sivirs are being organised at village level
to provide broader health coverage.
20

Š 405 frozen semen centres were established for breed improvement to


increase the productivity of local non descript cattle & buffalos.
Š Phase wise training of Veterinarians and paravet staff organised to
control the Bird Flue.
Š 600 unemployed youths trained under Scientific Animal Husbandry
Programme.
Š Cattle Census 2007 done with help of 14000 unemployed educated
youths.
Egg production increased from 661 M to 702 M by t he end of 2006. Wool
production increased from 3.58 lakh Kg. to 11.842 lakh Kg. the end of 2007.
4.1.2 Dairy Development
Š A new dairy projects with a capacity of 20,000 LPD has been
established at Ranchi headquarter under CSS programme.
Š 1450 Milk Producers have been trained for Dairy Farm Management.
Š 160 local unemployed youths are being trained as Gokul Gram Mitra.
Š For Breed improvement of Milch Cattle with the help of BAIF 105 new
Dairy Cattle Development Centre have been established.
Š Scheme for Induction of 6632 high yielding crossbreed Milch Cattle has
been sanctioned. 2469 beneficiaries families belong to ST community.
Š 14 Milk Processing and Chilling Centres have been installed out of
which 4 are in TSP area.
Š 8 Milk Bulk coolers have been established in TSP area.
Š 2 Nandi Gram have been established in TSP area.
Š 4000 tribal families in 8 districts have benefited under Gokul Gram
Vikash Yojana.
Š 50 Ha. of tribal land has been developed as Silvi-pasture.
Š 250 Dairy Co-operative Societies in tribal areas have been
strengthened.
Milk production enhanced from 9.51 lakh metric ton per year to 13.36 lakh
metric ton per year by he end of 2006.
4.1.3 Fisheries
Š 6 new fish hatcheries at Ranchi, Latehar, Palamu, Deoghar, Dumka
and Hazribag were established.
Š 280 new ponds of 0.30 acres each belonging to ST farmers were
constructed on 100% subsidy basis.
Š 25 old revenue ponds were renovated
Š 300 lakh fish fingerling-stocking were done in different reservoirs.
Š 22 lakh Fish Seed were distributed.
21

Š 2000 fishermen were trained.


Š 200 fishermen trained in Andhra Pradesh and CIFRI, Bairakpur in
modern fish farming techniques.
Š 1200 pucca houses distributed to poor homeless Fishermen under a
CSS.
Dairy and Fisheries have proved to be an important tool of socio-
economic change among the rural farming community as main /
subsidiary source of occupation. As sustain efforts, 54000 Mt. fish were
produced in the State.
4.1.4 Co-operatives
Š National Agricultural Insurance Scheme
o No. of Farmers insured : 6.39 lakh ( 2007-08)
o Compensation granted :
Year No. of Amount
Farmers Disbursed
2005-06 59,313 Rs. 10.60 cr.
2006-07 5,94,813 Rs. 104.71 cr.
Š 67 Godowns were completed and 61 are under construction.
Š 15,386 MT fertilizers and 1180 Q Paddy seeds were made available to
farmers on fair prices during Kharif 2007.
Š 8.90 lakh persons have opened their accounts with 430 LAMPS and 298
PACS. An amount of Rs. 118.55 cr. has been generated through savings
and Rs. 47.25 cr. were disbursed as loan.
Š 711 women have been provided employment under Self Employment
Scheme and they are generating income of Rs. 80.00 lakh P.A.
Š Rs. 137.85 cr. have been distributed to 2.92 lakh farmers as short term
loan.
Š A Cold storage at Kanke is being constructed by VEGFED.
Š JHASCOLAMPS purchased lac from ST / SC farmers on remunerative
prices so that they should feel encouraged for lac production. The
details are as under -
Year Quantity of lac Support Price
purchased
2004-05 2179.42 Q Rs. 1.98 cr.
2005-06 1510.39 Q Rs. 1.60 cr.
2006-07 1984.45 Q Rs. 2.05 cr.
22

4.2 Forest & Environment


Š 10,903 JFM Committees were constituted which are protecting 21,560
sq kms of forests area in the State.
Š 47092.26 ha. of forest land have been treated by the various
development agencies.
Š 2.14 lakh ha. of forest land has been rehabilitated.
Š Medicinal plants were planted on 69.12 ha. of non-forest land.
Š Cultural operation and eradication of lantana was carried over 4849.94
ha. of forest lands.
Š 994.352 lakh trees were planted over 99435.26 ha. of forest land under
rehabilitation of degraded forest.
Š 612.805 trees were planted over 24512.22 ha. of forest land under
plantation of quick growing species.
Š 208.399 lakhs trees were planted over 12508.93 ha. of forest land under
soil conservation and aforestation.
Š 61.961 lakhs trees were planted over 2478.43 ha. of forest land under
lac development programme.
Š 26.103 lakhs trees were planted over 2610.33 ha. of forest land under
fuel and fodder plantation.
Š Road side plantation was done over 802.03 km.
Š 65232 gabion plantations were done.
Š Nurseries were maintained over 240.368 ha.
Š 16 causeways and 14 culverts were constructed on Naxals affected
roads.

During the Tenth Five Year Plan, efforts have been made for rehabilitation
of degraded forest, plantation of quick growing species, soil conservation
& afforestation. There is increase of 79 sq. km. of forest cover in the State
Since2001.

4.2. Water Resources


At the beginning of the 10th Plan assured irrigation was available to only
2.67 lakh ha. (8% of cultivable area). During the 10th Plan period
additional 6.83 lakh hectare irrigated capacity was created (Major &
Medium irrigation : 2.20 lakh ha. and Minor irrigation : 4.63 lakh ha. ). As
a result area of irrigated cultivable land has increased to 22% (3rd MI
Census report). It is proposed to create approximately 7.24 lakh ha. (
23

Major & Medium irrigation : 4.16 lakh ha. and Minor irrigation : 3.08 lakh
ha. ) of irrigation potential during 11th Plan period.
Š Two medium irrigation schemes, namely, Latratu and Tapkara were
completed, creating an additional irrigation potential of 3560 Ha.
Š 13500 Ha. of irrigation potential was created from Subernrekha
Multipurpose Project, Ajay Barrage Project, Kansjore, Katri,
Dhansinghtoli, Sonua and Upper Sankh Reservoir Projects uptill now.
Š 28,520 Ha. of lost irrigation potential was restored from 45 old medium
irrigation projects.
Š 246 Check Dams/ Series Check Dams were constructed creating 18,372
ha. of irrigation potential.
Š 1845 Micro-lift irrigation schemes were completed creating 18,644 ha. of
irrigation potential.
Š 286 MI schemes were completed creating 10309 ha. of irrigation
potential.
Š 424 Ahar / Ponds were constructed creating 5668 ha. of irrigation
potential.
Š 3304 dug wells of different-dia were dug-up creating 3906 ha. of
irrigation potential.
Š 10 Lift Irrigation projects were completed creating 380 ha. of irrigation
potential.
Š 221 MI project/Check Dam Project, 58 LI Projects and Old Water
Bodies were renovated restoring 15,436 ha. of lost irrigation potential.

At the beginning of the 10th Plan assured irrigation was available to only
8% of cultivable area. During the 10th Plan period, it was increased to 22
% (As per Third Minor Irrigation Census report). Our target is to bring
25% of the total cultivable land under assured irrigation by 2010.

4.3. Rural Development

Š SGSY : 42580 SHGs formed


31892 women SHGs formed
23492 SHGs Assisted for economic activities
23972 SHGs took up economic activities
4770 BPL families crossed the poverty line
12576 individual Swarojgaries assisted for economic
activities
24

1906 women Swarojgaries assisted for economic


activities
2109 disabled Swarojgaries assisted for economic
activities

Š NREGA : 28.63 lakh households issued job cards


11.13 lakh households demanded job
11.61 lakh households provided employment
479.40 lakh mandays created
1.98 lakh women provided employment
113.801 lakh days worked by women

Š IAY : 1.97 lakh New Houses Constructed


74043 Houses upgraded

Š DPAP : 1332 Project taken up in 15 district


6.66 lakh hacts. area covered

Š IWDP : 1.246 lakh hacts. area covered


24 districts covered

Š MLA Fund : 42394 schemes completed

Š MMGSY : 358 medium and large bridges completed

4.4. Power
Power is the prime mover of the economy and a critical input for
economic and industrial growth.
Š No. of inhabited villages : 29,445
Š No. of villages electrified : 9,618 (32.66%)

No. of Villages Electrified


Year Connectivity Connectivity from
from Grid Solar System
Till 2000 - 01 3859
25

2001 - 02 537 -
2002 - 03 771 18
2003 - 04 1225 50
2004 - 05 1598 -
2005 - 06 940 277
2006 - 07 324 -
2007 - 08 (upto July'07) 19 -
Total 9273 345
o During 2000 - 01, only 3859 villages were
electrified. By the end of 10th Plan about 5400
villages have been electrified.
Š BPL houses electrified : 73,676

Š Total project cost of all 22 districts worth Rs. 2663.30 Crores has
been submitted to the REC. Projects for 13 districts worth Rs.
1316.61 cr. have been sanctioned. An amount of Rs. 285.24 cr. has
been released to the implementing agencies under RGGVY.
Details are as follows :-
( Rs. in Crore)
Agency No. of Project Fund Released
Districts Cost by REC
allotted
JSEB 6 740.48 195.84
NTPC 8 1063.02 49.02
DVC 8 859.80 40.38
Total 22 2663.30 285.24

Š 27,056 solar home lights and 1,919 streets light were installed
under Remote village electrification through Solar Photo Voltaic
(SPV) System.
Š One 16 KWp SPV Power Plant installed in one village of W.
Singhbhum which is giving power to 349 households.
26

Š Steps are taken to reduce T&D Losses by

ƒ Replacement of defective meters and installation of Feeder /


Distribution Transformer / Consumer Meters as well as
telemetering.
ƒ Replacement of old & rotten conductors & transformers
ƒ Conducting raids to curb the theft of energy.
ƒ One Time Settlement Scheme introduced.
ƒ New KV Sub-stations (33/11 KV) are being constructed.

Š We are expected to reduce T&D loss to 20% by the end of 11th plan
period.
Š 24 MoUs signed with private investors with aggregate capacity of
31,040 MW.
Š 54.80 Km. extension of 33 KV line
Š 36.15 Km. rehabilitation of 33 KV line
Š 87.54 Km. extension of 11 KV line
Š 94.85 Km. extension of LT line
Š Construction of 33 200 KVA power sub-station
Š Construction of 211 100 KVA power sub-station
Š Construction of 23 63 KVA power sub station
Š Conversion of 100 KVA transmission sub-centre into 200 KVA
transmission sub-centre.
Š Conversion of 63 KVA transmission sub-centre into 100 KVA
transmission sub-centre.
Š 402 transformers were changed
Š The Jharkhand State Electricity Regulatory Commission, the Consumer
Grievance Redressal Forum, the Electricity Ombudsman, and the District
Coordination Committees are in place as required under the Electricity Act
2003.

4.5 Industry and Mining


Jharkhand is one of the richest States in mineral resources in the world.
40% of the total minerals of the country are available in this State. The
State is sole producer of Cooking Coal, Uranium and Pyrite. It ranks first
in the production of Coal, Mica, Kyanite and Copper in India. Major
achievements in this sector are : -
Š STPI at Ranchi has been functional with Connectivity Facility around
50 km area.
27

Š Mini Tool Rooms at Ranchi & Dumka have been commissioned and
training programme started.
Š Urban Hat at Hazaribagh, Deoghar & Giridih are at the completion
stage.
Š Tasar Training Centre at Amda, Saraikela has been started with the
help of NIFT Kolkata. 174 Candidates have been trained so far.
Š Shaheed Nirmal Mahto, Jharkhand Silk Training Institute at Bhagaiya
(Godda) has been established. More than 517 weavers have been
trained till today.
Š ATDC has been established at Ranchi.
Š Santhal Pargana Industrial Area Development Authority (SPIADA)
has been established.
Š Soft Loan given for revival of Bihar Sponge Iron, Chandil and Estern
Synpacks.
Š 1820 beneficiaries have been benefited under PMRY.
Š A new Mineral Policy 2005 has been drafted.
Š Mineral Advisory Committee has been constituted.
Š To ensure safety of life, “The Restriction on Construction in Unsafe
Area Act, 2004” has been enacted.
Š To control underground fire in Jharia, the state govt. has set up Jharia
Rehabilitation Development Authority.
Š For the present Gram Sabha has been given the right of management
of sand quarries.
4.7 Road & Air Connectivity
Š 2500 km. of roads have been strengthened and widened.
Š 37 bridges were completed.
Š 2 Air Stripes have been extended.
Š Boundary walls of 4 Air ports constructed.
Š 12 Pacca Helipads were constructed in different districts.
Š 3 Aircrafts were purchased.
Š 1 motor glider purchased to impart training.
Š 14 roads over bridge were completed.
Š Work on installation of 9 check posts on inter state border has been
started. These will help prevent tax evasion.
Š Smart Card system has been introduced for registration of vehicles.

4.8 Public Distribution & Consumer Affairs


28

The Govt. is committed to ensure food security for all, create a hunger free
Jharkhand and reform and improve the Public Distribution System (PDS)
in order to serve the poor.
Š 9.17 lakh are benefited under Antoyadaya Anna Yojana every year.
Š 2 lakh are benefited under Annapurna Yojana since year 2005-06.
Š 23.94 lakh BPL families were distributed iodised salt every year.
Š The Directorate of Food and Consumer Affairs has been constituted to
ensure the timely and continuous flow of food grains to the BPL
families from godowns to PDS dealers.
Š To protect the interests of the consumers, District Consumer Forums at
District Level and State Commission at the State level, have been
constituted under the Consumer Protection Act, 1986.

4.9 Human Resource Development


The govt. of Jharkhand is committed to ‘Education For All’ and gave top
priority to development of human resources. The State Government
initiated several measures like -
ƒ Universalization of primary education
ƒ Increase in enrolment
ƒ Retention of students in schools
ƒ Improvement of education infrastructure at Primary, Secondary
and Higher education level
Š Under Sarwa Siksha Abhiyan,
ƒ 16,201 EGS centres were upgraded to Primary Schools,
ƒ 5,824 Primary Schools were upgraded as Upper Primary Schools.
ƒ 1,506 New School Buildings were constructed.
ƒ Drinking water facilities were provided in 5,201 schools.
ƒ Toilets were constructed in 6,344 schools.
ƒ 27,677 Teachers were appointed in upgraded Primary Schools.
ƒ 11,405 Teachers were appointed in upgraded Middle Schools.
ƒ 25,161 Para Teachers were appointed in the ratio of 1 : 40.
ƒ 136 Kasturba Gandhi Balika Vidyalayas were opened.
ƒ Dropout rate has come down to 44 percent.
ƒ Student : teacher ratio is now 1 : 48 in place of 1 : 59 in 2000
ƒ Out of school children dropped from 13.88 lakhs to 3.66 lakhs.

Š 35.24 lakh students were benefited under State Literacy Mission.


29

Š 76.36 lakh students were benefited under Mid Day Meal Scheme.
Š Free text books were distributed among 12.40 lakh students.
Š 2,850 students were given Merit Scholarship.
Š 8,958 Primary / Middle Schools were strengthened.
Š 4,884 students were given Merit cum Means Scholarship.
Š 10,247 students were provided cycles.
Š 8 public libraries were strengthened.

4.10 Technical Skill Development


Š BIT, Sindri and 2 Polytechnics were selected for Quality Improvement
under TEQIP.
Š Intake Capacity increased at -
o BIT, Sindri : 251
o BIT, Mesra : 230 and
o Polytechnics : 1200
Š Hostel facilities for 500 students were created in BIT, Sindri.
Š 2 Hostels, 3 additional class rooms and 2 workshops were constructed
in Polytechnics.
Š Vocational Training Programmes have been taken up in Polytechnics.
Š Hotel Management and Catering Technology and Bio-Technology
courses were introduced in BIT, Mesra.
Š 2 new Women Industrial School were opened one at Chandankiari and
other at Jamtara.
Š 1 Govt. Polytechnic has been set up at Kharsanwan.
Š 5 Engineering Colleges and 1 Polytechnic have been started in private
sector.
Technical quality improvement programme has yielded positive results
and there are 100% placements in BIT, Sindri and 50% in Polytechnics for
students.

4.10 Health and Family Welfare


Š The State has formulated and adopted three important Policies in the
Health sector -
o Health Policy
o Drug Policy
o RCH & Population Policy
Š The govt. started Catch-up round as biannual affair since 2004 to
deliver routine immunization and micro nutrients over and above
30

normal operation going on round the year. It reaches all 32,615


villages in the State every year.
Š IMR has reduced from 72 to 49 per 1000 live births.
Š MMR has reduced from 540 to 371 per lakh live births.
Š Decadal growth rate has reduced from 26.3 to 23.3 per 1000
population.
Š Use of family planning devices/measures is getting popular in
Jharkhand.
ƒ 35.7% women are using family planning devices.
ƒ Female sterlization is 23.4%.
ƒ Use of oral pills is 3.8% against the National average of 3.1%.
Š Jharkhand ranks 4th in the country in male sterlization.
Š Regular immunization rate increased from 9% (in 2001) to 51.9%
Š Polio Vaccines coverage has increased upto 98.2%.
Š Leprosy rate in State has been reduced from 1.49 % (in 2001) to 1.40 %.
Š Full immunization (12-23 months) is 34.5%.
Š Children receiving BCG vaccines (12-23 months) is 72.9%.
Š In respect of TB Jharkhand has improved from 20th position in 2000 to
15th position in 2006.
Š Children receiving Polio vaccines (12-23 months) is 40.3%
Š Children receiving DPT vaccines (12-23 months) is 48%
Š Children receiving Vitamin A doses (12-23 months) is 23.3%. In respect
of Vitamin-A coverage Jharkhand has improved from 20th position in
2000 to 3rd position in 2006.
Š Children (age 0-5 months) exclusively breastfed is 57.8% higher than
the National average of 46.3%.
Š Children (age 6-9 months) receiving solid or semi-solid food and breast
milk is 65.3% higher than the National average of 55.8%.

4.11 Urban Development


Urban development aims to provide basic services to urban areas in the
entire State. Jharkhand has, at present, 152 small & medium towns and
around 22.24% population. Urban population is growing at the rate of
2.3% PA. Urbanization in Jharkhand is less than National Average of
27.78%. During 10th Plan, the achievements in this sector are -
Š Ranchi and some important towns of the state like Dumka,
Jamshedpur, Deoghar are being renovated as modern cities.
31

Š The priority of the govt. is to provide pure and safe drinking water to
every citizen residing in the urban areas. Under different Urban Local
Bodies, 19 schemes were completed and 14 are near completion.
Š 798 KM of urban roads and 623 KM length of urban drain were
constructed.
Š 7362 units of service latrine were converted into water seal latrine and
154 units of community latrine were constructed in urban areas.
Š 160 High Mast lights and street lights like Sodium Vapor lights and
tube lights were installed in different urban areas of the state.
Š Systematic Solid Waste Management system is being developed for all
major towns of the State.

4.12 Drinking Water & Sanitation


Š Urban Water Supply schemes at Ranchi and Dhanbad were completed.
Š 2799 partially covered habitations were covered.
Š 4400 not covered habitations were covered.
Š 270 fluoride / Arsenic treatment attachment were installed in water
quality problem areas.
Š 108 Rural Piped water supply schemes were constructed / upgraded.
Š 60763 Tube Wells were constructed.
Š 29224 Tube Wells were relocated.
Š 343 traditional sources of water were revived.
Š 8625 school toilets were constructed under Total Sanitation Campaign.

4.13 Focused Groups (ST/SC/BC/Minorities/Women/Youth)

4.13.1 Economic empowerment


Š 589 buses were distributed to 5890 tribal educated unemployed
youths.
Š 140 buses were distributed to 1400 educated unemployed youths of SC
communities.
Š 25 ST boys have been trained as commercial pilot in Pondichery and
Kanpur. 22 of them were employed in different airlines.
Š 120 Kiosks have been sanctioned for the members of minority
community.
Š 89 PTG graduates have been appointed in the State Govt. jobs.
4.13.2 Education
32

Š Approx. Rs. 70.00 crores were distributed as scholarship to the


students of ST, SC and BC Community.
Š 16,220 students are receiving free education in 110 residential schools.
Out of which 87 belong to ST, 21 SC and 2 BC.
Š 1391 tribal students were given Birsa Munda Scholarship for studying
in technical institutions outside the State.
Š 139 SC students were given Ambedkar Scholarship for studying in
technical institutions outside the State.
Š A Poly-technic institute for STs/SCs at BIT Mesra has been established.
124 ST/SC (including PTGs) students have completed their Diploma
course in various streams.
Š 197 students were inducted for training in various vocational trades at
different institutes like – IDTR, Jamshedpur; ISM, Pundag; SIS, Action
Tal and XISS, Ranchi.
Š 115 youth were trained in Hotel industry at ISM.
Š 210 youth received vocational training in Electronics at BIT Mesra.
Š 338 youth were trained in Automobile, Hospital Management, Beauty
Parlour by Action & Tal.
Š 6 Ashram/Eklabya School one each at Ranchi, W. Singhbhum,
Saraikela-Kharsawan, Gumla, Dumka and Sahebganj have been set up.
They are exclusively meant for ST boys/girls studying in 6th to 12th
class.
Š 183 better equipped hostels (100 bedded and 50 bedded) for STs, SCs,
BCs and minorities were constructed.

4.13.3 Health
Š 14 Gramin Hospitals were set up in the State.

4.13.4 Agriculture
Š 2110 irrigation wells of 20’ diameter have been dug for Tribal
population.
Š 223 check dams were constructed.
Š 3 cold storages at Ranchi, Dumka and Hazaribagh have been
sanctioned to provide benefit to ST farmers.
Š 14 Multi-purposes Halls are under construction.
4.13.5 Community Empowerment
Š 24342 houses for PTGs under Birsa Awas Yojna have been sanctioned
and 14,811 were completed. Each house costs Rs. 70500.
Š 1.98 lakh houses have been sanctioned under Deen Dayal Awas
Yojana. 1.64 lakh houses were constructed. 29,108 beneficiaries belong
to SC Community and 39,707 to ST Community.
33

Š The amount of legal aid to fight for recovery of their land is given to
the Scheduled Tribes has been increased from Rs. 2500.00 to Rs.
5000.00.
Š The economic aid of Rs. 5000 per acre per year is given for agriculture
after the restoration of illegally transferred /alienated tribal land.
Š Economic aid of Rs. 1000 per acre is paid to ST/SC/BC/Rtd. Defence
Personnel/Landless allotees of surplus ceiling lands.
Š Astroturfs for Hockey grounds at Khunti, Gumla and Simdega have
been sanctioned.
Š Academies of Chhau Dance and Archery have been setup in Saraikela.
4.13.6 Social Security
Š 2 lakh additional beneficiaries are being included under social security
scheme. The pension amount has also been increased from Rs. 100 to
200 Rs. per month.

4.13.7 Women Empowerment


Š Various welfare schemes to fight social evils like dowry, witchcraft and
to encourage inter caste marriages have been formulated. Under ICDS
7726 Anganwadi Centres have been set up which will benefit 7.72 lac
women and children.
Š State Women’s Commission & Social Welfare Advisory board are
being constituted.
Š Under Chief Minister Kanyandan Yojna girls belonging BPL families
are given assistance of cash and kind worth Rs. 10,000 for marriages
every year since 2003-04 and uptil now 43155 girls were benefited
under the programme.

Year No. of Benefited


2003-04 9269
2004-05 9931
2005-06 13115
2006-07 10840
Total 43155

Š 2 New High Schools for SC girls at Chatra and Garhwa were started.
Š 2 New High Schools for OBC girls at Palamu and Dumka were started.
Š Approx. 1.01 lakhs girl students belonging to ST, SC and BC
communities studying in VIII, IX & X std were distributed bicycles.
4.14 Sports, Arts & Culture
Sports is the lifestyle of the people of Jharkhand. It is home to many
famous players of National / International fame. Captain of Indian
Cricket team, Mahendra Singh Dhoni hails from Jharkhand.
34

4.14.1 Sports
• Rs167.50 Lakhs have been distributed as cash reward to 321 Medal
Winners in various sports. 144 belong to ST and 20 to SC communities.
• Rs. 24.12 Lakhs have been given as Stipend to 57 sportsmen. 35 belong to
ST and 13 to SC communities.
• A grant of Rs. 175.71 lakh was provided to 9 different Sports Associations
for promotion of sports.
• Birsa Munda Award, Jaipal Singh Award & Albert Ekka Awards in
various sports for life time achievement have been started from year 2007-
08.
• 12 new Residential Training Centers, 31 Day Boarding Sports Training
Centres have been opened. In these centres 1078 boys and girls are
receiving training. 754 trainees belong to ST and 165 to SC category.
• 16 Multistation Gym have been established.
• 6 Women players of National Hockey Team belong to Jharkhand who
participated in Common Wealth Games and won Silver Medals.
• State team won 23 Medals including 6 Gold in 33rd National Games held
at Guwahati in Feb. 2007 and 14 Medals in 32nd National Games,
Hyderabad.
• State Boys and Girls both team own Gold Medal in 34th National Rural
Sports meet held at Aurangabad, Maharastra 18-21 Dec. 2006.
• State boys hockey team won Gold Medal and girl team won Silver Medal
in National Rural Sports meet held at Kokrajhar, Assam 4-7 Jan. 2007.
• State boys team won 3 Gold 4 Silver and 4 Bronze Medal in National Rural
Sports meet held at Kokrajhar, Assam 4-7 Jan. 2007.
• State Women Hockey Team won Gold Medal by defeating Punjab in
National Women Sports Festival 2007 held at Sangli, Maharastra 27-30 Jan.
2007.
• State boys and girls team won all together 72 Medals in Archery in
14/17/19 year age group in 52nd National School game 2007 held at
Jamshedpur 1-5 Feb. 2007.
• State team won 3 Medals in National School Games Athletics, held at
Pune, Maharatra 30 Dec. 2006 – 2 Jan. 2007.
• State boys and girls team won Gold Medal in National School Games
Football event held at Nadia, West-Bengal 30 Jan 2007 - 5 Feb. 2007.
• Ranchi is hosting the 34th National Games. A Mega sports complex of
international standard with all the facilities for organising major events
like Athletics, Tennis, Aquatic Games, Swimming Pool, Velodrum,
Shooting etc. are being developed. For the accommodation of 6000
players, coaches etc, a sports village is being developed on PPP mode.
35

• Birsa Munda Stadium is being developed as Astro-turf Stadium for


National Games.
• 22 stadiums have been constructed and rest 42 are under construction in
all over the state.
• 37400 NSS volunteers are enrolled in Colleges and Universities.
• 20187 NCC cadets are enrolled in 198 Schools and Colleges.

4.14.2 Art & Culture


• 159 Akhara and 90 Dhumkudia building are being constructed to
preserve the culture of tribal community.
• Jharkhand Kala Mandir has been registered under Societies Registration
Act 1860 to take care of tribal and folk art.
• Cultural exchanges with the State of Jammu & Kashmir have been started
under Inter State Cultural Exchange programme.

4.14.3 Archaeology
• Several unreported sites of great archaeological importance have been
discovered in Ranchi, Dumka & Saraikela-Kharsawa. As a result, village
to village archaeological survey has been started.
• Several monuments in Sahebganj, Ranchi and Gumla districts are being
conserved from archaeological point of view.
• Archaeological explorations in Ramgarh, Hazaribagh, Ranchi and
Sahebganj districts have revealed many important historical and pre-
historical sites.
• An all India Archaeological seminar on Megalithic Culture of Jharkhand
was organized in which top archaeologists of the country participated.

4.14.4 Museum
• A photo exhibition “Archaeology Through Sky” was organized with the
help of Israeli Govt.
• Art Museum Building is being constructed at Ranchi.
• Small Museum building is being constructed at Itkhori in Chatra district.
• A Research Library has been established in the Ranchi Museum.

5. MONITORABLE TARGETS FOR 11TH FIVE YEAR PLAN (2007-12)

5.1. The Planning Commission has set following monitorable targets for the
State during the 11th Plan period (2007-12). These are given below –
5.1.1 Income & Poverty
Š Accelerated growth rate of 9.8% of GSDP in order to double per capita
income by 2016-17.
36

Š Increased agriculture growth rate of 6.3%


Š Create 2.12 Million new work opportunities
5.1.2 Education
Š Reduce dropout rate of children from elementary school from 65.49 to
29.70 by 2011-12.
Š Increase literacy rate to 70.56%.
Š Lower the gender gap in literacy from 28.4% to 23% points
5.1.3 Health
Š Reduction of IMR to 24 and MMR to 123 per 1000 live births by 2012.
Š Reduce Total Fertility Rate to 2.2
Š Reduce malnutrition among children of age group 0 – 3 years to half its
present level.
Š Reduce Anaemia among women and girls by 50% by the end of 11th
Plan.
5.1.4 Women and Children
Š Raise the sex – ratio for age group 0 – 6 years to 973 by 2011-12 and to
989 by 2016-17.

6. THRUST AREA / STRATIGIES


6.1 Agriculture and Allied Sector
6.1.1 Agriculture
In Jharkhand, 70 - 80% people depend on agriculture and allied activities
for their livelihood. Jharkhand has great possibilities in Agriculture,
Horticulture and Floriculture and efforts are being made for their
development. The Planning Commission has fixed a target of 9.8% annual
GDP growth rate during the 11th Five Year Plan for Jharkhand.
Agriculture sector is required to grow at 6.3% p.a.
Major strategies for growth of the sector in 11th Plan are as under:-

Š Increase in agriculture production through crop diversification to


pulses, oilseeds and vegetables.
Š Increasing Seed Exchange further.
Š Setting up of Seed village in each district.
Š Promote agriculture extension.
Š Shifting from traditional mono cropping to horticulture and area
expansion under commercial horticultural crops.
Š Strengthening of plant resource centre / agri – business centres.
Š Promote agriculture research and education.
37

Š Extensive Soil and Water Conservation measures.


Š Increase in minor irrigation.
Š Strengthening of rain water harvesting structures.

6.1.2 Animal Husbandry

As main /Subsidiary source of occupation Animal husbandry / dairy /


fishery have proved to be important tool of socio-economic change among
the rural farming community in Jharkhand. Keeping this in view, during
the 11th Plan period (2007-12), the major strategies of development
programme in this sector are : -
Š Enhancing Milk Production / Productivity
Š Creation of awareness amongst milk producers, training of staff
dealing with extension and paravet training to rural unemployed
youths.
Š Breed improvement of local non-descript breeds of cattle.
Š Efficient milk marketing system for procurement, transportation and
sale of milk and milk products.
Š Arrangement of feed, fodder (green fodder), mineral and other feed
supplement at the door steps of the milk producers.
Š Induction of improved breed milch cattle to boost up the milk
production as well as income generation to the rural families.
Š To extend modern technology of mixed carp culture and seed
production to the ponds and reservoirs.
Š To strengthen rural economy by engaging more rural poor people in
fish farming.
Š To encourage local fish farmers to take up the trade of fish seed
production in private sector to meet the demands of quality fish seeds.
Š To impart training to fish farmers in improved techniques of fish
rearing and seed production.
Š To arrange demonstration of improve techniques in selected Govt. fish
farms.

6.2 Irrigation
Majority of the population in Jharkhand is dependent on Agriculture and
existing irrigation coverage being 22% of the available arable land as
against national coverage of 40%, irrigation, therefore, is critical factor for
increasing agricultural production and productivity.
The following strategies will be adopted in this sector:-
38

Š The main focus would be on increasing irrigation coverage by taking


minor irrigation scheme.
Š Major Irrigation project to be completed in a time bound manner;
Š Making existing irrigation network more efficient;
Š Move towards effective Participatory Irrigation Management (PIM)
Š Increase in irrigational coverage through a mix of major, medium,
minor and ground water schemes;
Š Through proper management of water the irrigated area will be
increased further by another 10-15% of cultivable area and also to
improve moisture level and under ground water table.

6.3 Infrastructure Development


6.3.1 Energy
The shortage of power continues to be a major constraints for economic
growth of the State. Hence, the strategies in the Power Sector are as
under:-
Š Access and availability of power to all households by 2012 and
overcoming of shortage of power by 2012.
Š Increase in availability of per capita of electricity to 1000 units by 2012
and provide minimum lifeline consumption of one unit per household
per day.
Š Protection of consumers’ interest.
Š Continuation of the reforms and restructuring of the power sector,
including operationalization of the unbundling of JSEB and franchising
of the distribution network.
Š Bring down the T&D losses to 22% and AT&C losses to 30% from the
2005-06 levels of 47.3% and 62.3% respectively.
Š Develop innovative institutional arrangements to encourage public-
private partnership in the power sector.
Š Renovation and modernization of the existing units.
Š Strengthening of the transmission and distribution system.
Š Engage with the Ministry of Atomic Energy for setting up of a Nuclear
Power Plant in Jharkhand.

6.3.2 Industry
The State has immense potential for industrialization with its large
deposits of minerals, which could provide a firm launching pad for
various industries. What is required is proper infrastructure, simplified
39

mechanisms, sensitive and proactive Government machinery and an


investor friendly atmosphere for industrial growth in the State.
The Industrial Policy of Jharkhand aims to make Jharkhand one of the
most preferred destination for industrial investment. The objectives of
Jharkhand Industrial Policy are -
Š Simplify rules, regulations and procedures to remove bottlenecks
Š Provide adequate good quality infrastructure support
Š Single Window System
Š Introduce latest scientific data collection system
Š Improve the quality of services to entrepreneurs.
Š Establish Entrepreneur Development Institute (EDI) and other
specialized institutions.
Š Identify the areas of concentration of traditional skills and provide
training, improved design, technological back up and marketing.
Š Encourage setting up of fruit processing, vegetable processing, spice
processing, horticulture and other food processing industries.
Š Develop Industrial Parks for specialized activities in the fields of
Information Technology, Tasar/ Mulberry, Electronics, Plastic,
Chemicals, Biotech and Herb, Exports and Food Processing with
adequate power, water, communication, transport and other facilities.
Š Emphasis on small power generating units and developing non-
conventional sources of energy through private participation.

6.3.4 Roads and Bridges


Followings are envisaged during 11th Five Year Plan:-
Š Connecting all District HQs with Capital Ranchi by well laid two lane
roads
Š Connecting various District HQs with neighbouring DHQs with two
lane roads.
Š Four laning of strategic roads& High Density Corridor
Š Strengthening & double laning all interstate State- Highways.
Š Replacing all old and distressed bridges on SHs
Š Widening of all bridges on SHs to two lane
Š Strengthening & Two laning of Inter State Roads
Š Widening & strengthening of Roads of Tourism importance
Š Widening & strengthening of Roads of Economic Importance
40

Š Widening & strengthening of all roads of the State Capital, Ranchi


Š Construction of ROBs
Š Unbridged gaps in road network to be bridged.

6.4 Human Resource Development


The State has set the following strategies during the 11th Plan (2007-12) -
Š Universal and complete elementary education.
Š Reduction in drop-out rate to minimal for boys and up to 10% for Girls
by the end of 11th Plan.
Š Decentralization of school management by giving more powers to
school management committees/village education committees.
Š Improvement in school infrastructure at par with Kendriya
Vidyalayas.
Š Greater role for NGO in Camp Schools/Bridge Courses.
Š Strengthening of Mid-day-Meal (MDM) Scheme and its expansion up
to Class-VIII.
Š Greater emphasis on school health programme. Co-ordination with
ICDS, health and other social services departments.
Š Creation of more teacher post and filling the existing vacancies on
priority/Strengthening of Teacher’s Training.
Š Identification of Disabled/Street children and their mainstreaming on
a larger way.
Š Preparation of long term plan for improving the Basic Education up to
Class – X.
Š All necessary support to SSA-2.
Š Expansion of Secondary Education through Public-Private
Participation/More financial support to Private/Aided schools.
Š Special efforts to cater the needs of SC/ST and Girls for Secondary
Education.
Š Enforcement of voucher scheme/free-ship to economically weak
students enrolled in private schools.
Š Combining Upper Primary Schools with Secondary Schools.
Š Strengthening of Teacher Education Institutes. Focus on Vocational
Education/Skill development/Co-ordination with different
Industries/Industrial associations for practical training and
employment of youth.
Š Promotion of Distance Education/National Open School system.
Š Promotion of Computer Literacy and Computer Aided Learning
41

Š Efforts for expansion of Higher Education in remote areas to provide


access to the students of educationally backward district.
Š Improvement in quality of Higher Education from its present level to
National level.
Š Establishment of National Law University.

6.5 Health
The State still lags behind in health care infrastructure and health
indicators. The strategies during 11th Plan will be as under:-
Š To improve the status of institutional delivery and safe delivery in the
State;
Š To strengthen infrastructure at district, sub-division and PHC level;
Š To encourage child immunization;
Š To improve IMR & MMR;
Š To create awareness among community about family planning devices;
Š To update the skill among medical/ paramedical personnel;

6.6 Programmes for TSP/SCP and District Plan


The Constitution of India provides the framework to safeguard and
protect the interest of Scheduled Tribes (ST)/Schedule Caste (SC). In view
of high poverty and unemployment amongst the tribes/Schedule Caste,
formulation and implementation of development programmes have
assumed significant importance. Every thing else being equals the deptt.
will give preference to SC/ST individuals / families/ tolas while
implementing their programmes.
Welfare Deptt. exclusively works for the betterment of SC/ST's. Welfare
Department has been made nodal department for TSP and SCSP schemes.
The funds allocated under TSP and SCSP are proportionate to the ST and
SC population of the State. Moreover, the funds allocated for their benefits
are non-divertible in nature.

6.7 Proposed Annual Plan (2008-09)


The Annual State Plan 2008-09 has been proposed to be at Rs. 801500.00
lakh. Out of the State Plan proposal a sum of Rs. 411184.00 lakh has been
earmarked for Tribal Sub-Plan (TSP) and a sum of Rs. 101275.00 lakh for
Special Component Sub-Plan (SCSP).
42

7. ISSUES/CONCERNS OF JHARKHAND STATE


(To be addressed by GOI & Planning Commission)

54% of the population of the State in rural areas are below poverty line.
The problem of poverty, illiteracy, unemployment, insufficient health
services and shortage of drinking water facility is acute in the State. The
ST population in the State is higher than the national average. The State
lacks in basic infrastructure pertaining to irrigation, electricity, road,
health care and rail transport. If the infrastructure is put in place,
Jharkhand would certainly be able to bring about inclusive economic
development.

7.1. ROAD / RAIL / AIR CONNECTIVITY


• The State Govt. has signed MoUs with large industrial houses for setting
up industries in the State and this has created possibilities of investment
of more than Rs. 2 lakh crores. These investments will materialize only if
there is necessary infrastructure in place in the State. Govt. of India and its
agencies can play an important role in this regard. There is need to
improve and strengthen national highways and rail network in the State.

National Highways
• The length of National Highways in Jharkhand is 1844.07 km, of which
833 km is single/intermediate lane. The State does not have any Four
Lane National Highway, except NH-2 (G.T. Road), which is 192 km long
traversing through three districts of Hazaribagh, Giridih and Dhanbad.
Under Central Road Fund, the Government of India mobilizes
approximately Rs. 275 crore annually from the State of Jharkhand.
• For improvement and maintenance of National Highways in the State of
Jharkhand, the Ministry of Shipping, Road Transport & Highways
releases a nominal sum of approximately Rs. 53 crore under NH(O)
head, Rs. 15 crore(approx.) under PR head and Rs. 7 crore (approx.)
under OR head, which is highly insufficient for maintenance of such vast
stretches of the National Highways in the State. The entire pavement crust
of national Highway also needs to be upgraded and strengthened due to
multifold enhancement in axle-load factor caused by increase in mining
and industrial activity.
• The National Highway Authority of India has been entrusted the
additional task of Four Laning of NH-33 under NHDP-IIIA(Hazaribagh-
Ranchi) and NHDP- HlB(Ranchi-Jamshedpur). But so far no concrete
43

result has come out, despite inviting tenders thrice to take up the task of
Four Laning of Ranchi-Hazaribagh portion of NH-33 under BOT.
Under this situation, it is expected that Four Laning of NH-33
should either be taken up on annuity basis by the NHAI or should be
taken up through its own funds by NHAI/MoSRT&H.

• It is also submitted that Four Laning of NH-31 from Bihar border via
Koderma upto NH-2 at Barhi, four Laning of NH-33 from Barhi upto
Hazaribagh and from Jamshedpur to Baharagora should be taken up on
priority basis.

• Additionally, four Laning of NH-75, NH-23, NH-32 and NH-6 should


also be taken up on priority basis by the MoSRT&H.

• Under National Highway Development Project IV, which provides for


upgradation of single/intermediate lane National Highways, the State
Government has identified 833.18 km National Highways in the State of
Jharkhand to be upgraded to two lanes with paved shoulders.

• Under National Highway Development Project V1IA, which


provides for construction of by-passes, the State Government has
identified and proposed by-passes for Ranchi, Hazaribagh, Bokaro,
Dhanbad, Medninagar, Chaibasa and Chakradharpur, measuring a
total length of 225.089 km.

State Highways
• As submitted on earlier occasions, the ambitious project of opening
of a new corridor from Govindpur to Sahebganj together with a
bridge over the river Ganga at Sahebganj is also expected to be taken
up.
The State Government has taken initiative to seek funds from
the Asian Development Bank, which is under process to take up the
construction and strengthening of road from Govindpur to Sahebganj
section, which would connect NH-2 with NH-80.
• The construction of bridge over the river Ganga spanning a length of
5.5 km will cost a whooping sum of nearly Rs. 1000 crore for which
Central assistance is requested as also sharing of cost with the State Govt.
of Bihar.
This corridor will open up access to North-East via Silliguri. With
the opening of this corridor, it is expected that the backward region of
Jamtara, Dumka and Sahebganj will get opportunity for increased
economic activities. Keeping in view the importance of this project for
the State, this State Highway needs to be notified as NH and this
44

corridor linking Govindpur on NH-2 to Katihar on NH-80 should also be


taken up on priority basis.

Construction of Rail Over bridge in Jharkhand


• The State Government has identified 21 railway crosses over bridges
(ROBs). The railway overbridges are expected to be constructed for
safety of railways as well as safety of road traffic. The State Government
is agreeable to take up construction of such ROBs on 50:50 cost sharing
basis.
Approval of such ROBs should be accorded at the earliest so
as to extend the benefit of such project to the public at the earliest.

Setting up of a Regional Engineers Training Institute


• There is no Regional Engineers Training Institute for imparting
knowledge about the latest technological innovations, upgradation of
skills, etc. for the Engineers in the entire Eastern Region.
It is requested that such Training Institute be set up for the
Eastern Region in the State of Jharkhand under support from CRF, etc.
by MoSRT&H, for which the State Government would provide sufficient
land free of cost.
• After creation of the State, new rail projects worth Rs. 2000 crores were
taken up with a contribution of 67% from the meagre state resources. The
MOU signed with the Railway has expired in Feb. 2007. Most of the
projects are incomplete. There is an urgent need to renew the lease and
speed up work on these projects so that they should be completed within
the stipulated time schedule. The State has repeatedly requested that the
investment for these rail projects should be met from the railway
resources. After the marked improvement in the finances of the railways,
the request of State Govt. should be given due consideration.
• Railways earn more than 50% of its freight revenue from Jharkhand
region. The Govt. of Jharkhand has requested for certain new essential
Railway lines to be taken up on priority basis. These will boost the
possibility of setting up of industries in this region, under various MoUs
already signed for units in steel and power sectors.

7.2. POWER
• The State Govt. has taken up rural electrification programme on a large
scale under the “Rajiv Gandhi Gramin Vidyutikarn Yojana” (RGGVY). It
is considered necessary that a general exemption under section 2 of the
Forest Conservation Act, 1980 is granted for carrying out the work related
45

to rural electrification as this will help speed up the implementation of the


schemes under this programme.
• Nuclear Power can play an important role in increasing power availability
in the State. Jharkhand is an important source of uranium in the country.
A Nuclear Power Plant should be set up in the State.
• At present, there is no central sector scheme for power transmission. The
State is experiencing difficulties in inter/intra state power transmission in
the absence of adequate transmission network. It is, therefore, requested
that a 'Central Sector Scheme' should be taken up for improvement/
strengthening of power transmission system.
• In case of Hydel Power Projects, 12% free power is provided to the host
states. This provision should be made applicable for Thermal Power
Projects also, where pit head plants are planned to be located. To some
extent, this will offset the ill effects of environmental degradation and
rehabilitation of the affected people.
• Present allocation of power from proposed 4000 MW Ultra Mega Power
Project in the State is 1000 MW. In view of ongoing RGGVY programme
and growing demand from industries the State will require more power.
Therefore, allocation of power from proposed 4000 MW UMPP requires to
enhancement to 1500 MW.

7.3. COAL / MINERALS


• The Coal India and its subsidiaries mine over 100 million tons of coal each
year. We request that preference should be given for coal linkages from
the mines in the State, to industries being set up in Jharkhand. The policy
on coal linkage needs to be reviewed so that the economic interests of a
poor state like Jharkhand are protected.
• State Govt. has signed MoUs with 10 Corporate houses for setting up pit
head coal based Independent power plants. Captive coal blocks may be
released against these MoUs so that the work starts early.
• The State is committed to utilize rich wealth of its mineral resources to
bring prosperity to its residents. It is, therefore, necessary that the
National Mineral Policy (NMP) should give priority in grant of mineral
concessions to value adders in the State. The policy should also aim at
gradual reduction in export of iron ore and allocate mines for captive use.
• Despite recommendations of the 12th Finance Commission and the Hoda
Committee, Ad-valorem rates of royalty for coal and iron ore is yet to be
notified. The royalty regime needs to be shifted to an Ad-valorem basis
urgently.
46

• The iron ore deposits of Jharkhand as reported by Indian Bureau of Mines


are approximately 3.7 billion tonnes. Out of this deposit, Steel Authority
of India and IISCO hold on to a deposit of over 2.4 billion tonnes in the
Chiriya / Gua group of mines in 10 leases covering an area of approx 4.9
Th. Ha. With the present level of exploitation of Iron Ore from such lease
hold area (varying between 0.5 to 0.7 MTA), SAIL thus has reserves for
2000 years in the aforesaid leases. The National Steel Policy 2005 envisages
to produce about 110 MTA of hot metal by the year 2020. Out of this
target, SAIL's growth plan states that it aspires to maintain its production
in the Indian Steel Industry at a level of about 28%.
• The National Policy further states "State Govt. would recommend renewal
of existing leases only against credible mining investment plans in a
specified manner". Therefore it is imperative that due scrutiny is required
to be made of all the leases of SAIL before the same are renewed. In the
light of the National Policy and the SAIL's growth plan, the State Govt. is
of the considered view that SAIL perhaps could be allowed to retain 1
billion tonnes of ore in Jharkhand and return the rest to the State Govt. for
value additions within the State and thus enhance the Steel making
capacity through various investors, who have shown keen interest for
investment in Jharkhand.
7.4. IRRIGATION
• In Jharkhand, 70-80% people depend on agriculture and allied activities.
The net sown area is 29.74 lakh ha. The State has low agricultural
productivity because less cropped area is only under assured irrigation
system.
• Another reason for under development of agriculture is predominance of
food crops. In order to encourage agricultural diversification, extension
activities need strengthening. Jharkhand has great possibilities in
'Horticulture' & 'Floriculture' and efforts are being made for their
development.
• Irrigation plays an important role in the development of agriculture. Only
22% of the net sown area enjoys irrigation facility as against the national
average of 40%. To augment irrigation facility, many schemes are being
implemented. If available water resources could be tapped and utilized
properly, irrigation capacity can be increased substantially in the State.
Govt. of India should take up 'Seed Replacement Scheme' and scheme for
creating irrigation facility on the field itself as Centrally Sponsored
Schemes, to achieve higher growth rate in agriculture sector.
• Jharkhand Govt. has taken up Swarnrekha Multipurpose Project which
aims to provide irrigation facilities in poverty stricken tribal areas of
Jharkhand, West Bengal and Orissa. The Govt. of India should take up
47

Swarnrekha Multipurpose Project as a National Project. If so done, it will


provide irrigation to 2.65 lakh ha..
• As per existing policy of Govt. of India, investment clearance is required
from Govt. of India for receiving financial assistance under AIBP. All
ongoing projects under AIBP in Jharkhand are roughly 25-30 years old. As
a result there has been many fold increase in the original project cost. On
account of this, six projects under AIBP are not getting investment
clearance. Consequently, irrigation potential of 41,000 ha. will not be
created. According to the new policy of MOWR new projects under AIBP
are sanctioned only after completion of the ongoing AIBP projects.
Because of the non-completion of existing AIBP projects, seven incomplete
projects which fulfill the criteria for inclusion under AIBP will not be
taken up in view of the existing policy. As a result, 1.27 lakh ha. of
additional irrigational potential could not be created. Our request is that
this policy needs to be relaxed for the States like Jharkhand.
• In view of the greater scope for development in the State, there is a need
to augment more water in Swarnarekha Basin. This could be possible by
forging linkage with South Koel river and Sankh river as well as linking
of river Ganga, Damodar and Swarnarekha. This would help the State in
augmentation of additional water in Swarnarekha basin and also for
making the downstream Swarnarekha navigable. Govt. of India is
requested to take up a techno economic study in this regard urgently.

7.5. FOREST
• The different legislations relating to forest and environment conservation
have hampered the essential developmental activities in the State. Most of
the State land, particularly where water and mineral resources are
available, and where projects can be set up, is classified as forest.
• The State Govt. was given the power to divert less than 1 ha. of forest land
for certain specified category of schemes upto 31st Dec. 2006. This power
needs to be revived.
• Jharkhand has around 30% of its land under forest cover as against the
national average of 23%. The sites selected for many irrigation and
developmental schemes include forest land also. The State may not have
suitable land free from forest area. Many developmental schemes can not
be implemented because of various provisions of Forest Conservation Act,
1980. The State is experiencing great difficulty in locating land for
compensatory afforestation. Steps should be taken to amend the related
laws immediately. While determining the parameters in this regard, the
available forest cover in the State and its present economic and social
48

status should be kept in mind. We would also suggest that for


compensatory afforestation, the State Govt. and private companies should
be allowed to use degraded forest land as is done in case of Central Govt.
projects. The provisions of the Forest Conservation Act should not be
made applicable to those projects which were sanctioned before the
coming into force of this law. The States which have more forest cover
than the National average should be given special financial assistance for
preservation and conservation of forests.

7.6. HEALTH
• The Centre has launched the National Rural Health Mission, but there is
no physical infrastructure to deliver primary healthcare to our people. At
the time of formation of the state, there was shortage of 37% Health
Centres, 64% Primary Health Centres and 82% Community Health
Centres, as per the norms of Govt. of India. To meet the shortage, heavy
investments are required. The Govt. of India should extend necessary
financial support in this regard taking into account the actual availability
and not the availability on national average basis.

7.7. HUMAN RESOURCE DEVELOPMENT


• In the last few years, as a result of Sarva Shiksha Abhiyan, the number of
students requiring secondary education has increased substantially. We
feel that Government of India should consider setting up large number of
secondary schools and Central Schools in the country for quality
education.
• It has been observed that children belonging to poor families could not go
to schools because their families depended upon the earnings of these
children. We think that the law banning child labour even in non-
hazardous areas is a step in the right direction. But, it is also necessary, that
in order to make sending children to schools attractive, for the BPL
families, these children should be given stipend. It will have a preventive
effect on the practice of child labour. Government of India should consider
starting a Centrally Sponsored Scheme in this regard.
• The Programme period of Sarwa Siksha Abhiyan (SSA) should be
extended till end of the 11th Plan period. The Govt. of India should a new
scheme on the lines of SSA in the Secondary Education Sector.
• Scheme for financial assistance to colleges located in Educationally
Backward Blocks should be launched.
• Vocational Schools located in Educationally Backward Blocks should be
financially supported.
49

7.8 Food grains Supply


The State Govt. is not getting full quota of food grains allocated by Govt.
of India under different schemes due to non-availability of sufficient
Railways rakes and insufficient storage capacity with FCI. At present, FCI
caters to 22 districts through 10 Food Supply Depots having storage
capacity of 1 lakh tones whereas it requires 1.50 tones of storage capacity.
FCI or CWC should build additional godowns immediately at all locations
where the delivery of food grains have to be made.

7.9 National Rural Employment Guarantee Act (NREGA)


The States, which have poor infrastructure and are economically
backward, should be allowed to take up infrastructure related schemes
under NAREGA.

8. RELEASE OF 12TH FINANCE COMMISSION GRANTS


The 12th Finance Commission Grants meant are not being released by
G.O.I. as elections have not been held. Elections to PRI's in Jharkhand
were notified but had to be cancelled following a High Court Judgement
in an election related matter. The issue is pending before the Hon'ble
Supreme Court now. G.O.I. is also a party to this case. In these
circumstances, the 12th Finance Commission Grants should be released
conditionally that elections will be held within a reasonable period (say 6
months ) of the judgement of the Supreme Court. Non release of Grant
(about 96.40 crores per annum) is hurting the interest of the poor people of
the State.

9. SPECIAL ECONOMIC PACKAGE


• Special economic packages have been given to North Eastern States,
Sikkim, Jammu & Kashmir, Uttranchal and Himachal Pradesh, this facility
has not been extended to Jharkhand with the result the industrial units,
which could have come up in Jharkhand are shifting to these States. There
is need to extend the package to Jharkhand also. Jharkhand is a poor State.
The topography of Jharkhand is hilly and undulating and the terrain
difficult. In view of development indices, Jharkhand also needs to be
included in the special category of States for central assistance purposes.
• Government of India should define State specific developmental plans
and policies and growth targets, which would bring the backward States
at par with the developed States of the country within next five to ten
years. For this, the requisite investments should be made available by both
the Government of India and the respective State Govt. We strongly
believe that till all around development takes place in the backward states,
50

the problem of extremism can not be tackled. Development is the only


effective solution for this problem. There is, therefore, need to develop
infrastructure in the backward states

I.A. AGRICULTURE

1. INTRODUCTION
Jharkhand with an area of 79.71 lakh ha and a population of 27 m is
primarily a rural economy. About 75% population resides in rural areas
and 66.85% of the total labour force is dependent on agriculture. Out the
of the total 22 districts of the state, the districts of Dumka, Jamtara, Godda,
Chatra, Gumla, Simdega, Lohardaga, Saraikela and all the three districts
of Palamau division has more than 75% working population engaged in
agricultural activities, either as cultivators or as agricultural labourers. In
Gumla and Simdega districts, more than 85% of the total workers are
engaged in agriculture.
The agriculture sector suffers from low capital formation and low
productivity. The institutional credit flow to the agriculture sector is
negligible and agricultural extension activities need to be strengthened.
The state has been categorized under agro climatic zone VII known as
Eastern Plateau and Hill Region and is further divided into 3 sub zones
viz. Central and North Eastern Plateau, Western Plateau and South-
Eastern Plateau.
Average annual rainfall of these zones varies from 1300 mm to 1400 mm
out of which 80% is received during four monsoon months (June-
September). The assured irrigation is available to hardly 8-11% area
during kharif, 6% during rabi and 1-2% during summer season. In the
absence of perennial river system, the agriculture is largely rain
dependent .
Agricultural economy of the state is characterized by the existence of large
number of small and marginal farmers. Agriculture operation in the state
is of the subsistence type due to the adverse land: man ratio. Land
distribution pattern among the cultivators is highly iniquitous and a large
number of holdings are uneconomic. On the whole, about 83 %
operational holdings are below 2.0ha, covering only 37% of the gross area.
Only 0.69% operational holdings are above 10 ha covering over 9% area.
Majority of the farmers thus fall under the category of small and marginal
farmers subsisting on a very small earning from farming occupation. They
51

have little or no resources of their own to provide for inputs needed to


increase the agricultural productivity.
One of the important factors for under development character of
agriculture is predominance of cereal crops in the state. About 92%
cropped area is covered under food grains and hardly 3-5% area is under
cash crops. 40% of the total cropped area remains largely mono-cropped
under rice. The lack of diversity in the cropping pattern makes the farmers
all the more vulnerable against any downward deviation in rainfall.
The growth in agriculture sector has a strong bearing on the growth of
other sectors and consequently the GSDP. This emphasizes the fact that
the planned strategies for the socio-economic development of the State
should be such so as to facilitate faster growth and development of
agriculture, horticulture and other allied sub-sectors. Keeping this in view,
various programmes were implemented during 10th Plan period such as -
Š Seed to the farmers:
Š Crop diversification:
Š Agricultural mechanization:
Š Rejuvenation of existing infrastructure:
Š Technology transfer:
Š Seed production:
Š Initiatives in Horticulture:
Š Extension activities in agriculture
Š Seed treatment
Š Agromet Advisory Services

Thus in 10th plan periods, major thrust was given to enhance crop
coverage, soil and water conservation, reduction in production cost,
agriculture mechanization, diversification of up land and medium land
through horticulture based activities; generating a driving force in
agricultural extension programmes, increase in crop production and
productivity through increasing seed replacement ratio and strengthening
capacity building among farmers.

Achievements
Š Yearwise HYV seeds distribution to farmers : -
Year Quantity (in Quintal)
2002-03 9585
2003-04 8552
52

2004-05 21127
2005-06 22366
2006-07 38258
2007-08 64336
Š Coverage area under pulses and oilseeds increased from 2.70 lakh ha.
to 4.03 lakh ha.
Š 150 tractors/Mini tractors and 2430 agricultural implements
distributed to farmers on subsidy basis.
Š 22 agricultural farms one each in every district being developed as
model agricultural farms.
Š 55 block nurseries and 1 progeny orchard have been rejuvenated.
Š “Soil Profile Cards” are being provided to the farmers on the basis of
soil sample collected from their fields.
Š A State level Soil Conservation Training Centre has been developed at
Nagri, Ranchi.
Š Extension Training Centre, Hehal and Soil Conservation Training
Centre, Demotand, Hazaribagh have been strengthened.
Š The establishment of KVKs in 22 districts of the state has been
facilitated.
Š Agricultural Technology Management Agency (ATMA) in 22 districts
are being Strengthen.
Š 10 seeds villages have been developed for paddy which have produced
33000 quintals of HYV of paddy in 2006-07.
Š 17 seeds villages for cereals are being developed.
Š 24 vegetables seeds villages have been developed through SHG.
Š 8000 thousand acres of additional areas have been brought under
multiple cropping.
Š A Bio-technology centre has been established in BAU for development
of research and education in agriculture.

During the Tenth Plan period (2002-07), there has been marked increase in
crop coverage, crop productivity and crop intensity. The launch of NHM
has caused impact on precision farming and commercial venture in
Horticulture. There has been 19% increase in the area of vegetable and
spices. There has been 28% increase in the area of fruits. Increased Crop
coverage and rise in crop productivity have shown silver lining. The
Planning Commission is targeting 9.8% annual GDP growth rate during
11th Plan for Jharkhand. To achieve this target, agriculture sector is
expected to grow at 6.3% p.a. Jharkhand has great possibilities in
53

Agriculture, Horticulture and Floriculture and efforts are being made for
their development.

2. STATE SHARE TO CSS


2.1. Micro Watershed under Micro Management [ 90 : 10 ]
It is proposed to undertake 200 micro watersheds under Micro
Management Mode in the year 2008-09.
2.2. National Horticulture Mission- NHM [ 85 : 15 ]
2.3. Micro Irrigation Scheme [ 80 : 20 ]
2.4 Pilot Weather based Crop Insurance (50 : 50)

3. STATE PLAN SCHEMES


3.1 Continuing Schemes
3.1.1 Agriculture
The net cropped area in the State is about 21 lakh ha with crop intensity of
about 114%. State represents primarily a mono cropping system with rice
as the main crop that accounts for 57% of gross cropped area. Wheat,
maize and pulses are the other crops occupying respectively 2.45%, 7.66%
and 12.02% of the gross cropped area.
The food grains as a whole cover 83% of the cropped area. Low
production and low productivity of these crops are the major problems of
the agriculture sector.
Major strategies during Annual Plan (2008-09) are as follows:-
Š Seed Exchange Programme
Š Strengthening of Seed village
Š Renovation/ Strengthening of Agriculture Farms and Seed Production
of HYV
Š Alternative Farming Programme
Š Training Demonstration and extension.
Š Skill Development Programme of SC Farmers in Agriculture works
Š Impetus to Farm Mechanization
Š Resource Management
Š Sugarcane Development
54

3.1.2. Horticulture:

Horticultural crops play an important role in diversification of land use


for better utilization, improvement in productivity, increase in
employment opportunities, better economic returns and nutritional
security.
The State has 0.28 lakhs ha. under fruit crops and 2.25 lakhs ha under
vegetables. The area under floriculture in the state is meagre. The climatic
condition of the State is suitable for the commercial cultivation of various
flowers. Medicinal and aromatic plants are growing in the state forests in
abundance. There is lot of potential of their being grown commercially by
the farmers.
In view of the low productivity of food crops and the geographical
situation of the State, horticulture offers an attractive option. Following
strategies for the development of horticulture in Jharkhand are :-
Š Development of Medicinal Plant
Š Integrated Farming Development
3.1.3. Soil and Water Conservation:
About 19 lakhs ha of agricultural land is subjected to severe soil erosion
and is lying waste. This can be reclaimed and brought under cultivation
and this can increase the net sown area of the State considerably.
The major strategies proposed are -
Š Soil Conservation Research and Training
3.1.4. Agriculture Research and Education:
The agricultural growth in right perspective is not possible without need
based agricultural research and well trained man power.
The SAU is supposed to impart quality education and to be engaged in
research to develop the area specific technology to develop the agriculture
technology ambience of the state.
The use of chemical pesticides and inorganic fertilizers is now being
replaced by the concept of Integrated Pest Management and Integrated
Nutrients Management. Birsa Agriculture University is the only SAU in
Jharkhand. Under another plan scheme, it is proposed to establish a
satellite tissue culture centre at Dumka and a state of the art quality
control labs attached to different facility. The main objectives are :
♦ Grant in aid to Birsa Agriculture University
♦ Grant in aid to Development of Seed processor at Gauriakarma
55

♦ Establishment of Agriculture College under BAU at Dumka &


Garhwa
♦ Establishment of Agriculture College under BAU at Godda
♦ Fund for Establishment of Livestock & Fisheries Research Institute
to BAU
♦ Grant in aid to Establishment of Dairy Technology College of BAU

3.1.5. Other Agriculture Programmes


♦ Strengthening of State Agriculture Laboratory
♦ Establishment of Quality Control Lab
3.1.6. Other General Economic Services
♦ Standardization of Weight's & Measures
3.1.5. Capital Formation in Agriculture
Modern vegetable marketing Infrastructure in the Agri Export Zone for
vegetables has been proposed. Besides this, Agriculture Colleges are
proposed at Godda, Garhwa & Dumka. Strengthening of Horticulture/
Agriculture Technology Park in Chatra and establishment of
infrastructure on quality control at Dumka are in process. The main
objectives are :
♦ Development of Agri Export Zone
♦ Establishment of Agriculture Technology Park in Dumka
♦ Establishment of Agriculture Technology Park in Chatra
♦ Establishment of Agriculture Technology Park in Godda

3.2 New Schemes


3.2.1 Agriculture
Major objectives are as follows:-
♦ Seed Treatment Programme
♦ Input distribution under seed exchange programme
♦ Input distribution under alternative farming scheme
♦ Establishment of Krishi Vigyan Udyog Kendra
3.2.2 Horticulture
Major objectives are as follows:-
56

♦ Establishment of Bio Industrial Water shed


♦ Establishment of Agri clinics and Agri Business Centre

3.2.3. Agriculture Research and Education:


♦ Establishment of Grain Bank

3.2.4. Other Agriculture Programme


♦ Establishment of Agriculture Development Council

4. TRIBAL SUB PLAN


A sum of Rs. 10607.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 17500.00 lakhs during Annual Plan 2008-09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 2460.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 17500.00 lakhs during Annual
Plan 2008-09.

6. The Outlay Approved for various schemes are given as under -

Agriculture
Annual Plan 2008-09
Sl. (Rs. In Lakh)
Name of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Share (CSS/CS)
i) Micro Watershed under Macro Management 330 192 138
(90 : 10)
ii) National Horticulture Mission ( 85 : 15) 1000 550 250 200
iii) Micro Irrigation ( 80 : 20) 60 40 0 20
iv) Pilot Weather based Crop Insurance (50 :50) 100 50 20 30
B. State Plan Schemes
I. Continuing Scheme
2401 : Agriculture
i) Seed Exchange Programme 1355 730 270 355
ii) Strengthening of Seed villages 100 60 20 20
iii) Renovation/Strengthening of Agriculture Farms 700 380 320
and Seed Production of Hybrid Seed
iv) Alternative Farming Programme 1200 650 240 310
v) Training, Demonstration and Extension 450 450 0
57

vi) Skill Development Programme of SC Farmers in 1000 1000 0


Agri. works
vii) Impetus to Farm Mechnization 400 220 80 100
viii) Resource Management 400 220 80 100
ix) Sugarcane Development 50 25 25
2401: Horticulture
x) Development of Medicinal Plant 100 50 20 30
xi) Integrated Farming Development 390 210 80 100
2402: Soil and Water Conservation
xii) Soil Conservation Research and Training 550 150 400
2415: Agriculture, Research and Education
xiii) Grant-in-Aid to Birsa Agriculture University 1800 1800 0
xiv) Grant-in-Aid to Development of Seed processor 300 300 0
at Gauriakarma
xv) Establishment of Agri.College under BAU at 100 100 0
Dumka & Garhwa
xvi) Establishment of Agriculture College under 400 400 0
BAU at Godda
xvii) Fund for Establishment of Livestock & Fisheries 200 200 0
Research Institute to BAU
xviii) Grant in Aid for Estabilishment of Dairy Tech. 200 200 0
College of BAU
2435: Other Agriculture Programms
xix) Strengthening of State Agriculture Laboratory 30 30 0
xx) Establishment of Quality Control lab 100 50 50
475: Other General Economic Services
xxi) Standardization of Weight's & Measures 50 50 0
4401: Capital Formation in Agriculture
xxii) Development of Agri Export Zone 50 50 0
xxiii) Establishment of Agriculture Technology Park in 200 200 0
Dumka
xxiv) Establishment of Agriculture Technology Park in 200 200
Chatra
xxv) Establishment of Agriculture Technology Park in 50 50 0
Godda
II. New Scheme
2401 : Agriculture
xxvi) Seed Treatment Programme 200 110 40 50
xxvii) Input distribution under seed exchange 800 430 160 210
programme
xxviii) Input distribution under alternative farming 800 430 160 210
Scheme
xxix) Establishment of Krishi Vigyan Udyog Kendra 3500 2000 1500
2402 : Horticulture
xxx) Establishment of Bio Industrial Water Shed 125 70 20 35
xxxi) Establishment of Agri Clinics and Agri Business 100 50 20 30
Centre
2415: Agriculture, Research and Education
58

xxxii) Establishment of Grain Bank 100 100 0


2435: Other Agriculture Programms
xxxiii) Establishment of Agriculture Development 10 10 0
Council
Grand Total 17500 10607 2460 4433

SUMMARY (Agriculture )

Annual Plan 2008-09


(Rs. In Lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked
B. State Share (CSS/CS) 1490 832 270 388

C. State Plan Schemes


i. Continuing Schemes 10235 6525 1790 1920
ii. New Schemes 5775 3250 400 2125
D. EAP ( if any)
E. Other
Grand Total 17500 10607 2460 4433

I.B ANIMAL HUSBANDRY

1. INTRODUCTION
Animal Husbandry plays an important role in Socio-economic
transformation of rural areas by providing gainful employment
particularly to small, marginal farmers and agriculture labour.
Development of Animal Husbandry has been envisaged as an integral
part of diversified agriculture. Most of the rural house holds of this State
have one or the other livestock rearing activity in their backyard. The
Animal Husbandry programmes provide good returns in a low gestation
period with minimal investment.
According to the 17th livestock census, 2003, the livestock in the State is as
under:-
Cattle - 7658721
Buffaloes - 1343494
Sheep - 679929
Goat - 5031016
Pig - 1107930
59

Horses and Poney - 4925


Dog - 485345
Poultry - 14429279
The cattle are generally poor producers due to inadequate nutrition, poor
management, tropical heat and diseases. Despite these factors, this
sector's contribution to income generation, providing employment and
gender empowerment is recognised.
The objective of Animal Husbandry is to develop livestock rearing as a
source of gainful employment by improving the productivity.
Achievements during 10th Plan

Year Production
Milk lakhs (in Egg (in Wool (in
lakh M. ton) million) lakh Kg.)
2002-03 9.51 661 3.58
2003-04 9.54 707 3.14
2004-05 13.30 710 1.48
2005-06 13.36 702 1.50
2006-07 14.52 716 11.84
Total 60.23 3496 21.54

ƒ Milk production to rise 14.88 lakh MT (anticipated during


07-08)
ƒ Egg production to rise 720 Million ( anticipated during 07-08)
ƒ Wool production to rise 12.31 lakh Kg.(anticipated during
07-08)

Š Animal Wealth Pasu Chikitsa Sivirs are being organised to provide


broader health coverage at village level.
Š 405 frozen semen centres were established for breed improvement to
increase the productivity.
Š Phase wise training of Veterinarians and paravet staff organised to
control the Bird Flue.
Š 600 unemployed youths trained under Scientific Animal Husbandry
Programme.
Š Cattle Census 2007 done with help of 14000 unemployed educated
youths.

Targets for 2008-09


60

Milk lakhs (in M. ton) Egg (in million Wool (in lakh kg)
15.21 723 12.78

Objectives and Strategies


Š To increase the livestock production such as milk, egg, meat and wool
and also the draught capacity of bullocks by intensive implementation
of controlled breeding programme.
Š To consolidate and strengthen the existing infrastructure facilities for
livestock development in the State.
Š Providing improved facilities of cross breeding, feeding, proper
management and animal health cover.
Š Creation of awareness among the animal and poultry keepers, training
of Staff dealing with extension and rural unemployed youth.
Š Control of diseases affecting animals.
Š Creation of disease frees zones.
Š Establishment of Mobile Poly Clinic.
Š To organize workshop/seminar on animal husbandry activities.

2. STATE SHARE TO CSS


2.1 Swine fever control under ASCAD Scheme [ 75 : 25 ]
Under this scheme, the targets are - i) immunization of lakhs animals
against diseases like Swine Fever, Haemorrhagic Septicaemia, Black
Quarter, Foot and Mouth Disease and Pestedes Petits Ruminanits; ii)
modernisation of Biological Production Unit and State Disease Diagnostic
Laboratories; iii) encouraging awareness among the livestock holders to
have their animals vaccinated and iv) monitoring & forecasting of animal
diseases.
2.2 Integrated Sample survey of milk, egg, meat and wool production
[50:50]
The scheme aims to estimate production of different livestock products
like milk, egg, meat and wool in the State by conducting sample survey of
livestock products. The survey is carried out round the year & throughout
the State. Data collectors go to the village in each month of the year for
collection of data. 50% salary is met from centre and rest from State.
2.3 Establishment of Veterinary Council [ 50 : 50 ]
A State Veterinary Council has been established in the state in order – i) to
regulate veterinary practices; ii) to maintain the register of State
61

Veterinary practitioners; iii) to monitor the professional conduct, etiquette


and code of ethics for veterinary professionals; iv) to upgrade the
professional skill and knowledge.

3. STATE PLAN SCHEMES


3.1. Continuing Schemes
3.1.1 Modernization of Hospital Dispensaries
It is a plan with the objective to modernize 243 different Veterinary
Hospitals and Dispensaries in a phased manner. 23 Hospitals were taken
up in 2008-08. The rest hospitals will be taken for modernization during
11th five year plan.
Under this scheme, strengthening of veterinary hospitals will be done
through modern equipments and by medicines for treatment of animals
and construction of new buildings.
3.1.2 Direction and Administration.
General administrative set up has been reorganized with the creation of
new divisions, districts, subdivisions and blocks. Therefore, there is need
for extension and expansion and strengthening of the present
organizational setup at all levels in order to make the programmes more
effective.
Under this scheme, to meet the establishment cost for six district animal
husbandry offices (Pakur, Jamtara, Chatra, Saraikela, Simdega and
Koderma) and one Regional Director Office, Kolhan and purchase of new
vehicle for sub division as well as regional level offices for proper
monitoring are proposed during 2008-09. The construction of animal
husbandry offices for Lohardga, Chaibasa, Gumla, Godda, Giridih,
Sahebganj and Jamshedpur.
3.1.3 Establishment of Class I dispensaries
Class – I Veterinary dispensaries are to be established for treatment,
Castration and Vaccination. Under this scheme, it is proposed to meet the
establishment expenditure of 19 veterinary dispensaries and to provide
infrastructural support to them.
3.1.4 Mobile polyclinic
Mobile polyclinic in the districts to provide treatment, Pathological test
and A.I. of the animal at the door steps of animal keepers are proposed.
3.1.5 Frozen Semen Bank
The scheme aims to gradual genetic improvement of local non descript
milch cattle and to preserve the germplasm of the indigenous descript
cattle at 405 Frozen Semen Centres in the State.
3.1.6 Strengthening of Animal Health and Production Institute, Kanke
62

In order to achieve the production of different animal vaccines upto 55


lakhs doses, it is proposed to strengthen Animal Health and Production
Institute, Kanke, Ranchi. Apart from this, it has also been proposed to
install new machines to enhance the production of more vaccines. It is also
proposed to establish district diagnostic laboratory in each district of the
State.
3.1.7 Control of animal diseases and livestock diseases
The main objective is to control fatal zoonotic diseases such as Rabbis and
Pullorum. Under this scheme a total of 1.50 lakhs birds by Random
sampling in organized; and unorganized Poultry Farms will be tested for
Poultry diseases. Similarly under this scheme a total of ten thousand
canine and bovine populations in each district will be protected from
deadly Rabbis diseases by immunization.
3.1.8 Scheme for establishment of Statistical Cell
It is proposed to establish Statistical Cell at Regional Director Kolhan's
Office, Chaibasa for monitoring and analysis of progress of various
schemes and posts of an Assistant Director (Statistics) and a Statistical
Assistant are proposed to be created during 2007-08.

3.1.9 Piggery Development


Under this scheme, Piglets will be distributed among farmers at the rate of
5 piglets per farmer. To achieve the target for distribution of Piglet it is
necessary to strengthen the Pig Farms. Out of selected beneficiaries 28%
will be ST and 16% will be SC and rest for General Class/ Women Group
of weaker section of the society. The Government Bacon Factory will also
be revived.
3.1.10 Cattle Shows and Fairs
To encourage the animal and Poultry Farmers, the Cattle Shows and fairs
will be organised every year.
3.1.11 Extension and Training
This scheme is meant for providing training to rural unemployed youth
farmers at district level and at State level as well as establish training
centres at district head quarters and strengthening of existing State
training centre at Kanke, Ranchi.
3.1.12 Poultry Development
The poultry development programme has been developed as an
enterprise in the State especially in the tribal and industrial area. As per
17th livestock census, 2003, Jharkhand Processes approximately 144.29
lakh poultry.
63

Under this scheme, day old chicks of low input birds are provided to the
SC, ST and other weaker section of the society. To provide day old chicks
and hatching egg to private poultry breeder, poultry farm at Hotwar and
Bokaro will be strengthened. It is also proposed to establish 3000 layer
farm along with hatchery facility at Dumka, Jamshedpur and Hazaribagh.
To help the poor section of the society in the tribal and other areas,
assistance is given for setting up backyard poultry farms. Under this,
subsidy is given for birds, feed and medicine as well as on hatchery
machine, egg setter machine and construction of room for keeping those
machines to selected beneficiaries.
3.1.13 Sheep and Goat Development
The main strategy is to improve the production by crossbreeding with
beetal and grading up with Black Bengal goat. The another objective of
this scheme is to provide genetically superior quality of Rams and bucks
to the farmers for genetic upgradation of their local sheep and goats.
It is proposed to provide a unit of 1 he goat and 10 she goats among the
SC and ST beneficiaries.
3.1.14 Establishment of GO SEVA AYOG
GO SEVA AYOG is to be established for the preservation and welfare of
Cattle.
3.1.15 Jharkhand State Implementing Agency for Cattle and Buffalo
Development
This scheme is meant to give financial support to bear the establishment
cost and infrastructural support to the Jharkhand State Implementing
Ageny, a Governmental organization registered under Society
Registration Act, 1860.
3.1.16 Distribution of Animals and Birds
It is proposed to distribute different livestocks and poultry unit of chicks,
unit of pigs and unit of goats.

3.1.17 Consultancy Services


Under this for evaluation of impact of different schemes of animal
husbandry programmes being implemented by the State Government a
comprehensive study will be conducted by hiering the team of experts by
out sourcing the professional and reputed organization is being proposed.

3.2. New Schemes


3.2.1 Animal health Programme
This is a new scheme under which every Touring veterinary officers have
to organize Pashu Chikitsa Sivir twice in a week to provide intensive
64

health coverage, treatment, vaccination, deworming and to generate


awareness of healthy animal husbandry practices among animal keepers.

3.2.2 Animal Breeding Sector

4. TRIBAL SUB PLAN


A sum of Rs. 1596.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 3000.00 lakhs during Annual Plan 2008-09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 355.00 lakhs has been earmarked for Special Component Sub
Plan out of total approved outlay of Rs. 3000.00 lakhs during Annual Plan
2008-09.

6. The Outlay approved for various schemes are given as under -


Animal Husbandry
Annual Plan 2008-09
Sl. (Rs. In Lakh)
Type of Scheme
No. Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. State Share (CSS/CS)
i) Swine fever control under ASCAD Scheme 75 75
ii) Integrated Sample survey of milk, egg, meat and 20 20
wool production
iii) Establishment of Veterinary Council 20 20

B. State Plan Schemes


i) Modernization of Hospital Dispensaries
ii) Establishment of Class I dispensaries 454 454
iii) Mobile polyclinic
iv) Direction and Administration 475 465 10
v) Payment to Consultant
vi) Frozen Semen Bank 109 109
vii) Strengthening of Animal Health and Production 80 80
Institute, Kanke
viii) Control of animal diseases and livestock diseases 25 25
65

ix) Scheme for establishment of Statistical Cell 3 3


x) Piggery Development 206 191 15
xi) Cattle shows and fair 110 36 30 44
xii) Extension and Training 93.9 70 23.9

xiii) Poultry Development 472 180 160 132


xiv) Distribution of Animal and Birds
xv) Sheep and Goat Development 400 180 150 70
xvi) Establishment of GO SEVA AYOG 50 50
xvii) Jharkhand State Dev. Implementation Agency for 0.1 0.1
Cattle Buffalo Dev.
New Schemes
xviix) Animal Health Programme for referral Hospital 331 331
xix) Animal Breeding Sector 76 63 13
Grand Total 3000 1596 355 1049

SUMMARY (Animal Husbandry )


Sl. Type of Scheme Annual Plan 2008-09
No.
(Rs. In Lakh)

Approved Flow to Flow to Flow to


Outlay TSP SCSP OSP
A. Earmarked

B. State Share (CSS/CS) 115 0 0 115


C. State Plan Schemes
i. Continuing Schemes 2478 1202 355 921
ii. New Schemes 407 394 13
D. EAP ( if any)
E. Other
Grand Total 3000 1596 355 1049
66

I.C. DAIRY DEVELOPMENT

1. INTRODUCTION

Dairy is important to supplement income and reduce under-employment


of small and marginal farmers and agricultural labourers. It also helps in
improving the nutritional standard of the people. It has been realized that
dairy development could be used as a tool for bringing about socio-
economic change among the rural farming community by providing milk
production as a subsidiary occupation. There is tremendous potential for
milk production activities in this State. There is adequate market potential
for sale of milk and milk products in this State due to a number of
industrially developed areas.
As per 2003 census data, there are 76.59 lakh cows and 13.43 lakh
buffaloes in Jharkhand. Yet the per cattle productivity is very low. It
stands at 1.59 kg per cattle per day against the National average is 3 kg per
cattle per day. Per capita availability of milk is just 140 gms per person per
day as against the National average of 235 gms per capita.
Recognized breeds of cattle represent a small fraction of the total cattle
population in Jharkhand. The local indigenous breeds are mostly draft
purpose breed. The local breeds do not produce adequate milk.
Animal Profile

Sl.No. Species Census 2003 (In lakh)


1. Cattle 76.59
2. Buffalo 13.43
3. Sheep 6.80
4. Goat 50.31
5. Pig 11.08

Status of Dairy Co-operatives


All the 24 districts of Jharkhand are in non-“Operational Flood” area. At
present there are 1490 primary Dairy Cooperative Societies (DCS) with a
total membership of 48750 and 12 District Cooperative Milk Unions
have been organized so far on “AMUL” pattern, With a view to sell the
milk procured through these DCSs, 14 Milk Processing and Chilling
Centres have been installed so far with a total handling capacity of 45,000
LPD (litres per day), against which the present handling is only about
20650 LPD. Further installation of 3 Milk Processing and Chilling Centres
are under progress with a total estimated capacity of 27000 LPD.

Dairy Development
67

Achievements during 10th Plan Period


Year Milk Production Induction of Milch Strengthening of Dairy
(in lakh M.ton) Cattle Co-operative Societies
Target Prod. Target Achiev. Target Achiev.
2002-03 13.36 9.51 800 800 75 75
2003-04 13.44 9.54 2420 2420 100 100
2004-05 13.83 13.30 1486 1473 125 125
2005-06 13.86 13.36 2438 2283 125 125
2006-07 14.52 14.52 8790 8790 150 150
[ * : Anticipated ]

Š In order to run the Milk Chilling Plants and Dairy Projects on


Commercial basis under the management control of National Dairy
Development Board a State level Jharkhand Dairy Project has been
organised.
Š For Breed improvement of Milch Cattle with the help of BAIF 105 new
Dairy Cattle Development Centre has been established.
Š 160 local unemployed youths are being trained as Gokul Gram Mitra.
Š Scheme for Induction of 6632 high yielding crossbreed Milch Cattle has
been sanctioned.
Š 1450 Milk Producers have been trained for Dairy Farm Management.
Š A new dairy projects with a capacity of 20,000 LPD has been been
established at Ranchi headquarter under CSS programme.

Objectives
Š Boost up the milk production to meet the requirement of the State.
Š Milk Productivity Enhancement.
Š Induction of improved breed milch cattle to boost up the milk
production as well as income generation to the rural families.
Š Creation of awareness amongst milk producers, training the staff
dealing with extension and paravet training to rural unemployed
youths.
Š Breed improvement of especially of local non-descript breeds of cattle.
Š Efficient milk marketing system for procurement, transportation and
sale of milk and milk products.
Š Arrangement of feed, fodder (green fodder), mineral and other feed
supplement at the door steps of the milk producers.

Dairy Development
68

Targets for the Annual Plan ( 2008-09) -

Year Milk Induction Strengthening/ Training to the


Production of Milch Organization of Milk Producers’
(in lakh MT) Cattle Dairy Co-operative
Societies

Target Target Target Target

2008-09 15.21 11000 550 11000

2. STATE PLAN SCHEMES


2.1 Continuing Schemes
2.1.1 Technical Input Programme

Input Distribution Programme


This is a scheme for providing infrastructural facilities to Dairy
Cooperative Societies (DCS), such as procurement and testing
arrangements, demonstration of green fodder production, subsidy on
balanced cattle feed, dry fodder, distribution of minerals calcium and
vitamin feed supplement, hygiene kit for Clean Milk Production, chaff
cutter, organisation of infertility, vaccination & deworming camps for
dairy cattle and Mastitis control programme and other inputs distribution
for dairy cattle.

Dairy Cattle Dev./Artificial insemination


This is a scheme for providing artificial insemination services for
improvement of less productive breed and also to provide other services
like feed supplement, other inputs, deworming, vaccination and infertility
- cum - health camp of milch cattle. 160 Dairy Cattle Development
Centres (DCDC) have been established and further 150 such DCDCs are
proposed to be set up with the help of BAIF Development Research
Foundation, Pune.
Apart from this, 200 Artificial Insemination Centre ( managed by
IndiaGen Limited ) and 500 Integrated Livestock Development Centres
(managed by J.K. Trust Gram Vikas Yojana) has been proposed to set up.

Productivity Enhancement Programme


This is a programme to train and support the progressive milk producers,
support for crossed heifer rearing especially produced under breed
improvement programme to ensure the crossbreed heifer to early

Dairy Development
69

maturity and thus provide longer lacation life and to improve the milk
production right from first lactation regular reproductive health camp to
control infertility in milch cattle and create awareness among the milk
producers by organising exposure visit to progressive dairy farmers of
other State.

2.1.2 Milch Cattle Induction Programme


This is a programme to induct high yielding milch cattle with a view to
boost the milk production of the State and to provide gainful self
employment opportunity to the rural families.

2.1.3 Training and Extension


It is felt that the training of milk producers and the staff dealing with
extension is of paramount for success of the Dairy Development
programmes. It is, therefore, proposed to train the milk producers, Dairy
personnel and rural unemployed educated youths in the practice of high
yielding dairy cattle management, modern techniques of dairy farming,
milk testing and society management, clean and hygienic milk
production, indigenous milk products manufacturing training, training of
Gokul Gram Mitra. Apart from this strengthening of existing Farmers
Training Centre, Ranchi, Workshops, Seminars, Milch Catele Fare - cum -
Dairy Industries Exhibition and other extension activities with
intervention of new technologies and establishment of new Animal
Resource Management Training Institute for advance training of paravet -
cum - resource person and refresher training of veterinarians and Dairy
Technologist is proposed.
2.1.4 Regional & District Administration and Extension
This is a scheme to meet the establishment expenditure for the Office
establishment and infrastructure to be created under State Plan and to
provide infrastructural support for proper implementation of the Dairy
Development Programme.
2.1.5 Consultancy Services
To prepare the mineral mapping of the State to fulfil the dificiency of
minerals in the milch cattle. BAIF has been appointed as consultant by the
State Govt. for such work.
2.1.6 Strengthening and running of Milk Chilling Centres
Under this scheme, strengthening or renovation of existing milk chilling
centres/ Rural dairies and establishment of new dairy processing plants
with a view to provide profitable disposal of milk produced by the rural

Dairy Development
70

milk producers will be taken up with a view to provide profitable disposal


of milk produced by the rural milk producers.
2.1.7 Gokul Gram Vikas Yojana
To strengthen every village as Gokul Gram, in each cluster of 4 - 5 villages
one Gokul Gram Vikas Kendra is proposed to establish. Under this
infrastructure for milk procurement and quality control arrangement at
village level is proposed.
Under this scheme infrastructure like-community building, common cattle
shed, drinking water for cattle, establishment of bulk cooling equipment,
infrastructure for vermi-compost, bio-gas plant feed supplement and
deworming programme, Audio-visual system, green fodder
demonstration nursery, training and awareness programme will be taken
up.
2.1.8 Khatal Rehabilitation
Under the direction of Hon'ble Jharkhand High Court in PIL No.
149/2003, the govt. has entered into consultancy with NABCONs to
prepare a DPR for shifting KHATALs located within the municipal limits
of Ranchi to outside the municipal limits. A Plan for rehabilitation of 1300
khatals has been prepared by the NABCONS.

2.2. New Schemes


2.2.1 Jharkhand Dairy Project
In order to run the Dairy Projects on commercial basis and intensive
implementation of dairy development programme, a state level Jharkhand
Dairy Project have been organised and also decided to handover the
management of this Project to National Dairy Development Board for
initial period of 5 years. .
3. TRIBAL SUB PLAN
A sum of Rs. 2999.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 5100.00 lakhs during Annual Plan 2008-09.
5. SPECIAL COMPONENT SUB PLAN
A sum of Rs. 598.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. Rs. 5100.00 lakhs during
Annual Plan 2008-09.

Dairy Development
71

6. The Outlay approved for various schemes are given as under -


Dairy

Annual Plan 2008-09


Sl. (Rs. In Lakh)
Type of Scheme
No. Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. State Plan Schemes
I. Continuing Scheme
i) Technical Input Programme
a. Input Distribution 300 150 50 100
b. Dairy Cattle Dev. / Artificial Insemination 1007 671 136 200
c. Productivity Enhancement 444 222 56 166
ii) Milch Cattle Induction Programme 866 402 276 188
iii) Training and Extension 425 325 50 50
iv) Regional & District Administration and 70 0 0 70
Extension
v) Consultancy Services 38 19 0 19
vi) Strengthening and running of Milk Chilling 700 350 0 350
Centres
vii) Gokul Gram Vikas Yojana 150 60 30 60
viii) Khatal Rehabilitation 500 500 0 0
II. New Scheme 0
ix) Jharkhand Dairy Project 600 300 300
Grand Total 5100 2999 598 1503

SUMMARY (Dairy )

Annual Plan 2008-09


Sl. (Rs. In Lakh)
Type of Scheme
No. Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. Earmarked
B. State Share (CSS/CS)
C. State Plan Schemes
i. Continuing Schemes 4500 2699 598 1203
ii. New Schemes 600 300 - 300
D. EAP ( if any) - - - -
E. Other - - - -
Grand Total 5100 2999 598 1503

Dairy Development
72

I.D. FISHERIES

1. INTRODUCTION
The fisheries development programme plays an important role in
development of rural areas of Jharkhand, which has good inland water
resources. Fish serves to supplement the nutritional food requirement of
the people, its production generates additional employment opportunities
and thus improves the income level in rural areas.
The vast inland fisheries resources in the State of Jharkhand are in the
form of ponds, bandhs, reservoirs and lakes covering a total water area of
about 1,32,676 hectares scattered all over the State particularly in rural
areas. The Jharkhand State lags in fish production inspite of suitable agro-
climatic conditions. Against the national average of 2150 Kg/Hectare/
year, the present level of fish production in Jharkhand is about 1435
Kg/Hectare/year. The main reason for this is that most of the tanks are
very old and practically unsuitable for fish culture due to heavy siltation
situation and weed infestation.
Achievements
Š 6 new fish hatcheries at Ranchi, Latehar, Palamu, Deoghar, Dumka
and Hazribag were established.
Š 280 new ponds of 0.30 acres each belonging to ST farmers were
constructed on 100% subsidy basis.
Š 25 old revenue ponds were renovated
Š 300 lakh fish fingerling-stocking were done in different reservoirs.
Š 22 lakh Fish Seed were distributed.
Š 2000 fishermen were trained.
Š 200 fishermen trained in Andhra Pradesh and CIFRI, Bairakpur in
modern fish farming techniques.
Š 1200 pucca houses distributed to poor homeless Fishermen under a
CSS.
Š 54000 MT fish produced in the State.

Objectives
Š To extend modern technology of mixed crop culture and seed
production.
Š To strengthen rural economy by engaging more rural poor people in
fish farming.
Š To involve financing institutions effectively for providing loans to fish
farmers for renovation of ponds and excavation of new ponds and
water logged areas to bring more area under fish culture and for
essential pisciculture materials like seed, manure, inputs, etc.
Fisheries
73

Š To encourage local fish farmers to take up the trade of fish seed


production in private sector to meet the demands of quality fish seeds.
Š To give special stress on raising the socio-economic condition of tribal
by adopting pisciculture - oriented schemes.
Š To provide basic civic amenities like housing, drinking water and
community hall for recreation to fish farmers on a cluster basis.
Š To impart training to fish farmers in improved techniques of fish
rearing and seed production and also to arrange for demonstration of
these techniques in selected government fish farms.

2. STATE SHARE TO CSS


2.1. Fish Farmers Development Agency [ 75 : 25 ]:
The main objective of this scheme is renovation of tanks and excavation of
new ponds, farms, hatcheries and develop water-logged areas to bring
them under pisciculture and for essential pisciculture materials namely
seed, manure, inputs, etc. and to introduce among fishermen modern
techniques of fish production through training programmes and provide
loans to fish farmers depending on availability of water bodies.
Under this scheme, 75% cost is borne by the Government of India and the
remaining 25% amount is provided by the State Government.
2.2. Housing Scheme for Fishermen [ 50 : 50 ]:
The main objective of the scheme is to develop model fishermen villages.
The Central and the State Governments share the cost of this scheme on
50:50 basis. 1200 houses with basic amenities have been proposed during
the year 2008-09.
2.3. Fisheries Training and Extension Scheme [ 80 : 20 ]:
The aim of this scheme is to equip the fishermen with modern techniques
of fish production through training programmes at the State level.
2.4. Prawn Hatchery Development Scheme [ 80 : 20 ]:
There is great potential for culture of fresh water prawns in Jharkhand.
There is no prawn hatchery in Jharkhand as of now although there is great
demand for the same. The aim of this scheme is to provide prawn seeds
for the development of Prawn Hatchery.
2.5 NFDB [ 90 : 10 ]

3. STATE PLAN SCHEMES


3.1 Continuing Schemes
3.1.1 Reorganization of the Directorate of Fisheries
The main objective of this scheme is to provide better administration,
monitoring and co-ordination between different departments and to
generate schemes for various fisheries programmes in the State. The

Fisheries
74

existing organizational structure both at the directorate and field level has
to be further strengthened.
3.1.2 Reclamation and development of Tank Fisheries
This scheme intends to produce quality carp fish seed needed for
increasing fish production and stocking quality seeds in different kinds of
water bodies.
3.1.3. Development of Reservoir Fisheries
The production of fish from reservoirs is very low which is required to be
raised. For achieving this objective, regular stocking of advance
fingerlings is of utmost importance.
3.1.4. Subsidy to Fish Farmers
This is a scheme to provide financial assistance to fish farmers, especially
those belonging to SC and ST categories. Under this scheme, subsidy is
given to them for construction of 30 decimal ponds for pisciculture. The
purpose of the scheme is to involve local fish farmers to take up the
activity of fish and fish seed production.
3.1.5. Extension Scheme for Fisheries
The main objective of the scheme is to demonstrate polyculture of spawn,
rearing fish seed, fish production and to give technical training to the
individual fish farmers at the state fish farms.
3.1.6. Fisheries Research Scheme
The objective of the scheme is to help fish farmers in enhancing fish
production and undertake water and soil analysis to examine and analyse
the causes of low productivity of the ponds.
3.1.7 Establishment of 6 new district offices
Six new district offices are proposed to open in the newly created districts
– Latehar, Simdega, Koderma, Pakur, Sarikela & Jamtara.
3.1.8 Survey, Monitoring and Evaluation Scheme
Under this scheme, it is proposed to prepare DPR through Department /
NGOs / Consultants for the development of fisheries in the State.
3.1.9 Reorganization of fish farmer Training Centre

4. TRIBAL SUB PLAN


A sum of Rs. 810.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs.2000.00 lakhs during Annual Plan 2008-09.

Fisheries
75

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 299.00 lakhs has been earmarked for Special Component Sub
Plan out of total approved outlay of Rs.2000.00 lakhs during Annual Plan
2008-09.

6. The Outlay approved for various schemes are given as under -


Fisheries
Sl. Type of Scheme Annual Plan 2008-09
No.
(Rs. In Lakh)
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Share (CSS/CS)
i) Fish Farmers Development Agency 30 9 4 17
[ 75 : 25 ]
ii) Housing Scheme for Fishermen [ 50 : 50 ] 260 160 40 60

iii) Fisheries Training and Extension [ 80 : 20 ] 4 2 1 1

iv) Prawn Hatchery Development [80 : 20 ] 8 8 0 0

v) NFDB (90:10) 40 12 6 22

B. State Plan Schemes


Continuing Schemes
i) Reorganization of the Directorate of 35 35 0 0
Fisheries:
ii) Reclamation and development of Tank 1058 360 160 538
Fisheries
iii) Development of Reservoir Fisheries: 150 60 32 58

iv) Extension Scheme for Fisheries: 120 36 18 66

v) Subsidy to Fish Farmers: 165 50 26 89

vi) Fisheries Research Scheme 25 8 4 13

vii) Creation of Six new Districts Office 50 15 8 27

viii) Survey, Monitoring & Evaluation Scheme 5 5 0 0

ix) Reorganization of fish farmer training 50 50 0


Centre
Grand Total 2000 810 299 891

Fisheries
76

SUMMARY TABLE (Fishery)

Sl. Type of Scheme Annual Plan 2008-09


No.
(Rs. In Lakh)
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) 342 191 51 100
C. State Plan Schemes
i. Continuing Schemes 1658 619 248 791
ii. New Schemes
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 2000 810 299 891

Fisheries
34

I.E. COOPERATION

1. INTRODUCTION
Co-operative movements aim at all round economic and social
development of small and marginal farmers, artisans. For the upliftment
of the people of this state, in general, and the tribal community as a whole
co-operatives have to play a vital and significant role. As co-operative
societies people with limited resources participate into an organised
economic activities for benefits of participants through mutual sharing of
management activity. Co-operative depends upon – self help through
mutual help. Agriculture is the life-line of the people living in this state.
They are engaged in small industries as well. In this context, the broad
objective of the co-operative is to handle this responsibility by providing
short and medium term production credit through a network of large
LAMPS and PACS and the eight District Central Co-operative Banks.
Department of Co-operation is widely spread over the state. There are
offices at divisional level, district level, block level. Eight District Central
Co-operative banks namely- Ranchi-Khunti, Gumla-Simdega, Chaibasa,
Deoghar, Dhanbad, Hazaribagh, Giridih and Dumka are functioning in
the state to provide short term credit to the farmers belonging to specially
Tribal and weaker sections of the State. Besides this, there are large
number of different types of Co-operative Societies through which
different types of economic activities are being implemented for the
upliftment of the people.

ACHIEVEMENTS
• Supply of 15386 M.T fertilizers to the farmers through
LAMPS/PACS/Vaypar Mandal Sahyog Samiti (VMSS).
• Providing banking facilities in rural areas and mobilizing small deposits
to the tune of Rupees 118 crores in 8,90,404 Accounts through
LAMPS/PACS under JAMA VRIDHI YOJANA.
• 6,39,936 Non Loanee Farmers have been covered under National
Agriculture Insurance Scheme through LAMPS/PACS during Kharif
2007.
• Rupees 4.93 crore have been disbursed to 49,043 farmers as compensation
for Kharif 2006 Crop Damage under National agriculture Insurance
Scheme in this financial year 2007-08.
• Self employment to 2161 women have been provided through 7 Primary
Rural Women’s Poultry Self-Supporting Co-operative Societies in the State

Rural Development
35

and the total sale of these societies taken together stands as Rupees
8,16,73,154.00 and the societies with the total profit Rupees 51,79,197.00 in
current fiscal year.
• NCDC sponsored ICDP programme is being implemented in Hazaribagh,
Deoghar & Dumka Districts. 152 LAMPS/PACS godowns cum offices
have been constructed and 15200 M.T. storage capacity have been created
during financial year 2007-08.
• Infrastructures like Cash Counter, Locker, Furniture & Fixture have been
provided to 127 LAMPS/PACS.

OBJECTIVES:
• Socio-economic development of the state through co-operatives
• Planning for co-operative development
• Evolution of appropriate policy for growth of co-operatives
• Upgrading skill through training, promoting good governances through
study visits
• Infrastructure development
• Providing financial support

2. State Share to CSS


2.1 National Agriculture Insurance Scheme (50 : 50)
This scheme is being implemented for the welfare of the farmers as per the
direction of the government of India since Kharif -2001. The implementing
agency is Agriculture Insurance Company of India. All loanee and non-
loanee farmers are the beneficiaries of this Scheme. State government
contributes its share as subsidy for premium, indemnity as well as other
administrative charges. 6,39,936 farmers have insured their crops in the
year 2007-08. The expenditure in this scheme is shared by the State
Government and Central Government in the ratio 50:50.
2.2 Revival of short term Co-operative structure (68 : 28 : 4)
Under the revival of Short Term Co-operative Structure. Government of
India, State Government and The Co-operative Societies concerned will
have to share in the ratio 68:28:4 in the revival package. According to an
estimate the revival package will be of rupees 120 crore in which Central
Government will pay about 30 (Thirty) crore in the first year and rest of
amount in succeeding two years.

Rural Development
36

3. State Plan Schemes:


3.1 Continuing Schemes:
3.1.1 Integrated Co-operative Development Projects (ICDP)
The scheme aims at strengthening existing primary co-operative societies
and developing PACS/LAMPS for multi purpose activities to improve
existing co-operative structure and modernization and upgradation of
management of co-operatives. The financial assistance is provided to co-
operative societies through state government in the form of loan, share
capital as well as subsidy under re-finance scheme of National Co-
operative Development Corporation (NCDC). In the year 2007-08, the
project was implemented in Hazaribagh, Deoghar, Dumka, Garhwa,
Giridih and Latehar Districts. The projects in Deoghar, Dumka and
Hazaribagh are going to completed. The projects in the districts of
Garhwa, Giridih and Latehar will continue.
3.1.2 Managerial Subsidy to PACS/LAMPS
As per the recommendation of Reserve Bank of India PACS and LAMPS
were formed. There are 474 LAMPS and 857 PACS in the state. There is a
provision of one Paid Manager in each PACS&LAMPS and one
Cooperative Extension Officer as Member Secretary in each LAMPS. The
salaries of these personnel are given as subsidy by the government and
disbursed through District Cadre Co-operative Societies.
3.13 Infrastructure for Primary Co-operative Societies and Regional offices
There is an urgent need not only to create new/additional infrastructure
but also to ensure that such infrastructure already created become
functional. To achieve this goal construction and repairing of godowns in
selected LAMPS/PACS/VMSS is required. At the same time, construction
of combined office buildings for regional offices and strengthening of
infrastructure of the same are also necessary.
3.1.4 Grant to Co-operative Training Centers at Ranchi and Deoghar
There are two Co-operative Training Centers at Ranchi and Deoghar each
in the state, which imparts training to Junior Co-operative Officers, Office
Bearers and Employees of different co-operative societies in the state.
3.1.5 Share capital and Subsidy/grant to special types of co-operative
societies for welfare of SC/ST/OBC and Women
In the state, there are so many special types of co-operative societies
registered for the welfare of SC/ST/OBC/Women. These societies are not
in a position to progress at their own due to paucity of fund. Therefore,
the state government assists them by way of granting subsidy.

Rural Development
37

3.1.6 Share capital contribution to JASCOLAMF, VEGFED and


JHAMCOFED
The Jharkhand State Co-operative Lac Marketing and Procurement
Federation Limited (JASCOLAMF) and The Jharkhand State Vegetable
Co-operative Marketing Federation (VEGFED) are the apex cooperative
institutions of the state and they are doing procurement, processing, value
addition and marketing of lack and vegetables respectively. Jharkhand
State Minor Forest Produce Co-operative Development and Marketing
Federation Limited (JHAMCOFED) is also an apex co-operative institution
and will undertake procurement, processing, value addition, marketing
and development of minor forest produce.

3.2 NEW SCHEMES:


3.2.1 Integrated Co-operative Development Project (ICDP)
As per the policy of the State Government ten new selected districts of the
State namely Lohardaga, Dhanbad, Godda, Sahebganj, East Singhbhum,
Koderma, Chatra, Jamtara, Pakur & Palamu are to be covered under
NCDC added Integrated Co-operative Development Project. A sum of
Rupees 2637.006 Lakh is proposed for the year 2008-09 as Loan, Subsidy
and Share Capital.
3.2.2 Computerization of DCCBS
3.2.3 Loan and subsidy to NCDC aided self-supporting Co-operative
Societies.
3.2.4 Loan and subsidy to VEGFED for construction and cold storage and
other infrastructure.

4. TRIBAL SUB PLAN


A sum of Rs. 5222.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 10000.00 lakhs during Annual Plan 2008-09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 1950.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 10000.00 lakhs during Annual
Plan 2008-09.

Rural Development
38

6. The Outlay approved for various schemes are given as under -


Co-operative
Annual Plan 2008-09
Sl. (Rs. In Lakh)
Type of Scheme
No.
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Share (CSS/CS)
i) National Agricultural Insurance Scheme (50 : 50) 740 315 60 365
ii) Revival of short term of Co-operative structure 1000 450 450 100
(68 : 28)
B. State Plan Schemes
Continuing Schemes
i) Integrated Co-operative Development Projects 711 182 80 449
ii) Managerial subsidy to PACS / LAMPS 200 90 20 90
iii) Infrastructure for primary Co-operative Societies 40 15 10 15
and Regional Offices
iv) Grant to Co-operative Training Centres at Ranchi 7 5 2 0
& Deoghar
v) Share Capital and Subsidy /Grant to Special type 700 340 70 290
of Co-operative
Societies for the Welfare of ST/SC/ OBC and
Women
vi) Share Capital Contribution to JASCOLAMPF, 600 500 25 75
VEGFED and JHAMCOFED
New Schemes
vii) Integrated Co-operative Development Project 2102 1140 207 755
(ICDP)
Additional New Scheme
viii) Computerization of DCCBS 500 225 50 225
ix) Loan and subsidy to NCDC aided Self 800 400 300 100
Supporting Co-operative Societies
x) Loan and subsidy to VEGFED for construction 2600 1560 676 364
and cold storage and other infrastructure

Grand Total 10000 5222 1950 2828

Rural Development
39

SUMMARY (Co-operative )

Annual Plan 2008-09


Sl. (Rs. In Lakh)
Type of Scheme
No.
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- --
B. State Share (CSS/CS) 1740 765 510 465
C. State Plan Schemes
i. Continuing Schemes 2258 1132 207 919
ii. New Schemes 6002 3325 1233 1444
D. EAP ( if any) -- -- --
E. Other -- -- --
Grand Total 10000 5222 1950 2828

Rural Development
40

II. A RURAL DEVELOPEMNT

1. INTRODUCTION

The Rural Development Department, Jharkhand implements several


programmes that aim at alleviating rural poverty through creation of
infrastructure, by generating sustainable employment opportunities for
the rural poor. It provides subsidies for acquiring employment generating
assets in order to generate self employment opportunities for the families
below poverty line. The banks provide the proportionate credit to the
beneficiaries.

Achievement
• SGSY : Year 2006-07 8908 SHGs formed
21883 Swarojgaries Assisted
2007-08 4530 SHGs formed

• NAREGA : 403.965 lakh mandays created


26314 schemes completed

• IAY : 57695 houses constructed


24486 houses upgraded

• DPAP 1332 projects taken up


6.66 lakh ha. area in 15 districts covered

• IWDP 24 projects taken up


1.246 lakh ha. area in 14 districts covered

2. State Share to CSS

2.1 SWARNAJAYANTI GRAM SWAROJGAR YOJANA (SGSY) (75 : 25)


Swarnjayanti Gram Swarozgar Yojana (SGSY) is a programme which
caters for creation of self-employment opportunities such by forming self
help groups of the poor, imparting training, delivery of credit, providing
for technological inputs and infrastructure and marketing facilities. SGSY
is funded by the Centre and the State in the ratio of 75:25.

Rural Development
41

The objective of SGSY is to bring the assisted poor families (Swarozgaris)


above the poverty line in three years, by providing them income
generating assets through a mix of a bank credit and government subsidy.
The above allocation includes provision for DRDA (Administration)
meant to be spent on DRDAs at district label. Physical target for SGSY
depends on per capita investment vis-à-vis number of individual
beneficiaries and economically assisted SHGs.

2.2 National Rural Employment Guarantee Act (NREGA) 2005 (90 : 10)
The centre government has launched a very important scheme namely
National Rural Employment Guarantee Act (NREGA) 2005 in order to
provide for the enhancement of livelihood security of the households in
rural areas of the country by providing at least 100 days guaranteed wage
employment in every financial year to every households whose adult
members volunteer to do unskilled manual work and for matters
connected therewith or incidental thereto.
The proposed allocation for the year 2008-09 is based on no. of registered
families upto Nov. 2007.

2.3 INDIRA AWAS YOJANA (75 : 25)


IAY is a flagship rural housing scheme which is being implemented by the
Govt. of India with the aim of providing shelter to the rural people living
below the poverty line. During 1999-2000 the Govt. of India has decided
that 20% of the IAY fund will be utilised to tackle the problem of
upgrading the unserviceable kachcha houses in the rural areas. The
remaining 80% of the funds are targeted specially for new houses to the
shelter less rural BPL households. Under this programme, together with
new construction and upgradation schemes there is another component
called “Credit cum subsidy scheme for rural housing”.
Physical target for 2008-09
New Construction : 49207
Upgradation : 24630

2.4 DROUGHT PRONE AREA PROGRAMME & INTEGRATED


WASTELEND DEVELOPMENT PROGRAMME
Through these programmes area specific works suited to the
environmental concerns of the region are taken up in order to promote the
process of sustainable development.

Rural Development
42

3. State Plan Schemes


3.1 Continuing Schemes
3.1.1 Legislature Scheme
Local area development schemes as proposed by members of legislature
are taken up under this programme. Under this scheme a sum of Rs.
200.00 lakhs is provided to each Member of State Legislature. The
enhancement from Rs. 150 lakh/MLA to Rs. 200 Lakh/MLA is in order to
carry out schemes under “Lok Jal Samridhi Yojana”.
3.1.2 Mukhyamantri Vikas Yojana(MMVY)
Local area development schemes as proposed by members of
legislature are taken up under this programme. Under this scheme a sum
of Rs. 100.00 lakhs is provided to each member of State Legislature.
3.1.3 NREGA (Establishment)
3.1.4 Block Building
3.1.5 SIRD
In view the training needs of functionaries of Rural Development
Department at different levels strengthening of SIRD is proposed.
3.1.6 Strengthening of DRDA
In the light of the enormity of tasks bestowed upon DRDAs, it would not
be out of place to make provisions for facilitating them with better
competent manpower, software and hardware.
3.1.7 Mukhya Mantri Gram Setu Yojana (MMGSY)
• Pul Pulia/ Bridges
• Special Division Establishment
3.1.8 Block Administration
3.1.9 DRDA Administration
3.1.10 Establishment of District Plan

4. New Schemes
4.1 Watershed Directorate

5. TRIBAL SUB PLAN


A sum of Rs. 31704.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 61500.00 lakhs during Annual Plan 2008-09.

6. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 6751.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of 61500.00 lakhs during Annual
Plan 2008-09.

Rural Development
43

7. The Outlay approved for various schemes are given as under –

Rural Development
Annual Plan (2008-09)
Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Share (CSS/CS)
i) SGSY (75 : 25) 2905 1404 226 1275
ii) NREGA 15223 7274 1750 6199
iii) IAY 3000 1500 300 1200
v) DPAP/IWDP 200 95 25 80
B. State Plan Schemes
Continuing Schemes
Community Development
i) Legislature Scheme (Lok Jal Smridhi Yojna) 16400 9180 1810 5410
ii) Mukhaya Mantri Vikas Yojna (MMVY) 8200 4590 1230 2380
iii) NREGA establishment 70 70 0
iv) Block Buildings 100 60 40
v) SIRD 100 100 0
vi) Strengthening of DRDA 105 62 43
vii) Mukhaya Mantri Gram Setu Yojna (MMGSY) 11500 4750 1410 5340
viii) Special Division Establishment 2733 1875 858
ix) Block Administration 581 495 86
x) DRDA Administration 303 203 100
xi) Establishment of District Plan 30 16 14
New Schemes
xi) Watershed Directorate 50 30 20
Grand Total 61500 31704 6751 23045

Rural Development
44

SUMMARY (Rural Dev.)

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow
Outlay TSP SCSP to OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) 21328 10273 2301 8754
C. State Plan Schemes
i. Continuing Schemes/ 40122 21401 4450 14271
New Schemes 50 30 20
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 61500 31704 6751 23045

Rural Development
39

II.B RURAL WORKS DEPARTMENT

1. INTRODUCTION
Rural Engineering Organization (R.E.O.) takes up creation of
infrastructure in the rural areas. The major schemes that have been
undertaken by the REO fall into two categories.
™ NREP Establishment
™ Minimum Needs Programme (Rural Roads)
Achievement during 10th Five Year Plan

Physical
No. of Length (In
Type Year Achievement
Schemes km)
Numbers Length
2000-01 213 1041.6320 206 958.189
2001-02 135 948.6800 119 791.134
2002-03 193 1757.0220 162 1415.534
Roads 2003-04 329 2155.106 286 1783.374
2004-05 305 1643.353 174 784.019
2005-06 2 0.0000 2 0.00
2006-07 215 1490.327 17 38.649
Total 1392 9036.12 966 5770.565
2000-01 26 2.013 20 1.108
2001-02 11 0.948 7 0.50
2002-03 21 3.786 18 3.315
Bridges 2003-04 12 1.091 11 0.591
2004-05 7 1.0923 5 0.445
2005-06 0 0.0000 0 0.00
2006-07 4 0.436 0 0.00
Total 81 9.372 61 5.959
Grand Total 1473 9045.492 1027 5776.858

2. STATE PLAN SCHEMES


2.1 Rural Roads
Under this programme unconnected rural areas will be connected by
roads and bridges. The existing rural roads will also be upgraded. The
socio economic conditions of the habitants will be enhanced.

Rural Works Department


40

2.2 REO Establishment (Strengthening of JSRRDA)


Jharkhand State Rural Roads Development Authority (JSRRDA) has
already been constituted in the state for better management of “Rural
Connectivity Programme” especially PMGSY. This important organ needs
capacity building. The services of qualified professionals are proposed to
be obtained by outsourcing or hiring on contract basis. Regular training
will be undertaken to keep the personnel abreast with latest knowledge in
the field.
2.3 NREP Establishment
The establishment cost of the NREP is met under this scheme.

3. TRIBAL SUB PLAN


A sum of Rs. 13963.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 28000.00 lakhs during Annual Plan 2008-09.

4. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 3107.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 28000.00lakhs during Annual
Plan 2008-09.

5. The Outlay approved for various schemes are given as under -


Rural Works Department

Annual Plan (2008-09)


(Rs. in lakh)
Sl.
Type of Scheme
No. Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP

A. State Plan Schemes


i) Rural Roads 25890 12303 3107 10480
ii) REO Estab. 1094 916 178
iii) Strengthening of JSRRDA
iii) NREP Estab. 1016 744 272
Grand Total 28000 13963 3107 10930

Rural Works Department


41

SUMMARY
Sl. No. Type of Scheme Annual Plan (2008-09)
(Rs. in lakh)
Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes / 28000 13963 3107 10930
New Schemes
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 28000 13963 3107 10930

Rural Works Department


42

II.C. PANCHAYATI RAJ

1. INTRODUCTION
In order to strengthen Panchayati Raj Institutions (PRIs) as per the spirit
of the Constitution and the Jharkhand Panchayat Raj Act, 2001, the
Department of Panchayati Raj has under taken several schemes such as
construction of Panchayat Bhawan (Buildings), grants to Zila Parishad
area, construction of Dak Bungalows, Office buildings, Bus stands in Zila
Parishad areas, Training to PRIs Officials and Staffs, Grants to Gram
Shabha etc is also being undertaken.

2. EARMARKED SCHEME
2.1. Backward Region Grant Fund Scheme (BRGF)
Under BRGF each panchayat or municipality within the backward
districts will be the unit for planning. Plans prepared by panchayat or
municipality will be consolidated into district plan by the DPC.
The objectives of BRGF are –
Š To redress regional imbalances in development
Š Bridge critical gaps in local infrastructure and other development
requirements.
Š Strengthen Panchayat / Municipality level governance to facilitate
participatory planning, decision making, implementation and
monitoring to reflect local need.
Š Provide professional support to local bodies
Š Improve the performance and delivery of functions assigned to
panchayat / municipalities.
Under BRGF, each district will receive a fixed minimum amount Rs. 10
crore p.a. 50% of the amount will be allocated on the basis of share of the
population of the district in total population of all backward districts. The
remaining 50% will be distributed on the basis of the share of the area of
the district in total area of all backward districts.
21 districts of the Jharkhand State except East Singhbhum have been
selected under BRGF programme.
3. State Plan
3.1 Continued Scheme
3.1.1 Construction of Panchayat Building
3.1.2 Grant to Zila Parishad or construction of Roads and Bus stand

Panchayati Raj
43

4. TRIBAL SUB PLAN


A sum of Rs. 9816.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 21000.00 lakhs during Annual Plan 2008-09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 1994.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 21000.00 lakhs during Annual
Plan 2008-09.
6. The Outlay approved for various schemes are given as under -
Panchayati Raj

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked Schemes
i) BRGF 16856 7766 1400 7690
State Plan Scheme
Continued Scheme
ii) Construction of Panchayat Building 4094 2000 594 1500
iii) Grants to Zila Parishad or Constr. of 50 50 0 0
roads
& Bus stand
Grand Total 21000 9816 1994 9190

SUMMARY

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked 16856 7766 1400 7690
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes/ 4144 2050 594 1500
New Schemes -- -- -- --
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 21000 9816 1994 9190

Panchayati Raj
92

II.D REVENUE AND LAND REFORMS

1. INTRODUCTION
The Land Reform measures initiated by the State Government have taken
progressive outlook. Yet the Govt. feels the need for adoption of some
important schemes for the implementation of land reform measures.

2. CENTRALLY SPOSORED SCHEMES


2.1 Updating of land records [ 50 : 50 ]
It is a central plan with 50% central assistance. Under this scheme, the
amount is released conditionally that the State Govt. share along with the
Central Govt. share will be utilised for implementation of the Scheme.

3. STATE PLAN SCHEMES


3.1 Continuing Schemes
3.1.1 Land Survey and Settlement
Record of rights of the land owners are being updated by six survey and
settlement offices in the state. It is proposed to print the Cadastral Survey,
Maps and other records.
3.1.2 Development of Hat, Bazar, Fair, Tank, River basin etc. under “Sairat”
This scheme aims at developing Hat, Bazar & Mela under Sairats which
are important for day to day life of the rural people.
3.1.3 Construction / Renovation of Revenue Tehsiles, Kutcheries and Damin
Bungalows
Old Revenue Kutchery buildings require repair and maintenance. New
buildings at many places are also required. There are 2014 Halka
Kutcheries in the State, out of which 136 need full renovation and 313
need general repairs. 44 Damin bungalows also need full renovation. The
State Govt. has decided to construct Halka Kutchery Buildings as are
necessary during the 11th plan period.
3.1.4 Restoration of Illegally transferred/alienated Tribal Land
Legal Aid to Tribals
In order to prevent alienation of raiyati interest of tribals of the state,
specific restrictions have been incorporated in the Chhotanagpur Tenancy
Act, 1908 and Santhal Pargana Tenancy Act. In case of illegal transfer of
raiyati rights provision for restoration of their land have been provided.
The amount of legal assistance has been fixed at Rs. 5000/- per case.
Financial Aid

Science & Technology


93

After restoration of illegally alienated land a financial assistance of Rs.


5000/- per acre is given to start cultivation.

3.1.5 Economic aid to the Allottees of Surplus Ceiling Land


The surplus lands are allotted to STs / SCs / Backwards / Retired
Soldiers for cultivation purposes under the Ceiling Act of 1961. They are
assisted with financial assistance of Rs. 1000.00 per acre for development
of land.

3.1.6 Strengthening of Revenue Administration


Six new districts were created after the creation of the State. In these
districts, district land acquisition offices is proposed to establish. For
strengthening of Revenue Administration vehicles have been purchased
for Additional Collectors, DCLR and Circle Officers. During 2008-09,
purchase of vehicles for Land Acquisition Officers, Settlement Officers &
seven Circle Officers are proposed.

3.1.7 Training to Revenue Personnel


For supervision of land work under control of Revenue & Land Reforms
Deptt. Regional Offices, Survey and Settlement offices, Land Acquisition
Offices, the officers working in those offices need to be provided training
on rules and regulations.

4. TRIBAL SUB PLAN


A sum of Rs. 1180.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 2500.00 lakhs during Annual Plan 2008-09.

Science & Technology


94

5. The Outlay approved for various schemes are given as under -

Revenue and Land Reform


Sl. No. Type of Scheme Annual Plan (2008-09)
(Rs. in lakh)
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Share to CSS
i) Strengthening of Revenue Administration 250 0 0 250
and updating of land records
B. State Plan Schemes
Continuing Schemes
i) Land Survey and settlement 150 75 0 75

ii) Development of Hat, Bazar and Mela 50 25 0 25

under Sairat
iii) Construction /Rennovation of Tehsil 1875 968 0 907

Kutchery, Damin Banglow Halka


Karamchari Quarters/Anchal Adhikari
iv) a) Legal aid for the restoration of 75 50 0 25

illegally transferred of land of Tribals


b) Financial Aid 25 15 0 10

v) Aid to Allottees of surplus ceiling land 5 2 0 3

vi) Revenue Administration & Purchase 30 25 0 5

of Vehicles
vii) Training to Revenue official 40 20 0 20

Grand Total 2500 1180 0 1320

Science & Technology


95

SUMMARY (Revenue)
Sl. No. Annual Plan (2008-09)
(Rs. in lakh)
Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) 250 250
C. State Plan Schemes
i. Continuing Schemes 2250 1180 0 1070
ii. New Schemes -- -- -- --
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 2500 1180 0 1320

III.A. MAJOR AND MEDIUM IRRIGATION

1. INTRODUCTION
Approximately 75 - 80% of the population is dependent on agriculture
sector for their livelihood. Existing irrigation coverage as per 3rd M.I.
Census is merely 22% of the available arable land (as against the national
coverage of over 40%). Irrigation is, therefore, the critical factor for
increasing agricultural production & productivity.
By the end of March’ 2007, 6.8297 lakh ha. irrigation potential has been
created after completion of 1 major, 98 medium irrigation projects and a
number of minor irrigation schemes.
Given the existing under developed status of the irrigation sector in the
state as well as the promise it holds for a breakthrough in the assault
against poverty a multi pronged strategy is being employed with the
following main components –
(a) Increase irrigation coverage through a mix of major,
medium, minor irrigation schemes and ground water
schemes
(b) Making existing irrigation network more efficient
(c) Move towards effective Participatory Irrigation Management
(PIM) and
(d) Strengthen and upgrade the administrative infrastructure &
improve the existing delivery and monitoring mechanism.

Science & Technology


96

Achievement
Š Two medium irrigation schemes, namely, Latratu and Tapkara were
completed, creating an additional irrigation potential of 3560 Ha.
Š 13500 Ha. of irrigation potential was created from Subernrekha
Multipurpose Project, Ajay Barrage Project, Kansjore, Katri,
Dhansinghtoli, Sonua and Upper Sankh Reservoir Projects uptill now.
Š 28,520 Ha. of lost irrigation potential was restored from 45 old medium
irrigation projects.
Š 246 Check Dams/ Series Check Dams were constructed creating 18,372
ha. of irrigation potential.
Š 1845 Micro-lift irrigation schemes were completed creating 18,644 ha. of
irrigation potential.
Š 286 MI schemes were completed creating 10309 ha. of irrigation
potential.
Š 424 Ahar / Ponds were constructed creating 5668 ha. of irrigation
potential.
Š 3304 dug wells of different-dia were dug-up creating 3906 ha. of
irrigation potential.
Š 10 Lift Irrigation projects were completed creating 380 ha. of irrigation
potential.
221 MI project/Check Dam Project, 58 LI Projects and Old Water Bodies
were renovated restoring 15,436 ha. of lost irrigation potential.
At the beginning of the 10th Plan assured irrigation was available to only 8% of
cultivable area. During the 10th Plan period, it was increased to 22 % (As per
Third Minor Irrigation Census report). Our target is to bring 25% of the total
cultivable land under assured irrigation by 2010.

Objectives
Š Major irrigation project are to be completed in a time bound manner.
Š Through proper management of water irrigated area may be increased
by another 10-15 % of cultivable area. Moisture level and under
ground table may also improve through ground water recharging.
Š Thrust may be given on minor and lift irrigation projects as they are
more suitable and economical and have short gestation period.

2. EARMARKED SCHEME
2.1 A.I.B.P ( M & MI )
Six irrigation projects as earmarked schemes, receiving assistance under
A.I.B.P. of MoWR, GOI are indicated as below :-
i. Gumani Barrage Project

Science & Technology


97

ii. Upper Sankh Res. Project

iii. Surangi Res. Project

iv. Sonua Res. Project

v. Panchkhero Res. Project

vi. Kansjore Res. Project

The Govt. of Jharkhand is pursuing for inclusion of Ajay Barrage Project;


Punasi Reservoir Project, Konar Irrigation Project and Kanchi weir re-
construction schemes under A.I.B.P. On approval by MoWR, GOI under
AIBP for 2008-09, additional amounts may be received as Central Grant.
3. STATE SHARE TO CSS/CS
3.1. Dam Safety
The Ministry of Water Resources is piloting a Dam Safety project for
World Bank assistance, wherein Jharkhand has also been included.
Accordingly a token provision is being proposed for this.

4. STATE PLAN SCHEMES


4.1 Continuing Schemes
Following major / medium schemes are under various stages of
execution. They are proposed for execution during 2008-09
4.1.1 Major Irrigation Projects
i. Subernrekha Multipurpose Project
ii. Ajay Barrage Project
iii. Gumani Barrage Project
iv. Amanat Barrage Projects
v. Konar Irrigation Project
vi. North Koel Project

vii. Bateshwar Sthan Pump Canal Project

4.1.2 Medium Irrigation Projects

i. Bhairwa Reservoir Project


ii. Suru Reservoir Project

iii. Nakti Reservoir Project


iv. Remrekha Reservoir Project
v. Jharjhara Reservoir Project
vi. Garhi Reservoir Project

Science & Technology


98

vii. Keso Reservoir Project


viii. Batane Reservoir Project
ix. Salaiya Reservoir Project
x. Kans Reservoir Project
xi. Satpotka Reservoir Project
xii. Torai Reservoir Project
xiii. Katri Reservoir Project
xiv. Dhansingh Toli Reservoir Project

4.1.3 Restoration of Old Irrigation Projects

4.2 New Schemes


The following new major / medium irrigation schemes are proposed to be
taken up during 2008-09 -
4.2.1 Major Irrigation Projects
i. Burhai Reservoir Project
ii. Kanhar Reservoir Project
iii. Tahle Reservoir Project
4.2.2 Medium Irrigation Projects
i. Sukari Reservoir Project
ii. Tilaiya Irrigation .Project
iii. Domani Nala Reservoir Project
iv. Kulhar Reservoir Project
v. Kanti Reservoir Project
vi. Raisa Reservoir Projects
vii. Tajna Reservoir Project
viii. Re-construction of Head - Works of Kanchi Weir Scheme
ix. Amant Reservoir Project
x. Suali Reservoir Project
xi. Emaliakogh Reservoir Project
xii. Right Banki Reservoir Project
xiii. Ranital Reservoir Project
xiv. Jinjoi Reservoir Project
xv. Phoolwaria Reservoir Project

4.2.3 E.R.M. of Completed Irrigation Projects


4.2.4 Capacity Building, Strengthening & Upgradation
i. Improved Water Management
ii. Survey and Investigation, Consultancy and Evaluation

Science & Technology


99

iii. E. Governance
iv. Constitution of Jharkhand Irrigation Commission
v. Bench Marking of Project
vi. Renovation of Old Vehicles/ New Vehicles for Newly created Divisions
vii. Renovation of Building & construction of new buildings
viii. Training/Workshop/Seminar Departmental Officers/Water User
Association/ Beneficiaries Committee
ix. National Hydrology Project

III. B. MINOR IRRIGATION

1. INTRODUCTION
The State of Jharkhand is situated in a plateau region having the
undulating topography. The annual precipitation in this State is 1300 mm
to 1400 mm. Minor & lift irrigation schemes are more suitable for this
region as they are economical to construct and have low gestation period
and do not involve any major land acquisition problem or displacement of
population.
Out of the total cultivable area (29.74 lakh ha.), only 12.765 lakh ha. can be
irrigated through Major and Medium Irrigation Schemes while the
remaining area has to be covered through Minor / Lift Irrigation
/Ground Water Schemes.

2. STATE SHARE TO CSS/CS


2.1 Pilot Project for restoration of Water Bodies [ 75 : 25 ]
Two districts Saraikela-Kharsawan and Palamu have been selected by
Ministry of Water Resources Govt. of India under the Pilot Project for
restoration of Water Bodies on 75:25 share basis.

3. STATE PLAN SCHEMES


3.1. Continuing Scheme
The following ongoing schemes are proposed during FY 2008-09 :-
i. Construction of Check Dam/ Series Check Dam.
ii. Construction of M.I. Schemes
iii. Construction of Microlift Projects
iv. Construction & Rehabilitation of Water Harvesting structures (M.I.
Projects/Check dams/ Ponds/Ahar etc) of Gram Bhagirathi Yojana under
NABARD
v. Ground Water Survey & Recharging Projects
vi. Construction of different dia dugwells

Science & Technology


100

vii Renovation M.I. Project/Ch. Dam Project


viii Renovation of Lift Irrigation Project
ix Renovation of Ahar – Ponds/Augmentation of traditional water resources
x Gram Bhagirthi Yojna (DPR)
xi Liability of BPDP

3.2. New Schemes

The following new schemes are proposed for 2008-09 :


i. Construction of Check Dam/ Series Check Dam.
ii. Construction of M.I. Schemes
iii. Survey & Investigation Consultancy & Evaluation Studies.
iv Training of Officials/ N.G.O/W.U.A
v Construction & Rehabilitation of Water Harvesting structures (M.I.
Projects/Check dams/ Ponds/Ahar etc) of Gram Bhagirathi Yojana under
NABARD
vi Water Harvesting Structure through N.G.O /W.A.U. under NABARD
vii Ground Water Survey & Recharging Projects
viii Renovation M.I. Project/Ch. Dam Project
ix Renovation of Lift Irrigation Project

III. C. COMMAND AREA DEVELOPMENT (CAD)

1. INTRODUCTION
Under Command Area Development and Water Management Programme
(CADWM), three projects namely Kanchi Weir, Mayurakshi and Annaraj
have been submitted to GOI. Kanchi & Mayurakshi have been accorded
approval.

2. STATE SHARE TO CSS/CS


Mayurakshi Reservoir and Kanchi Irrigation Project are proposed to be
executed under Central assistance.

Science & Technology


101

III. D. FLOOD CONTROL

1. INTRODUCTION
Many villages on the right bank of river Ganga have been threatened due
to erosion of the bank of the River Ganga, for the last several years. The
River Ganga in endangering the National Highway No. 80 running
parallel to the river on to right bank . Some small rivers in the district of
Godda and Pakur are also causing flood problems. The river Sone is
engulfing agricultural land in Palamu district. To save the villages,
National Highway anti- erosion works such as revetment and bed bars
will have to be done.

2. STATE SHARE TO CSS/CS


2.1 Anti-erosion works in Ganga Basin (75 : 25)
The Ministry of Water Resources (MoWR), GoI is piloting Anti-erosion
works in Ganga Basin on the basis of 75 : 25. The execution of anti-erosion
works is decided on the basis of actual site conditions which are decided
after the visit of C.W.C. members.
Sl. No. Name of Project

i. Anti erosion works at various sites (Budhwaria, Narayanpur etc)


between Sahebganj & Majhartola on right bank of river Ganga.
ii. Anti erosion works at various sites (Shobhapur, Sarkanda, etc)
between Sahebganj & Majhartola on right bank of river Ganga.
iii. Restoration work of Siwaria-Goregama right embankment.

iv. River training work on right bank of Sone river between village Deori
to Dangwar in Palamu district.
v. Anti erosion work on right bank of river Ganga between
Mahabbattola to Majidtola in Sahebganj district.
3. STATE PLAN SCHEMES
3.1 Continuing Schemes
3.1.2 Flood Protection Schemes
The following projects are proposed during 2008-09 : -
Sl. No. Name of Project
i. Anti Erosion work to protect seven villages (Yadavnagar, Bada
Chandpur, Abdullapur etc.) from Gumani river in Barharwa block in
Sahebganj district.

Science & Technology


102

ii. Restoration of Sangrampur, Narayanpur, Vishrampur embankment


in Godda district.
iii. Flood protection work of Afflux land of Triveni weir.

iv. Restoration of embankment from Pathkachpara to Kenduatand on


right bank and from Mohanpur to Saptar on left bank of Patro river in
Madhupur block in Deoghar district.
v. Protection work of Anti Erosion work at Barkuria village in Chaibasa
district.
vi. Anti erosion works near Tarhassi Bazar on Amanat river in Manatu
block.
vii. Anti erosion works near Tandawa village on right bank of Danro
river.
viii. Anti erosion works near Kajaldaha & Jhunki Village on the bank of
Brahmani river in Sikaripara block of Dumka district.
3.2 New Schemes
3.2.1 Flood Protection Scheme
The following projects are proposed during 2008-09 : -
Sl. No. Name of Project
i. Raising & strengthening of embankment between Nemtari to
Kanbhara and Sarotia to Simralari in Godda block.
ii. Anti erosion on work on right bank of village Sikkimeral Palamu
district.
iii Anti erosion work on river North Koel on right bank near Raja
Harishchandra near Medaninagar.
iv Anti erosion work on left bank of north Koel river in Maghgawn
block
v Anti erosion work on left Banki river in Gaarhwa town area.
vi Anti erosion work near vill- Asangi, Adityapur, Sarikela Kharsawa.
vii Antierosion work on right bank of kharkai river, near Shastrinagar
viii Anti erosion work in village kakarbona in Pakur block
ix Anti erosion work in village Godermana on left bank of Kanhar river
x Flood protection work in right bank of Sone river between Sundrpur
& Dumarsota
xi Flood protection work of Bannasiya village in west Singhbhum
district
xii Anti erosion work to protect village – Benakara & Gaganpuna,
Hatpur from Brahamari river in Palamu district.

Science & Technology


103

Water Resources (Irrigation)

Annual Plan (2008-09)

Sl. (Rs. in lakh)


Type of Scheme Flow Flow
No. Approved Flow to
to to
Outlay OSP
TSP SCSP
A. Earmarked Schemes
i) AIBP ( M&MI) 7100 3800 2300 1000
B. State Share to CSS
ii) Dam Safety ( M&MI) 20 20 0
iii) Pilot Project for restoration of water bodies (Minor) 100 50 50
iv) Mayurakhi Res. And Kanchi Irri. Project (CAD) 200 0 40 160
v) Anti Erosion works in Ganga Basin (F) 1220 1220 0
C. State Plan Schemes
Continuing Schemes
i) Major and Medium Irrigation 33790 14520 12820 6450
ii) Minor Irrigation 9010 3789 1032 4189
iii) Flood Control 280 280 0
New Schemes
i) Major and Medium Irrigation 6890 4000 1570 1320
ii) Minor Irrigation 890 425 110 355
iii) Flood Control 500 500 0
Grand Total 60000 28604 17872 13524

SUMMARY (Water Resources)

Sl. No. Type of Scheme Annual Plan (2008-09)


(Rs. in lakh)
Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. Earmarked 7100 3800 2300 1000
B. State Share (CSS/CS) 1540 1290 40 210
C. State Plan Schemes
i. Continuing Schemes/ 43080 18589 13852 10639
New Schemes 8280 4925 1680 1675
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 60000 28604 17872 13524

Science & Technology


104

IV. ENERGY

INTRODUCTION

Power plays an important role in all round development of the State. Availability
of sufficient power is unavoidable for meeting the means of subsistence of
common people and industrial development. The aim of 11th five year plan is to
increase power generation, encourage power sector development and
competition in the sector, reduce cross subsidy, protect interest of consumers and
ensure quality power supply with transparent policies.

Achievements

• No. of villages electrified (2000-01) : 3859


• No. of villages electrified (2002-07) : 5400
• No. of BPL houses electrified : 73,676
• Sanctioned projects for 13 districts worth : Rs. 1316.61 Cr.
• The Jharkhand State Electricity Regulatory Commission, the Consumer
Grievance Redressal Forum, the Electricity Ombudsman, and the District
Coordination Committees are in place as required under the Electricity
Act 2003.

2. State Share to CSS

2.1 Rajiv Gandhi Gramin Vidyutikarn Yojana (RGGVY) (90 : 10)


Under centrally sponsored RGGVY scheme all unelectrified villages of
state (approx 19239) are to be electrified. Above scheme has been financed
by REC as 90% grant and 10% loan and fund is directly made available to
executing agencies. (Six (6) districts have been allotted to J.S.E.B., eight (8)
districts to DVC and eight (8) districts to N.T.P.C.) 10% Loan and amount
of interest payable thereon is to be borne by State Government.

2.2 A.P.D.R.P (50 : 50)


In order to improve power distribution system in urban areas of the State
and reduce AT & C losses, Central Government has sanctioned 13
schemes in the year 2002 – 03 with project cost of Rs. 444.83 Crore. Under
this scheme the work relating to replacement of old conductors,
augmentation of transformers, feeder metering, providing electronic
meters to consumers are being executed in 13 towns of the State. The
financing of above scheme has been arranged by way of 50% grant from
Government of India and 50% loan by Jharkhand State Electricity Board
from financial institutions or own resources of Jharkhand State Electricity
Science & Technology
105

Board. Against 50% central share, 25% grant and 25% loan is to be made
available to State, but out of sanctioned central share only a sum of Rs.
175.84 Crore has been received by State and balance fund of Rs. 46.575
Crore is yet to be received. As a result of execution of works under above
scheme in respective towns, AT & C losses have reduced from 63% to 54%
and transformer burning rate has been reduced from 12% to 7.8%.
Presently issue of work orders for establishment of fuse call center for all
over state is under process. During financial year 2006 – 07, 5 schemes
(Giridih, Chaibasa, Basukinath, Dumka and Saraikela, Kharsawa) have
been sanctioned for Rs. 27.91 Crore under A.P.D.R.P. Schemes which will
be financed as 25% grant and 75% loan.

3. State Plan Schemes


3.1 Continuing Scheme
3.1.1 Generation
At the time of creation of state the demand for power was approximately
700 – 750 MW which has been increased to 1100 MW. This demand is met
by P.T.P.S. (100 MW), TVNL (200 MW), DVC (400 MW, in DVC command
area) and rest from central allocation. For power generation coal based
generating unit is P.T.P.S. (installed capacity 840 MW) and Hydel power
station is S.R.H.P. Sikidri (130 MW). Out of 10 units of P.T.P.S. only 3 units
are generating approximately 110 MW power.

3.1.2 Distribution
Annual development program
In distribution sector all those villages have been taken up which are
already energized. The number of such villages is approximately 9000. In
these villages augmentation of distribution transformers & conductors is
necessary in accordance with power demand & load of these villages. In
order to ensure energy accounting installation of meters, augmentation of
Power Sub Station (P.S.S.) & T.R.W. Civil work in pole factory and works
for construction of 40 new Power Sub Station (P.S.S.) is to be taken up.
It is proposed for establishment of data center for bringing qualitative
improvement in information technology system of Electricity Boards in
which computer and IT related equipments are to be installed.
Establishment of Data center will help in proper co-ordination in power
generation, transmission & distribution and required data and
information will be made available immediately. This will require
software, hardware along with proper infrastructure.

Under RGGVY scheme all unelectrified villages in the state are being
electrified. On implementation of power distribution in all villages in the
State, Birsa agricultural pump energization scheme is to be started for

Science & Technology


106

development of agriculture sector in rural area. For this scheme 3 phase 11


KV HT line, 3 phase LT line, 3 phase 100 KVA / 63 KVA D/S/S
construction and single phase 16 KVA D/S/S construction, 3 phase
electronic meter installation and service connection is proposed.
3.1.3 Transmission
In order to improve transmission system in the State, 6 nos. 132 / 33 kV
transmission grid substation in Latehar, Lohardagga, Kanke, Sahebganj,
Pakur and Dumka are being constructed under old scheme.
In addition to this the work relating to construction of 132 kV Double
Circuit transformer line Dumka – Deoghar and Dumka & Pakur are in
progress.

Augmentation of Grid S/S


The work relating to augmentation of 220/ 132 / 33 kV G/S/S in Lalmatia
(N.T.P.C.), Replacement of conductor of 8C and 9C line of Hatia – P.T.P.S.,
provisional of additional power transformer is Hatia, Namkum, Goelkera,
Noamundi G/S/S, 33 kV Sparebay for Hatia, Namkum, Garhwa,
Rajkharsawan, Goelkera, Dalbhumgarh, Adityapur and construction of
G/S/S in Hatia and Namkum are in progress.
The work relating to replacement of breaker, C.T., C.R. Panel, V.C.B.,
Battery charger isolator and re-conducting is in progress at Kend posi,
Kamdara, Hatia, RajKharsawa, Noamundi, Garwaha, Deoghar, Namkum
and Goelkera.
3.1.4 Support of Successor Companies of J.S.E.B.
Unbundling of J.S.E.B. is to be done in accordance with provision of
Indian Electricity Act 2003, for which four companies have been formed
and transfer scheme has been approved by cabinet with some conditions.
In order to provide initial financial assistance after unbundling of the
Board into four successor companies.
3.1.5 Jharkhand Renewable Energy Development Agencies (JREDA)
Under non conventional energy development programme following
works are to be taken up. National Biogas (Domestic Size – 2 Cu. Meter)
Institutional (15 Cub. meter, 20 Cub. meter, 35 Cub. meter and 45 Cub.
meter).
National improved Chulha program – Solar photo voltaic programme
(Solar lantern, Solar spect light, Solar Summercible pump – 1800 watt),
Solar Hot water equipment and Solar Cooler dish type under solar
thermal programme, Survey, Third Party inspection, Consultancy
services. Awareness comp, training programme & establishment.
Every family is to be provided with one solar lantern, one improved
chulhas, installation of bio gas plant to beneficiaries and installation of

Science & Technology


107

solar street light and installation of solar street light as per requirement
under integrated rural energization programme.
3.1.6 Mini Hydel Project
The work relating to ongoing eight mini hydel projects in the state is to be
completed for which Rs. 25.00 Crore is proposed in the financial year 2008
– 09.
3.1.7 Consultancy for Energy Conservation and misc. work
Energy Conservation programme is undertaken in the state in accordance
with guidelines of Bureau of Energy Efficiency Government of India. For
development of power sector and allied activities, consultancy services are
to be taken.
3.1.8 KoelKaro Hydel Power Station
For salary and establishment expenditure of director land acquisition and
rehabilitation.

3.1.9 Tenughat Vidyut Nigam Ltd.

It is proposed to convert earlier loan amount of Rs. 1000.00 Crore into


equity and to provide Rs. 250.00 Crore as additional equity capital for
increasing the share capital of TVNL. The equity capital of TVNL was Rs.
100 Crore at the time of creation of TVNL.

3.2 New Scheme

3.2.1 Generation
Under continuing scheme, the work relating to renovation for unit no. 3, 5,
9 & 10, comprehensive overhauling of unit no. 1, 2 & 6. Pollution control
measures and augmentation of switch yard are being executed in P.T.P.S.
Under new scheme R & M of unit no. 8 comprehensive overhauling of
unit no. 7, capacity addition through P.P.P. (Public Private Partnership),
development of coal block and mining and desilting of nalkari are to be
taken up. The two units (2 x 65 MW) of Swarnrekha hydel power project,
Sikidiri is approximately 30 years old and comprehensive overhauling of
these units has not been done so far. As such in order to enhance the
capacity and ensure effective generation from these units overhauling and
modernization (RLA / R&M) work is to be taken up.

3.2.2 Distribution

Birsa Agriculture Energization

Science & Technology


108

In order to ensure proper irrigation system in rural areas of the State,


B.A.P.E.S. is to be started to provide 125000 electrical connections to
agricultural pump sets.
IT initiatives / E governance

It is proposed to introduce IT system for effective implementation of


power distribution system in JSEB through proper co-ordination of power
generation, transmission, load management & distribution system. Under
these scheme services of experienced consultant is to be utilized and
scheme is to be implemented in phase manner. A sum of Rs. 40 Crore is
proposed for this work.

3.2.3 Transmission

Under new scheme 220 / 132 / 33 kV grid substation is to be constructed


in Chatra, Govindpur, Chaibasa, Giridih, Sikaripara and Koderma.

Augmentation of Grid S/S

The work relating to augmentation of transformation capacity of 132 / 33


/ 25 kV G/S/S is in progress in Dalbhumgarh, Goelkera, Jadugoda,
Noamundi and Gumla.

3.2.4 State load Despatch Centre (SLDC)


In accordance with provision of Sec. 31 of Indian Electricity Act 2003
independent state load dispatch center is to be established. At present
C.L.D.C. of J.S.E.B. has been notified as S.L.D.C. The establishment of
S.L.D.C. is to be taken up immediately considering possibilities of
unbundling of Board and IPPs in power sector. For establishment of
S.L.D.C. with latest technologies & modern equipments, infrastructures
and trained manpower is to be arranged.

5. TRIBAL SUB PLAN


A sum of Rs. 20875.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 70000.00 lakhs during Annual Plan 2008-09.

6. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 7005.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 70000.00 lakhs during Annual
Plan 2008-09.
7. The Outlay approved for various schemes are given as under -

Science & Technology


109

Energy

Annual Plan (2008-09)

Sl. (Rs. in lakh)


Type of Scheme Flow
No. Approved Flow to Flow to
to
Outlay TSP OSP
SCSP
A. State Share (CSS/CS)
i) RGGVY (90 : 10) 12500 6875 1620 4005
ii) APDRP (50 : 50) 5000 2750 650 1600
B. State Plan Schemes
Continuing Scheme
i) Generation 10000 10000
ii) Distribution 8700 2750 635 5315
iii) Transmission 15000 7000 3500 4500
iv) JREDA 3500 1500 600 1400
v) Mini Hydel Project 1100 1100
vi) Energy Conservation/ Consultancy 145 145
and other works
vii) Support to Successor Company of JSEB 10500 10500
viii) Koel Karo Hydel Projects 55 55
ix) TVNL 500 500
New Scheme
xiii) SLDC 3000 0 3000
Grand Total 70000 20875 7005 42120

Science & Technology


110

SUMMARY (Energy)

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked --
B. State Share (CSS/CS) 17500 9625 2270 5605
C. State Plan Schemes
i. Continuing Schemes 49500 11250 4735 33515
ii. New Schemes 3000 3000
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 70000 20875 7005 42120

VI.A CIVIL AVIATION

1. INTRODUCTION
After the creation of Jharkhand State, programmes are being implemented
to provide better structural & technical facilities for existing airports & air
transport systems within the State. The Jharkhand Flying Institute is the
only DGCA approved organization in Jharkhand for providing training
facilities to pilots and Aircraft maintenance engineers.
Š State Aviation intends to develop & modernize in-depth evaluation
to ensure that Aviation standards comply with Civil Aviation Safety
Requirements and other DGCA regulations.

Achievements
After the creation of Jharkhand state, programmes had been envisaged for
providing better structural and technical facilities for the airports in
Jharkhand. Various steps were taken for extension of airstrips,
construction of Helipads etc. Construction of airstrip at Dumka has been
completed. Constructions of Helipads have been completed in four
districts.

OBJECTIVES AND STRATEGIES


• Construction of new airstrips in 12 districts of the state for better
and fast connectivity within the state thus facilating landing of
Boeing and other bigger aircrafts.

Science & Technology


111

• Strengthening and extension of existing seven airstrips in the state


• Induction of one police-version helicopter for better surveillance
and rescue operations
• Induction of one VIP version Helicopter for VVIP Movement
within the state.
• Purchase of one twin engine aircraft for VVIP flying +
multipurpose role within and outside the state.
• Creation of Jharkhand flying Institutes in 4 places for training of
youth of Jharkhand as pilots on PPP basis.
• To provide air transport facilities for tourism and medical
evacuation on commercial basis
• Purchase of three trainer aircrafts and two motor glider for the
newly established flying Institutes for training purpose and to
promote aero sports and tourism on commercial basis.

2. STATE PLAN SCHEMES


2.1 Continuing Scheme
2.1.1 Purchase of Agusta AW139 and one Agusta 109(P)

2.2 New Scheme


2.2.1 Purchase of 01 (One) King Air B-200 Aircraft :- Purchase of 1 (One)
King Air B-200 Aircraft
It is purposed to purchase to one Air B-200 Aircraft for VIP flying for
long range flight. ex-Delhi/ Mumbai/ Kolkatta Chennai etc. Purchase
of the aircraft could save charter expenses to a great extend.

2.2.2 Development of Infrastructure for Jharkhand Flying Institute in


Hazaribagh/Dhanbad/Palamou/Dhalbhumgarh or Chakulia
Participating in the business process of outsourcing revolution on
Public Private Partnership and keeping in view the shortage of pilots it
is planned to established international level Aviation Pilot training
institute as per ICAO standards for the youth of tribal areas of
Jharkhand in the district of Hazaribagh, Dhanbad, Palamou,
Dhalbhumgarh or Chakulia at Rs. 5.00 crores each.

2.2.3 Construction of Aircargo terminal base of Chakulia


Jharkhand state is an important Industrial, animal husbandry,
floriculture and horticulture base. To make an arrangement of import
and exports of the mineral goods by air transport it is proposed to
construct Air cargo handling unit at Chakuliya. It could also serve as
an alternative for clearing cargo congestion at Kolkatta Airport.

Science & Technology


112

2.2.4 Construction of ATC and Met Office with equipments at


Hazaribagh, Dumka, Palamau and Dhanbad

2.2.5 Fund for acquisition of Land for expansion of Birsa Munda

3. TRIBAL SUB PLAN


A sum of Rs. 6500.00 lakhs has been earmarked for Tribal Sub Plan out
of total approved outlay of Rs. 10000.00 lakhs during Annual Plan
2008-09.
4. The Outlay approved for various schemes are given as under -

Civil Aviation

Annual Plan 2008-09


(Rs. In Lakh)
Sl.
Type of Scheme
No.
Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. State Plan Schemes
Continuing Schemes
i) Purchase of Agusta 139 and Agusta 109P Helicopter 2200 2200 0
New Schemes
ii) Purchase of 1 (One) King Air B-200 Aircraft. 2500 2500
iii) Development of infrastructure for Jharkhand Flying 600 600
Intitute in Hazaribagh, Dhanbad, Palamu on PPP
basis
iv) Infrastructure development of Air Cargo base at 300 300 0
Chakuliya on PPP basis
v) Construction of ATC and Met office with equipments 400 400
at Hazaribag Dumka, Palamau and Dhanbad
vi) Fund for acquisition of Land for expansion of Birsa 4000 4000 0
Munda airport, Ranchi
Grand Total 10000 6500 0 3500

SUMMARY (Civil Aviation)

Annual Plan 2008-09


(Rs. In Lakh)
Sl.
Type of Scheme
No.
Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. Earmarked
B. State Share (CSS/CS)

Science & Technology


113

C. State Plan Schemes


i. Continuing Schemes 2200 2200 0
ii. New Schemes 7800 4300 3500
D. EAP ( if any)
E. Other
Grand Total 10000 6500 0 3500

VI.B. ROADS & BRIDGES

1. INTRODUCTION:

The Road infrastructure in Jharkhand requires augmentation. Growth of


population and vehicles has burdened the existing road network. This
needs to be taken care of by means of maintenance, upgradation and
construction.
At present, the roads in the state of Jharkhand have following deficiencies:
Š Inadequate width
Š Missing links/ Bridges
Š Inadequate Pavement thickness
Š Weak and Narrow Bridges
Š Inadequate Curves/Super Elevation
Š Poor Riding Quality
Š Deficient Traffic Safety Provisions
Š Bottle necks due to congestion and railway level crossing
The Road infrastructure of the state is divided basically into three
categories -
a. National Highway
b. State Highway & Major District Roads.
c. Rural Roads & Minor District Roads.
National Highways is the primary system of roads. Similarly State
Highways, Major Districts Roads (MDR) and other roads provide
secondary system and the Rural Roads and Minor District Roads provide
tertiary systems. The present availability of these roads is as follows:

Category of roads Approx length (Kms)


National Highways including NH-2 1844 Km
(transferred to NHDP)

Science & Technology


114

State Highways & PWD Roads including 6880 Km


Major District roads (including urban roads)

The National Highways are the responsibility of the Ministry of Surface


Transport, Govt. of India. These are maintained by funding from GoI by
the Road Construction Department as its "Agency". The State Highways ,
Major District Roads and other roads known as "PWD Roads" are the
property of Road Construction Department, GoJ . These roads are
maintained and developed by Road Construction Department, GoJ
primarily through funding from State Budget. The other sources of
funding are central assistance or other schemes like state's share in Central
Road Fund etc.

Achievements

Sl. Year 2002-03 2003-04 2004-05 2005-06 2006-07 Total


No.
Work
1 Strengthening /
Widening &
274 548 782 645 250 2498
Strengthening of
Roads ( in Km)
2 Bridge completed
10 3 8 16 0 37
(in Nos.)

Š Construction of Section - VII of four lane Ranchi Ring Road has been
started.
Š Strategic REO/ District Board roads have been included in the existing
road network of PWD roads and have been under implementation of
upgradation and strengthening.

Objective of the 11th Plan


Main objectives in the road sector are as under -
• Connecting all District HQs with Capital Ranchi with well laid two
lane roads
• Connecting various District HQs with neighbouring
District HQs with two lane roads.
• Four laning of strategic roads & High Density Corridors

Science & Technology


115

• Strengthening & double laning all interstate State-


Highways.
• Replacing all old and distressed bridges on SHs
• Widening of all bridges on SHs to two lane
• Strengthening & Two laning of Inter State Roads
• Widening & strengthening of Roads of Tourism importance
• Widening & strengthening of Roads of Economic Importance
Widening & strengthening of all roads of the State Capital, Ranchi
Construction of ROBs. Unbridged gaps in road network to be bridged.
• Strategic REO/ District Board roads have been included
in the existing road network of PWD roads, which need
upgradation and strengthening.

2. STATE PLAN
2.1 Continuing Scheme
2.1.1 Roads
2.1.2 Bridges
2.1.3 Machines & Tools
2.1.4 Director & Administration

2.2 New Scheme


2.2.1 Roads
2.2.2 Bridges

3. EXTERNALLY AIDED PROJECT (EAP)


The State Government has proposed to undertake the work of widening &
strengthening to 2 – 4 lanes roads around 550 Kms of State Highways (SH)
& others roads with assistance from Asian Development Bank (ADB). This
scheme will be implemented on 80 : 20 basis.
In first phase, "Govindpur - Jamtara - Dumka - Sahebganj Road" is
proposed.

4. TRIBAL SUB PLAN


A sum of Rs. 40940.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 60000.00 lakhs during Annual Plan 2008-09.
5. The Outlay approved for various schemes are given as under -

Science & Technology


116

Roads & Bridges

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Plan Schemes
Continuing Schemes
i) Roads 44668 29468 15200
ii) Bridges 5480 2640 2840
iii) Machines & Tools 822 442 380
iv) Director & Administration 493 313 180
New Schemes
v) Roads 5667 3367 2300
vi) Bridges 1370 710 660
B. EAP
v) widening & strengthening to 2 – 4 lanes for 5500 4000 1500
roads around 550 Kms of State Highways
Grand Total 64000 40940 23060

SUMMARY (Roads & Bridges)

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes 51463 32863 18600
ii. New Schemes 7037 4077 2960
D. EAP ( if any) 5500 4000 1500
E. Other -- --
Grand Total 64000 40940 23060

Science & Technology


117

INTRODUCTION
Transport and Communication related activity is an important area of
activity in the Services Sector. Smooth movement of goods and hassle free
public transport system is one of the indices of modern and better
administered state. Better administered Transport system act not only as
catalyst for growth but also provides employment to many. The Govt. of
Jharkhand is determined to improve the transport system and take it to
the level of states, which are rated as BEST in the country during the
eleventh five year plan. Following are the important departmental
schemes, which are proposed to be taken up in the financial year 2008-09.

2. STATE SHARE TO CSS

2.1 Railway Projects


The State Government of Jharkhand has entered into an MOU with the
Ministry of Railways (19th Feb. 2002) for taking up six railway projects in
the state. The projects had to be completed in five years time. The total
cost of the projects was estimated at Rs. 1997.00 Crore. The cost of the
projects had to be shared between Government of Jharkhand (66.66%) and
the Ministry of Railway (33.33%) upto 2006-07 a sum of Rs. 608.36 crore
has been given to the Railways. All rail projects are in progress and the
work of Ranchi to Lohardaga has been completed and extension upto Tori
is in under construction. The term of M.O.U. has lapsed on 18.02.2007 and
the renewal of the M.O.U. is in process. After renewal of MOU the balance
amount will be given to railway in phasewise.

3. STATE PLAN SCHEMES


3.1 Continuing Schemes
3.1.1 Setting Up of Check Post
For effective collection of tax and provide other service facilities schemes
for installation of 9 check posts on inter state border initiated. These check
posts will be preventing not only the tax evasion, but also clandestine and
illegal vehicle movement. The scheme is already under implementation.

3.1.2 Building Construction & Repair


Majority of offices are being old government premises and not
convenient. So, Schemes of improvement and extension of the existing
buildings of RTA's and DTO offices are proposed to be taken up. The
construction of 11 new District Transport Offices, an estimate of Rs.
363.00 lacs has been prepared @ 33.00 lacs per unit, for this a sum Rs
100.00 lacs is available in current financial year 2007-08.
3.2 New Schemes

Science & Technology


118

3.2.1 Purchase of Vehicles


For the collection of revenue and implementation of Motor Vehicle rules
effectively it is necessary to provide vehicles to all district transport and
enforcement officer.

3.2.2 Payment for Special Services


A sum of Rs. 5000.00 lacs has to be received as loan from HUDCO against
the plan outlay of Rs. 17000.00 lacs in the financial year 2007-08 and
necessary action is being done.

4. TRIBAL SUB PLAN


A sum of Rs. 6692.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 17000.00 lakhs during Annual Plan 2008-09.
5. The Outlay approved for various schemes are given as under -

Transport

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Share to CSS (66.66 : 33.33)
i) Railway Projects 16310 6300 10010

B. State Plan Schemes


Continuing Schemes
i) Setting Up of Check Post 579 325 254
ii) Building Construction & Repair 100 67 33
New Schemes
iii) Purchase of Vehicles 5 5
iv) Payment for Special Services 6 6
Grand Total 17000 6692 10308

Science & Technology


119

SUMMARY (Transport)

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) 16310 6300 10010
C. State Plan Schemes
i. Continuing Schemes 679 392 287
ii. New Schemes 11 11
D. EAP ( if any) -- --
E. Other -- --
Grand Total 17000 6692 10308

Science & Technology


120

VII.A SCIENCE & TECHNOLOGY

1. INTRODUCTION
The situation of Jharkhand inherited inadequate and poor technical
education infrastructure, the State has launched a drive to bring about
substantial enhancement in the access to technical education for the
students of the State as well as enhancing quality and standards of Science
and Technical education. Programmes, which have been launched by the
State Government, are oriented towards substantial capacity addition by
taking up establishment of new Institutions such as Engineering Colleges,
Polytechnics, Centers for Advanced Studies in Departments of
Universities/Colleges.
Investments in the Government sector have been proposed to be
substantially stepped up and at the same time all out efforts are proposed
to mobilize private sector investment as well as launch joint venture
initiatives and projects based upon PPP model so that the largest possible
number of students from Jharkhand are benefited and are able to have
access to the means of Higher education in Science and Technology at
reasonable cost so that they do not have to migrate to other States for the
same.

Strategy / Initiatives
The State Government has decided to take the following steps for
improvement in science and technology education both in qualitative and
quantitative terms -

• To complete the construction and establishment of four


Engineering Colleges in the Government sector at Ramgarh,
Chaibasa Dumka & Deoghar. The Construction work commenced
during 2007-08.
• To mobilize private sector investments through invitation of
Expression of Interest and making available the necessary
Government infrastructure on approved terms. On the basis of the
invitation of the EOI, (06) six nos. of proposed Institutions [(05) five
Engineering Colleges plus (01) one Polytechnic)] have already been
recommended for consideration for approval by the AICTE.
• Efforts are being made to mobilize joint sector collaboration with
public sector/ private sector undertakings/ industries, in particular
with Vinova Bhave University, SAIL. XLRI, NIFFT for the purpose
of setting up Engineering, Management Colleges/ Polytechnics in
the joint sector.

Science & Technology


121

• Sustained efforts will be made to facilitate setting up of


Engineering Colleges by renowned private sector investors, who
are already engaged in this field in other States.
• As a measure of quality improvement, the State has taken steps to
bring about improvement in the functioning of the existing
technical Institutions in the Government Sector. A study has
already been entrusted to XLRI to undertake evaluation of the
existing Polytechnics with the objective of substantially
augmenting their level of functioning and taken up formulation of
TEQIP Phase-II Programme on that basis.
• BIT, Sindri has already been covered in the TEQIP Programme
under the World Bank Project. Steps have been initiated for
improving the functioning of the Engineering College in the
Government sector by providing greater autonomy, creating
additional infrastructure facilities and induction and in-service
training programmes for the faculty and various other steps under
the Projects. The college has already introduced the semester
system and obtained NBA accreditation in most branches. It is
proposed to remodel the College and a project will be formulated
to enable it to achieve the deemed University status.
• Curriculum of the Polytechnics has been revised in consultation
with NITTTR and the new curriculum which is more focused
towards current needs and aspirations will be introduced from the
next financial year.
• Five new Women’s Industrial Schools are proposed to be set up
with focus on vocational education for women.
• Vocational education programmes have already been taken up in
the Polytechnics under the control of the Government. It will be
ensured that Polytechnic education in Jharkhand is strongly linked
to vocational training programmes for the weaker sections and
women as well as community development programmes.
• Setting-up of a Technical University for the State of Jharkhand not
only to affiliate higher technical Institutes but also to set up
Departments, Colleges, and Centers of advanced Study etc.

2. STATE PLAN SCHEMES


2.1 Continuing Schemes

2.1.1 Strengthening & modernization of Engineering College


A Project Report is being prepared to bring BIT, Sindri at par with IITs
having a Deemed University status. It is proposed to both take up
additional new courses as well as provide additional infrastructure for
this purpose. The project will also aim at restructuring the functioning of
the Institute to qualify for a Deemed University.
Science & Technology
122

2.1.2 Strengthening & modernization of Polytechnics


A study has already been taken up through XLRI to evaluate the current
level of functioning of the Polytechnics in the Government sector in the
State and the study is expected to recommend a package of measures,
which when implemented will substantially augment the functioning of
the Polytechnics in the Government sector in the State and making them
model Institutions.
2.1.3 Vocational Training Programme in Govt. Polytechnics/Mining
Institutions
Vocational Training programmes are being conducted since last year in all
the Govt. Polytechnics.
2.1.4 Grant-In-Aid to Jharkhand Council on Science & Technology
The activities of the Jharkhand Council on Science & Technology will be
focused on popularization of Science in the State as well as on promoting
higher education and research in Engineering Colleges and University
Departments. The District and Regional Science Centers, Planetarium and
Fossil Park are under execution. Schemes for scholarship and research
grants will be taken up with the objective to popularize higher Scientific
and Technical education.

2.1.5 State Technical Education Council


With the addition of a large number of Technical Institutions as projected,
the need to ensure adequate standards in testing and certification norms
will be met through strengthening of the existing State Board of Technical
Education:
2.1.6. Establish new Technical Institution in private/joint sector on PPP basis
2.1.7 Grant-In-Aid to private sector and Technical Institutes/Universities
To encourage for setting up new Technical Institutions in Private sector
Government has taken a decision to provide land at nominal price,
connecting road, water and electricity facilities are to be provided for
setting up new Technical Institutes in the private sector. In addition,
Advanced Centers of Study such as Centre for Nano Technology and
Advanced Centre for Energy and Environment etc. are also proposed to
be taken up with the State assistance.
BIT Mesra is renowned Engineering College in Non-Govt. Sector. The
Govt. of is committed to meet the expenditure of 50% in respect of
admissible DA/ADA & differences to revised pay to the teaching & Non-
teaching staff of the institute. In lieu of that 50% seats are filled up by the
competent students from the State.
2.1.8 Setting up of Technical University and Women’s Industrial Schools
A University of Technology will be set up to affiliate colleges and centers
of study providing degree education in various areas of technology and
generally promote Technical Education in the State. To enhance the
coverage of existing Women's Industrial Schools additional five nos. are

Science & Technology


123

proposed to be set up during the 11th five year plan to provide additional
vocational training opportunities for women.
In anticipation of complete the construction work the Govt. has decided
to run the Govt. Industrial Schools in other Govt. or rental building for the
aforesaid purpose.

2.1.9 Construction of Technical Education Institutes (Polytechnic/


Engineering Colleges)
At present there are 13 Government Polytechnics. Eight additional
Polytechnics have been sanctioned by the Government to be taken up for
construction immediately. In addition the Ministry of Human Resource
Development has identified eleven Districts on the basis of various
parameters of backwardness where new Polytechnics will be set up with
100% assistance by the Ministry of Human Resources Development. In
addition, the private sector will be encouraged to set up Polytechnics.
Thus it will be ensured that every District is provided at least one
Polytechnic by the end of 11th Five Year Plan. Wherever necessary,
additional infrastructure will also be provided for the existing
Government Polytechnics from the funds under this Budget head.
The Chaibasa, Ramgarh, Dumka and Deoghar Engineering Colleges,
which have been taken up for construction will be completed during the
11th five year Plan period.

3. EXTERNALLY AIDED PROJECT


3.1. Technical Education Quality Improvement Programme (TEQIP)
To make existing Technical Institutions including Polytechnic Institutions
up-to-date and center of excellence, projects will be taken up.

4. TRIBAL SUB PLAN


A sum of Rs. 4158.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 10000.00 lakhs during Annual Plan 2008-09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 1746.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 10000.00 lakhs during Annual
Plan 2008-09.

Science & Technology


124

6. The Outlay approved for various schemes are given as under -


Science & Technology

Sl. Type of Scheme Annual Plan (2008-09)


No.
(Rs. in lakh)
Approved Flow Flow to Flow
Outlay to TSP SCSP to OSP
A. State Plan Schemes
Continuing Schemes
i) Strengthening & Modernization of Engineering 250 100 40 110
College (for Degree / PG Courses)
ii) Strengthening & Modernization of Polytechnics/ 500 209 88 203
Mining Institution (for Diploma Courses)
iii) Vocational Training Programme in Polytechnics/ 25 10 4 11
Mining Institutions
iv) Grant in aid to Jharkhand Council on Science & 140 56 21 63
Technology
v) State Technical Education Council 25 11 4 10
vi) Establish new Technical Institution in private/joint 750 313 132 305
Sector on PPP basis
vii) Grant to Pvt. Sector's Technical Institutes/ 800 332 140 328
University
viii) Setting up of Technical University and Industrial 210 87 37 86
Women School
ix) Construction of Technical Education Institutes ( 6800 2840 1200 2760
Polytechnics/ Engineering Colleges )
B. Externall Aided Project (EAP)
x) Technical Education Quality Improvement 500 200 80 220
Programme (Externally Aided)
Grand Total 10000 4158 1746 4096

SUMMARY (Science & Technology)

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow Flow to Flow
Outlay to TSP SCSP to OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes / 9500 3958 1666 3876
New Schemes
D. EAP ( if any) 500 200 80 220
E. Other -- -- -- --
Grand Total 10000 4158 1746 4096

Science & Technology


125

VII.B INFORMATION TECHNOLOGY

1. INTRODUCTION
The Information Technology Department of the State has been functioning
as an independent entity since June 2003. However, formally the
department was created vide State Govt. notification dated 17.09.2004.
Prior to this the functions of the department were clubbed together with
the Deptt. of Science and Technology. The scope and direction of the
functions to be carried out during the 11th Five Year Plan (2007-12) is
primarily focused on e-Governance activities and providing support for
the same. The Department of Information Technology is also mandated to
carry out computerization of the activities of various Departments. The
Department and its agencies –JAP-IT & JSAC since inception in 2003, have
taken up a number of Pilot Projects.
The IT Department would, in addition, take up training and capacity
building activities, promote growth of IT skilled personnel by setting up
IIIT and extending IT education through the exiting Technical Institution
and Universities, formulating training policy for all Government and
implementing the same, providing quality IT training facilities to
Government employees at State Division, district and Block level. The
focus of implementation of the programmes would be directed towards
the weaker and deprived section of the society including SCs and STs.
Service will be delivered to the Common Citizens through Common
Service Centre (CSC) and other computerization programme.

Strategy
Infrastructure and Connectivity
Capacity Building
NeGP
Service Delivery
Departmental Computerization
Grants to the JAP-IT and JSAC.

2. EARMARKED SCHEMES

2.1 National e-Governance Plan


The State is committed to implement various projects under the National
e-Governance Plan. Preliminary steps like creation of institutional
framework and preparation of capacity building and e-Governance road-
map has already been completed.
A detailed proposal for preparing DPR of seven Core Projects and 5
Departments for computerization as per e- Governance Road map has

Information Technology
126

been formulated. NISG has been selected as consultant for the said work.
Following are the Core Projects:-
• State Data Centre
• State Portal
• Citizens Grievance Redressal system through Call Centers/ Centre
help Desk/Portal.
• Citizens’ service Centre for Urban Areas (e-Suvidha)
• e-Procurement Solution
• Office Automation
• Integrated Financial Management Solution.

2.2 Support to JharNet


The state has taken up an ambitious project establishing the State Wide
information and communication network called JharNet and its 1st phase
has been completed. 2nd phase is near about for completion. Presently the
cost of the project is estimated at Rs 128 crores. Data, Video and Voice will
be transmitted from Headquarter to Block level and vice versa.

2.3 Common Service Centre


It will provide delivery points for Government Services to rural citizens
of the state. The centres would promote rural entrepreneurship, build
rural capacities and enable community participation and collective action
for social change. The project cost is Rs. 8612.00 lakhs. It is fully funded
by Govt of India under the NeGP program. The project period is a four
years and budget will be required for payment as revenue support to the
Service Centre Agency, out of 4562 CSCs, 987 CSCs have been
established.

3. STATE PLAN SCHEMES

3.1 Continuing Schemes

3.1.1 LAN
11 Government buildings are connected through LAN and the
maintenance of LAN and State Data Center is proposed annually.

3.1.2 Departmental Computerization:


Computerization of Transport, Treasury, Registration and Commercial
taxes has been completed but some few developments is going on. There
is also need for maintenance of installed computers and peripherals. These
projects needs for continuous supervision. So, technical manpower and
vehicles are required. Maintenance of Portal, JCMIS is going on.

Information Technology
127

3.1.3 Publicity of I.T


There is need of publicity of I.T. projects in state and country. For
exchanging the views, seminars and workshop will be organized. I.T.
Dept. has also to participate in workshop and seminars, which is
organized in country or outside country.

3.14 Video Conferencing in Jail and Court


Video conferencing facility was established in 17 Jail and district court of
state. In F.Y 2008-09 5 more jails and courts will be taken up.

3.1.5 Purchase of software


There is need of licenses of up date software i.e MS Office, Oracle etc in
different departments.

3.1.6 Grant to JAP-IT

3.1.7 Grant to JASC

3.1.8 NRIS

3.1.9 Establishment of Information Technology Dept.

Two Computer Operator/Data Entry Operator/Typist are working in the


Dept. Some Programmer and Hardware Specialist will be appointed very
soon.
3.1.10 Development and Establishment of Training Centres

4. New Schemes

4.1 Establishment of IIIT and IT Bhawan


Govt. is also determined to setup a IIIT to build up pool of skilled
manpower/ IT professionals for Business/ Industry and Education. A
proposal for construction of separate IT building has been prepared in
which offices like IT, JSAC, JAP-IT, and NIC will be housed.

4.2 Crop Condition Information System


Draught Information will be given to the Block Level and condition of
crops will be given to the farmers through satellite picture.

4.3 SATCOM based Tele Education


Education related projects would be implemented adopting useful
satellite technique in distant and rural populated areas.

Information Technology
128

4.4 Computerization of New Govt. Departments


New Departments will be computerized.
4.5 Development of infrastructure of Information Technology

4.6 Establishment of Studio for Video Conferencing based training at


Ranchi and at all district headquarters

4.7 Establishment of knowledge centres at State headquarters and district


headquarters

4.8 Computerization of Land Records

4.9 Digitization of Govt. records and Legacy data and purchase of Laptops

5. TRIBAL SUB PLAN


A sum of Rs. 5974.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 10000.00akhs during Annual Plan 2008-09.

6. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 840.00 lakhs has been earmarked for Special Component Sub
Plan out of total approved outlay of Rs. 10000.00 lakhs during Annual
Plan 2008-09.

7. The Outlay approved for various schemes are given as under -

Information Technology
Annual Plan (2008-09)
(Rs. in lakh)
Type of Scheme Flow
Sl. Approved Flow Flow to
No. to
Outlay to TSP OSP
SCSP
A. Earmarked Schemes
i) NeGP 1500 900 200 400
ii) Support to JharNet 1000 280 120 600
iii) Common Service Center 1077 301 129 647
B. State Plan Schemes
Continues Scheme
iv) Support of LAN 100 100 0
v) Computerization of other deptt. & 275 200 25 50
Running Projects
vi) Grant to JAP-IT 100 80 20 0
vii) Grant to JSAC 110 90 20 0

Information Technology
129

viii) Publicity of IT 100 60 20 20


ix) Video Conferencing in Jail and Court 75 50 25
x) Purchase of Software 120 100 20 0
xi) NRIS 228 160 30 38
xii) Estab. Of IT Deptt. 10 10 0
xiii) Development and Estb. of Training 190 140 10 40
Centres
C. New Schemes
xiv) Establishment of IIIT & I.T. Bhawan 500 400 100 0
xv) Crop Condition Information System 40 28 4 8
xvi) SATCOM based Tele Education 200 100 22 78
xvii) Computerization of New Govt. Deptt. 1000 600 120 280
xviii) Development of infrastructure of 500 500 0
Information Technology
xix) Establishment of Studio for Video 475 375 0 100
Conferencing based training at Ranchi
and at all district headquarters
xx) Establishment of knowledge centres at 900 600 0 300
State Headquarters and District
Headquarters
xxi) Computerization of Land Records 1000 500 0 500
xxii) Digitization of Govt. records and 500 400 0 100
Legacy data and purchase of Laptops
Grand Total 10000 5974 840 3186

SUMMARY (Information Technology)


Annual Plan (2008-09)
(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. Earmarked 3577 1481 449 1647
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes 1808 1390 245 173
ii. New Schemes 4615 3103 146 1366
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 10000 5974 840 3186

Information Technology
233

I.E. FOREST & WILDLIFE

1. INTRODUCTION

Forests in Jharkhand extends over 23,605 Sq Kms representing 29.61 % of


the total geographical area of the State of which 81.27% (i.e.19,185 Sq Kms)
are protected forests, 18.58% (i.e. 4,387 Sq Kms) are reserved forests and
0.15% (i.e. 33 Sq Kms.) are unclassed forests.
As per the state of forest report 2003, published by forest Survey of India
(FSI) Ministry of Environment and Forest, Govt. of India, out of the total
forest cover of the state, 2,544 Sq kms. Forests have crown density more
than 70% are classified as “Dense Forest”, 9.137 Sq Kms forests have
crown density between 40% & 70% are classified as “Open Forests.”
Thus 28.50% (i.e. 22,716 Sq Kms) of the state geographical area is under
forest cover. FSI has also evaluated the forest and Tree Cover of the state
27724 Sq Kms of the land comes under this category. Thus 34.78% of the
State Geographical area is covered under Forest and Tree Cover. There is
an increase of 79 sq km of forest cover in comparison to the year 2001.
Planning Commission, Govt. of India, has fixed monitor able targets for
the Forests and Forests and Tree Cover. It has directed the States that by
2012, the total Forests and Tree Cover Should be 33% of the States,
geographical area.
The 11 the five year Plan envisages some challenging targets for the
Department like-Block Plantation in 308860 ha, Road side Plantation 4900
Km, Gabion Plantation 317000 nos, permanent nurseries 12700 ha. The
plan lays emphasis on involvement of people in forest conservation &
development, constitution of forest development agencies, conservation &
development and creation of GIS cell at forest headquarter.
During the plan period the department has been actively implementing
the JFM resolution issued by the State Govt. in September’ 2001 It has
been made mandatory to have one third of the total strength of member
of executive committee as women to ensure the participation of the
women in the decision making in respect of forest protection &
development. A total of 28 forest development agencies (FDA) have been
constituted in the state so far.
To ensure the people’s participation in the plantation programmes,
entry point activities have been made the part of all plantation schemes.
10 to 15% of the amount earmarked for plantation is being spent on
entry point activities every year. The items of the works to be
undertaken in the villages under entry point activities are those
suggested by the villagers based upon PRA exercises.

Modern research nurseries have been created to supply a quality planting


stock to the people as well as for the departmental plantation schemes.

Planning & Development (Incl. Statistics)


111

The dept. is maintaining 240.368 ha of permanent nurseries for supplying


improved planting stock.
During the plan period (since 2002-03) approximately 150 lakhs mandays
are being generated every year. A total of 10903 committees have been
constituted so far which are protecting 21560 sq km of forest area. By the
end of the financial year 2007-08 a total 47092.26 ha of forest land have
been treated by the various forest development agencies in the state.
A training-cum-demonstration centre for development of medicinal plant
in the state has been established in Petarwar at Bokaro distt. A network of
20 demonstration centre-cum-medicinal plan nurseries have also been
established in the state with the help of National Medicinal Board.
A total of 214385.902 ha of forest land has been rehabilitated under the
state & the central sector schemes so far. The financial achievement of the
department in the state sector during the year 2003-04, 2004-05, 2005-06 &
2006-07 was 89.90%, 89.75%, 87.46% & 91% and for 2007-08 the anticipated
achievement is expected to be 99%.

2. STATE SHARE TO CSS


2.1 Palamau Tiger Reserve [ 50 : 50 ]
The Project tiger area is spread over 979.27 Sq kms. The main objective of
the scheme is to maintain and develop the project area so as to provide a
congenial environment for sustenance and breeding of the tiger and its
habitat. There has been significant improvement in ecology of the
National Park since the commencement of the scheme.

2.2 Biological Park at Ranchi (Bhagwan Birsa Biological Park) [ 50 : 50 ]


A Biological Park at Ranchi is created on the latest techniques of wildlife
management in captivity. The scheme aims to meet the infrastructure
facilities, construction of new animal enclosures and introduction of new
animals.
Public Private Partnership (PPP) concept for adopting animals for their
foods, maintenance of cages etc will be introduced to raise awareness and
sensitivity among the people.

2.3 Integrated Forest Protection Scheme ( 75 : 25 )


Under this scheme works like Forest fire mapping, Tracing fire with the
help of satellites to control fire from spreading over large area, Fire
protection, boundary pillars construction, improvement of infrastructure
facilities are being undertaken.
2.4 Integrated development of wild life habitant (50 :50)
2.5 Vulture conservation of Breeding (50 : 50)

3. STATE PLAN SCHEMES

Planning & Development (Incl. Statistics)


112

3.1 Continuing Schemes


3.1.1 Intensification of Forest Management
This scheme envisages strengthening of infrastructure of the Department
for better and effective protection, conservation and management of
natural forests as well as facilitating implementation of various
developmental programmes.
It envisages the construction of offices for CFs, DFOs and ROFs,
construction of residences for all level officers & subordinate staff
wherever housing facility in not available or inadequate, protecting
various forest offices by erecting pucca boundary wall, providing housing
facilities to staff and officers, construction of forest rest houses,
Improvement & furnishing of newly constructed Auditorium at Ranchi
vehicles for improving the mobility including computerization.
3.1.2 Planning, Monitoring and Evaluation
Under this scheme the impact assessment of the Plantations of the year
2005-06 will be carried out.
3.1.3 Training Facilities
This scheme meets the cost of in-service training of State Forest Service
Officers, Forest Rangers, Foresters & Forest Guards, Office staffs and
members of the JFM committees. Three forester’s training schools at
Ranchi (Mahilong), Hazaribagh and Chaibasa have been created to cater
the increased need of the trained personnel. These three schools are being
maintained under this scheme. The training programmes for the different
level of officials will include orientation courses/workshops on various
themes relevant to the meet the challenges in their area of their activities.

3.1.4 Forest Publicity & Public Relations


The scheme aims to sensitize the people about the importance of the
forests and motivate them in tree plantation and protection work. This is
being done by organizing Van Mahotsava, Wildlife week, exhibiting stall
in various state level and District level exhibitions, organizing the street
plays and publicizing the achievements of the Forest Department.

3.1.5 Forest Resources Survey


Degradation of Forests due to pressure of human and animal population
and mining activities needs immediate attention. The existing Forest
Resources Survey Division has started survey of forest of the state as per
the guidelines issued by the working plan code. Till 2002-03 detailed
survey for Hazaribagh east and Gumla Forest Division have been
completed. Also under the Scheme plantation over 61.42 ha has been
raised in the year 2002. Survey works for Ranchi East division and Giridih
division (including Giridih afforestation Divison) is under progress.

Planning & Development (Incl. Statistics)


113

In this current financial year it is proposed to carry out detail


survey in two Divisions and afterward every year survey of two Divisions
will be taken up. Establishment of Biodiversity Park at Ranchi is also
proposed under this scheme. Every working Division is proposed to
prepare Detail Project Report (DPR) for five years. DPR will have
provision for Development works to be taken up under various schemes.

3.1.6 Research and Evaluation


Under this scheme the plantation is to be taken up, using the modern
nursery techniques. Nurseries for raising quality bamboo seedlings have
been established under this scheme. Besides this grafted variety of Amla is
being raised for sale among the local people. Plantation of bamboo
seedlings raised by tissue culture has been tried in Latehar Destt. Rates of
improved variety seedling is purposed to be revised so that this project
may be become self-sustaining. Sponsors for various forestry related
research is to be explored so that this may earn revenue for the state.

3.1.7 Rehabilitation of Degraded Forests


The forests get degraded due to biotic pressure like illicit cutting, grazing
& fire. A typical degraded forests shows stunted & hacked tree growth
along with blank areas, devoid of any trees. The root stock of existing
vegetation is capable to grow as tree, provided it is cut back & protected.
Such areas are taken up under this scheme. The natural vegetation is
tended & blank area is planted with indigenous species. This type of
projects will be taken up under NAREGA.

3.1.8 Plantation of Quick Growing Species


This scheme aims to augment the growing stock in the degraded forests
by raising quick growing species to meet the future industrial and
commercial needs of timber. Emphasis has been placed on plantation of
timber species like shisham, gamhar, teak etc. Special efforts will be made
to plan fruit trees and other fuelwood species. The areas which are totally
devoid of the trees are chosen for plantation under this scheme. This type
of projects will be taken up under NAREGA.

3.1.9 Road side Plantation –cum- urban forestry


This scheme aims at providing a green belt in and around urban areas as
well as plantations along the main PWD road & National highways. This
will create a pollution free healthy environment for the town dwellers and
relieve the inhabitants & people travelling through the roads. Two rows of
seedlings are to be planted along the National Highways and State
Highways with barbed wired fencing & Iron gabion plantation will be

Planning & Development (Incl. Statistics)


114

done in urban areas and creation & maintenance of permanent nurseries


will be taken in this scheme.

3.1.10 Development of Minor Forest Produce


This scheme relates to raising of Sisal, used for manufacture of ropes for
lacal consumption and for marine purposes. This species (Mexican
variety) is capable of being grown on worst type of sites like barren and
degraded hills. This will be planted on a large scale in the district of
Latehar, Nurseries will be established for this purpose. Plantations of
Bamboo, the poor man’s timber, Tasar and Khair shall be taken up under
this scheme. Efforts will be taken up to link plantation raised under this
scheme with S.G.S.Y. scheme of Rural Development Deportment for
collection, value addition and marketing of MFPs collected from these
plantations.
It is proposed to take services of various service providers for formulation
of schemes, preparing DPR of the project, preparing modules for training,
marketing etc.

3.1.11 Lac Development


This scheme relates to survey of Loc host plan availability in the state & to
ensure training of farmers in new techniques of Lac cultivation,
processing, marketing & availability of broodlac to lac growers, who are
mostly tribals, in Chotanagpur and Santhal Pargana area by plantation of
lac host plants. Efforts will be taken up to link plantation raised under this
scheme with S.G.S.Y. scheme of Rural Development Deportment.
It is proposed to take services of various service providers for formulation
of schemes, preparing DPR of the project, preparing modules for training,
marketing etc.

3.1.12 Soil Conservation & Afforestation


Under this scheme such areas with are prone to soil erosion i.e. along river
embankments will be taken up, the work of soil conservation bully
plugging and plantation of soil binding species will be taken up by
different divisions. No new scheme is taken up since 2007-08. Only
ongoing projects under this scheme are proposed to be completed. This
type of projects will be taken up under NAREGA.

3.1.13 Intensive Forest Development Programme- Fuel and Fodder Project


Plantation of Fruit grafts and other species on the non forest land e.g. Gair Majrua
land & land belonging to institutions & people from weaker section of above
poverty line of the society will be taken up under this scheme. Plantation on land
belonging to BPL (Below Poverty Line) will be taken up under NAREGA.
Plantation of Biofuel (Jatropha etc) on private and Gair majrua land is to be taken
up.

Planning & Development (Incl. Statistics)


115

3.1.14 Development of Other Parks


The state has one National Park, One Biological Park in Ormanjhi, Eleven
Sanctuaries, One Crocodile Farm at Muta and One deer Park at Kalamati.
The scheme aims to take care of these parks and to meet the infrastructure
facilities, construction of new animal enclosures and introduction of new
animals. Public Private Partnership (PPP) modal is to be introduced for
repair and maintenance of various enclosures made by the department.

3.1.15 World Bank aided Participatory Forest Management Project


Works related to the preparation of mico plans based on the participation
of JFMPC & eco development committees, training of the villagers & field
staff, observation and conduct of the project in Non-TSP areas will be
taken up under this scheme. Strengthening of Project Coordination Unit
will also be taken up under this scheme.

3.1.16 Integrated Forest and Village Development Scheme


The degraded forests in the State are spread over 12,500 sq. km. Not only
the shrink in the forest area but also the degradation of the quality,
density and productivity of these forests is the cause of concern. The Joint
Forests Management and Eco-development committees constituted in the
state are now being associated in protection of forests.

Public Private Partnership (PPP) is proposed to be Introduced in the JFM


committees will be involved in raising plantations on degraded Forest
land. Many will be provided by the department directly though JFM
committees. In forest phase two committees will be identified in each
Territorial Division who will raise Plantation of native species over 50 hec.
Micro-plan prepared in consultation of these committees will be
implemented under this scheme. The scheme envisages the Plantation of
the species which are important as timber, fodder, fuel wood, minor forest
produce etc. The species which are good soil binder will also be planted
under this scheme.
It is proposed to take services of various service providers for formulation
of schemes, preparing DPR of the project.

3.2 New Schemes

3.2.1 Grant in aid :-


It is proposed to give grant in aid to Jharkhand State Pollution control
board & Jharkhand State Forest Development Corporation Ranchi
respectively.

Planning & Development (Incl. Statistics)


116

4. TRIBAL SUB PLAN


A sum of Rs. 7597.012 lakhs has been earmarked for Tribal Sub Plan out
of total approved outlay of Rs. 11500.00 lakhs during Annual Plan 2008-
09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 1240.750 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 11500.00 lakhs during Annual
Plan 2008-09.

6. The Outlay approved for various schemes are given as under -

Forest & Wildlife


Annual Plan (2008-09)
Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State share to CSS
i) Palamau Tiger Project (50:50) 60.000 60.000 0.000 0.000
ii) Bhagwan Birsa Park Ranchi (50:50) 25.000 25.000 0.000 0.000
iii) Integrated Forest Protection Scheme (75 :25) 100.000 60.000 0.000 40.000
New scheme under CSS
Integrated development of Wild life
iv) habitant (50 : 50) 40.000 20.000 0.000 20.000
v) Vulture conservation of Breeding (50 : 50) 40.000 20.000 0.000 20.000
B. State Plan Schemes
Continuing schemes
vi) Intensification of Forest Management 1436.519 1021.237 169.000 246.282
vii) Planning Monitoring & Evaluation 5.000 5.000 0.000 0.000
viii) Training Facilities 120.000 72.000 0.000 48.000
ix) Forest Publicity and Public Relation 75.000 65.000 0.000 10.000
x) Forest Resources Survey 768.600 336.750 187.850 244.000
xi) Research & Evaluation 404.900 250.000 18.900 136.000
xii) Rehabilitation of Degraded Forests 701.301 402.349 0.000 298.952
xiii) Plantation of QGS 214.325 123.867 0.000 90.458
xiv) Road Side Plantation incl. Urban Forestry 2031.059 1405.695 200.000 425.364
xv) Development of MFP 1800.000 1000.000 350.000 450.000
xvi) Lac Development 535.000 370.760 95.000 69.240
xvii) Soil Conservation & Afforestation 205.661 122.430 0.000 83.231
xviii) Intensive Forest Development Programme- 600.000 300.000 50.000 250.000
Fuel wood Fodder
Project
xix) Dev. of other Parks 1031.135 834.424 0.000 196.711
xx) Jharkhand participatory Forest management 34.000 0.000 0.000
Project 34.000
xxi) Integrated forest and Village Development 272.500 102.500 170.000
Scheme 0.000

Planning & Development (Incl. Statistics)


117
New Scheme
xxii) Grant-in-Aid to Jharkhand State Pollution 1000.000 1000.000 0.000
Control Board 0.000
Grand Total 11500.000 7597.012 1240.750 2662.238

SUMMARY
Annual Plan (2008-09)
(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) 265.000 185.000 0.000 80.000
C. State Plan Schemes
i. Continuing Schemes 10235.000 6412.012 1240.750 2582.238
ii. New Schemes 1000.000 1000.000 0.000 0.000
D. EAP ( if any) -- -- -- --
E. Other (12th Fin. Com.) -- -- -- --
Grand Total 11500.000 7597.012 1240.750 2662.238

VIII.A PLANNING AND DEVELOPMENT


(INCLUDING STATISTICS)

1. INTRODUCTION
Well equipped planning machinery is required to ensure a system of
scientific planning for the assessment of plan resources and optimal
utilisation at various levels.
The Directorate of Statistics and Evaluation is entrusted
with the responsibility of collection, compilation,
tabulation and analysis of various types of statistical
data required by the State Govt./ Central Govt.. and
Researchers. Various types of Statistics collected by the
Directorate are Agriculture Statistics, State Income,
Vital statistics, Price and other Socio-Economic
statistics. Agriculture survey wing brings out reports on
Agriculture production, District-wise crop yield, reports
for agricultural insurance schemes, and different use of
Planning & Development (Incl. Statistics)
118

land etc. Vital statistics wing is mainly entrusted with


the work of registration of births and death. State
Income wing of the Directorate brings out data on
subjects like State Domestic Product, Capital formation
etc., National Sample Survey wing of the Directorate
conducts surveys on selected topics selected by GOI.

The Planning and Development Department of the State is the


co-ordinating department for all plan related work.

2. STATE SHARE TO CSS


2.1 Improvement of Crop Statistics (ICS) (50 : 50)
2.2 Timely Reporting Scheme (TRS) (50 : 50)
The share of Government of India is in the form of grant.

3. STATE PLAN SCHEMES


3.1. Continuing Schemes
3.1.1 Greater Ranchi Development Agency
The State Government has setup “Greater Ranchi Development Agency
(GRDA)”, a company registered under the Companies Act, 1956 to
construct, execute and manage public works, government projects of all
kinds and all other works of conveniences or other public or private
liability.

3.1.2 Jharkhand State Planning Board


The Planning Board has been constituted with the purpose of making
assessment of all resources of the state determining priorities formulating
plans and a balanced growth of the study.
3.1.3 Installation of Raingauge
The Directorate of Statistics & Evaluation has the responsibility to collect
rainfall data which is needed to monitor drought situation as well as crop
prospects in the State. It is proposed to purchase 43 new rain gauges from

Planning & Development (Incl. Statistics)


119

Indian Meteorological Deptt., Pune. These machines will be installed at


relevant block headquarters.

3.1.4 Computerization of Directorate of Statistics


Collection and analysis of data collected from Agricultural survey,
Rainfall studies, Socio - economic survey, Economic census, Irrigation
census is the responsibility of the Directorate. Computerization of the
Directorate along 12 District Statistical offices is the need of the hour for
an MIS relating to developmental status and activities of the State.

3.1.5 District Plan untied fund (including establishment cost)


The untied fund has important role for all round development of the
district. The untied fund is being allocated to the districts for small
schemes of supplementary nature at village & Panchayat level. Schemes
to be taken under untied fund is being selected at grass root level. Thus
untied fund has very important role in decentralized planning process.

3.2 New Scheme

3.2.1 Construction of Yojana Bhawan

3.2.2 Contractual Allowances & Consultancy Fees

4. TRIBAL SUB PLAN


A sum of Rs. 6095.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 12900.00 lakhs during Annual Plan 2008-09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 400.00 lakhs has been earmarked for Special Component Sub
Plan out of total approved outlay of Rs. 12900.00 lakhs during Annual
Plan 2008-09.

6. The Outlay approved for various schemes are given as under -

Planning & Development (Incl. Statistics)


120

Planning

Annual Plan (2008-09)


(Rs. In lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Share to CSS
i) ICS 3.5 3.5 0 0
ii) TRS 3.5 3.5 0 0
B. State Plan Schemes
Continuing Scheme
iii) GRDA 40 40 0 0
iv) Jharkhand State Planning Board 1 1 0 0
v) Installation of Raingauge 2 1 0 1
vi) Computerization of Directorate of 10 6 4
Statistics
vii) District Plan untied fund 11800 5000 400 6400
New Scheme
viii) Construction of Yojana Bhawan 1000 1000 0
ix) Contractual Allowances & Consultancy 40 40 0 0
fees
Grand Total 12900 6095 400 6405

SUMMARY (Planning)

Annual Plan (2008-09)


(Rs. In lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) 7 7
C. State Plan Schemes
i. Continuing Schemes 11853 5048 400 6405
ii. New Schemes 1040 1040 0 0
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 12900 6095 400 6405

Planning & Development (Incl. Statistics)


121

VIII.B TOURISM

1. INTRODUCTION

The State of Jharkhand is endowed with immense bio-diversity, moderate


climate, rich cultural and historical heritage, religious places of worship
and ethnic aspects to make the State the ultimate destination for tourists.
The State Government has a firm belief that development of tourism
sector would not only generate immense employment opportunities –
directly or indirectly – but also would contribute in accelerated economic
development. This would not only ensure showcasing of rich traditional
and cultural heritage of the State but also would have cascading effect in
development of other sectors. Rightfully, the State Government has
accorded TOURISM THE STATUS OF INDUSTRY in Jharkhand.
It is felt that to ensure rapid development in tourism sector, there is a need
to develop tourist circuits and destinations providing various amenities,
both way-side and at different destination points, supporting the tourists
by providing conveyance, lodging and other pre-requisites, etc.
Involvement of private sector, villagers and other stake holders as
partners in promotion and development of tourism industry of the State is
an important and critical aspect, which would go a long way in
maintenance, upkeep and sustenance of the assets and facilities created in
this regard for a long time.
Making the people of the State, Nation and the World aware of the rich
endowments of nature, its cultural heritage, spiritual places and other
traditions are essential impediments for boosting tourism industry in the
State.
An outlay of Rs. 160 crores has been provided for continuing and new
schemes in 2007-08. All proposed schemes are to be completed in the
stipulated time.

2. OBJECTIVE
Tourism is the major engine of economic growth in most parts of the
world. Several countries have transformed their economy using their
tourism potentiality to its maxima.
Tourism has great capacity to create large scale employment of diverse
kind – from the most specialists to the unskilled and it is well known that
our state needs generation of massive productive employment
opportunities. Following are five key statistic objectives which need to be
achieved.
• Positioning and maintaining Tourism Development as a priority
activity.
• Enhancing and maintaining the competitiveness of the State as the
most preferred Tourist Destination.

Tourism
122

• Improving the existing Tourism Product & Expanding this to meet


new market requirements.
• Creation of International Class Infrastructure.
• Developing sustained and effective marketing plans and programmes.

3. STRATEGY

To develop the tourism in Jharkhand, the following strategies have been


adopted:-
• Enrichment and Development of Tourist Circuits and Destinations.
• Providing various public amenities, both wayside and at destination
points.
• Comfortable transportation of the tourists along the various Tourist
Circuits of the State.
• Collaborations with various People and Private Institutions, both
wayside and at destinations for ownership and support to various
activities under tourism sector of this State.
• To develop ties with regional, national and international institutions to
boost up tourism industry in the State.
• Making people aware in the State, country and the world over about
various activities, destinations of tourist interest in the State.
• Promoting Public- Private- Partnership (PPP) in development of
various tourist destinations and providing related facilities.

4. CENTRALLY SPONSORED SCHEMES

4.1 State Share to Schemes under Central Financial Assistance


The Government of India under different schemes, such as Integrated
Development Project for identified Tourist circuits and Tourist
destinations, organization of events/festivals, etc. and other programmes
– accords sanction to the proposals received from State on case-to-case
basis. These programmes need the matching State share for execution.

5. STATE PLAN SCHEMES

5.1 Tourism Publicity


Publicity plays a very vital role in the field of tourism. Publicity is made
through print and electronic media, hoardings, films, website,
representation and participation in national and international tourism
fairs and festivals, exhibition, mart, etc. Expert and experienced Media
Management Agency needs to be selected for more effective penetration
and adopting professional approach in this regard. Various events are to
be organized in different parts of the State for Tourism promotion.

Tourism
123

5.2 Training
In the present times tourism-industry needs professionalism in various
fields like Hospitality, Services, Co-ordination, etc. Persons working in
this sector, whether Public or Private, are required to be trained.
5.3 Computerization And Modernization
Various tourist complexes and information centres are to be equipped
with modern connectivity, internet, computer, etc. to support various
tourism activities speedily and accurately.
5.4 Strengthening of Tourist Information Centres
Presently there are seven tourist information centres within Jharkhand
and one each at Kolkata and Delhi. Strengthening of these tourist
information centres considering the Jains traffic is required to facilitate
regional, national and international tourists. New tourist information
centres at Bodh Gaya, Varanasi, Mumbai, Chennai, Ahmedabad,
Bangalore, etc. are proposed to be set up.
5.5. Adventure Tourism
Adventure tourism occupies a key position in the tourist map of the State.
The State has a number of big water bodies, mountains, water falls,
enchanting forests, etc. where adventure tourism activities like
Paragliding, Parasailing, Rock climbing , Hot ballooning , trekking , Water
sports, Scuba diving , snorkelling, etc. has great potential.
The State Government proposes to set up an Adventure Tourism
Academy in the State with various extension centres spread out in
various regions of the State to promote adventure tourism by making
available various adventure tourism facilities and training the adventure
service providers.
5.6 Institute of Hotel Management and Food Craft Institute
An Institute of Hotel Management has been approved by the Government
of India to be set up in the State in consonance with which, an Institute is
being set up at Ranchi. The State Government intends to set up a world
class Hotel Management Institute for which additional financial assistance
would be provided by the State Government. It is proposed that a Food
Craft Institute would be set up in the State with the help of the
Government of India. The additional financial assistance required in this
regard would be provided by the State Government. Setting up of this
Institute will enable availability of trained manpower in Hotel and
Hospitality Services.
5.7 Management subsidies, incentives, expenses etc.
There are various tourist destinations in the State, which needs upkeep,
cleanliness and their maintenance, particular water falls, spiritual places,
heritage sites, etc.
The State Government has evolved a system involving Voluntary
Agencies, Non-Government Organisations, Service Providers, etc. to
properly maintain and manage such tourist destinations in the State
involving local people, who will be trained and provided necessary

Tourism
124

equipment, etc. to carry out such responsibilities. The Jharkhand Tourism


Development Corporation will play the pivotal role in this regard.
Special steps would be taken to ensure safety and security of the tourists.
A special Tourist-Friendly Security is proposed to be provided in this
regard.
5.8 Financial Assistance to Jharkhand Tourism Development Corporation
for developing Tourism Transport.
A comfortable, accessible and good high standard transportation to
various tourist circuits and destinations is the backbone to promote
tourism. Financial assistance to the Jharkhand Tourism Development
Corporation would be provided to develop such tourism transport in the
State.

5.9 Integrated Development of Tourism


5.9.1 Integrated Development of various tourism, Circuits and Destinations
Jharkhand State has many attractive tourist destinations. The tourist
circuits and various tourist destinations in the State are required to be
provided with high quality infrastructure, various public and wayside
amenities, etc. The approach roads to various tourist spots would be
developed to provide smooth and comfortable transportation to such
tourist spots. Efforts in this direction have been initiated in the 10th Five-
Year Plan. This scheme would be continued with more resources in the
11th Five Year Plan.
5.9.2 Upgradation, Construction and Rehabilitation of Tourist Complexes/
Hotels
Tourist complexes and State Hotels in the State are the core infrastructure
development for tourism industry. It is proposed that as per the
requirement various tourist complexes and State Hotels in the State are
built and the old tourist complexes/hotels be renovated, so as to ensure
excellent residential facilities to the visiting tourists, guests.

5.9.3 Land Acquisition/Purchase/Transfer for Developing Tourist Spots


To provide quality tourist facilities at various tourist spots in the State, the
availability of land is the most critical aspect. It is proposed to
acquire/purchase/transfer such lands in this regard.

5.10 Wayside Amenities


Highway Tourism is an integral part of present day tourism promotion
activity and therefore an initiative called “Aram” having the facility for
parking, restaurant, restrooms, etc. was initiated in the 10th Plan period. It
is imperative that these initiatives are continued in the 11th Five Year Plan
period at new locations.
Wayside amenities on National Highways and State Highways are
proposed to be set up at regular intervals, in which an effort would be
made to promote Public- Private- Partnership (PPP).

Tourism
125

5.11 Consultancy Services for Project Preparation, Conducting Studies, etc.


A number of attractive potential tourist spots in the State needs to be
developed for which Detailed Project Reports are to be prepared.
Consultancy Services are also required in promotion of tourism activities,
conducting various tourist related studies, etc. The resultant output and
information would enable promoting Public-Private Partnership in
developing tourism sector.
5.12 Share Capital to Jharkhand Tourism Development Corporation (JTDC)
JTDC is an Undertaking of the Government of Jharkhand. JTDC has to
play a greater role for development of tourism sector. This is important
that the JTDC is supported by the government in the form of share capital
and grants.
5.13 Incentives under State Policy
The State Government has accorded the Status of Industry to the tourism
sector. Accordingly, as per the State Policy, various incentives are
admissible to promote and attract private investments in tourism sector. A
smooth, efficient and transparent mechanism would be evolved to
provide such incentives expeditiously.

6. TRIBAL SUB PLAN


A sum of Rs. 6362.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 16000.00 lakhs during 2008-09.

7. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 1670.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 16000.00 lakhs during Annual
Plan 2008-09.

8. The Outlay approved for various schemes are given as under -


Tourism
Sl. Type of Scheme Annual Plan (2008-09)
No.
(Rs. in lakh)
Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. State Share (CSS/CS)
i) State share to schemes under Central Financial 500 300 0 200
Asst
B. State Plan Schemes
ii) Tourism Publicity 1000 450 0 550
iii) Training 30 10 5 15
iv) Computerization & Modernization 20 12 0 8
v) Strengthening of tourist information centre 200 40 15 145
vi) Adventure tourism 1000 400 100 500

Tourism
126
vii) Institute of Hotel Management and Food Craft 500 350 50 100
Institute
viii) Management Subsidy, Incentive, expenses etc. 300 100 50 150
ix) Financial Assistance to Jharkhand Tourism 300 120 30 150
Development Corporation for Tourism
Transport
x) Integrated Development of Tourism
a) Integrated development of various tourism 7000 2650 850 3500
cicuits and destinations
b) Upgradation of Hostel, tourist complexes 200 80 20 100
etc.
c) Land (Acquisition/purchase/transfer) 1000 300 100 600
xi) Wayside Amenity at various places 2600 1000 300 1300
xii) Consultancy and other services 300 150 0 150
xiii) Share Capital to JTDC 50 50 0 0
xiv) Incentives under State Policy 1000 350 150 500
Grand Total 16000 6362 1670 7968

SUMMARY (Tourism)
Annual Plan (2008-09)
Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) 500 300 200
C. State Plan Schemes
i. Continuing Schemes
15500 6062 1670 7768
ii. New Schemes
D. EAP ( if any) -- --
E. Other -- --
Grand Total 16000 6362 1670 7968

Tourism
123

VIII.C FOOD & CIVIL SUPPLY

1. INTRODUCTION
The Government of Jharkhand is committed to ensure food security for
all, create a hunger free Jharkhand and reform and improve the Public
Distribution System (PDS) in order to serve the poorest of the poor in the
State. For this, the Department of Food, Public Distribution and Consumer
Affairs has been assigned the task of distribution of food grains and other
essential commodities to the people of the State. The commodities include
rice, wheat and Kerosene Oil, which are supplied to the Public in general
and the people living below the poverty line in particular.

During 10th Five Year Plan (2002-07) various plan scheme like Antyodaya
Anna Yojana, Annapurna Yojana, free distribution of LP Gas Chulha to
BPL families, distribution of iodised salt Act subsidized rate to BPL
families was taken up by the Government of Jharkhand to provide
essential commodities to BPL families and destitute person.

During 11th Five Year Plan (2007-12) the above plan schemes like
Annapurna Yojana, Antyodaya Anna Yojna, Distribution of iodised salt at
subsidized rate to BPL families, Godown construction and functioning of
Public Distribution Grievance Redressal Commission will continue while
some new schemes like setting up Village Grain Banks in drought and
flood prone area, tribal area, food scarce inaccessible hilly area and LPG
connection to BPL families shall be taken up.

2. EARMARKED SCHEME
2.1 Annapurna Yojana (APY)
Under this scheme 10 kg of rice per month per beneficiary is given free of
cost. The number of beneficiaries is 2 lakhs. The rice is distributed to the

HRD(Primary/Secondary/Higher Education)
124

beneficiaries directly by the district administration without any


intervention of PDS dealers.
The State Government has ensured that the District Administration will
directly do distribution of rice to the beneficiary after lifting from FCI
godowns and there is no role of PDS dealers in the distribution of
Annapurna rice.

3. STATE PLAN SCHEMES


3.1. Continuing Scheme
3.1.1 Antyodaya Anna Yojna (AAY)
Under this scheme, foodgrains (wheat and rice) at the
rate of 35 kg per family every month at subsidised rate
(wheat @ Rs. 2.00 per kg and rice @Rs 3.00 per kg)
are distributed to the selected families. The number of
the selected BPL families is 9,17,900. The cost of
handling, transportation, dealer’s margin money, sales
taxes etc. are borne by the State.

3.1.2 Distribution of Iodised Salt


Under this scheme, each BPL family will get 2 kg iodised salt per month at
the subsidised rate of 25 paise per kg. 23.94 lakhs BPL families including
AAY families to be benefited under this scheme.

3.1.3 Construction of Godown


Keeping in view of the limited storage capacity for food grains received
from Central Government through FCI, the State Government has decided
to construct godowns in areas having scarce / shortage of storing
capacity.

3.2. New Scheme

HRD(Primary/Secondary/Higher Education)
125

3.2.1 Village Grain Bank


The main objective is to provide safeguard against starvation during
natural calamity or the lean season when the marginalized food ensured
households do not have sufficient resources to purchase the rations. They
can borrow foodgrains from Village Grain Banks set up within the village
in such eventuality. The group will decide the quantity to be lent and
period of repayment themselves.

The grain banks are to be set up in food scarce areas like the drought
prone areas, tribal areas and the inaccessible hilly areas.

The scheme will have two components, viz, food components and cash
components. Under the food component each grain bank will store one
quintal of foodgrains (rice and wheat) per family for an average 40
BPL/Antyodaya families, which will be released as one time grant by
Central Government. The cash component will include cost of weights
and measures, storage bins / godowns, rentals, training, transportation,
administrative and monitoring expenses which would be released by the
Central Government through State Government for setting up and
running the grain bank.

It is proposed to have 583 village grain banks in the villages of PTGs/ ST/
SC families.

3.2.2 LPG Chulha Distribution


The scheme of free distribution of single burner LPG chulha to BPL
families (including Antyodaya families) was started in the year 2004-05.
There are 23.94 lakh identified BPL families (including Antyodaya
families) in the state. It is proposed that during 2008-09, 1.00 lakh BPL
families will be provided Double Burner LPG Chulha along with rubber
tube and 14.50 kg. gas cylinder (with gas) free of cost.

HRD(Primary/Secondary/Higher Education)
126

4. TRIBAL SUB PLAN


A sum of Rs. 4231.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 7500.00 lakhs during Annual Plan 2008-09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs.761.00 lakhs has been earmarked for Special Component Sub
Plan out of total approved outlay of Rs. 7500.00 lakhs during Annual Plan
2008-09.

6. The Outlay approved for various schemes are given as under -


Food, Public Distribution and Consumer Protection

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked Schemes
i) Annapurna Yojana 1535 756 131 648
B. State Plan Schemes
Continuing Schemes
ii) Antyodaya Anna Yojana 1928 1138 200 590
iii) Distribution of iodised salt at subsidized 3590 2077 350 1163
rate to BPL families
iv) Construction of Godown 160 80 50 30
New Schemes
v) Village Grain Bank 237 155 20 62
vi) LPG Chulha Distribution to BPL families 50 25 10 15
Grand Total 7500 4231 761 2508

HRD(Primary/Secondary/Higher Education)
127

SUMMARY

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked 1535 756 131 648
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes 5678 3295 600 1783
ii. New Schemes 287 180 30 77
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 7500 4231 761 2508

HRD(Primary/Secondary/Higher Education)
128

IX. GENERAL EDUCATION

INTRODUCTION
The Government of Jharkhand is committed to “Education For All” and has
given top priority for development of human resources. The State Government
has already initiated several measures for universalisation of primary education,
increase in enrolment and retention of students in school and improvement of
educational infrastructure.
The literacy rate of the state is 54.13% as per the 2001 census. It is still much
below the National Average of 65.38%.
Achievement During 10th Plan Period
The State Govt. has made significant progress in different fields of education.
This is evident from the achievements made in the area of Elementary,
Secondary and Higher education.
At the time of creation of Jharkhand 17842 villages/habitations were not having
the facility of primary school. This situation has changed and now every
village/habitation has either a primary school or an EGS centre for its children.
No. of Primary Schools has gone up from 16322 to 26261,no of Middle Schools
has improved from 4055 to 9550. Similarly, enrolment of 6-14 age group children
has increased many folds and now 5820683 children are in the schools out of
their total population of 6187181 and only 366498 children are out of school. The
no. of out of school children at the beginning of the 10th plan period was
approximately 1300000.
Drop out rate has come down from 51% to 44% and retention has increased. In
the field of school infrastructure 1079 new school buildings, 16219 additional
class rooms have been added. Apart from this 5019 schools have been provided
with drinking water and toilet facility. Teacher pupil ratio has been improved
substantially and 8000 regular and 59000 Para teacher have been appointed.
In the field of Secondary education, Department has also taken initiatives to
strengthen High Schools and +2schools and approximately 400 high schools
have been provided with funds for civil work and other academic purpose.
Department took a policy decision and formed Jharkhand Academic Council to
regularize the Examination Schedule of class X and XII. Due to these corrective
measures, results of class X has improved from 32% in 2001 to 76% in 2005.
Department has given due importance to development in the fields of Higher
education as well Development grants have been provided to the Universities
and its constituent colleges on a regular basis. Teacher training has been given
due priority and many B.Ed. colleges have established in private sector.
In the 11th plan period, the State Govt. proposes to give emphasis on further
reduction in drop out rate and gender gap, improvement in overall literacy rate

HRD(Primary/Secondary/Higher Education)
129

of State and strengthening the school infrastructure, empowerment of teachers


for improvement in quality of education, empowerment of community to
manage the affairs of schools. More school facilities in the rural areas and
targeting the rural boys and girls will be the main thirst areas of Secondary
education. Vocational education and computer based learning will be focused.
To promote the habit of learning among rural people libraries will be established
and strengthened. According to the approach paper prepared for 11th five year
plan Department has set following goals :
Š Universal and complete elementary education.
Š Reduction in drop-out rate to 0% for boys and up to 10% for Girls by
the end of 11 t h Plan.
Š Decentralization of school management by giving more powers to
school management committees/village education committees.
Š Improvement in school infrastructure at par with Public
School/Kendriya Vidyalayas.
Š Greater role for NGO in Camp Schools/Bridge Courses.
Š Strengthening of Mid-day-Meal (MDM) Scheme and its expansion up
to Class-VII (We understand GOI is planning to support State Govt. in
their endeavours.
Š Greater emphasis on school health programme. convergence with
ICDS, health and other social services departments.
Š Creation of more teacher posts and filling the existing vacancies on
priority/Strengthening of Teacher’s Training.
Š Identification of Disabled/Street children and their mainstreaming in
a larger way.
Š Preparation of long term plan for improving the Basic Education up to
Class – X.
Š All necessary support to SSA-2.
Š Expansion of Secondary Education through Public-Private
Participation/More financial support to Private/Aided schools.
Š Special efforts to cater to the needs of SC/ST and Girls for Secondary
Education.
Š Enforcement of voucher scheme/free-ship to economically weak
students enrolled in private schools.
Š Focus on Vocational Education/Skill development/Co-ordination with
different Industries/Industrial associations for practical training and
employment of youth.
Š Promotion of Distance Education/National Open School system.
Š Promotion of Computer Literacy and Computer Aided Learning
Š Efforts for expansion of Higher Education in remote areas to provide
access to the students of ed ucationally backward district.
Š Improvement in quality of Higher Education.

HRD(Primary/Secondary/Higher Education)
130

Š Establishment of National Law University.


Š IX. A. PRIMARY EDUCATION

1. INTRODUCTION
Universalisation of Elementary Education (UEE) is the foremost task
before the State Government. State Government is taking every measure
to enroll the children of 6-14 age groups in schools. Community
mobilization has been done and VECs are managing their respective
schools. School infrastructure and teachers training is continuously
focused upon. Disabled children and out of schools children are being
mainstreamed through camp and bridge course. Still we have to go a long
way as 366000 children are out of school, Quality of education has to be
improved. The focus of 11th plan in elementary sector will lie on these
issues mainly. Keeping this in view, the State Govt. has fixed following
goals -
Š To enrol all out of school children
Š To reduce the drop-out rate by 4-5%
Š Provision of school Infrastructure
Š Strengthening of existing Primary Teachers Training colleges by
providing necessary infrastructure and other support.
Š Development of village education committee’s members as and school
Managers.

2. STATE SHARE TO CSS


2.1 Sarva Siksha Abhiyan (S.S.A) [ 65 : 35 ]
SSA is the flagship scheme of elementary education which is being
implemented with the assistance of GOI and time for its completion has
been fixed till 2010. The funding pattern has been done on 65 : 35 basis
from 11th plan period. State Govt. would request with all its emphasis not
to reduce the Central support for this scheme. If required the education
Cess be raised to 4% or whatever lower rate is required.
This scheme is in its 7th year of implementation covering the entire State.
The main objective of the scheme is to enrol all the children of age group
6-14 in primary schools imparting free and compulsory education.
2.2 Kasturba Gandhi Balika Vidyalaya (50:50)
A special programme to improve the girl's education in the age group 6-14
will be implemented in different blocks, where women's literacy rate is
below the national average. Under this scheme, a residential schools will
be opened in those blocks.
The scheme has been launched in the year 2006-07 with the support of
GOI for drop out Girls of educationally backward blocks having 75% and

HRD(Primary/Secondary/Higher Education)
131

more ST/SC population and female literacy below the national average of
women literacy.
Like SSA share between GOI and State Government, the share pattern has
is being revised from 75:25 to 50:50 in the 11th plan period. GoJ would
request GoI to retain it at present levels. As this school is being run on a
residential basis for drop out of girls, there is a need for up gradation of
these schools up to Class 10th to avoid the further drop out of girls.
2.3 State Literacy Mission Authority ( SLMA)
The Total Literacy Campaign, Post Literacy programme, Special Literacy
drive etc are being implemented in different districts of the state through
State Literacy Mission Authority. The Government of India provides its
share in the T.S.P. districts in a ratio of 4:1 basis and in the OSP districts in
a ratio of 3:2.
2.4 Saraswati Vahini (Mid- day- Meal scheme)
The scheme has been initiated after the directions of Hon’ble Supreme
Court in the case no. W.P(C)196/2001 Union of civil liberties v/s Union
Government. As per the interim order by the Hon’ble Supreme Court the
scheme has been started in the State from the financial year 2003-04.
Under this scheme, cooked Mid-Day-meal containing 450 calories and 15
grams of protein will be provided to students of class 1-5. Cooked Mid-
Day-meal is provided for 25 days in a month.
GOI is providing Rs. 1.50 per child as its share and State Government
provides Rs.1.00 per child as conversion cost. This scheme requires to be
extended to the students of class VIII as well to avoid discrimination
among children studying in same school.

3. STATE PLAN SCHEMES


3.1 Continuing Schemes
3.1.1 Free distribution of Text-books
All ST/SC boys and all girl students are getting free text books under SSA
programme. Rest of students of General and O.B.C category are being
provided free Text book from State government Budget. Number of
Students of these category are estimated to be 1366406 in the year 2007-08.
3.1.2 Merit Scholarship
The main objective of this scheme is to promote meritorious students and
give them incentives; the State Government has decided to provide Merit
scholarship to 10 students of every block.
Previously under the scheme 5 students were getting this scholarship.
Now 10 meritorious students will get this scholarship every year. Rate of
scholarship will be Rs 200/- p.m for 10 months. Out of these 10 students 2

HRD(Primary/Secondary/Higher Education)
132

each will be selected from SC, ST and Girls respectively and 4 from
General Category. Scholarship will be provided to students of Class 6-8
who pass out from Class-V. Students are selected on a state level
examination.
3.1.3 Strengthening Primary/Middle Schools
The State has 10827 old Primary and 15435 new Primary Schools and 4055
old and 5495 new Middle Schools. HRD department has taken up the
strengthening/Structural up-gradation of these schools. Civil works is
being done from S.S.A. under the ceiling and norms fixed for it. S.S.A.
provides only 9 classrooms for one Middle School where as many schools,
with more than 1000 enrolment, do not have adequate infrastructure
facilities in it. Apart from these, SSA norms do not permit for
procurement of furniture and other equipments from its fund. Due to
these constrains, state government has decided to provide fund for the
gaps which SSA is not filling.

3.1.4 Primary Teacher Training Colleges


The state has 24 PTTCs out of that 9 have been upgraded as DIETs before
1994. A plan for Teacher Education was submitted to GOI for upgradation
of remaining PTTCs and release of grants for old and newly upgraded
DIETs but GOI accorded its sanction for grant only to 9 newly upgraded
DIETs and 3 DRCs (District Resource Units) rejecting the proposal of grant
to those 9 DIETs which were upgraded during 9th plan period. As these
DIETs have a poor infrastructure, they require construction of
administrative and academic wings for its smooth functioning.
3.1.5 Seminar/ Symposium
Some special occasions/ Events/ Days have to be celebrated/ Organised
at times. A part from this procurement and publications of journals/
Booklets/ Leaflets etc. are also done. One major thing which is also
needed at many times is the services of professionals/ experts for different
works.
3.1.6 Support to un-aided schools
There are many elementary schools which have got Government sanction
for its establishment. These schools were serving the area and its
population without any financial support from the Government. There
was a consistent demand for financial support from the Government by
these unaided schools. Keeping this in view the government has decided
to provide grant to these schools under the provisions of Act and Rules
framed for this purpose.
3.1.7 Teacher Award

HRD(Primary/Secondary/Higher Education)
133

Teacher are the back bone of any education system and they need
incentive for their good work. The State Govt. has made a plan to reward
the teachers of proven academic quality on National Teacher Award
pattern. This reward scheme will be implemented from block to state
level.

3.2. New Scheme


3.2.1 Special Incentive to Dropped out Children

4. TRIBAL SUB PLAN


A sum of Rs. 19556.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 59620.00 lakhs during Annual Plan 2008-
09.
5. SPECIAL COMPONENT SUB PLAN
A sum of Rs. 9931.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 59620.00 lakhs during Annual
Plan 2008-09.

6. The Outlay approved for various schemes are given as under -


Primary Education
Annual Plan (2008-09)
Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State share to CSS
i) Sarva Siksha Abhiyan (S.S.A) (65 : 35 ) 40000 12800 7000 20200
ii) Kasturba Gandhi Balika Vidyalya (KGBV) 2100 672 336 1092
iii) State Literacy Mission Authority (SLMA) 205 65 33 107
iv) Saraswati Vahini (Mid- day- Meal scheme) 13000 4160 2080 6760
B. State Plan Schemes
Continuing Scheme
i) Free distribution of Text-books 1688 810 878
ii) Merit Scholarship 110 56 18 36
iii) Strengthening of Primary/Middle School 1554 654 300 600
iv) Primary Teacher Training College 800 267 133 400
v) Seminar/ Symposium 10 5 0 5
vi) Support to un-aided schools 50 16 8 26
vii) Teachers award 53 26 13 14
New Scheme

HRD(Primary/Secondary/Higher Education)
134

viii) Special Incentive to Dropped out Children 50 25 10 15


Grand Total 59620 19556 9931 30133

SUMMARY ( Primary Education )

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked
B. State Share (CSS/CS) 55305 17697 9449 28159
C. State Plan Schemes 0
i. Continuing Schemes 4265 1834 472 1959
ii. New Schemes 50 25 10 15
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 59620 19556 9931 30133

HRD(Primary/Secondary/Higher Education)
135

IX. B. SECONDARY EDUCATION

1. INTRODUCTION
Sarwa Siksha Abhiyan (SSA) has created an excitement for education in
rural areas and number of students enrolled in Elementary Sector has
gone up. Due to higher rate of enrolment and retention, pass out from
elementary sector has increased significantly.
Keeping in view the growing number of students, coming out from
elementary schools to high schools, an elaborated plan for more high
schools has to prepared and achieved in a phased manner and within
stipulated time. In the state there are 1235 High Schools. The main
problem of Secondary Education area is the access. On an average a
student has to travel 10-15 km. to reach a high school as there is one high
school for every 18000 population against the required average of 10000
population. To reduce this, department has to double the number of high
schools in 11th plan period and has fixed following goals for Secondary
Education :
Š Reduction in access area by means of establishing new high schools.
Š Retention of enrolled students.
Š Improvement in girls enrolment by 10% particularly ST/SC and other
weaker sections of the society.
Š Development of schools by providing better school building/
furniture/Library/Laboratories/Common rooms/Toilets etc.
Š De linking of at least 50% degree colleges by means of providing more
+2 level schools.
Š Strengthening of Teachers Training Institutes.
Š Strengthening of SCERT.
Š Strengthening and modernization of field offices.
Š In the approach paper there was a suggestion that GoI would be
perhaps starting a CSS for Secondary Education on the Lines of SSA
for primary education. We request GoI to support GoJ in this regard.

2. STATE SHARE TO CSS

2.1 Establishment of Residential Schools (75 : 25)


Government of India has proposed to establish Residential Schools on the
pattern of Navodaya Vidyalayas in Tribal Sub Plan area. According to this
proposal 12 Residential Schools will be opened in TSP districts of the

HRD(Primary/Secondary/Higher Education)
136

State. GOI has indicated that it will provide 75% share and state will have
to provide 25% share.
2.2 Computer Literacy and Computer Aided Learning
As the Information Technology (IT) is spreading rapidly, if state does not
take initiatives in this field, students of state may leg behind at national
level. Extension of computer Education and its knowledge to the rural
students is the demand of the time. The State Govt. has made a plan to
introduce Computer Education in all Government Secondary Schools
during 11th Five Year Plan period .

2.3 Modern School

2.4 Support to Vocational Education


The State Govt. has started the process of industrialization in a big way. It
will create many job opportunities and state will have to produce trained
youths for these jobs. To fulfil the requirement of different Industrial
Sectors vocational Education will be introduced in Secondary Schools on a
large scale in different trades. In the 11th Five Year Plan, focus of
vocational Educational will be on the students of class 9-12 students.

2.5 Strengthening of B.Ed Colleges (CTE)


The State has 4 govt. B.Ed colleges. A proposal for teacher education was
submitted to GOI for sanction different types of training institutes. The
Government of India has given indication for sanction of 3 College of
Teacher Education (CTE) and one Institute for Advance Studies in
Education (IASE) for Jharkhand.
These Training Institute will serve districts of Ranchi, Gumla,
Lohardagga, Hazaribagh, Kodarma, Giridih, Deoghar, Dumka and
Jamtara. Remaining 13 districts will have no facility of Secondary level
teacher education institute in Government sector. It will create problem in
organizing Pre and in service training course for Government teachers in
these areas. There shall be a need for establishment of atleast 4 new CTEs
in unserved areas in the 11th Five Year Plan period.

2.6 Establishment of JCERT

3. STATE PLAN SCHEMES


3.1 Continuing Schemes
3.1.1. Post creation in upgraded Middle School

HRD(Primary/Secondary/Higher Education)
137

3.1.2 Post creation in + 2 Schools


The State Govt. has upgraded many Middle Schools to High School and
High Schools to +2 Schools. Due to this, there is need for creation of post
in these schools. The State Govt. has initiated the process to make
appointment on these posts very soon.

3.1.3 Strengthening of Field Offices & Provision of MIS


The inspecting machinery of the Secondary Education wing of the State
include the Directorate, Regional Deputy Directors posted in Divisional
Head Quarter, DEOs posted at District level and sub-divisional education
officers working at sub-divisional level offices. These field offices need
support for its smooth functioning. These offices have to be electronically
net-worked also. The department has created different types of posts in 4
newly created districts and office equipments and other facilities will be
required for this.

3.1.4 Inter School Competition


To develop healthy competition among children of different schools, Inter
School Competitions will be organized to promote sports, Art and
Culture, Music etc. Competition will be organized at Block, District and
State level every year.

3.1.5 Grant in Aid to Vitta Rahit Vidyalayas


Many schools, which were established with the permission of state
Government and they are serving the population of the area. The State
Government has decided to provide Grant in Aid to Vitta Rahit
Vidyalayas which have been established and functioning as per the Rules
and Regulations. An Act has already been enacted for this purpose. The
State Govt. has decided to support more private schools to reduce the
burden on Government for establishment of new High School.

3.1.6 Scholarship to the Students Enrolled in RIMC and Merit cum poverty
Scholarship
State Government is providing annual scholarship to the student of
Jharkhand who are enrolled in Rashtriya Indian Military College (RIMC),
Deharadun. State Government is providing merit-cum-poverty
scholarship to students of BPL family every year. Under the scheme 10
student of every block are selected thorough a state level examination.
Scholarship is provided to the students of class IX and Rs. @ 200/- p.m. for
10 months.

HRD(Primary/Secondary/Higher Education)
138

3.1.7 Free Cycle distribution


To promote the education among girls and to improve their attendance in
school, the State Govt. has decided to provide free cycles to the General
and OBC girl students of BPL family, who are studying in class 8.

3.1.8 Free Education for girls up to Intermediate level


To promote the education among girls government has taken a decision to
provide free education to every girl studying in Intermediate classes.
Tuition and examination fee will not be charged from girl student under
the scheme. The amount will be reimbursed to state academic Council and
different Universities.

3.1.9 Strengthening for Public Libraries


The State has 1 state library, 4 divisional libraries, 12 district library and 1
sub-divisional library. Additional 5 new district libraries are to be created
at Deoghar, Bokaro, Jamtara and Koderma. Each new district library has
to be provided staff and other infrastructure. Existing libraries do not have
own building, so there is a need to construct buildings and other
infrastructure.

3.1.10 Seminar/symposium
The HRD department organizes Teachers day, publish/purchase/print
other educational journals/booklets/leaflets and short term training
courses (other than teachers training) also.

3.1.11 Grant-in-aid to Netarhat Awasiya Vidyalaya/Indira Gandhi Balika


Vidyalaya and Sainik Vidyalaya
The State Government provide fund for development of Netarhat
Awasiya Vidyalaya and Indira Gandhi Balika Vidyalayas every year from
its plan head to keep these Vidyalayas in good condition. State also
provide grant to Sainik School, Tilaya for its upkeep. There is a need to
continue support to these Vidyalayas on a regular basis in the 11th Five
Year Plan period.

3.1.12 Teacher Award


Teacher are the back bone of education system and they need incentive for
their good work. The State Govt. has made a plan to reward the teachers
of proven academic quality on National Teacher Award pattern. This
reward scheme will be given from block to state level.

HRD(Primary/Secondary/Higher Education)
139

3.2. New Scheme


3.2.1 Education Information Centre (EIC)
3.2.2 Jharkhand State Open School System (JSOSS)
3.2.3 On line Education via Satellite
3.2.4 Constitution of Engineering Cell
3.2.5 Upgradation of KGBV

4. TRIBAL SUB PLAN


A sum of Rs. 3686.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 8470.00 lakhs during Annual Plan 2008-09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 1291.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 8470.00 lakhs during Annual
Plan 2008-09.

6. The Outlay approved for various schemes are given as under -


Secondary Education

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State share to CSS
i) Estab. Of Residential School 400 336 64 0
ii) Computer Literacy and Comp. aided learning 1200 384 192 624
iii) Model School 4000 1280 640 2080
iv) Support to vocational Education 400 128 64 208
v) Strengthening of B.Ed. Colleges (CTE) 400 192 64 144
vi) Estab. of JCERT 550 462 88 0
B. State Plan Schemes
Continuing Scheme
i) Post Creation in Upgraded Middle Schools 50 25 5 20
ii) Post Creation in +2 Schools 100 50 0 50
Strengthening of Field Offices and provision of 40
100 50 10
iii) MIS
iv) Inter School Competition 45 38 7 0
v) Grant in-Aid to Vitta Rahit Vidyalayas 100.5 50.5 10 40
vi) Scholarship to the Students Enrolled in RIMC 1.5 1.5 0.0 0.0

HRD(Primary/Secondary/Higher Education)
140

vii) Merit-cum-poverty Scholarship 115 56 18 41


viii) Free Cycle distribution 150 150 0 0
ix) Free Education for girls up to intermediate level 150 126 24 0
x) Strengthening for Public Libraries 100 50 10 40
xi) Seminar/Sympozium 25 21 4 0
xii) Grant in-Aid to Netarhat Awasiya Vidyalaya 100 84 16 0
xiii) Grant in-Aid to Indira Gandhi Awasiya 84
100 0 16
Vidyalaya
xiv) Grant in-Aid to Sainik Vidyalaya 50 0 8 42
xv) Teacher award 50 42 8 0
New Scheme
xvi) Education Information Centre (EIC) 20 10 3 7
xvii) Jharkhand State Open School System (JSOSS) 30 25 5 0
xviii) On line Education via Sattelite 100 50 10 40
xix) Constitution of Engineering Cell 30 25 5 0
xx) Upgradation of KGBV 103 50 20 33
Sub Total (State Plan) 8470 3686 1291 3493

SUMMARY ( Secondary Education )

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) 6950 2782 1112 3056
C. State Plan Schemes 0
i. Continuing Schemes 1237 744 136 357
ii. New Schemes 283 160 43 80
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 8470 3686 1291 3493

HRD(Primary/Secondary/Higher Education)
141

IX. C. HIGHER EDUCATION

Before the creation of the state of Jharkhand, only one of the three existing
Universities for higher education under the control of Department of
Higher Education, Govt. of Jharkhand was registered under Sec.12(B) of
the UGC act 1956. None of three Universities had its own campus. They
were lacking sufficient class rooms and developed laboratories. A number
of incomplete building in different colleges need fund for completion. The
campus of the three universities have to be developed; Neelambar-
Pitambar University, Daltanganj and a National Law University, Ranchi
are proposed to be set up. The draft Bill of the proposed National Law
University, Ranchi is under process of the State legislature approval.

2. STATE PLANS
2.1 Continuing Scheme
2.1.1 Grant in Aid to Universities
• S.K. University, Dumka
• Ranchi University, Ranchi
• Vinova Bhave University, Hazaribagh
The Jharkhand State has three full functioning Universities and sixty six
constituent colleges in it. The Ranchi University has an old campus, which
is not suitable for academic and administrative purpose due to its location
and shortage of space. It has been planned to shift this university to some
more spacious place for which land acquisition work is in progress.
Similarly other universities like Vinova Bhave, Hazaribagh and Sidhu-Kanu-
Murmu University, Dumka also need new building for administrative and
P.G. Department for academic purpose. Apart from University buildings,
buildings of constituent colleges of these universities need strengthening
NOC to about two dozen constituent colleges for starting B.Ed courses
have been given. Required no. of rooms, Library, furniture and teaching
aid material etc. of have to be provided. For this purpose one time grant to
the concerned constituent colleges are proposed to be provided. Keeping
in view the need of all Universities, P.G. Deptts and constituent colleges.
2.1.2 Grant-in-Aid to Vitta Rahit Colleges
2.1.3 Grant-in-Aid to Universities for free Education to Girls
A scheme of free education to girl's students upto Post Graduate standard
was launched in the financial year 2005-06.

HRD(Primary/Secondary/Higher Education)
142

2.1.4 Proposed Law Universities, Ranchi


2.1.5 Seminar/Symposium/Publication
It is proposed for holding seminar, symposium, and publication of
Journals Books.
2.1.6 Automation and Computerization of Universities
2.2 New Scheme
2.2.1 Grant-in-Aid to Universities
• Nilambar Pitambar Universities, Palamau
• Kolhan Universities, Chaibasa
2.2.2 Redressal of Regional imbalances in Higher Education
2.2.3 Land Acquisition
2.2.6 Estb. of advance science & Tech., Research Centres in different
Universities

3. TRIBAL SUB PLAN


A sum of Rs. 1178.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 1910.00 lakhs during Annual Plan 2008-09.

3. The Outlay approved for various schemes are given as under –


4. Higher Education
Annual Plan (2008-09)
Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Plan Schemes
Continuing Scheme
i) Grant -in-Aid to Universities
- S. K. University, Dumka 400 400 0 0
- Ranchi University, Ranchi 300 300 0 0
- Vinova Bhave University, Hazaribagh 300 300
ii) Grant -in-Aid to Vitta Rahit Colleges 300 100 200
iii) Grant -in-Aid to Universities for Free Education 200 140 60
to Girls
iv) Proposed Law University, Ranchi 50 50 0
v) Seminar / Sympozium / Publication 10 10 0 0
vi) Automation and Computerization of Universities 100 65 35
New Scheme
vii) Grant in aid to Universities

HRD(Primary/Secondary/Higher Education)
143

a) Nilambar Pitambar University, Palamau 50 50


b) Kolhan University, Chaibasa 50 50 0
viii) Redressal of Regional imbalances in Higher 50 38 12
Education
ix) Land Acquisition 50 50
x) Estb. of advance science & Tech., Research Centre 50 25 25
in different Univ.
Grand Total 1910 1178 0 732

SUMMARY ( Higher Education )

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes 1660 1065 0 595
ii. New Schemes 250 113 0 137
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 1910 1178 0 732

HRD(Primary/Secondary/Higher Education)
144

IX.D. SPORTS & YOUTH SERVICES, ART & CULTURE

1. INTRODUCTION
This department is mandated to promote the sports & other youth
activities aimed to harness the youth power for excellence and is also
responsible for preserving, promoting, developing and showcasing the
tremendous diversity and richness of its cultural heritage.
The state is home to famous athletes such as Jaipal Singh, Michael Kindo,
Helen Soy, Sabitri Purti, Charles Brownes, to name a few. Its contributions
and dominance in games of archery, hockey, both men and women,
middle distance running etc. are well recognised. The rural hinterland,
especially among tribal communities, is replete with sporting talent.
The state has 3 out of 4 forms of Chhau practiced here besides a wide
variety of folk and tribal dances such as Paika, Rinjha, Firkal. Each of the
seasons has its own special dance and unique practitioners. There are
many different forms of painting prevalent in the state, viz. Jadopatia,
Pytkar, Kohbar and Sohrai. The state have religious shrines of more than
1000 years old.
The Archaeological wealth of Jharkhand is also well known. So far 154
archaeological monuments and sites have already been listed.
All of these cast a special responsibility upon the State for preservation,
promotion, showcasing and harnessing, thereby enriching the life of its
citizens, forging a Jharkhandi identity and present to the world its
richness.
The Department of Art, Culture, Sports & Youth Affairs consists of the
following four sectors:-
♦ Sports & Youth Affairs : This sector is concerned with promoting
players, creating and maintaining infrastructure, nurturing promising
talent and providing opportunity for proving their talent.
♦ Cultural Affairs: This sector is concerned with promoting artists from
visual/plastic, performing as well literary arts, carrying out
documentation and research, organising cultural events, and nurturing
cultural institutions, thereby encouraging all round improvement in
the cultural activities within the state.
♦ Archaeology: This sector is concerned with to protect and conserve the
monuments lying in the jurisdiction of the state which are not
protected by the Govt. of India should be protected by the state govt.
♦ Museum: For the preservation of archaeological objects & materials
and cultural property and to educate the common people in this area,

Sport & Youth Services and Art & Culture


145

these museums are in existence since undivided state. Apart from


documenting and doing publication for the benefit of the masses and
scholars, museum organizes special exhibition, seminars, lectures etc.
for the benefits of students and common people.

1.1 ACHIEVEMENTS
Sports & Youth Affairs:
Š Jharkhand is a rising star in the field of Sports. Several of its players are
now playing for the country, especially in the games of Hockey and
Archery. Captain of Indian Cricket Team Mahendra Singh Dhoni is also
from Jharkhand.
Š The Department mainly looks after the school games, Rural Games and
Women Games directly and other games through extending financial
assistance to Sports Organizations, is trying its best to promote sports all
over the states.
Š To promote sports, Sports Policy of the State has been formulated.
Š To encourage Sports Persons cash reward scheme for medal winning
sports person has been launched. Under this scheme so far cash reward
of Rs167.50 Lakh has been distributed among 321 Medal Winner sports
person. Out of this 144 are ST and 20 are SC.
Š Under Sports Stipend Scheme so far stipend for 57 sports persons
incurring annual expenditure of Rs. 24.12 Lakhs has been sanctioned.
Out of this 35 are ST and 13 are SC beneficiaries. Fresh applications have
also been invited.
Š In 2006-07 grant of Rs. 53.30 lakh was provided to 9 state sports
associations. During Xth five year plan perion grant of Rs. 175.71 lakh
was provided to sports associations. For the year 2007-08 applications
for grant to sports association has been invited.
Š Birsa Munda award, Jaipal Singh award & Albert Ekka award for life
time achievement in sports, best Coach, Sports Promotor and Best
Sports Associations respectively have been started from year 2007-08.
Š Prior to the division of state, there were only six sports training centres
running in different schools, in which there were only one coach.
Besides opening 12 new residential training centers, 31 Day Boarding
Sports Training Centres have been opened. In these residential and Day
Boarding Sports Training Centres 1078 boys and girls are taking sports
training. Out of 1078 Sports trainees 754 are ST and 165 are SC.
Š 16 multistation gym has been established in 2006-07. These multistation
gyms are situated in stadiums and sports training centers.

Sport & Youth Services and Art & Culture


146

Š Every year Rural and Women Sports competition Block, District and
State level are organized. Players selected from district level competition
take part in state level competition.
Š Players selected form state level competition of Rural & Women sports
are sent to participate in National Level Rural and Women Sports
Competition.
Š Every year Subrato Cup for Football and Nehru Cup for Hockey are
being organized as part of school game.
Š National Hockey Team of Women in which there were 6 players form
Jharkhand won Silver Medal in Common Wealth Games.
Š State team won 23 Medals including 6 Gold in 33rd National Games
held at Guwahati in Feb. 2007. Before this in 32nd National Games
Hyderabad state team won 14 Medals.
Š In 34th National Rural Sports meet held at Aurangabad, Maharastra 18-
21 Dec. 2006. State Boys and Girls both team own Gold Medal.
Š In National Rural Sports meet held at Kokrajhar, Assam 4-7 Jan. 2007.
State boys hockey team won Gold Medal and girl team won Silver
Medal.
Š In National Rural Sports meet held at Kokrajhar, Assam 4-7 Jan. 2007.
State boys team won 3 Gold 4 Silver and 4 Bronze Medal.
Š In National Women Sports Festival 2007 held at Sangli, Maharastra 27-
30 Jan. 2007. State Women Hockey Team won Gold Medal by defeating
Punjab.
Š In 52nd National School game 2007 held at Jamshedpur 1-5 Feb. 2007.
State boys and girls team won all together 72 Medals in Archery in
14/17/19 year age group.
Š In National School Games Athletics, held at Pune, Maharatra 30 Dec.
2006 – 2 Jan. 2007. State team won 3 Medals.
Š In National School Games Football event held at Nadia, West-Bengal 30
Jan 2007 - 5 Feb. 2007 State boys and girls team won Gold Medal.
Š For the National Games 2007, the state capital Ranchi has been selected
as the host city, for which a Mega sports complex of international
standard is being developed here. This Mega sports complex will be
equipped with all the facilities for Athletics, Tennis, Aquatic Games,
Swimming Pool, Velodrum, Shooting range three Indoor Stadiums for
Gymnastic, Judo, Fencing, Table Tennis, Badminton, Kabaddi etc
besides administrative building and other facilities. For the
accommodation of players, coaches etc, on PPP basis a sports village is
also being developed nearby, for accommodating about 6000 sports
persons. For National Games, the Birsa Munda Stadium as well as
Astro-turf Stadium is also being renovated.

Sport & Youth Services and Art & Culture


147

Š To create sports infrastructure all over the state during Xth five yerar
plan period apart from stadiums being constructed at Ranchi total 62
stadium construction scheme in different districts have been taken up.
Out of this 22 stadiums have been completed.
Š Youth policy of the state has been drafted. It is in process of approval of
the Govt.
Š Under NSS 37400 volunteers are enrolled. Regular NSS camps are being
organized in Colleges and Universities.
Š 20187 NCC cadets are enrolled in 198 Schools and Colleges.

Art & Culture


Š To preserve Akhara & Dhumkudia culture of tribal community 159
Akhara and 90 Dhumkudia building are being constructed.
Š To take care of specifically tribal and folk art form Jharkhand an
organization has been registered under Societies Registration Act 1860
by the name Jharkhand Kala Mandir.
Š Through Talent Hunt Scheme a number of Folk and tribal artist have
been located and presented at State & National level.
Š Documentary films on cultural subjects have been made which exhibit
the colorful and rare art forms of Jharkhand.
Š Cultural researches have been conducted on several rare topics from the
villages of Jharkhand.
Š Inter state Cultural Exchange programme have been started and cultural
exchange was made with the state of Jammu & Kashmir.

Archaeology
Š Village to village archaeological survey has been started and works in
three districts namely Ranchi, Dumka & Saraikela-Kharsawa have been
completed which has brought to light several unreported, till the date,
sites of great archaeological importance.
Š For archaeological conservation survey of several monuments in
Sahebganj, Ranchi and Gumla districts have been made and these
monuments are being conserved shortly.
Š Archaeological explorations in Ramgarh, Hazaribagh, Ranchi and
Sahebganj districts have brought to light many important historical and
prehistoric sites with great archaeological potentialities.
Š Archaeological excavations licence has been sanctioned by the
archaeological survey of India for excavating the sites of Ghorsimri in
Kodarma districts and Khukhara in Ranchi districts.

Sport & Youth Services and Art & Culture


148

Š An all India Archaeological seminar on Megalithic Culture of Jharkhand


was organized in which top archaeologists of the Nation and the State
participated.
Š The archaeological conservation scheme under 12th Finance commission
have been taken up and the Maluti group of temples is being conserved
through Archaeological Survey of India. Besides the estimates have
been finalized for Sutiyambe and the ancestral residence of Late Bibhuti
Bandhopadhaya at Ghatshila where work is being started.

Museum
Š With the help of Israel Govt. a photo exhibition “Archaeology Through
Sky” was organized.
Š Construction of State of Art Museum Building is under progress at
Ranchi. Civil construction work will be completed by the end of March
’08.
Š Small Museum building is being constructed at Itkhori in Chatra
district.
Š Land for Museum Building have been earmarked at Dumka. The
construction will start shortly.
Š A Research Library has been established in the Ranchi Museum.

2. STATE SHARE TO CSS


2.1. National Service Scheme [ 7 : 5 ] :
Under this scheme college students are encouraged to participate in social
work. This scheme is implemented through Universities/ colleges of the
state. For this scheme central and state govt. sanction grants in the ratio of
7:5 respectively for two types of programmes -
a. Regular activities: During these activities Rs. 160.00 is spent for each
volunteers for regular N.S.S. activities.
b. Special Camps : 50% of total strength of sanction N.S.S volunteers are
selected for special camp and Rs. 300 is spent on each volunteer.

2.2. Multipurpose Cultural Centres [ 50 : 50] :


The central govt. supports construction of multipurpose cultural centres in
districts as well as state headquarter on equal sharing basis upto a limit of
Rs. 2.00 crores and Rs. 5.00 crores respectively.

Sport & Youth Services and Art & Culture


149

3. STATE PLAN SCHEMES


3.1 Continuing Schemes
Sports
3.1.1 Organising International/ National/ State Competition:
For promoting sports activities in the state the government supports
organizing State level National as well International Competitions in the
state. 34th National Games will provide competitive environment and
competition opportunities to the sports person of the state.
The Department also organizes school level competitions as well as rural
and women games every year, so that new talent should come out. Special
training camps are organised for these talented players, so that they may
bring glory to the state.
The Department provide assistance to different sports association for there
regular activities. They are provided fund for organising training camps /
competition / purchasing sports equipments etc.
The Department also organizes sports competition on the occasions of
Independence Day, Republic day, State Establishment Day, National
Sports Day as well as on 3rd January the birth day of Jaipal Singh the
famous Hockey player.
3.1.2 Sports Welfare Fund
The Department tries its best to help the needy sports person in distress
such as illness or any other need of such types. We are also planning for
Life/ Medical insurance and rehabilitation. We also reward the sports
person on the basis of their achievements. A player of state winning gold
in Olympic will be given 75 lakhs as reward and so on. We regularly
organize reception for the sports person for their achievements.
3.1.3 Sports Material / Equipments
The state government provides sports material to different schools of the
state for sports activities. It also provides sports material / equipments to
different sports bodies. We are also planning to provide sports material to
different youth clubs.
The purpose of this scheme is to make game popular upto village level
and this would bring new talented players in limelight.
3.1.4 Sports training/talent search scheme
At present there are 17 residential sports training centres and 31 day
boarding centres in different districts of the state. Here, the students are
provided financial help for their education / meal / sports kits / medical

Sport & Youth Services and Art & Culture


150

as well as their residential accommodation. The department has also


provided qualified coaches for each training centre.
A talent such programme is also being carried out by the department for
selection of young promising sports person of 9-14 years for these centres.
For this scouting is also done in the rural areas. These schemes bring
several talented sports person.
3.1.5 Consultancy services / training / workshop
The department has taken a decision to construct stadium in every district
head quarters / sub divisional head quarter / block head quarter. Every
district will be provided an indoor stadium also. For construction of these
stadiums consultancy services of architects and experts will be needed.
Refresher course for coaches, instructors is also needed. Last year the
department organized a training course for the coaches with the help N.I.S
Patiala, so that the coaches may know the latest rules as well as technique
of the game. These training workshops will help both the coaches as well
as players.
3.1.6 Grants to Sports Authority of Jharkhand / Sports Publication and
Library
For development of sports, Sports Authority of Jharkhand has been
created. This Authority will make comprehensive programme for
development of sports like organizing different competitions,
procurement of sports equipments, sports publications of National /
International standards and developing a good library of sports. We will
need fund to meet establishment cost of this authority also.
3.1.7 Sports Stipend
A new tendency of alluring talented sports persons have been noticed in
recent years by providing them job or cash incentives. Some talented
players of state have been allured previously by other state/organisations.
The State Govt. is framing sports policy where in preference in
employment will be given. Therefore, the deptt. proposes to provide
stipend to talented sports persons of the state. Every player, who has the
winning medals for the state, will be provided stipend up to Rs. 3000 to
6,000 per month and will be provided coaching.
3.1.8 Preparation for National Games and organising National Games 2007
The state of Jharkhand have been given responsibility of organising 34th
National Games. For this A mega sports complex is being constructed at
Hotwar, Ranchi for this purpose. The state likes to perform its best in this
National Games. For this purpose a good number of coaches of repute will
be invited for providing coaching to the state players. Services of sports

Sport & Youth Services and Art & Culture


151

exports will also be taken. To conduct game sports equipments for all the
games have to be procured. Large no. of sports equipments are to be
imported. Besides this as a host we will have to arrange for lodging.
boarding, fooding, transportation, medical facilities etc.
Coaching to prepare state team for National Games has already been
started. First phase of coaching has been completed and second phase will
start soon. Tender process to purchase sports equipments has already
been started. Under this scheme fund available this year will be utilized in
procurement of sports equipment and first and second phase of training of
players of state team. Date for National Games has not been fixed as yet. It
is to be finalized by IOA. Since construction work in mega sports complex
is behind schedule, National Games is likely to be organized in next
financial year.
3.1.9 Sports Infrastructure at district level
Jharkhand has immense sports talent. Love to the sports runs in the blood
of Jhakhand youths. Due to lack of sports infrastructure in every district
young sports persons suffer a lot. If sports infrastructures are provided,
sports talent from hinterland will come to fore. Govt. intends to create
infrastructure at every level. In first phase at least one indoor and out-
door stadium with necessary infrastructure is planned to be constructed at
district level and sports potential areas. Apart from construction of
Stadiums under this scheme play fields at panchayat and village level will
also be developed.
3.1.10 Construction of Mega Sports Complex
In 2007, 34th National Games will be hosted by Jharkhand. To organize
this prestigious event, Mega sports complex is being constructed at
Hotwar, Ranchi. In this Mega Sports Complex stadiums and sports
facilities will be of International standards. Present Project cost of all the
components of this Mega Sports Complex is approx Rs. 45000 lakhs. Some
work items such as ‘Z’ section of gallery, some finishing & all the
furnishing items of stadium were not included in estimate of stadiums.
These items may cost Rs. 5000 lakhs. This way total cost of all the
structures of Mega Sports Complex will be about Rs. 50000 lakhs. This
Mega Sports Complex is likely to be completed by next financial year. Till
2006-07 Rs. 24842 lakh was made available to deposit work agency of
different works department. In the present fiscal year budget provision of
Rs. 17500 lakh is available. Due to various reasons work progress in all the
structures of Mega Sports Complex are running behind schedule. Out of
Budget provision of Rs. 17500 lakhs in 2007-08, approx 12500 lakhs may
be utilized, rest Rs. 5000 lakhs is likely to be surrendered. This surrender
amount and cost involved in left over items will be required next year.

Sport & Youth Services and Art & Culture


152

3.1.11 Assistance to organizations / Agencies working for youth welfare


To implement youth policy of the state services of organization/ agencies
working for youth welfare will be taken. Organizations/ agencies
working for youth welfare will be assisted under this scheme.
3.1.12 Participation/ organization of youth festival
Development of youths of Jharkhand is very essential and steps shall be
taken for this. Every year National youth festival is organized at national
level. To participate in the National youth festival state team is prepared
and sent . Apart from this tribal youth festival will also be organized at
state level. State level Youth Festivals shall also be organised every year.
Under this Scheme national level seminars shall also be conducted.

Art & Culture


3.1.13 Inter State Cultural Exchange
Under this scheme cultural troupe of the State is sent to other States.
Similarly teams of other States are also invited to perform in Jharkhand.
By this cultural exchange artists of the State get exposure and opportunity
to learn.
3.1.14 State Chhau Dance Centre
The State Govt. runs a Chhau Dance centre at Saraikela where children are
provided training of dance mask making etc. The trainee students are
provided scholarship and their teachers are provided honrarium.
Manbhum style of Chhau is also one of the important dance popular in
this state. Training of this style is also being promoted.
3.1.15 Establishment of Jharkhand Kala Mandir
For training and organising various cultural activities, the Govt. of
Jharkhand has got registered Jharkhand Kala Mandir under Society
Registration Act 1860. A good numbers of programmes of the department
like exhibition, fine art competitions, folk drama competitions, Kavi
Sammelan, programme for child artists etc. are being organized through
Jharkhand Kala Mandir.
3.1.16 Artist Welfare and Honour
To help eminent artists in distress, a scheme of artist welfare fund has
been created through which we help the needy artist. Artist like
Padmashree Guru Kedar Nath Sahu and Sri Makardhwaj Darogha has
been benefited by this scheme. The state has also started honouring its
artists on the basis of their performances and life long contribution to the
society.

Sport & Youth Services and Art & Culture


153

3.1.17 Cultural Research, Survey and Documentation / Documentary films /


Publication
Research, Survey and Documentation of Jharkhand Culture are being
mooted, so that people may know about these important aspect related to
Jharkhand Culture. Documentary films related to art and cultural heritage
& issue of Jharkhand are being prepared. These films are being produced
with the help of trained and experienced producers and directors.
Publications related to various aspects of Jharkhand Culture will be
brought out, so that people may know Jharkhand in a better way. This
will attract tourists also to this date.
3.1.18 Promotion of literature
For promoting literary activities in Hindi as well as the regional languages
of state, the writers of the state are being honoured so that they create a
literary atmosphere in the state.
3.1.19 Cultural Consultancy, Studies and Trainee
Consultancy service is needed for preparation of various schemes as well
as construction of multipurpose cultural complex besides this we also
organise various training programmes and workshops for the artists of the
state. Experts are invited for these training and workshops.
3.1.20 Talent Hunt at District Level
Under this scheme Talent Hunt programmes are organized in every
District. As two new districts have been created a negligible amount has
been added to the previous year’s budget. Through this scheme a number
of very good artists and cultural organizations could be located and
presented to the audience on state and nation level. It is a very useful
scheme which is organized through local District administration. So the
proposal to continue this scheme is justified.
3.1.21 Construction of Culture Centre
To promote cultural activities in different parts of state the department
plans to construct at least one multipurpose cultural centre in every
district headquarter through state plan scheme to preserve tribal culture
like DHUMKURDIA & AKHARA etc.
3.1.22 Govt. Manbhum Chhau Dance Centre
At Silli, a building of utilitarian nature has been selected for the Chhau
Centre which will start functioning by December’ 07, as is anticipated.
This building will be provided with furnitures, musical instruments,
costumes etc. on minimum requirement basis. The tutors will be paid
honorarium and the trainees will receive financial support. In 2008-09 the
centre will start functioning in a full fledged way.

Sport & Youth Services and Art & Culture


154

3.1.23 Grant in- aid to Cultural Bodies


In the year 2007-08 approximately 40 good cultural NGOs have applied
for grants-in-aid in response to the advertisement. By November end they
will be sanctioned the grants on merit basis. The scheme is being
implemented for the first time. As the infrastructure of the Deptt. is very
limited so it is necessary to seek the help of NGOs to reach to the farthest
village. So, to expand the area of the Deptt. more NGOs are to be brought
to our fold to help us in implementing our scheme.
3.1.24 Centre of Art Excellence
The state is still devoid of any high standard Art Centre or auditorium.
With a view to establish center of art excellence this scheme was included
in this financial year as new scheme with an outlay of Rs. 100 lakhs.
Project report to establish center of art excellence is being prepared and
work will start soon. This scheme needs to be continued in the next
financial year also. Centre of Art Excellence will be a hub of cultural
activities. Thearte/Dance Workshops, Choreography, Exhibitions,
Cultural Research works, Audio- Video Recording studio, Art galleries
etc. will be the parts of this centre.

Archaeology
3.1.25 Archaeological Survey, Excavation/ Exploration/ Documentation and
Conservation
The department desires to take up survey of all the districts of the state
one by one and major archaeological monuments and sites will be
declared protected. 154 archaeological sites and monuments have already
been listed. Documentation work of about 150 monuments will also be
carried out. Conservation work of Dombary Hill is being done. Such type
of conservation work will continue.
3.1.26 Cultural Heritage Protection Campaign / training / Consultancy services
etc.
It is necessary to raise awareness among the common masses of their
history and archaeology so that they may develop a sense of
belongingness to this state. For involving people in preservation of their
heritage particularly the younger generation. Exhibition, tours, lectures
will be organized for this purpose all over the state. Teachers & students
will be provided training for promoting conservation also for which help
of experts will be taken. Seminars will also organised for this purpose.

Sport & Youth Services and Art & Culture


155

3.1.27 Archaeological Research, Assistance and Publication


For the people and institutions who will like to document the
archaeological wealth of this state, Grants in aid will be provided.
Publications related to the monuments of the state will be also published
to make people aware about the monuments of the Jharkhand.
3.1.28 Development of Sutiyambe
Sutiyambe is a very important cultural centre for the people especially
tribal communities of Jharkhand, where Madra Munda, the great Munda
king had his seat of administration. This hillock is sacred to large section
of its population. It is proposed to develop this complex by undertaking
an integrated project for proper exposition as well as facilitating visits to
the place.

Museum
3.1.29 Education activities of Museum (Special exhibition / Seminars etc.)
For attracting visitors towards museums special exhibitions are arranged
by the museums. Besides this certain publications related to the exhibits
will be published. Seminars will also organised by the museum.
3.1.30 Research Library
For making museum a research centre is being developed.
3.1.31 Purchase of cultural property
For enriching museum and preserving culture property, such type of
objects will be purchased by the museum authority.
3.1.32 Museum Building
The construction of museum building at Ranchi has started and museum
building at the Dumka will start soon. A small museum is also proposed
at Itkhori, Chatra.
3.1.33 Grant in Aid for exhibiting cultural property
Grants will be provided to the Govt. as well as private Museums and
other such Institutions involved in collecting and displaying the Antique
and Art objects etc. This will be provided in order to facilitate them in
upgrading the quality of display collection and acquisition of objects.

Sport & Youth Services and Art & Culture


156

3.2 NEW SCHEMES


Sports & Youth Affairs
3.2.1 Construction of Sports Hostel at sports training centre
At present there are 17 residential sports training centers in the state. It is
planned to open at least one Residential Sports Training Centres in each
districts. These residential sports training centers are attached with
schools. Sports trainees are housed in existing school hostels. They are not
getting there better environment for sports trainees. To improve
conditions of sports training centers construction of sports hostels in all
the 17 existing residential sports trainings centers is proposed.
3.2.2 Construction of Youth Resource Center
To channelise Youth energy State Youth Policy is being formulated. It is in
approval stage. To implement youth policy, establishment of State and
District Youth Resource centre has been planned. These youth resource
centre shall have a meeting hall, information centre, library, gym etc.
These youth resource centre will be equipped to guide and provide all
type of informations to youths. In first phase construction of five such
youth resource centre will be taken up in 2008-09.
3.2.3 Establishment of Sports Academy
Presently in our State there is no Sports Academy. As is well known
Jharkhand is rich in Hockey & Football. So for the next year it is proposed
that a Football Academy shall be constructed at Ranchi and a Hockey
Academy shall be constructed at Khunti. Residential facilities shall be
provided in addition to the Games Infrastructure.
3.2.4 Provision of Higher Standard Coaching to players
At present small day boarding & residential centres are running at
different places of Jharkhand for various games. But these centres are
running only in Middle Schools & High Schools. No provision has been
made for college level players. The proficient players need higher
coaching facilities available in other places of country. Since the sports
persons of Jharkhand are very poor. The department proposes to finance
the players for higher coaching sports institutions. It is also felt that the
players in addition to sports coaching should continue their study. So it is
proposed that such proficient players (on the basis of past performance i.e.
winning of Gold, Silver & Bronze in National Events) on the basis of their
economic conditions shall be sponsored for coaching centres outside the
state in addition to bearing the cost for education in nearby
Colleges/Universities.
3.2.5 Professional/Vocational training for youths
Jharkhand being a poor state youths do not get adequate opportunity for
training in professional & vocational courses. At present the Labour

Sport & Youth Services and Art & Culture


157

Welfare department runs ITIs in different places. However there are lot
many professional avenues which are not covered by the Labour
Department. Sewing, shoemaking, handicrafts making, fashionable goods
preparing, fire works etc. are a few to be mentioned. The Department
proposes to open up small economic ventures at remote places to train the
youths and the Department shall also sponsor candidates to such
professional training centres.

Cultural
3.2.6 State Cultural Festival
Under this scheme Tribal & Regional Dance Festival and such other
cultural National level festivals shall be held to promote the cultural
heritage of the State. In many states such festivals are being conducted
each year.
3.2.7 Creation and Management of Kala Academy
For the specific attention to the traditional and contemporary visual and
performing art forms of Jharkhand, the creation of State Kala Academy
(Sangeet Kala Academy and Lalit Kala Academy) is proposed. This
Academy will be responsible to look after over all development in the
field of visual/performing arts and artists of the state.
3.2.8 Erection of Statues of the prominent Martyrs of the state at important
places
As the Statue of Mahatma Gandhi has been erected at Morabadi Ground,
it is proposed to erect more such statues of prominent martyrs of
Jharkhand at important points of the State.
3.2.9 Providing Traditional Costumes and Musical Instruments to selected
Cultural Groups.
In the rural area of Jharkhand, there are several high standard traditional
music and dance groups are there who are very poor. Distribution of
traditional costumes and musical instruments to such groups shall enable
them to present themselves in various level competition/performances.
This would motivate them to pursue their career.

4. TWELVETH FINANCE COMMISSION SCHEMES


4.1 Heritage Conservation
Govt. of India has allocated a sum of Rs.1000.00 lakhs on the
recommendation of 12th Finance Commission for a period of 2006-07 to
2009-10 which will be utilized for conservation and development of
monuments/archaeological sites.

Sport & Youth Services and Art & Culture


158

5. TRIBAL SUB PLAN


A sum of Rs. 18428.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 26500.00 lakhs during Annual Plan 2008-09.

6. SPECIAL COMPONENT SUB PLAN


A sum of Rs.2856.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 26500.00 lakhs during Annual
Plan 2008-09.

7. The Outlay approved for various schemes are given as under -


Art & Culture
Annual Plan 2008-09
Sl. (Rs. In lakh )
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State share to CSS
i) National Service Scheme 50 30 5 15
ii) Construction of Multipurpose Cultural 500 350
Complex 12(C) 150
B. State Plan Schemes
I. Continuing Scheme
1 Sports & Youth Affairs
i) Organising International/National / State 250 175 25 50
Competitions grant to Sport Association
ii) Sports Welfare Fund / Honour 100 70 10 20
iii) Sports Material / Equipment 100 85 15 0
iv) Sports Training / Talent Search 450 350 50 50
v) Consultancy Service / Training 20 0 0 20
vi) Grants to Sports Authority / Publication/ 35 0 0
Library 35
vii) Sports Stipend 60 50 10 0
viii) Organising 34th National Game 4000 4000 0 0
ix) Sports Infrastructure at District Level 9500 4825 975 3700
x) Const. of Mega Sports Complex 8300 6900 1400 0
xi) Assistance to Organisation / Youth 20
Welfare 20
xii) Participation / Organisation of Youth 75 75
Festival
2 Art & Culture
i) Inter State Cultural Exchange 4 4
ii) State Chhau Dance Centre 10 10

Sport & Youth Services and Art & Culture


159

iii) Estab. of Jhakhand Kala Mandir 40 35 5


iv) Artist Welfare / Honour 7 5 2
v) Cultural Research / Survey / 10 10 0
Documentation / Documentary Film and
Publication
vi) Promotion of Literature 3 3 0
vii) Cultural Consultancy, Studies & Training 4 4 0
viii) Talent Hunt at District Level 14 7 7
ix) Const. of Cultural Centre 500 250 100 150
x) Govt. Manbhum Chhau Dance Centre 6 6 0
xi) Grant - in - Aid to Cultural Bodies 25 20 5
xii) Centre of Art & Excellence 50 50 0
3 Archaeology
i) Archaeological Survey / Exploration etc. 26 26
ii) Cultural Heritage Protection Campaign / 30 30
Training / Consultancy
iii) Archaeological Research / Assistance / 5 5
Pbulication
iv) Development of Sutiyambe 100 100
4 Museum
i) Exhibition / Siminar / Educational 5 5 0
Activities
ii) Research Library 1 1 0
iii) Purchase of Cultural Property 2 2 0
iv) Museum Building 400 200 100 100
v) Grant - in Aid for exhibition of cultural 10 10 0
property
II. New Scheme
1 Sports & Youth Affairs
i) Sports Hostel / Training Centre 500 400 100 0
ii) Const. of Youth Resource Centre 250 100 50 100
iii) Estab. of Sports Academy 200 200 0
iv) High Standard Coaching to Players 30 20 2 8
v) Professional / Vocational Training to 30 20 2 8
Youths
2 Art & Culture
i) State Cultural Festival 150 150 0
ii) Management of Kala Mandir 20 20 0
iii) Erection of Statues at important places 78 50 10 18
iv) Providing Traditional Costumes/ 30 25 2 3
Instruments to selected cultural groups
C. 12th Finance Commission
1 Museum
i) Heritage Conservation (TFC) 500 500
Grand Total 26500 18428 2856 5216

Sport & Youth Services and Art & Culture


160

SUMMARY ( Art & Culture )

Annual Plan 2008-09


Sl. (Rs. In lakh )
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked
B. State Share (CSS/CS) 550 380 5 165
C. State Plan Schemes
i. Continuing Schemes 24162 17063 2685 4414
ii. New Schemes 1288 985 166 137
D. EAP ( if any)
E. Other (12th Fin. Comm.) 500 0 0 500
Grand Total 26500 18428 2856 5216

Sport & Youth Services and Art & Culture


235

IX.E. HEALTH, FAMILY WELFARE, MEDICAL EDUCATION


& RESEARCH

1. INTRODUCTION
The Government of Jharkhand is determined to provide quality health
care services to all sections of society particularly to those who are living
in remote and difficult areas. In the Population Policy, it is expressed that
the State is fully committed to achieve replacement level fertility and
thereafter population stabilization by promoting informed choice,
widening the Contraceptive choices available, empowering communities
and women involving all stakeholders from the Private, Public, NGO,
Organized and Co-operative sectors and encouraging use of modern
Contraceptive particularly spacing methods. The ultimate goal is to
deliver the health care facility to the last village, the last household and
the last person in the State. Apart from this, National Rural Health
Mission’s objectives are to be achieved. The objective of the Eleventh Plan
2007-2012 lies in the objective of NRHM. As such, the main thirst is given
over the strengthening of Primary Health Care units. These are proposed
to be strengthened and upgraded as per IPH norms in order to make them
viable to deliver the maximum of their capabilities to the Rural masses.
The comparative health indicators in 2001 and at present stand as below: -

Sl. Health indicators Status on Present status


No. 2001
1 Decadal Growth 26.3 23.1
2 Infant Mortality Rate 72.0 49/1000
3 Maternal Mortality Rate 540 371/100000
4 Safe Delivery - 27.80
5 Institutional Delivery - 22.40
6 Crude Birth Rate - 26.80
7 Crude Death Rate - 7.90
8 Total Fertility Rate - 2.71
9 Couple Protection Rate - 37.90
10 Complete ANC Check up - 32.80
11 Full Immunization - 51.90
12 Rate of Blindness 1.49% 1.40%
13 Leprosy Prevalence Rate 1.36 1.69
(in 10000) Source: SLO,
Jharkhand
14 T.B. 54 per 113 per 100000
Case Detection Rate 100000 (out of 142/per

Health & Family Welfare


235

lakh/per qrt.)
48 per 100000 (out
Case Detection Rate New 18 per of 52/per
Sputum Smear Positive T.B. 100000 lakh/per qrt.)
Case
Source: State RNTCP
Office Jharkhand, Ranchi
Report Upto 2006
15 Malaria
Slide Falciparum Rate [SFR] 7.31 2.31
Slide Positivity Ratio [SPR] 15.42 9.25
Plasomodium Falciparum 47.41% 24.96%
[pf]%
Source: State Malaria
Office Jharkhand, Ranchi
Report Upto 2006
Source:- DLHS RCH-3 & UNICEF

2. STATE PLAN SCHEMES

2.1 MEDICAL HEALTH AND PUBLIC HEALTH

2.1.1 PRIMARY HEALTH CARE (RURAL AND URBAN)


The basic objective of the NRHM is to provide accessible, affordable and
accountable health care in rural areas. Its primary focus is on making the
public health system fully functional as per Indian Public Health
Standards (IPHS) at all levels.
Taking the IPHS into account the models for community Health Centers,
Primary Health Centers and Health Sub Centers have been developed.
The fully functional public health system will include not only the
buildings to be constructed but also the proper human resources to be
placed at every public health facility. Thus while preparing the model
plan for the CHCs, PHCs and HSCs it has been ensured that not only the
health facility building but also the appropriate residential spaces are
created so that the medical personnel, paramedics and other staff can be
stationed at those facilities. This will help us in providing the public
health care services at regular basis.

The primary Health Care facilities are planned on the basis of population
norms as following:-

Health & Family Welfare


235

Tribal Areas General Areas


(Population for one (population for
facility) one facility)
1. Sub Center 3,000 5,000
2. Primary
30,000 20,000
Health Center
3. Community
80,000 1,20,000
Health Center

In the State, as per the above norms, there should be 7088 Health Sub
Centers. At present there are 3958 Subcenters. Out of these 1732 are
functioning in the government buildings, 1956 in the rented buildings and
270 in the rent free buildings. However, most of these subcenters are in
dilapidated condition and do not have the residences for ANMs. Thus
there is a need to make the 7088 sub-centres as new.

In the State, as per the above norms, there should be 1126 PHCs. At
present there are 330 Additional PHCs in the State, which are to be
converted into PHCs. However, these 330 APHCs do not have required
building. Thus 1126 new PHCs are to be constructed in the State. Also
construction of Labour Room in Each PHC.

The CHCs are to be placed at every blockhead quarter. There are 212 block
headquarters in the State. However, the block headquarters where District
Hospitals or Sub-divisional Hospitals are located need not be provided
with a CHC. Thus 188 CHCs are to be created. Moreover at 32 block
headquarters the 30-40 bedded Referral Hospitals are already there. Thus
now CHCs are to be created only in 156 blockhead quarters. The 32
Referral Hospitals need to be upgraded /renovated to provide the
services to be offered by CHCs.
Upgradation and extension of Health Information Management System
in all PHCs. It is proposed to cover five more Districts of the State during
2008-09.
Primary health care units include the construction & renovation of
Mother and Child Health Centre in the State.
16 Referral Hospitals are proposed to be renovated.

2.1.2 SECONDARY HEALTH CARE


a) Up gradation of Sadar Hospital, Ranchi into 500 Bedded Hospital.
b) Construction of Sadar Hospital Building -
Construction of 100-300 bedded hospital at Dumka, Godda, Pakur,
Jamtara, Dhanbad, Bokaro, Chatra, Koderma, Gumla, Simdega,
Garhwa, Lohardaga, Chaibasa, Jamshedpur.

Health & Family Welfare


235

c) Construction of Sub-divisional Hospital Building -


Construction of 50 bedded hospital building at Barhi, Bermo,
Bundu, Husainabad, Chhatarpurat, Nagaruntari, Madhupur,
Rajmahal, Ghatsila, Chakkardharpur and Chandil. '
d) Installation of Incinerator at Sadar & Sub-divisional Hospital
Incinerator in Indoor hospitals having capacity of 50 bedded or
above.
e) Regional Diagnostic Centre
Construction of 100-300 bedded hospital at Hazaribagh, Dumka,
Daltonganj, Chaibasa.
f) Construction of residential accommodation in Sadar and Sub-
divisional Hospital for Doctors and Para Medical Staff in the
hospital premises.

3. MEDICAL EDUCATION & RESEARCH


a) Grant-in-aid to RIMS for development of hospital and College
b) State Share for upgradation of RIMS into a Super Speciality
Hospital
c) Development of Patliputra Medical College and attached Hospital
Dhanbad
d) Development of MGM Medical College and attached Hospital
Jamshedpur
e) Grant-in-aid to RINPAS
f) Establishment and Development of Para-Medical Institutions
g) Grant-in-aid/Soft loan to Medical College in Private Sector
h) Establishment of new Medical College at Dumka and Palamau

3.1 Training
Training is an integral part of Health Care delivery system. NRHM seeks
the convergence of all Health Programmes. Hence training modules are to
be carried out in a regular scientific & systematized manner. Besides this,
Para Medicals such as Nurses (Grade A) receive stipend under this Head.
There are only 10 ANM Schools in the State. 12 ANM Schools are
proposed to be taken up in 12 Districts.

3.2 AYUSH
Development of Medical Colleges of AYUSH is the important component
of NRHM is to be strengthened. With a AYUSH Directorate to facilitate
the State with adequate Doctors in AYUSH (The Indian System of
Medicine and Homoepathy), the Jharkhand Government has sanctioned
one Medical College in each stream of AYUSH i.e. Ayurvedic Medical
College at Chaibasa, Ayurvedic Pharmacy College at Sahebganj and
Gumla, Homeopathy Medical College at Godda and Unani Medical

Health & Family Welfare


235

College at Giridih. All these establishments require strengthening as per


their Central Council of India norms. Establishment of State Drug Testing
Laboratory (DTL)/State Enforcement Mechanism for State Licensing
Authority/State Council of Registration (AYUSH)/Opening of Yoga,
Siddha and Panchkarma Centres/Opening of District Joint Hospitals in
new Districts Kunti and Ranchi.

3.3 Control of Diseases


a) Communicable diseases
Under this category, establishment cost of some of the TB units are borne.
These units are ongoing establishments. These shall continue. These will
be shifted to Non-Plan in future. Also development of IDH building in
Ranchi.
b) Non-Communicable Diseases
Under this category establishment cost of Malaria and Leprosy control
Programme of Tribal Sub Plan area is born. Since these establishments are
likely to continue for implementation and supervision of these
programmes.

3.4 OTHER PROGRAMMES


a) Medical Assistance to BPL
This is an ongoing scheme to be continued in XI th Plan period. This is a
realistic scheme which provides financial assistance to BPL patients for
incurable diseases. A maximum assistance to the tune of Rs. 1.50 lakhs is
given for Heart Surgery, Kidney Transplantation etc.
b) Assistance to State Institute of Public Health
The State Institute of Public Health would impart Training Programmes
for all Medical Professionals of Public and Private Sectors. The necessary
infrastructure is to be created by the State Government. However the
recurring cost of the Institute will be borne out of the training fees
received from the trainee professionals.
c) Establishment of Trauma Centres and Mobile Health Clinics (on
National Highways)
Trauma Centres on National Highways seem to be useful in saving the
human life while a road accident occurres. These centers are proposed to
handle the emergencies. As such adequate infrastructure is to be built up
in-terms of space, OTS, personnel’s and all necessary gadgets. Similarly
mobile health clinics can deliver the preventive & curative treatment in
rural areas. These are supplementary schemes proposed to be continued
in XIth Plan period.

Health & Family Welfare


235

d) Assistance to Super Speciality Hospital in Private Sectors


The Government of Jharkhand has notified an incentive Health Policy to
provide for the establishment of Super Speciality Hospital in Private
Sectors.

4. TRIBAL SUB PLAN


A sum of Rs. 24321.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 40000.00 lakhs during Annual Plan 2008-09.

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 3544.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. Rs. 40000.00lakhs during
Annual Plan 2008-09.

6. The Outlay approved for various schemes are given as under -


Health & Family Welfare
Sl. Type of Scheme Annual Plan (2008-09)
No.
(Rs. in lakh)
Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. State Plan Schemes
1 Primary Health Care
i. Establishment of New Health Sub Centres 2000 1000 400 600
ii. Establishment of Primary Health Centres
iii. Establishment of Community Health Centres 7050 3525 1000 2525
iv. Up gradation and extension of Health
Information Mgmt. System
in all PHC's of 3 Districts
v. Renovation of Hospitals Refaral 1200 600 132 468
2 Secondary Health Care
i. Upgradation of Ranchi Sadar Hospital into 500
Bedded Hospital
ii. Development of Sadar and Sub Divisional
Hospital in-terms of Infrastruture, Bed Capacity,
Equipment, acccommodation etc./ Construction
of Civil Surgeon Office with Doctors &
Paramedical Staffs Quarters.
iii. Building construction of Sadar Hospitals 17520 12440 1400 3680
iv. Building construction of Sub-divisional Hospitals
v) Purchase of Incinator
vi) Upgradation into 300 Bedded from 100 bedded
of Regional Hospital Dumka, Daltonganj

Health & Family Welfare


235

vii) Construction of Residential Building at Sadar and


Sub-divisional
level (B, C and D Type)

3 Medical Education & Research


i. Grant -in-aid to Rajendra Insititute of Medical
Sciences for Development
ii. State share for up gradation of RIMS into a 3375 3375 0
Super Speciality
Hospital
iii. Development of Patliputra Medical Collage and 431 431
Hospital
iv. Development of MGM Medical College and 431 431 0
Hospital
v. RINPAS, Grant-in-aid 100 100 0
vi. Establishment and Development of Para Medical 37 37 0
Institutes
vii. Soft Loan/Grant-in-aid to Medical Colleges in 42 42
Private Sector
viii. New Medical College at Santhal Paragana and 200 100 100 0
Palamau
4 Training including Establishement of ANM 600 338 12 250
Schools in 12 district
5 AYUSH
i) Development of Medical Colleges of AYUSH 1100 642 458
ii) State Drug Testing Laboratory (DTL)
iii) State Enforcement Mechanism for State
Licensing Authority
iv) State Council of Registration (AYUSH) 234 174 60
v) Opening of Yoga, Siddha and Panchakarma
Centres
vi) Opening of District Joint Hospitals in new
Districts (Khunti, Ramgarh)
6 Control of Diseases
i) Communicable Diseases (T.B.) Establishment 75 75 0
cost and Development of Infection Disease
Hospital at Ranchi
ii) Non Communicable Diseases (Maleria/Leprosy) 1050 984 66
iii) Purchase of Machines/Equipments for different 1000 500 200 300
Hospitals
7 Other Programme
i) Medical Assistance to BPL People 1500 300 1200
ii) Assistance to Institute of Public Health
iii) Construction of Hostel Building
iv) Construction of Auditorium Building 2005 2005
v) Establishment of Trauma Centres and Mobile
Health Clinic (on National Highway)
vi) Soft Loan/assistant to Super Speciality Hospital 50 50
in Private Sector
Grand Total 40000 24321 3544 12135

Health & Family Welfare


235

SUMMARY ( Health & Family Welfare )


Annual Plan (2008-09)
(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes 40000 24321 3544 12135
ii. New Schemes
D. EAP ( if any) -- -- -- --
E. Other (12th Fin. Comm.) -- -- -- --
Grand Total 40000 24321 3544 12135

Health & Family Welfare


235

IX.F. WATER SUPPLY & SANITATION


1. INTRODUCTION

In Jharkhand entire population does not have access to safe drinking


water & sanitation. Rural sanitation coverage is very low. About 30% of
habitations have partial facility with drinking water. All habitations do
not have safe drinking water as source contains Fluoride, Arsenic & Iron.
The programmes such as Accelerated Rural Water Supply Programme
(ARWSP), Swajaldhara and Total Sanitation Campaign were launched
in serving the rural population with water and sanitation related services
all across the State.

Achievement
Š Reorganization of Ranchi Urban Water Supply scheme was completed
and commissioned
Š Improvement of Dhanbad Water Supply scheme completed and
commissioned
Š Water Supply to Medininagar Urban Area started Phase-1 started
Š 4400 nos. of NC and 2799 nos. of PC covered
Š 270 Nos. of Fluoride/Arsenic Removal Attachments installed in water
quality problem areas.
Š 108 Rural Pipe Water Supply schemes constructed/upgraded.

Objectives
Š to mitigate problems of quality drinking water
Š to increase the coverage of safe drinking water
Š to replace spot- source by piped water supply
Š to maintain the water table in order to prevent depression in ground
water resource
Š to maintain and recharge the quality of U/G water
Š To convert individual household service latrines into septic latrines
and to provide community latrines for those who use the open field.

2. STATE SHARE TO CSS

2.1 BHARAT NIRMAN : -


Following works are proposed -
a. Coverage of NC /PC habitation
b. Reallocation of Tube wells to rejuvenate outlived Tube wells

Water Supply & Sanitation


235

c. Rain water harvesting to enrich ground water with respect to


quantity as well as quality.
d. To provide safe water to quality affected areas.
e. Laboratory to test water quality.

2.1.1 Accelerated Urban Water Supply Programme (AUWSP) (50 : 45 : 5)


With contribution of 50% Central: 45% State and 5% Beneficiary, two W/S
schemes namely Latehar & Rajmahal and Seven W/S Schemes namely
Meru, Baliapur, Panchet, Dugdha, Basukinath, Manoharpur and
Husainabad already sanctioned are under execution.
2.2 Total Sanitation campaign
This scheme is already under execution in all the districts of the state of
Jharkhand. Matching state share is given as per provisions in the
sanctioned DPR.

3. STATE PLAN SCHEMES

3.1 Continuing Schemes

3.1.1 Rural Piped Water Supply

3.1.2 Rural Tube Wells Schemes

3.1.3 Urban Water Supply


10 (Ten) urban water supply schemes are under implementation at
various locations in Dhanbad, and Ranchi districts. Dhanbad phase–II is
proposed.
3.1.4 Direction and Administration

The following work will be taken up -


i) Survey and Consultancy for engineering studies and technical
investigations.
ii) Training and work shop to train personnel for new knowledge &
motivation
iii) Minor works for extension of office buildings, extension of running
schemes in problem areas etc.

4. TRIBAL SUB PLAN


A sum of Rs. 8367.12 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 27000.00 lakhs during Annual Plan 2008-09.

Water Supply & Sanitation


235

5. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 886.50 lakhs has been earmarked for Special Component Sub
Plan out of total approved outlay of Rs. 27000.00 lakhs during year
2008-09.
6. The Outlay approved for various schemes are given as under -
Drinking Water

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Share to CSS
i. Rural Sanitation 5008 2668.82 0 2339.18
ii. ARWSP 8600 3618.30 736.50 4245.20
iii. AUWSP 100 40 0 60
B. State Plan Schemes
iii. Rural Water Supply - Pipe 6834 1510 100 5224
iv. Direction & Administration 100 80 0 20
v. Tubewells 558 250 50 258
iv. Urban Water Supply 5800 200 0 5600
Grand Total 27000 8367.12 886.50 17746.38

SUMMARY ( Drinking Water )

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) 13708 6327.12 736.50 6644.38
C. State Plan Schemes
i. Continuing Schemes 13292 2040 150 11102
ii. New Schemes
D. EAP ( if any) -- -- -- --
E. Other (12th Fin. Comm.) -- -- -- --
Grand Total 27000 8367.12 886.50 17746.38

Water Supply & Sanitation


235

IX.G. HOUSING

1. INTRODUCTION
Jharkhand has about 2.69 crore population living in 24 districts. Housing
problem is quit serious in urban areas, especially for the people of middle
or lower Income group. Improvement of housing facilities is an important
objective of the State Government.
This department is responsible for laying overall policy frame work and
co-ordination of activities of different agencies. It works primarily through
the Jharkhand State Housing Board which has been constituted to provide
schemes to needy person at affordable prices. The Board acquire land at
district headquarter and develop plots and construct houses/flats under
different groups of society as per actual need of the locality.

2. Achievement
• Construction of 252 L.I.G plots at Bariatu, Ranchi.
• 300 L.I.G schemes at Jamshedpur
• 40 M.I.G at Baralota, Daltonganj
• Repairing and development of roads at Harmu and Bariatu
• Construction of 24 M.I.G Flat at Adityapur, Jamshedpur.
• Development of Mixed plot at Adityapur, Jamshedpur.

3. State Plan

3.1 Continuing Scheme

Construction of 11 H.I.G Houses at Hirapur, Dhanbad

3.2 New Scheme

3.2.1 Acquisition of land at Dumka

3.2.2 Development of acquired land at Deoghar

3.2.3 Land Acquisition at Dhanbad

3.2.4 Technical consultancy Seminar, Training

Housing
235

4. TRIBAL SUB PLAN


A sum of Rs. 850.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 850.00 lakhs during Annual Plan 2008-09.

5. SUMMARY (Housing)

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked
B. State Share (CSS/CS)
C. State Plan Schemes
i. Continuing Schemes
a. 11 HIG House Construction at Hirepur, 120 120 0 0
Dhanbad
ii. New Schemes
a. Land Acquisition at Dumka 120 120 0 0
b. Land Acquisition at Deoghar 50 50 0 0
c. Land acquisition at Dhanbad 550 550 0 0
d. Tech. Consultancy, Seminar, Training 10 10 0 0
Grand Total 850 850 0 0

Housing
235

IX.H. URBAN DEVELOPME0NT

1. INTRODUCTION

Urban Development Department provides basic services to urban areas in


entire state as per the provision of Municipal Corporation/ Municipality
Act. Responsibilities of ULBs have increased manifolds in recent past after
enactment of 74th Constitutional Amendment Act. The twelfth Schedule
brings into the municipal domain among others such areas like as urban
and town planning, regulation of land use, planning for economic and
social development, safeguarding the interests of weaker sections of
society including the handicapped and mentally retarded, Slum
improvement and upgradation, urban poverty alleviation, promotion of
cultural, educational and aesthetic aspects. The subject of ‘cattle pounds'
has been extended in the Twelfth Schedule to include 'prevention of
cruelty to animals'. The Constitution thus envisages urban local bodies as
being totally responsible for all aspects of development, civic services, and
environment in the cities, going far beyond the traditional role. At present,
Urban Development Department implements its development
programmes through two(2) Municipal Corporations and thirty seven (37)
Municipalities & Nagar Panchayats.

1. EARMARKED SCHEMES

1.1 Jawaharlal Nehru National Urban Renewal Mission (JNNURM):


Jawaharlal national Urban Renewal Mission is major initiative by the
Government of India towards development of urban areas. Under this
mission the Central Govt. would provide financial assistance varying from
50% to 80%. The balance has to be borne by the state share and Urban
Local Body. The CDP's for selected three towns in Jharkhand have been
submitted to Govt. of India for their approval and simultaneously the
ULBs have taken initiatives to prepare the DPRs for the different sectors as
identified / prioritized in the CDP. The major sector for preparation of
DPR's are Water Supply Scheme, Drainage & Sewerage, Urban Transport,
Solid Waste Management, River Front Development, Urban Renewal
Scheme, BSUP (Basic Services to Urban Poor), Slaughter House. The
scheme could not take off in launching financial year 2005-06. Till Oct,
2007 scheme is still to start. With this view it is necessary to take initiatives
in coming time make vigorously. DPRs for various sectors are under
preparation.

Urban Development
235

1.2 Urban Infrastructure Development Scheme for Small and Medium Towns
(UIDSSMT):
UIDSSMT Scheme applicable in all ULBs other than the JNNURM towns
through which Financial Assistance of 80% of the project cost could be
availed from Govt. of India and 10% has to be born by the State Govt. and
balance 10% has to be borne by the ULB's. The ULB's are preparing DPRs
by engaging consultants. DPR's for Water Supply Scheme at Deoghar,
Solid waste Management Hazaribag and Chas, Water Conservation
Project of Daltonganj is being submitted to GOI for funding.

1.3 Integrated Housing and Slum Development Programme (IHSDP):


Under IHSDP, the central government provides financial assistance of
80% of project cost for slum improvement including housing and
infrastructure in slum area. In case of housing, a beneficiary contribution
upto 10-12% is made essential. A comprehensive project proposal
incorporating housing and infrastructure has to be prepared for approval
of the scheme. Most of the ULBs are in process of preparing the project
report.

1.4 National Urban Information System (NUIS):


Through this project the Maps of Urban Areas have to be digitalised so
that the maps are available for various purposes. In the first phase, the
maps for five cities i.e. Bokaro, Dhanabd, Jamshedpur, Mango, and Ranchi
are being prepared by the Survey of India, Dehradun. In the next five
year, there is a proposal to prepare the maps for all the towns in
Jharkhand.

2. STATE SHARE TO CSS

2.1 Swarna Jayanti Shahri Rojgar Yojna (SJSRY) 75 : 25


Under SJSRY scheme the Govt. of India and the State Govt. provide
Financial Assistance at the ratio of 75:25. Through this scheme, funds are
provided for creation of employment opportunities to the unemployed in
the urban areas, development of Child & Women and create wage
employment.

2.2 National River Conservation Programme (NRCP) 70 : 30


Under this scheme, there are three ongoing projects i.e. Damodar
Development Scheme, Swarna Rekha Development Scheme and Ganga
Development Scheme (Phase-2). The Central Govt. Provides 70% of the
project cost and balance 30% has to be born by the State Govt. So far 40
projects under Damodar Development Scheme and 7 projects under
Swarnarekha Development scheme and 2 projects under Ganga

Urban Development
235

Development Scheme are taken up. 26 projects worth cost Rs.2400 lakhs
has been forwarded to Govt. of India for sanction.

2.3 National Lake Conservation Programme (NLCP) 70 : 30


This is a centrally sponsored scheme for the conservation of the Lakes and
Water Bodies for which Central Govt. provides 70% of the project cost and
balance 30% by the State Govt. The detailed project report for Ranchi
Lake, Topchanchi Lake etc are under preparation. There is a need to
conserve the lakes at different locations like Ranchi, Jamshedpur,
Dhanabd, Chakulia, Simdega, Mihijam, jamtara, Bundu, Basukinath,
Lohardaga, Chakradharpur, Kharsawan, Saraikela, Deoghar, Madhupur,
Chatra, Koderma, Chas, Katras etc.

3. STATE PLAN

3.1 Urban Transport (including Bus Stand):


The Urban Development Department provides loan and grants to its
urban local bodies for the development of roads in urban areas. In order to
improve the urban transport roads, flyovers, bridges, MRTS, public
transport etc are developed on the priority basis. There is a proposal to
develop modern bus stands in important towns in the state. A sum of
3000 lakhs was earmarked in the FY 2007-08. The govt. of Jharkhand has
sanctioned the proposal of Ring road at Hazaribag and its total cost come
to Rs. 64.00 crore. The State Govt. has sanctioned Rs. 2.00 crores in the
year 2007-08 and the rest amount i.e. 62.00 crores is needed to complete
this ambitious scheme. Besides this, many important schemes like,
construction of Bye-pass road/Ring Road/Fly over etc. proposal for
construction of Bye-pass road of Gumla and Pakur and Fly over/Ring
Road/Bye-pass road in Deoghar are yet to be taken in the financial year
2008-09, hence.

3.2 Urban Water Supply


The state Government is committed to provide safe and sufficient water
supply for the citizens of urban areas. The population is growing at faster
rate in the urban areas. In order to complete the drinking water supply
schemes for Giridih, Dumka, Birsanagar (Jamshedpur), Lohardaga,
Mango, Katras, Chatra, Jugsalai, Mihijam and Deoghar in current year
2007-08, the committed liability of Rs. 215.69 Crores is required to meet
the liabilities. There is an urgent need to provide fund for water supply in
Chaibasa, Chas, Jhumritilaiya, Mango, Dhanbad, Garwah, Godda,
Chakradharpur. In addition to above it is proposed to provide provisions
for installing Handpumps to meet the requirement of drinking water in
emergency particularly during summer.

Urban Development
235

3.3 Sewerage/Drainage
All the ULBs are facing the problem of sewerage and drainage in the
urban areas. Action has been initiated to develop the sewerage problem in
Ranchi. A project proposal of about Rs. 750.00 crores is being prepared by
the consultant which would be submitted to Govt. of India for funding
under JNNURM. The project proposal for Sewerage and drainage for
Deoghar, Dumka, Medininagar is also to be taken up in due course. There
is a need to provide storm water drainage facilities to avoid water logging.
3.4 Solid Waste Management
In order to keep the towns clean and pollution free, there is a need to
improve the solid waste management of ULBs. The twelfth finance
commission has provision of fund for developing the solid waste
management system in towns from the state head.
3.5 Community & Individual Toilet/Urinals
The Govt. of Jharkhand has eliminated the inhuman practice of carrying
night soil on head. The goal of elimination of manual scavenging has been
achieved by the department and the state has been declared as scavenging
free state. At the same time to meet the requirement of the increasing
population in the urban areas there is a proposal to construct few more
community toilets. Besides this there are large number of urban poors,
specially ST & SC population, who have not the facility of dry latrine and
they are bound to go out side. This activity of the urban poors adversely
effect the environment and the Govt. is keen to facilitate dry latrines to
such urban poors.
3.6 Civic Amenities (Park/Market Complex/Lighting/Night Shelter/ EIUS/
Beautification of Marriage Hall/ Hostel for Working Women etc.)
Under civic amenities, the State Govt. aims at providing the various civic
facilities to urban poor through urban local bodies like parking, street
light, market complex, mall, crematoria, orphan house, old age home,
library, museum, art gallery, development of park, dharmshala, night
shelter, sanitary equipments etc. The allocations would be given to ULBs
as per the requirement. It is a proposed to construct crematoria and
slaughter house in Jamshedpur, Deoghar, Dhanbad, Daltonganj, Dumka
and Ranchi on priority basis. The steps would be taken to develop as
many schemes as possible under the PPP mode. Proposals have been
received in the department for Construction of Market Complexes in
various urban local bodies. There are some liabilities with the department
like construction of market complex in Sahebganj/Town Hall in
Chakulia/Market Complex in Basukinath and Construction of Market
Complex in Giridih.

Urban Development
235

3.7 Land Acquisition


There is need to acquire suitable land for development of civic amenities
i.e. Bus stand, Transport system, Sewerage Treatment Plant, Solid Waste
management etc in the urban areas. It is observed that due to
unavailability of land in the urban areas sometime ULBs are unable to
create infrastructure for providing the basic services.
3.8 Consultancy/Master Plan
In order to prepare detailed Project Report for various sectors under
JNNURM, UIDSSMT and IHSDP, the consultants need to be hired. The
services of the consultants are being taken for preparation of the DPRs like
Water Supply project for Ranchi, Solid Waste Management, River Front
Development, Basic Services to Urban Poor, Ranchi Transport
Management Plan, Drainage and Sewerage Plan for Ranchi, Slaughter
House by most of the ULBs.
3.9 Capacity Building of Corporations, Authorities and ULBs
The State Government has a proposal to restructure the ULBs based on the
present population. Dhanbad Municipality has been converted into
Dhanbad Municipal Corporation by incorporating adjoining Notified
Area committees. There is a proposal to constitute Municipal Corporation
at Jamshedpur, Deoghar, Hazaribag, and Chas Municipality on the same
line by incorporating the adjoining areas. The Government also has a
proposal to restructure the existing ULBs for which a report has been
prepared by Regional Centre for Urban and Environment Studies
(RCUES), Lucknow. Report/ received recommendation from the institute
and is under consideration in Government.
3.10 Jharkhand Urban Planning Management Institute
The State Government envisages to set up an Urban Planning
management Institute in collaboration with Corporate Houses/Technical
Institutes, registered under societies act, for capacity building of the ULBs.
The Architecture and infrastructure work and for management of city
administration. The State Government is sending its officials for similar
training to the other states at present.
3.11 Jharkhand Urban Infrastructure Pooled Fund (JUIPF) Grant
4. 12th FINANCE COMMISSION SCHEMES
4.1 Development of Capital City
Keeping in view of the necessity of the new capital township in the state
capital of Jharkhand, the 12th commission has earmarked a sum Rs. 200
crores. This amount would be made available to the state Govt. in phases
from FY 2007-08 to 2009-10. Master plan for Ranchi is under process as per
the requirements for availing financial assistance. Fresh identification of
the sites for development of new township is in final stage.

Urban Development
235

4.2 Solid Waste Management


As per the recommendations of the 12th finance commission, Rs. 98 crores
has been earmarked for the solid waste management by ULBs of
Jharkhand. The commission also recommends to earmark at least 50% of
the funds for implementation of the solid waste management projects. The
ULBs are preparing DPRs for solid waste management for their towns.
5. TRIBAL SUB PLAN
A sum of Rs. 20205.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 35000.00 lakhs during Annual Plan 2008-09.
6. SPECIAL COMPONENT SUB PLAN
A sum of Rs. 2660.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 35000.00 lakhs during Annual
Plan 2008-09.
7. The Outlay approved for various schemes are given as under -
Urban Development

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked Scheme
i) JNNURM / UIDSSMT / IHSDP 12000 6000 1200 4800
Dhanbad and Jamshedpur (50 : 50)
Ranchi & Others (80 : 20)
Average (35 : 65)
ii) NUIS 100 55 0 45
B. State Share (CSS/CS)
i) SJSRY (75 : 25) 100 50 10 40
ii) NRCP (70 : 30) 50 0 0 50
iii) NLCP (70 : 30) 50 0 0 50
B. State Plan Schemes
i) Urban Transport ( Loan & Grant ) 3500 1750 350 1400
ii) Urban Water Supply ( Loan & Grant) 4000 2000 400 1600
iii) Sewerage / Drainage ( Loan & Grant) 1500 750 150 600
iv) Solid Waste Management ( Loan & Grant) 100 50 10 40
v) Community Toilet/Urinals ( Loan & Grant) 1000 500 100 400
vi) Civic Amenities/ Parking/ Market Complex 2400 1200 240 960
vii) Land Acquisition 1500 825 0 675
viii) Consultancy/ Master Plan 1000 550 0 450
ix) Capacity Building of Corp., Authorities / 500 275 0 225
ULBs
x) Jharkhand Urban Planning Management 100 100 0 0

Urban Development
235

Institute
xi) Jharkhand Urban Infrastructure Pooled Fund 100 100 0 0
(JUIPF) Grant
C. 12th Finance Commission
i) Dev. of Capital City 5000 5000 0 0
ii) Local Bodies Grants Scheme 2000 1000 200 800
Grand Total 35000 20205 2660 12135

SUMMARY ( Urban Dev. )

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked 12100 6055 1200 4845
B. State Share (CSS/CS) 200 50 10 140
C. State Plan Schemes
i. Continuing Schemes 15700 8100 1250 6350
ii. New Schemes
D. EAP ( if any)
E. Other (12th Fin. Comm.) 7000 6000 200 800
Grand Total 35000 20205 2660 12135

Urban Development
235

IX.I. INFORMATION AND PUBLIC RELATION

1. INTRODUCTION

The information and Public Relations Department is having the onerous


responsibility of carrying the message of the Government to the people of
the State and also keep the government informed of the public reactions to
the schemes and measures being taken. It has to play the role of two way
traffic system. Being the backbone of the government it has to play a vital
role in the development process of the government. Its role is educative
because it has to reach the people to secure their active co-operation and
active involvement in the development and welfare activities of the
government.
To achieve these objectives, various mass media, both traditional and
modern are pressed into service. Efforts have been made in different plans
to strengthen, expand and modernise both the equipment and techniques
of mass communication, to meet the growing requirements of the
situation. Moreover, with the present Information revolution and the
pressing demand of the ‘Right of Information of people’, it has become
imperative to make the Information and Public Relations Department
proactive and responsive.

2 State Plan
2.1 Continuing Scheme
2.1.1 Rajya Suchana Bhavan

The construction of a Suchana Bhavan at Ranchi was approved in the year


2007-08 by the Cabinet and is likely to be completed under current Five
Year Plan period.

2.1.2 Purchase of Motor Vehicles

2.1.3 Flag, Holdings, Pamphlets and Postures for publication and Mfg.

2.2 New Scheme

2.1.2 Production of films


2.1.3 Purchase of Doordarshan sets, Mike and Computer
2.1.4 Establishment of Jan Sanchar Sansthan
2.1.5 Geet Natya
2.1.6 Exhibition

Information & Public Relation


235

3. TRIBAL SUB PLAN


A sum of Rs. 783.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 1000.00 lakhs during Annual Plan 2008-09.

4. The Outlay approved for various schemes are given as under -

Information & Publicity

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow
Outlay TSP SCSP to OSP
State Plan Schemes
A. Continuing Scheme
i) Rajya Suchana Bhawan 500 450 50
ii) Purchase of Motor Vehicles 100 50 50
iii) Flag, Holdings, Pamphlets and Postures for 150 100 50
publication and mfg.
B. New Scheme
(i) Production of Films 30 30 0
iv) Purchase of Doordarshan Sets, Mike and 138 90 48
Computer
(v) Estb. of Jan Sanchar Sansthan 25 25 0
(vi) Geet Natya 12 8 4
(vii) Exhibition 45 30 15
Grand Total 1000 783 217

Information & Public Relation


235

SUMMARY ( PRD )

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow
Outlay TSP SCSP to OSP
A. Earmarked -- -- -- --
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes / 750 600 150
New Schemes 250 183 67
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 1000 783 0 217

Information & Public Relation


235

IX.J. WELFARE

1. INTRODUCTION

This department is mandated to look after the welfare of the most


underprivileged sections of the society namely the Schedule Tribes,
Scheduled Castes, Backward classes and Minorities and the task of
bringing all round development of these sections. During the financial
year 2008-09, it wills the endeavour of the state to continue the plans and
programs with greater emphasis so that the Scheduled Tribes, the
Scheduled Castes, the Backward Castes and Minorities could reap the
benefit of the programs.
Population of Jharkhand 269.45 lakhs
ST population 70.87 lakhs (26.30% of total popl.)
Notified Tribes 32
Notified Primitive Tribes 9
ST population in TSP blocks (112) 56.31 lakhs (44% of TSP population)
ST population in OSP blocks (100) 14.36 lakhs (10.24% of OSP
population)

These ST population mostly live in remote rural villages where the


infrastructure facilities are the weakest. The incidences of poverty are
plentiful. The status of education/literacy among ST population is also
poor. As per 2001 census, as against the state average of 43.71%, the
literacy rate among tribal is as low as 33%. The scenario is even worse in
the case of tribal women whose literacy rate is as low as 22.11%. The
endeavour of the department are :-
(i) To provide employment/income generation activities to ST
population with a view to enhance their economic status.
(ii) To provide educational facilities to ST population with a view to
increase literacy rate among ST people especially ST girls.
(iii) To create infrastructure facilities in tribal areas with a view to bring
them at par with the state average of these facilities.
(iv) To execute and implement similar schemes meant for welfare of
SC/OBC/Minority communities.
The total outlay under TSP and SCP are above 26.3 % and 11.84 %
respectively i.e. the % ST and SC Population of the state.

Welfare (SC/ST/OBC/ Minority)


235

10th Five Year Achievements:


Economic Empowerment Segment
¾ Distribution of buses to STs. – For providing self employment to nearly
5890 youth of ST community, 589 buses have been distributed to them.
¾ Distribution of buses to SCs. – For providing self employment to 1400
youth of SC communities, 140 buses have been distributed to them.
¾ Commercial Pilot Training scheme for the STs – Twenty –five ST boys
have been trained as commercial pilot in Pondicherry and Kanpur. 10
boys already got job in deferent Air-lines.
¾ Setting up of Kiosks for the members of Minority community – 120
kiskos have been sanctioned in the year 2006-07 far at the total cost of
Rs. 60 lakhs.
¾ Rural livelihood projects based on water shed development in the
tribal dominated areas. – This programme is being run by Tribal
Development Society with the help of IFAD ( International Fund for
Agriculture). In the 2nd phase he programme has been extended in 4
new blocks, making the coverage area of this programme in 300
villages in 12 blocks.
¾ New schemes launched by the T.C.D.C. – Several new schemes of self
employment have been launched / are being launched, by TCDC for
people belonging to ST, SC, BC and Minority.
Education Segment
¾ Every year the department distributes approx. 70-80 crore as
scholarship to the students of ST, SC and BC community. This scheme
(State Share) has been transferred to Non-plan since 05-06. However
the central assistance received is released by making provision in
appropriate plan head.
¾ Nearly 16220 students get free education in a network of 110
residential schools out of which 87 are meant exclusively for ST, 21 for
SC and 2 for BC community.
¾ Birsa Munda Technical Scholarship for ST students studying in
technical institutions outside the state. – 1391 tribal students have been
benefited so far under this scheme. Similarly 139 SC students have
been benefited under Ambedkar Technical Scholarship.
¾ Establishment of a Polytechnic institute for the STs / SCs at BIT,
Mesra. - 124 ST (including PTG) and SC student have passed out in
Diploma course in various streams.

Welfare (SC/ST/OBC/ Minority)


235

¾ Distribution of bicycles to girl students studying in VIII, IX & X std of


STs , SCs , BCs. – Approx. 101083 girls students have benefited under
this scheme till 05-06. It is expected that 175765 more girls student will
be benefited in the year 07-08. The high school girls belonging to
ST/SC/BC community were facing tough time walking on foot to their
schools located far away from their villages. Insecurity on the way was
another issue. This has led to a sharp decline in the dropout cases
among girl students.
¾ Vocational Training programme for STs, SCs, BCs, Minorities and
PTGs have been given much emphasis in last two years. Institutes like
IDTR, Jamshedpur, Kolkata, Bhopal, Institute of Science and
Management (ISM), Pundag, Ranchi, Security and Intelligence
Services(SIS) Action etal, XISS, Tally have been involved in these
trainings. Total 197 student were inducted in Vocational training
during 2005-06.
¾ Setting up of Ashram/Eklavya Schools. Six Ashram/Eklavya Schools
one each at Ranchi, West Singhbhum, Saraikela-Kharsawan, Gumla,
Dumka and Sahebganj. Four schools have been completed. These are
meant exclusively for ST boys/girls from 6th to 12th class.
¾ Construction of better equipped hostels for STs, SCs, BCs and
Minorities - After creation of the state so far 257 hostels ( 100 bedded
and 50 bedded) have been sanctioned. Nearly 183 have been
completed and rest are in various stages of construction.
¾ Enhancement in scholarship rates since 2003 -04 for ST and SC student.

Health Segment
¾ Setting up of 14 Gramin Hospitals in Meso areas. – The hospitals will
be operationalzed soon.
Agriculture Segment
¾ Excavation of Irrigation Wells.- So far 2110 wells have been sanctioned
benefiting a large number of Tribal population.
¾ Construction of check- dams – So far 233 check dams have been
constructed/are under construction.
¾ Construction of cold storages – Three cold storage one each at Ranchi,
Dumka and Hazaribagh have been sanctioned to provide benefit to ST
farmers.
¾ Construction of Multi purpose Halls in 14 Meso areas.

Welfare (SC/ST/OBC/ Minority)


235

Culture & Sports scheme


¾ Setting up of Academies of Chhau dance and Archery academy in
Saraikela-Kharsawan.
¾ Three Astroturf for hockey grounds at Khunti, Gumla and Simdega
have been sanctioned to benefit hockey players of tribal areas.
¾ Birsa Awas Yojana for the PTGs.- This scheme intends to provide a
house at a cost of Rs. 70500/- to each PTG family. Till now 24342
houses have been sanctioned and 14811 have been completed . Rest
are under construction.

Acheivements during 2007-08


As proposed, during 2007-08, the ball has be set rolling for achievement of
targets set forth for the year. 2007-08. Some of the main areas worth
mentioning are:-
¾ Major thrust in the area of vocational training programmes of
vocational training for tribally SC, BC & Mino. youth are in progress in
collaboration with-Security and intelligence sciences for training more
than 4000 youth as security guard
¾ Indian Institute of Science(ISM) for training youth in hotel industry-
115till now.
¾ IDTR(Indo Denish Tool Room) and its allied institutes at Kolkata,
Indore and hyderabad for deploma cource in CnC-till now.
¾ BiT(Mesra) for providing Vocational Training in Electronic and
Electrical till 210 till now
¾ Action & tal for authombile, hosptitalely, hospital management,
beauty parlour etc- 338 till now
¾ Tally, for computer accessories.
¾ Training for nurses, pilot, Air hostess, and apparel training. in process
of being finalized.
¾ Tally for computer accounting.
¾ During 2006-07 5000 youth will be given training in various vocational
field. As per the information available the placement is more than 90%
¾ A sum of Rs. 1300 lakh is proposed to be spent during 2007-08 under
this scheme.
¾ Total 32 No. of new hostels sanctioned and are under construction.

Welfare (SC/ST/OBC/ Minority)


235

¾ 4 Ashram School and 2 Eklavya school(10+2) being handed over to


reputed NGO,s for making them state
¾ Two new high school for S.C. girls (at Chatra and Garhwa) started and
two for O.B.C girls at Palamu & Dumka startted
¾ Conservation cum Development(CCD) started. Sy. plan for PTG(100%)
central Assistance being launched
¾ Jharkhand state scheduled cast corporation (JSSCDC) started
distribution of loan to beneficiaries.
¾ Construction of Haj house, for the benefit of Haj piligrims, has been
started and will be completed soon.
¾ Rates of meals and other items in residential schools enhanced. but of
25 pilots trainees sponsored by the welfare department
¾ 22 pilots have been placed in various air lines.
¾ 89 PTG graduates have been directly appointed in state government
jobs.

2. EARMARKED SCHEMES
2.1 Article 275 (1) of the Constitution
Grants under this head are used for filling up the critical infrastructure
gaps necessary development of tribal population of the State and are
necessary to bring the tribal areas at par with the rest of the country.

2.2 SCA to TSP


Funds under this head are to be utilised for employment & income
generating activities. It is proposed to take up various schemes in field of
agriculture / horticulture / Land reforms /Water shed development /
Animal Husbandry / Ecology environment / Development of Forest and
Forest villages / Development of Entrepreneurship and SSI as per Govt. of
India’s guidelines.

3. STATE SHARE TO CSS


The following schemes are proposed on the basis of 50:50 CSS schemes : -

a. Protection of Civil Right Act


b. SC/ST Atrocities Act, 1989
c. Pre Examination centre(PRK)SC
ST
OBC

Welfare (SC/ST/OBC/ Minority)


235

d. Jharkhand Tribal Research Institute


e. Hostel Construction for Boys & Girls for STs
SCs
OBCs
f. Opening and Maintenance of Ashram Schools/Coaching and
Allied.

4. STATE PLAN SCHEMES


4.1 Continuing Scheme
(Welfare of SCs)

The following objectives are as follows :


• Furniture, TV for boys and Girls
• Re-imbursment of Examination fee
• Computer and TV for Residential School
• Medical Aid
• Vocational Training
• Legal Aid
• Strengthening of Laboratory for Residential School
• Teacher Training
• Construction & Renovation of Residential School
• Bicycle for Girls Students
• Grant in aid to NGOs
• Estab. and Grant to SCDC
• Share Capital to SCDC
• Direction and Administration
• Seminar Technology Camp
• Hostel renovation

(Welfare of STs)
The following objectives are as follows :
• Reimbursement of Examination fee
• Boundary Wall & Renovation of ahersthan/ Hargari/Masna/
Sarna to Tribals
• Furniture, TV, Utencil for Hostels
• Re-organization of Ayurvedic Centers
• Supply of Medicine in Ayurvedic Centers
• Bicycle for Girls
• Strengthening of Laboratory for Residential School
• Medical Aid
• Vocational Education

Welfare (SC/ST/OBC/ Minority)


235

• Legal Aid
• Grant to NGOs
• Computer, Lightening, Conductor & TV for residential Schools
• Consultancy Study
• Renovation of Pahariya Dewakalin day School
• Special Medical Scheme for PTG
• Vocational Education for PTG
• Mid day meal for Pahariya
• Seminar & Technology camp
• Grant to TCDC
• Share Capital to TCDC
• Constitution of PTG Authority
• Constitution & Maintainance of State Tribal Commission
• Bharat Darshan for PTG
• Maintainance of Rural Hospital
• Lac Development Plan
• Maintainance of Ashram/Eklavya Schools (Grant to NGOs)
• Maitainance (Grant) to Birsa Munda Ulihatu/Schools
• Meso Project Administration
• Jharkhand Adivasi Vikas Karyakaram(IFAAD)
• Renovation of hostels
• Construction & Renovation of resi. School
• House construction for PTG
• Renovation of Birsa Munda Ulihatu Complex

(Welfare of OBCs)
The following objectives are as follows :
• Reimbursement of Examination fee
• Grant to BC Corporation
• Bicycle for BC Girls Students
• TV & Computer and lightening conductor in residential School
• Medical Aid
• Furniture, TV & Untensil for Hostel
• Vocational Training (Commercial) for BC
• Maintenance of residential School (establishment)
• Construction of Resi. School

(Welfare of Minority)
The following objectives are as follows :
• Construction of Hostel for Boys & Girls Hostel
• Construction of Hostel for Boys & Girls Hostel
• Upaskar for Hostel

Welfare (SC/ST/OBC/ Minority)


235

• Boundary wall of Kabristhan


• Vocational Commercial training for Minority boys & girls
Students
• Construction of Kiyosk for Minority
• Bicycle for Minority Girls Students
• Development of Minority Finance Corp.
• Share Capital to Minority development and Finance corporation
• Renovation of Minority Hostels
• Construction of Haj House

4.1 Continuing Scheme


An budget provision of Rs. 25364.00 lakh has been made for the year 2008-
09 for implementation of schemes of Welfare Department in the category
of ST/SC/OBC and Minority. These include continuing as well as new
schemes.

4.2 New Scheme


• Running of PTG primary schools
• Renovation of BC hostels

5. EXTERNALLY AIDED PROJECT (E.A.P.)

5.1 Jharkhand Tribal Development Society


A World Bank/IFAD assisted project known as the Jharkhand Tribal
Development Programme has been launched with the appointment of a
full time State Programme Director and recruitment of support staff. As
per the proposed scheme of funding, the State has to spend its share of Rs.
969.00 lakh in 8 years. This is being provided every year in the State
Budget. The Balance fund of Rs. 7691.00 lakh is to be provided by the
funding agencies for which an outlay of Rs. 2000.00 lakh is proposed in
the 100% Centrally Assisted schemes head from which advance for donor
contribution is proposed to be paid during year 2008-09.

6. TRIBAL SUB PLAN


A sum of Rs. 20166.50 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 25000.00 lakhs during Annual Plan 2008-09.

Welfare (SC/ST/OBC/ Minority)


235

7. SPECIAL COMPONENT SUB PLAN


A sum of Rs. 3065.00 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 25000.00 lakhs during Annual
Plan 2008-09.
8. The Outlay approved for various schemes are given as under -
Welfare
Sl. No. Type of Scheme Annual Plan (2008-09)
(Rs. in lakh)
Approved Flow to Flow to Flow
Outlay TSP SCSP to OSP
A. Earmarked Schemes
1 Article 275(1) of constitution 2800 2800
2 SCA to TSP 7750 6500 1250
B. State Share to CSS (50 : 50)
3 Protection of Civil Right Act. 20 20
4 SC, ST Atrocity Act. 1989 40 40
5 Pre- Examination Training Center ( Park )
for SCs 20 20
for STs 25 18 7
for OBCs
6 Jharkhand Tribal Research Institute 50 50
7 Hostel construction for Boys & Girls students
for SCs 350 350
for STs 450 330 120
for OBCs 210 110 100
8 Opening & Maintenance of Ashram Vidyalaya 305 268 30 7
and Coaching & Allied
C. Continuing Scheme
Welfare of SCs
9 Furniture, Utensil, TV for Boys & Girls Hostel 100 100
10 Re-imbursement of Examination fee 90 90
11 Computer and TV for Residential School 40 40
12 Medical Aid 30 30
13 Vocational Training 200 200
14 Legal Aid 2 2
15 Strengthening of Laboratory for Residential 5 5
School
16 Teacher Training 17 17
17 Construction & Renovation of Residential 200 200
School
18 Bicycle for Girls Students 200 200
19 Grant in aid to NGOs 100 100
20 Estab. and Grant to SCDC 100 100

Welfare (SC/ST/OBC/ Minority)


235

21 Share Capital to SCDC 100 100


22 Direction and Administration 50 50
23 Seminar Technology Camp 11 11
24 Hostel renovation 110 110
Welfare of STs
25 Reimbursement of Examination fee 160 160
26 Boundary Wall & Renovation of ahersthan/ 200 175 25
Hargari/Masna/ Sarna to Tribals
27 Furniture, TV, Utencil for Hostels 259 159 100
28 Re-organization of Ayurvedic Centers 2 1.5 0.5
29 Supply of Medicine in Ayurvedic Centers 11 10 1
30 Bicycle for Girls 400 290 110
31 Strengthening of Laboratory for Residential 10 8 2
School
32 Medical Aid 60 48 12
33 Vocational Education 440 330 110
34 Legal Aid 10 8 2
35 Grant to NGOs 300 275 25
36 Computer, Lightening, Conductor & TV for 100 75 25
residential Schools
37 Consultancy Study 80 80
38 Renovation of Pahariya Dewakalin day School 20 20
39 Special Medical Scheme for PTG 40 40
40 Vocational Education for PTG 50 50
41 Mid day meal for Pahariya 50 50
42 Seminar & Technology camp 20 20
43 Grant to TCDC 100 100
44 Share Capital to TCDC 50 50
45 Constitution of PTG Authority 20 20
46 Constitution & Maintainance of State Tribal 10 10
Commission
47 Bharat Darshan for PTG 20 20
48 Maintenance of Rural Hospital 100 100
49 Lac Development Plan 200 200
50 Maintainance of Ashram/Eklavya Schools 140 140
(Grant to NGOs)
51 Maintenance (Grant) to Birsa Munda 65 65
Ulihatu/Schools
52 Meso Project Administration 561 561
53 Jharkhand Adivasi Vikas Karyakaram(IFAAD) 500 500
54 Renovation of hostels 200 150 50
55 Construction & Renovation of resi. School 250 200 50
56 House construction for PTG 1526 1526
57 Renovation of Birsa Munda Ulihatu Complex 15 15
Welfare of OBCs
58 Reimbursement of Examination fee 100 100
59 Grant to BC Corporation 20 20
60 Bicycle for BC Girls Students 650 450 200

Welfare (SC/ST/OBC/ Minority)


235

61 TV & Computer and lightening conductor in 10 8 2


residential School
62 Medical Aid 60 20 40
63 Furniture, TV & Utensil for Hostel 100 30 70
64 Vocational Training (Commercial) for BC 400 400
65 Maintenance of residential School 120 60 60
(establishment)
66 Construction of Resi. School 200 100 100
Welfare of Minority
67 Construction of Hostel for Boys & Girls Hostel 400 250 150
68 Upaskar for Hostel 70 40 30
69 Boundary wall of Kabristhan 400 250 150
70 Vocational Commercial training for Minority 300 200 100
boys & girls Students
71 Construction of Kiyosk for Minority 1 1
72 Bicycle for Minority Girls Students 220 100 120
73 Development of Minority Finance Corp. 50 50
74 Share Capital to Minority development and 50 50
Finance corporation
75 Renovation of Minority Hostels 10 10
76 Construction of Haj House 400 400
D. New Scheme
77 Running for PTG Primary School 90 90
78 Renovation of B.C. Hostels (New Scheme) 5 5
E. Externally Aided Project (EAP)
79 Grant to Jharkhand Tribal Development 2000 2000
Programme (IFAD)
Grand Total 25000 20166.50 3065 1768.5

9. SUMMARY TABLE (Welfare)


Sl. Type of Scheme Annual Plan (2008-09)
No. (Rs. in lakh)
Approved Flow to Flow
Flow to TSP
Outlay SCSP to OSP
A. Earmarked 10550 9300 1250
B. State Share (CSS/CS) 1470 776 460 234
C. State Plan Schemes
i. Continuing Schemes / 10885 7995.50 1355 1534.50
New Schemes 95 95
D. EAP ( if any) 2000 2000
E. Other -- -- -- --
Grand Total 25000 20166.50 3065 1768.50

Welfare (SC/ST/OBC/ Minority)


235

IX.K. LABOUR, EMPLOYMENT AND TRAINING

1. INTRODUCTION
Government of Jharkhand through Department of Labour, Employment
and Training is committed to provide enhanced Social Security to its old
age helpless persons, to protect the interests of its working class in the
organised and unorganised sectors in the fast changing economic scenario,
to effectively implement various labour laws and to produce trained man
power.
In order to achieve these broad objectives the state government of
Jharkhand is committed to participate in all major central initiatives like
Indira Gandhi National Old Age Pension Scheme, Aam Admi Bima Yojna,
Upgradation of ITIs, Converting ITIs in Centre of Excellence, etc. While
we are continuing with the most of schemes initiated earlier we are
undertaking to start a number of new schemes.
Apart from schemes relating to social security and modernization of
administrative machinery we are committed to set up at least one
I.T.I.(General) in all districts and sub divisions and at least one I.T.I.
(Women) in every district so that once they become functional we can
train upto 10000 youths through them.
We fully hope that these trained youths in various trades will be able to
fill the gap of trained manpower in the state.

2. EARMARKED SCHEMES
2.1 Indira Gandhi National Old Age Pension Scheme
National Old Age Pension Scheme sponsored by Government of India
under National Social Assistance programme, as per the decision of the
state government males/females as above 60 years whose annual income
is Rs. 5000/- in rural area and Rs. 5500/- in urban area were paid pension
@Rs. 200/- per person per month. Ministry of Rural Development,
Government of India has decided to pay pension @ rs. 400/- per month
with effect from 01.08.2006. Under the scheme, in Tribal Sub Plan 179205,
in Other Sub Plan 116564 and in Special Component Plan for Schedule
Caste 70467 pensioners are getting the benefit of pension; the total number
of pensioners are 366236.
From 19.11.07 National Old Age Pension Scheme has been converted in
Indira Gandhi National Old age Pension Scheme, under which
males/females of the age of 65 years and above of BPL family are paid

Labour & Employment


235

pension Rs. 400/- per months. Accordingly, all the districts of the state
have been directed to make available the list/full details of the persons of
the target group. As per the provisional figures, it is proposed that 126385
numbers of pensioners are likely to be added in Tribal Sub Plan, 101964 in
Other Sub Plan and 29069 in Special Component Plan for Schedule Caste.
On the above basis category wise number of pensioners in Indira Gandhi
National Old Age Pension Scheme are proposed as below :-
1. T.S.P - 305590
2. O.S.P. - 218528
3. S.C.S.P. - 99536
Total - 623654
Indira Gandhi National Old Age Pension Scheme is effective form
19.11.07. The budget estimate for financial year 2008-09 is Rs. 17016.59
lakhs in Tribal Sub Plan, Rs. 12377.14 lakhs in Other Sub Plan and Rs.
5324.85 lakhs in Special Component Plan for Scheduled Cast. The total
budget estimate under Indira Gandhi National Old Age Pension Scheme
is Rs. 34718.58 lakhs. The details have been shown in the following table:-

Tribal Sub Plan Number of Pensioners Rupees in lacs

Additional Assistance
A. Arrear (2007-08) 126385X400X4.5 2274.93
B. Current ( 2008-09) 305590X400X12 14668.32

Administrative - 73.34
Expenditure %

Sub Total 17016.59

Other Sub Plan

Additional Assistance
C. Arrear (2007-08) 101964X400X4.5 1835.35
D. Current ( 2008-09) 218528X400X12 10489.34

Administrative - 52.45
Expenditure %

Sub Total 12377.14


Special Component Plan for Schedule Caste

Additional Assistance

Labour & Employment


235

E. Arrear (2007-08) 29069X400X4.5 523.24


F. Current ( 2008-09) 99536X400X12 4777.72

Administrative - 23.89
Expenditure %

Sub Total 5324.85

2.2 National Family Benefit Scheme


Under National Family Benefit Scheme, the earning member who is head
of the family of BPL category, of the age of 18 and 65 years, on his death,
his dependent of his family is paid Rs 10,000/- in one stroke. In this
scheme 100% is funded by Government of India.

3. STATE SHARE TO CSS


3.1 Rehabilitation of Bonded Labour [ 50 : 50 ]
Under Central Sponsored Scheme Rehabilitation of Bonded Labourers is
being done at the rate of Rs. 20,000/- per labourer. The expenditure is
born by the Centre and State at 50:50 ratio.

3.2 Upgradation of ITIs [ 75 : 25 ]


Under this scheme ITI Ranchi (Gen.) and ITI, Dhanbad have been
established as “Centre of Excellence” in “Production and Manufacturing”
sector. A batch of 100 trainees are being imparted training. A batch of 71
Students are being trained in ITI, Dhanbad.

3.3 National Health Insurance Scheme [ 75 : 25 ]


In this centrally sponsored scheme it is proposed to implement the
national health insurance scheme in the state for the welfare of
unorganized workers and their families and who are living below the
poverty line. The funding is on the basis of 75:25 but the administrative
costs have to be bare by the State Government.

3.4 Aam Admi Bima Yojana [ 50 : 50 ]


Aam Admi Bima Yojana has been launched in 2007-08 as central
sponsored scheme. Under the scheme, after the death of insured person
due to accident, his dependent has to be paid Rs 75,000/- and due to loss
of one limb, insured person is paid Rs. 37500/-. Under the scheme, his two

Labour & Employment


235

school going spouses reading in class IX to XII will get scholarship @


100/- per month per child.
Aam Admi Bima Yojna has been launched by the Ministry of finance. Vide
letter no. S-13011/02/2007 INS III dated 13-07-2007 through LIC for
earning person of landless families between the age of 18 to 59 years.
Along with this letter has been enclosed the photo copy of S.R.S. bulleting
April, 2003. As per report 3.12 lakh beneficiaries of rural landless house
holds has been reported in Jharkhand State. On this basis state
government has to pay Rs. 3.12 lakh per annum @ Rs. 100/- per person on
50:50 basis.
Accordingly for the year 2008-09 under Tribal Sub Plan Rs. 152.88 lakh as
premium for 152880 persons and under Other Sub Plan Rs. 96.72 lakh for
96720 persons and Under Special Component Plan for Scheduled caste Rs.
62.40 lakh for 62400 persons.

4. STATE PLAN SCHEMES


Continuing Schemes
4.1. Survey of Migrant Labour
A large number of labourers migrate to different parts of the country to
earn living. A plan designated as Survey of Migrant Labour has been
started in the financial year 2006-07 to know the condition of these
migrant labours and to assist them.
4.2 Organisation of Rural Training Camps / Workshops
Under this scheme training camps will be organised at various levels to
educate and to sensitise the stake holders such as public representatives,
labourers, unions, government servants, NGOs etc with respect to existing
labour laws. This assumes relevance due to changed economic Scenario.
The officers of the department will also be provided training to enhance
there skill and vision.
4.3 Organization of Jharkhand Child Labour Commission
The State Government has decided to constitute a Child Labour
Commission with a view to eradicating practice of child labour and
formulating and executing schemes for the welfare and development of
the children of under age. The commission shall study the issue of the
child labour and suggest welfare measures to State Govt. for remedy.
Child Labour Commission as mandated by law in the State.
4.4 Strengthening machinery for Implementation of Minimum Wages Act
and other Labour Laws
Under this scheme extension of the offices of Labour superintendent
(General) previously created is districts-Latehar, Simdega, Jamtara and

Labour & Employment


235

Saraikela-Kharsawan of the State is proposed to implement the provisions


of labour laws more speedily and effectively. It is also proposed to create
the post of Labour Superintendent (General) in newly created districts
such as Ramgarh and Khunti.

4.5 Equipping and Strengthening of Labour Offices


It is proposed to provide vehicles, computers, Fax machines, Photocopier,
Furniture and telephones etc. to the regional labour offices situated in
different districts of Jharkhand including head quarter establishment to
facilitate infrastructural resources in these offices to cope with day to day
modernization and e-governance. In this scheme vehicles and furnitures
will be purchase for Six Deputy Labour Commissioner and Eleven
Assistant Labour Commissioner of the state.
4.6 Construction of Houses for Bidi Workers
Under this scheme it is proposed to construct 1000 houses @ Rs. 40,000/-
per houses for Bidi workers who are not covered with the benefits of any
other scheme launched for the welfare of such workers by the state
government.
4.7 Construction of Hospital for Beedi Workers
Under this scheme it is proposed to construct buildings for
hospital/health care units for proper check-up of Bidi workers in different
districts of Jharkhand. Cluster of Bidi workers one found mainly in the
district of Santhal Pargana and W.Singhbhum districts.
4.8 Fund for the welfare of Labourers engaged in Buildings and other
Constructions Work
Under this scheme it is proposed to contribute fund for the welfare of
workers engaged in buildings and other constructions work. A welfare
board for workers engaged in buildings and other construction work is
constituted shortly.
4.9 Survey of Child Labours
Under this scheme it is proposed to conduct survey and rehabilitation
work of child labours released from different hazardous occupations and
process in the context of child labour laws and those child labours coming
from other states.

4.10 Construction of Buildings of Labour offices


Under this scheme it is proposed to construct the buildings for regional
and local offices in different districts such as Hazaribagh, Daltonganj,
Chatra, Godda, Jamtar,a Pakur, Simdega, Lohardaga and Latehar of the
state where these offices are not located in the government buildings.

Labour & Employment


235

4.11 Creation of new Gazetted posts under Labour Commissioner


Under this scheme it is proposed to create and set up offices of Director
(Minimum Wages), Chief Inspecting officer, Additional Registrar(Trade
Union), Assistant Labour Commissioner (Research)/ Assistant Labour
Commissioner (CIO), Deputy Labour Commissioner (Monitoring Cell),
Statistical Authority (equivalent to ALC), Canteen Manager( equivalent to
Labour superintendent) for better enforcement of different labour laws
such as Minimum Wages Act, Migrant Labour Act, Trade Union Act,
Shops & Establishment Act and C.M.I. Act etc ant to establish government
canteens in secretariat buildings and Legislative Assembly of the state.
In financial year 2008-09 an outlay of Rs. 60.00 lakh is proposed It is also
proposed to establish the office of Assistant labour Commissioner in the
office of Resident Commissioner, New Delhi for welfare of migrant
labours who migrant from Jharkhand to Hariyana, Punjab also and Delhi
and to establish a better relation between these states. It is proposed to
create one post of ALC, two post of Assistant welfare of and two post of
IVth grade employee.

4.12 Extension of special Employment Exchanges For Physically


handicapped in Bokaro Steel city, Ranchi and Jamshedpur
To provide the Employment Assistance to the physically handicapped
persons is one of the main function of Employment service among others.
Keeping this view in mind as per provision of “The Persons with
Disabilities (Equal opportunity, Protection of Rights and Full
Participation) Act 1995. Three special Employment Exchange for
physically handicapped has been established in Bokaro, Ranchi and
Jamshedpur, on the basis of 80:20 of Central & State expenditure
respectively. As per instructions of Central Govt., Since Financial Year
2007-08 the plan is being continued in State plan.

4.13 Management Information System


Under this scheme information’s pertaining to admission, examination
and other information’s regarding ITIs are maintained at headquarter
level. It is planned to connect ITIs to Directorate through networking.

4.14 Construction of Building of ITI’s


Under this plan new Buildings of already functional and existing ITIs and
additional constructions of building for ITI Jamshedpur, Women ITI
Latehar, boundary wall of Chiabasa and new construction of building of
women ITI Jamshedpur, Combined Training Bhawan at Ranchi and
boundary walls of women ITI Ranchi, ITI Dumka, ITI Daltenganj and ITI
Kharsawan and also for staff quarters, ITI Daltenganj.

Labour & Employment


235

4.15 Establishment of new women’s ITI


Under this scheme, the unskilled and unemployed girls and women are
given technical Training to make them skilled and self reliant for
employment & self employment. For proper functioning of four existing
women ITI (One Hazaribagh under OSP & Three Chaibasa , Jamshedpur
and Latehar under TSP) furnishing them with essential equipments as per
norms of Govt. of India’s Training manual.

4.16 New Trade/Courses in already established ITI’s


Under this scheme new trades based on new technology have been
introduced in the existing ITI’s of the state. This scheme is currently
established at ITI, Ranchi(Gen.), Bokaro, Dumka, Dhanbad, Chaibasa,
Hazaribag, women ITI, Ranchi & women ITI, Dumka Seven hundred &
sixty students will benefit with this plan. For furnishing the institutes for
these trades with essential machinery / equipments and for
establishment.

4.17 Establishment of New ITI’s


Under this scheme ITI’s were established in various districts for training
for unskilled youths in different trades to make them eligible for
employment and self employment. For development of infrastructural
facilities and making available machines and also establishment cost to the
ITI’s running at Giridih, Jhamshedpur, Garhwa & Kharsawa.

4.18 Establishment of ITI’s in uncovered Districts / Places


Under this scheme ITIs are established in those districts/Places which are
not covered with ITIs. The objective of the scheme is to make available
technical training at the door step to the prospective aspirants and the
unemployed youth.
For TSP area establishment of ITIs, purchasing of machine & equipment &
construction of new buildings for proposed, ITIs at Simdega, Lohardaga,
Khunti, Jamtara, Latehar and Gumla.
For OSP area it is proposed for establishment and cost machine &
equipment, for ITI at Godda the construction of new building of ITI at
Ramgarh and Garhwa (Jhagratand)

4.19 Employee State Insurance Scheme


Under Employee State Insurance Scheme, there are two posts of Regional
Administrative Medical Officer and their officers at Jamshedpur and
Dhanbad. Their work is supervision and inspection of E.S.I. dispensaries
and hospitals in their Zone.

Labour & Employment


235

New Scheme
4.20 Rehabilitation of Child Labours
In this scheme it is proposed to establish a residential school-cum-
vocational training centre each in Chaibasa and Ranchi.

4.21 Equipping and Strengthening of Industrial tribunal and Labour Courts


It is proposed to equipping and strengthening the existing offices of
Industrial Tribunal, Ranchi and Labour Court, Ranchi, Hazaribagh,
Jamshedpur, Bokaro, Dhanbad and Deoghar by providing these offices
with vehicles, Computer and furniture.

4.22 Establishment of the State Labour Institute


It is proposed to establish a State Labour Institute at Ranchi for training
and enhancing the skill and vision of different officers Inspectors/Boiler
Inspectors and Labour enforcement officers etc.

4.23 Strengthening of Craftsman / Apprenticeship training Schemes


Under this scheme strengthening and empowerment of Directorate of
Employment & Training (training wing) will be under taken. For this it is
proposed to start a new scheme namely “Strengthening of Craftsman /
Apprenticeship training schemes” under which it is proposed to create, as
per guidelines of Directorate General of Employment & Training, Ministry
of Labour, Govt. of India required Gazetted & non-gazetted posts at state
headquarters and also to establish regional Directorates at Dumka,
Jamshedpur and Hazaribagh and creation of necessary gazetted / non-
gazetted posts for these regional directorates thereby.

4.24 Strengthening/modernization of ITIs


AS the machines and equipment of ITIs have become old and obsolete,
replacement with new and modern one’s is a glaring need. For
modernization and replenishment of equipments/machines of ITIs at
Ranchi(Gen.), Ranchi (women), Dhanbad, Dumka, Dumka(women) and
sahebganj.

4.25 Land acquisition for ITIs


This is new plan which will take care of fund requirements for land
acquisition costs for setting up the new I.T.Is in the eventuality of non
availability of government land.

4.26 Establishment of ITIs in uncovered Sub divisions


Under this plan it is proposed to establish ITIs at all the uncovered sub
divisions namely :- 1. Husainabad, 2. Nagar Utari, 3.Chhattarpur, 4.

Labour & Employment


235

Ghatsila, 5. Chakradharpur, 6. Chandil, 7. Barhi, 8. Bermo, 9. Bokaro City,


10. Madhupur and 11. Rajmahal.

4.27 Establishment of Women ITIs in Industrial towns


Under this plan women ITIs is proposed to be established in Bokaro and
Dhanbad.

4.28 Establishment of Women ITIs in uncovered districts


Under this plan women ITIs are proposed to be established at the
following districts :- 1. Khunti, 2. Simdega, 3. Gumla, 4. Lohardaga, 5.
Daltonganj, 6. Garhwa, 7. Kharsawan, 8. Giridih, 9. Chatra, 10. Godda, 11.
Deoghar, 12. Sahibganj, 13. Pakur and 14. Ramgarh.

4.29 Consultancy
In 2008-09 plan an outlay of Rs. 5955.00 lakh is proposed under various
categories of ITIs for construction of new buildings so as to cover all the
uncovered districts and sub divisions with at least one general I.T.I. and
one women ITI in all districts. So far this work had been undertaken with
the help of different work agencies in different district lacking in
uniformity and centralised monitoring for this work. It is proposed to
engage one or more consultants on concept to commissioning basis who
will provide architectural/structural plan, drawing & design, tendering
and supervision cover.

3. TRIBAL SUB PLAN


A sum of Rs.25128.09 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 50000.00 lakhs during Annual Plan 2008-09.
4. SPECIAL COMPONENT SUB PLAN
A sum of Rs. 6220.86 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 50000.00 lakhs during Annual
Plan 2008-09.

Labour & Employment


235

5. The Outlay approved for various schemes are given as under -


Labour, Employment and Training
Annual Plan (2008-09)
Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked Scheme
i) Indira Gandhi National Old Age Pension Scheme 34719 17016.59 5324.86 12377.55
ii) National Family Benefit Scheme 1959 1037 400 522
B. State share to CSS
i Rehabilitation of Bonded Labour Scheme 10 5 5 0
(50 : 50)
ii) Upgradation of Industrial Training Institute 58 18 40 0
(75 : 25)
iii) National Health Insurance Scheme (New) 1560 650 234 676
(75 : 25)
iv) Aam Admi Bima Yojana (New) (50 : 50) 312 153 62 97
C. State Plan Schemes
Continue Scheme
i) Survey of Migrant Labour 20 10 5 5
ii) Training and Workshop/Organisation of Rural 25 15 5 5
Training Camp
iii) Organisation of Child Labour Commission 30 30 0
iv) Enforcement of M.W. Act & other labour laws 20 12 8
v) Equipping and strengthening of labour offices 220 120 100
vi) Housing for Beedi workers 400 160 80 160
vii) Construction of hospital for Beedi workers 48 48 0
viii) Fund for the Welfare labours engaged in 25 10 5 10
buildings & other construction
ix) Survey of Child Labours 15 5 5 5
x) Construction of buildings for labour offices 550 200 350
xi) Creation of New Gazzetted Post Under Labour 60 60 0
Commissioner.
xii) Extension of Employment Service 513 270 30 213
xiii) Management Information System 3 0 0 3
xiv) Construction of Building of it is 515 415 0 100
xv) Women’s ITIs Scheme (Establishment of New 203 156 0 47
Women it is)
xvi) New Trades/Courses in Already Established ITIs 175 106 69
xvii) ITIs General Scheme (Establishment of New 498 245 0 253
ITIs)
xviii) Establishment of ITIs in Uncovered Districts 2382 1694 0 688
xix) Employee State Insurance Scheme 15 7.50 0 7.5
New Scheme
xx) Rehabilitation , School-cum Training Centre for 100 50 25 25
Child labour
xxi) Modernization of tribunal and labour court 45 15 0 30
xxii) Establishment of labour institute 100 100 0 0
xxiii) Strengthening of Crafts man/Appreticeship 15 10 0 5

Labour & Employment


235

training Scheme
xxiv) Strengthening/modernization of ITIs 300 250 0 50
xv) Land Acquisition of ITIs 500 300 0 200
xvi) Establishment of ITIs in Uncovered Sub divisions 3025 1100 0 1925
xvii) Establishment of Women ITIs in Industrial towns 160 0 0 160
xviii) Establishment of Women ITIs in Uncovered 1120 560 0 560
Districts
xxix) Consultancy 300 300 0 0
Grand Total 50000 25128.09 6220.86 18651.05

SUMMARY

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked 36678 18053.59 5724.86 12899.55
B. State Share (CSS/CS) 1940 826 341 773
C. State Plan Schemes
i. Continuing Schemes / 5717 3563.50 130 2023.5
New Schemes 5665 2685 25 2955
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 50000 25128.09 6220.86 18651.05

Labour & Employment


235

IX.L. SOCIAL WELFARE

1. INTRODUCTION

As we approach the beginning of the 11th Five Year Plan, the Department
of Social welfare, women and Child Development can look back with
pride the achievements of the last 5 years in the areas of nutrition, care for
the physically challenged and empowerment of women. Some of the
salient features in our campaign against malnutrition among children
between the ages of 0 to 5 are the universalisation of the nutrition
program to all the 212 blocks of the state. All children irrespective of their
caste, creed and colour are covered by this scheme, including pregnant
and lactating mothers. This is an important step in ensuring that the child
of the poorest family in the state is ensured of adequate supplementary
nutrition when it is most needed for his or her overall mental and physical
well being.

In the areas of the care of the physically challenged, one singular


achievement is the introduction of a the Swami Vivekananda Nisshakt
Swawlamban Protsahan Yojana whereby every physically challenged
person above the age of 5 years is given a monthly stipend of 200 rupees.
In all it is estimated that the state has a physically challenged population
of around 3% of the total population. Besides this, a number if initiatives
has been made to build, and commission blind schools in several districts.

One notable achievement during the last plan period was the synergy
developed between the Departments of Health and Family Welfare and
the Social Welfare Department which has given a considerable boost to
the success of routine immunization in the anganwadi Centers to children
and mothers. This synergy is to be kept intact in the coming years as well.

Empowerment of women and the care of the girl child also engaged the
attention of the Department during the 10th Plan Period and the thrust in
this area is proposed to be continued in the 11th Plan period as well. The
prevention of sexual harassment at the workplace needs special mention
as the department has spearheaded awareness campaign in all
government offices and the educational institutes. Today each department
has constituted complaints committees to take cognizance and take
corrective action against offenders.

The Department is now geared to meet the challenges of the 11th Five Year
Plan with renewed commitment to our set goals and new approaches, to
match the changes that are emerging in the society due to accelerated

Jails
235

economic growth. With the economy growing at a rate of 8% and above,


the outlook is bright. But along with accelerated economic growth there
are also certain negative trends that we have to watch out for. The 11th
Plan speaks of inclusive growth wherein the fruits of development and
growth are equitably distributed among all sections of society. We must
therefore ensure that the underprivileged and the differently enabled
persons are not left out or marginalized. We must also ensure gender
equity and protection of women at the workplace as more and more
women goes out of their homes and engages in productive economic
activity. Involvement of the non governmental agencies and the private
sector needs to be encouraged to social commitments so that a strong
partnership is built between government on the one hand and the private
sector on the other.

One thrust area during the 11th Five Year Plan is the rescue and
rehabilitation of adolescent girls who migrate from the rural heartland of
the state to big metropolitan cities who are lured on the promise of jobs
but later sexually and physically abused. With rapid economic growth,
these are the side effects which are bound to occur and the department is
committed that such vulnerable sections are protected; their problems
documented and monitored with adequate safety net and rehabilitation
schemes.

2. EARMARKED SCHEMES

2.1 Adolescent Girls Scheme


The only scheme designated as Earmarked Scheme for the Department of
Social Welfare, Women & Child Development is the Supplementary
Nutrition for Adolescent Girls Scheme. However, as already stated in the
2006-07 Write-up and as reported to the Planning & Development
Department from time to time this earmarked scheme has ceased to have
an independent identity since the same has been amalgamated since 2006-
07 with the general ICDS Supplementary Nutrition Programme because
the latter scheme also provides SNP for adolescent girls alongwith
lactating/pregnant mother and children.

3. STATE PLAN SCHEMES

Continuing Scheme

3.1 Supplementary Nutrition Programme (SNP)


The scheme of providing supplementary nutrition to the children in the 0-
6 year groups, adolescent girls as well as pregnant and lactating mothers

Jails
235

is the flagship scheme of the Department of Social Welfare, Women &


Child Development. This scheme is being implemented through a
statewide network of 32343 Anganwadi Centres (AWCs) spread over 204
ICDS projects in Jharkhand. The food distributed on 300 days a year
contains 300+ calories and 10 gms of protein per serving. The Govt. of
India has recently revised the rate of food per serving to Rs. 2.00, Rs. 2.30
and Rs. 2.70 for normal children, adolescent girls/pregnant and lactating
mothers and under-nourished children respectively. There is no role for
contractors in the supply of the SNP food and the procurement of the
same is done at the Anganwadi level by the Sevikas concerned.

3.2 Establishment & maintenance of special schools for Spastic & Other
Disabled Children
The scheme for the spastic children is being implemented in this State
through NGOs in different blocks of the State. For this scheme funds are
provided to those NGOs that wish to open special schools for the benefit
of spastic children. It is proposed to cover under the scheme the schools
meant for non-spastic disabled children as well from the next financial
year onwards.

3.3 Scheme for Blind, Deaf & Dumb Children


The Jharkhand Government is running a number of schemes for the
overall development of persons with disabilities such as schools for the
blind and the deaf and dumb. The Government is running schools and
hostels for the deaf and dumb at Ranchi and Dumka, and a school for the
blind at Ranchi. Buildings for opening more schools for blind persons
have already been completed at Giridih, Simdega and Saraikela and
Chaibasa. Similarly, buildings for opening new schools for the deaf and
dumb have already been completed at Dhanbad, Bokaro, Hazaribagh,
Giridih, Chaibasa and Gumla. These schools are likely to be made
operational in the coming financial year.

3.4 Other Schemes for the Disabled


Apart from the above, attention is being given to the distribution of
scholarships to disabled students who are studying in various institutions
and schools run by the State Government or NGOs. The scholarship of Rs.
100.00 per month is provided for the disabled resident students studying
in Class – I to VIII in schools run by the Govt. or NGOs. The Govt. also
runs a scheme of free distribution of special aids and equipments to the
disabled persons.

Jails
235

3.5 Scheme for the Welfare and Empowerment of the Women


For the welfare and uplift of the women in the State, a number of
measures/schemes have been taken up, such as, constitution of State
Women Commission, construction of Observation Homes/Children
Homes/Special Homes, setting up of Women Helpline. The department
has earmarked separate budget for launching campaign against the evil
practice of dowry and encouraging inter-caste marriage. A programme for
running Day Care Centres for the children of working women is also
being implemented. Funds are also allotted for organizing campaigns
against the curse of witch hunting prevalent in some parts of the State.
The state Govt. also runs a scheme of imparting training to rural women
in various vocational areas to enable them to earn their livelihood.

3.6 Hostel for Working Women


The working women, particularly tribal and unmarried females hailing
from rural areas, face the problem of proper accommodation in the towns
where they work. To sort out this problem, hostels for the working
women in Dhanbad, Bokaro, Ranchi and Jamshedpur have been
constructed. These are in the process of being made functional with the
help of NGOs.

3.7 Scheme for Old Age Home


For the welfare of old aged persons two old-age homes have already come
up at Ranchi and Hazaribagh and another old-age home is being
constructed at Giridih. Steps are being taken to make them operational
through reputed NGOs.

3.8 Special Scheme for Child Delinquents, Orphans, Shelterless children &
maintenance of After Care Homes
The scheme for the orphan and destitute children is being implemented in
this State through NGOs in different blocks of the State. From the financial
year 2008-09 onwards this scheme is designed to cover maintenance of
After Care Homes too. For this scheme funds are provided to those NGOs
that are desirous of running special schools/homes and After Care
Homes.

3.9 Scheme for Purchase of Utensils


For preparation and service of Khichri under the SNP utensils are
required. Hence it is proposed under this scheme to provide utensils to
the Anganwadi Centres (AWCs) at the rate of Rs. 3000 per AWC.

3.10 Swami Vivekananda Nisshakta Svavalamban Protsahan Yojana


Since the financial year 2006-07 the govt. has started this scheme

Jails
235

whereunder an amount of Rs. 200 per month is granted to the disabled


persons of the state who, as per a survey conducted through Anganwadi
Workers, number 2,01,936. It is proposed to continue this scheme in
coming financial year as well.

3.11 Construction of buildings for Projects & AWCs


Most of the 204 Projects and 32343 AWCs are running in rental buildings.
It is, therefore, proposed to construct as many buildings for these offices
as economically feasible. For this we want to take up construction in other
7926 AWCs under State Plan at the rate of sanctioned estimate amounting
to Rs. 1,91,900 per AWC.

3.12 Weighing Machine, Growth Chart & Monitoring of ICDS Programme


The children of Jharkhand suffer from malnutrition on an alarming scale.
In fact 50% of these children are malnourished. Hence, steps are required
to be taken to ensure that the malnutrition rate is reduced by 50%. Fund is
also required to be allocated for the monitoring of the ICDS programme.
In the coming financial year as well sufficient fund is proposed to be
released for the scheme.

3.13 Grants-in-aid for NGOs.


It is now a universally acknowledged fact that better results in the field of
social welfare can be achieved if the Govt. works with competent NGOs in
tandem. As present we provide grants-in-aid from state plan fund to
NGOs working in the sectors of women helpline, spastic children,
orphan/destitute children etc. In other cases the Deptt. examines project
proposals received from NGOs and sends them forward to GOI for release
of fund. It is proposed to continue the scheme is 2008-09 as well so that
competent and reputed NGOs may be engaged in newer and newer
sectors of social welfare, such as women empowerment, old age homes,
working women's hostels, rehabilitation of children/women rescued from
brothels/domestic violence.

3.14 Establishment of Rehabilitation Centres for rescued maidservants


It is an open secret that the children and women migrate out of the state to
cities like Delhi, Mumbai, towns/villages of Haryana etc. for working as
servants for their livelihood. In many such cases they are subjected to
violence, exploitation and bondage. Some institutions work for rescuing
the victims. In most cases the rescued maidservants are initially stationed
at Delhi and then transferred to Ranchi for repatriation. For smoothly
conducting these operations it is imperative that a rescue centre at Delhi
and Ranchi each be constructed and adequate staff and accessories be

Jails
235

provided for their functioning. Especially for the Delhi rescue centre a
post of competent rank should be created for liasoning the repatriation
activities. Therefore the scheme which was introduced in the last financial
year is proposed to be continued and strengthened.

3.15 Mukhyamantri Kanyadan Yojana


From financial year 2007-08 onwards this scheme is being executed by the
Department of Social Welfare, Women & Child Development. Under this
scheme newly married females belonging to the BPL category are given Rs
5000/- in cash and utensils worth Rs. 5000.

4. TRIBAL SUB PLAN


A sum of Rs. 14214.141 lakhs has been earmarked for Tribal Sub Plan out
of total approved outlay of Rs.30000.00 lakhs during Annual Plan 2008-09.
5. SPECIAL COMPONENT SUB PLAN
A sum of Rs. 2552.713 lakhs has been earmarked for Special Component
Sub Plan out of total approved outlay of Rs. 30000.00 lakhs during Annual
Plan 2008-09.
6. The Outlay approved for various schemes are given as under -
Social Welfare

Sl. Type of Scheme Annual Plan (2008-09)


No.
(Rs. in lakh)
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked Schemes
i) Adolescent girls 510.000 132.600 60.180 317.220
B. State Plan Schemes
i) Nutrition ( SNP ) 19500.000 9100.000 2200.000 8200.000
ii) Utensils for Nutrition Programme 50.000 30.000 0.000 20.000
II Child Welfare
i) Construction and renovation of Observation 100.000 50.000 0.000 50.000
(Remand) Homes & Accessories
ii) Maintenance of Observation Homes 200.000 100.000 0.000 100.000
iii) Special Scheme for Child Delinquents, 170.000 85.000 0.000 85.000
Orphans, Shelterless Children and maintenance
of after care home
III. Women’s Welfare
i) Construction of Working Women's Hostel & 130.000 65.000 0.000 65.000
Accessories
ii) Maintenance of Working Women’s Hostel 14.000 7.000 0.000 7.000

Jails
235

iii) Construction & Maintenance of Nari Nikatan 40.000 20.000 0.000 20.000
Cum Training Centre/ Short Stay Homes for
Destitute, Helpless & Dejected Women
iv) Training for Development of Skill and 100.000 40.000 20.000 40.000
Entrepreneurship in Women
v) Dowry Eradication Programme 7.000 4.425 1.765 0.810
vi) Honorarium to Anganwadi Workers/ Helpers 2134.638 941.375 251.888 941.375
vii) Norad (Swawlamban) 65.000 40.000 0.000 25.000
viii) Establishment of Rehabilitation Centres for 40.000 40.000 0.000 0.000
rescued maidservants
ix) Mukhyamantri Kanyadan Yojana 1475.000 737.500 0.000 737.500
x) Eradication of the Practice of Witch Hunting 50.000 25.000 0.000 25.000
xi) Women Helpline Scheme 42.000 28.000 0.000 14.000
xii) Weighing Machine, Growth Chart & 100.000 50.000 0.000 50.000
Monitoring of ICDS Programme
xiii) State Women Commission 50.000 50.000 0.000 0.000
IV. Welfare of Handicapped
i) Scholarship to Handicapped 60.000 26.460 7.080 26.460
ii) Establishment & maintenance of special School 200.000 100.000 0.000 100.000
for Spastic and other disabled Children
iii) Special Equipment for Disabled (deaf) 100.000 44.100 11.800 44.100
iv) Workshop for the Disabled 17.000 10.000 0.000 7.000
v) Construction, Repairs & Accessories of Blind 60.000 60.000 0.000 0.000
School
vi) Maintenance of newly built Blind Schools and 90.000 60.000 0.000 30.000
grant-in-aid to NGOs for Blind School
vii) Construction & Accessories of Deaf and Dumb 20.000 10.000 0.000 10.000
School
viii) Maintenance of newly built Deaf & Dumb 90.000 30.000 0.000 60.000
Schools and grant-in-aid to NGOs for Deaf &
Dumb School and accessories
ix) Economic & Social Survey of the Disabled 30.000 15.000 0.000 15.000
x) Swami Vivekananda Nisskatta Swawlamban 3000.000 1500.000 0.000 1500.000
Protsahan Yojana
xi) Assistance for treatment of hearing impaired 2.000 2.000 0.000 0.000
persons
xii) Establishment for the Disabled Commissioner 40.000 40.000 0.000 0.000
V. Others
i) Training Programme for Regional Officers/ 5.000 0.000 0.000 5.000
Departmental Officer in different Institutions
ii) Exhibition, Seminar, Conference & Awards 50.000 25.000 0.000 25.000
iii) Construction of Old Age Home 80.000 40.000 0.000 40.000
iv) Maintenance of Old Age Home 40.000 20.000 0.000 20.000
v) Construction of Project Offices and Anganwadi 1305.362 652.681 0.000 652.681
Centres
vi) State Social Welfare Advisory Board 33.000 33.000 0.000 0.000
Grand Total 30000.000 14214.141 2552.713 13233.146

Jails
235

SUMMARY ( Social Welfare )


Sl. Type of Scheme Annual Plan (2008-09)
No.
(Rs. in lakh)
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked 510.000 132.600 60.180 317.220
B. State Share (CSS/CS) -- -- -- --
C. State Plan Schemes
i. Continuing Schemes / 29490.000 14081.541 2492.533 12915.926
New Schemes
D. EAP ( if any) -- -- -- --
E. Other -- -- -- --
Grand Total 30000.000 14214.141 2552.713 13233.146

Jails
235

X.A. JAIL

1. INTRODUCTION
There are 26 (Twenty-six) Jails including 3 (Three) Central Jails, 19
(Nineteen) District Jails and 4 (Four) Sub-jails in the State of Jharkhand. To
ameliorate the pathetic condition of the prisoners due to overcrowding
leading to health and sanitation problems, a new Central Jail at Hotwar in
Ranchi of the capacity to imprison 3325 male and 100 female has been
constructed and made functional. Further District Jail at Ghaghidih in
Jamshedpur with a capacity of 1447 prisoners has also been constructed
and will be made functional soon. Open Jail at Hazaribagh apart from
Five new sub jails at Nagarutari, Ramgarh, Barhi, Hussainabad and
Madhupur are in the process of construction. Two new District Jails at
Deoghar and Latehar and Sub Jails at Chandil, Bundu and Chakardharpur
have been sanctioned and are in process of land acquisition. The existing
capacity of the jail is also being increased by the construction of 54
additional prisoner’s ward out of which 22 wards have been made
functional. The provision of Lightening Conductors and Water
Harvesting facilities in the prison buildings has been proposed in this
financial year.
Security aspect of the prisons, due to the upsurge of Naxal activities has
been upgraded and strengthened by providing facilities like E-governance
(PMS), Video Conferencing, Barbed Wire Fencing (including consentina),
Morcha, Police Barrack, Portable Huts, Close Circuit T.V., Watch Towers,
Metal Detectors etc. Further Mobile Jammers, Solar Power Fencing,
provision of sophisticated arms, computerized interview system with
baggage scanning X-rays machine has been proposed in 2008-09. Further
correctional activities like Yoga, Meditation, Literacy and Educational
Programmes, Vocational/ Industrial Training, Library etc. are being
undertaken. Upgradation of Medical facilities, facilities for jail staff
(including mobile sets/ laptop to officers) sanitation and water supply,
complete renovation of age old historical prison like Loknayak Jaiprakash
Narayan Central Jail, conversion of District Jail Sakchi, Jamshedpur to
Women’s Jail, upgradation of the Jail Training Institute, Hazaribagh etc.
has also been included in the state plan 2008-09.

OBJECTIVE
Annual Plan (2008-09) has been prepared keeping multidimensional
approach for the overall development of prisons, taking into account

Jails
235

correctional as well as Human Right provisions. The objective is to


provide sufficient accommodation, adequate water and sanitation
facilities, health care, security and correctional activities, and also to
optimally use E-Governance in the Management of Prisons.
1. State share to CSS - Nil
2. State Plan Schemes - Continuing Scheme.

3.1 CONTINUING SCHEMES


The following schemes are : -
• Construction/ Completion of New Jails
• Construction of Staff Quarters
• Construction/ Completion of Additional Wards / Perimeter
wall
• Prison Correctional Activities including training and Industrial
Activities
• Provision of Security related installations
• Sanitation/ Water Supply/ Electrification
• E-Governance/ Video Conferencing
• Jail Hospital Strengthening
• Renovation of Jail/ Jail Training Institute
• Facilities for Jail Staff
• Upgradation of Probation Services

NEW SCHEMES

The following schemes are : -


• Installation of Lightening Conductor
• Drinking Water Purifying unit
• Installation of Sewerage Treatment Plant (including Bio Gas
unit)
• Strengthening of Jail Library
• Construction of Boundary Wall of Prison Premises
• Acquisition for Jail land
4. TRIBAL SUB PLAN
A sum of Rs. 2110.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 5000.00 lakhs during Annual Plan 2008-09.

Jails
235

5. The Outlay approved for various schemes are given as under -


Home Deptt. ( JAIL)
Annual Plan (2008-09)
Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Plan Schemes
Continuing Schemes
i) Construction/completion of New Jails 500 100 400
ii) Construction of Staff Quarters 700 350 350
iii) Construction/completion of Additional 1000 450 550
Wards/Perimeter wall
iv) Prison Correctional Activities including 200 100 100
training and Industrial Activities
v) Provision of Security related installations 300 150 150
vi) Sanitations/Water 200 100 100
Supply/Electrification
vii) E-Governance/Video Conferencing 100 50 50
viii) Jail Hospital Strengthening 200 100 100
ix) Renovation of Jail/Jail Training 350 175 175
Institutes
x) Facilities for Jail Staff 100 50 50
xi) Upgradation of probation services 50 25 25
New Schemes
xii) Installation of Lighting Conductor 100 50 50
xiii) Drinking Water purifying Unit 200 100 100
xiv) Installation of Sewarage Treatment Plant 300 150 150
(including Bio Gas Unit)
xv) Stregthening of Jail Library 100 60 40
xvi) Construction of Boundary wall of Prison 500 50 450
Premises
xvii) Acquisition for Jail land 100 50 50
Grand Total 5000 2110 2890

Jails
235

SUMMARY ( Jail )

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- --
B. State Share (CSS/CS) - -
C. State Plan Schemes
i. Continuing Schemes / 3700 1650 2050
New Schemes 1300 460 840
D. EAP ( if any) -- --
E. Other -- --
Grand Total 5000 2110 2890

Jails
235

X.B. BUILDING CONSTRUCTION

1. INTRODUCTION
The Building Construction Department is responsible for construction and
maintenance of all the Government buildings in the state as well as
Jharkhand Bhawan at New Delhi. The Buildings which are constructed
and maintained are :

• All the Government offices in the State Capital and rest of the State.
• Government residences for the officers & staff of the State
Government.
• State Guest Houses, Circuit Houses and Inspection Bungalows of
this Department.
• Jan Suvidha Buildings
• Government residences for Ministers & M.L.A's
• Government residences for the Judges and Government employees
of Hon'ble court and lower courts
• High Court & other Court buildings
• Vidhan Sabha permises
• Jharkhand Bhawan, New Delhi
• Maintenance of Raj Bhawan.

Achievement During 10th Plan Period


Expenditure
Year Outlay(in lakhs) Exp. (in lakhs)
2002-03 4851.00 4196.00
2003-04 4600.00 4300.00
2004-05 4600.00 2796.00
2005-06 5500.00 4889.00
2006-07 7000.00 7000.00

2. State Share to CSS


2.1 Construction of Judicial Buildings
3. State Plan Schemes
3.1 Continue Scheme

• Office Buildings
• Govt. Residential buildings

PWD (Building)
235

• Circuit houses
• Court Buildings

2.1 Justification of each component


• The Building Construction Department constructs various office
buildings as per the requirement of various Departments. The
specifications/ requirements are obtained from the various
departments and accordingly DPR is formulated.
• At present the total staff strength of the State Govt. is
approximately 1.50 lakhs against which only approximately 12500
residences are available with the Building construction Deptt.
• Circuit Houses & Inspection Bunglows, Since the creation of
Jharkhand Construction work of Circuit houses have already been
completed and the rest shall be completed by 2006-07.
• Training shall be important to the Civil Engineers both inside and
outside the State in primere Institution like Building Research
Institute, Roorkee and various Indian Institute of Technologies.
Steps shall be taken to construct a Central Engineering Institute at
Ranchi which shall eater to the needs of all engineers of various
work Departments.
• Provision of Library, Workshops and Seminars regarding various
technical components shall be held inviting technical personnel of
national fame.
4. New Scheme

• Office Buildings
• Govt. Residential buildings
• Circuit houses
• Court Buildings
5. TRIBAL SUB PLAN
A sum of Rs14083.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 20000.00 lakhs during Annual Plan 2008-09.

PWD (Building)
235

6. The Outlay approved for various schemes are given as under -

Building Construction

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State share to CSS
i) Construction of judicial Buildings 70 40 30
B. Continuing Scheme
i) Office Buildings 700 582 118
ii) Circuit Houses 200 100 100
iii) Court Buildings 900 635 265
iv) Govt. Residential Buildings 600 330 270

C. New Scheme
v) Office Buildings 5000 3500 1500
vi) Circuit Houses 200 100 100
vii) Court Buildings 3330 2296 1034
viii) Govt. Residential Buildings 9000 6500 2500
Grand Total 20000 14083 0 5917

SUMMARY ( Building Const.)

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- -- --
B. State Share (CSS/CS) 70 40 30
C. State Plan Schemes
i. Continuing Schemes 2400 1647 753
ii. New Schemes 17530 12396 5134
D. EAP ( if any) -- --
E. Other -- --
Grand Total 20000 14083 5917

PWD (Building)
235

X.C. HOME (POLICE)

1. Introduction
Police Modernization (Centrally Sponsored) Scheme has been
implemented for the last 7 (seven) years after the formation of Jharkhand
in 2000.

2. Continuing Scheme
2.1. Sainik Kalyan Directorate

2.2 New Scheme


2.2.1 US/LS Quarters
2.2.2 Civic Amenities in Police Line
2.2.3 Construction of Building
2.2.4 Strengthening of Training Facilities
2.2.5 Construction of Composite Police Head Quarters Building
2.2.6 Land Acquisition

2. Twelfth Finance Commission

Rs. 3150 lakhs is being earmarked as per the award of the 12th Finance
Commission for 2008-09 for special needs of Police forces.

3. TRIBAL SUB PLAN


A sum of Rs. 4203.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 6373.00 lakhs during Annual Plan 2008-09.
4. The Outlay approved for various schemes are given as under -

Home Deptt. ( Police)

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. State Plan Schemes
Continuing Schemes
i) Sainik Kalyan Directorate 268 268 0
New Scheme
ii) US/LS Quarters 2000 1450 550

Home ( Police / Guards / Fire Services )


235

iii) Civic Amenities in Police Line 100 100 0


iv) Construction of Building 300 300 0
v) Strengthening of Training Facilities 200 200 0
vi) Construction of Composite Police Head 300 300 0
Quarters Building
vii) Land Acquisition 100 100 0
B. 12th Finance Commission 3105 1485 1620
Grand Total 6373 4203 0 2170

5. SUMMARY ( Police )

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. Earmarked
B. State Share (CSS/CS)
C. State Plan Schemes
i. Continuing Schemes / 268 268
New Schemes 3000 2450 550
D. EAP ( if any)
E. Other (12th Fin. Comm.) 3105 1485 1620
Grand Total 6373 4203 2170

Home ( Police / Guards / Fire Services )


235

X.D. HOME GUARDS

1. INTRODUCTION
The annual plan for the ensuing financial year 2008-09 gives priority to the
development of the basic infrastructure in the districts and other units of
the Department, which is required for the very existence and smooth
functioning of the organization. Keeping this aim in mind, a proposal for
phasewise development of the basic infrastructures like construction of
buildings in those districts and units where land is available for the same.
2. STATE PLAN SCHEMES
2.1 Continuing Schemes
2.1.1 Central Training Institute, Dhurwa

2.1.2 Purchase of Residential and Non- Residential Buildings for the office of
the District Commandant, Ranchi from Jharkhand State Housing
Board.

2.1.3 Home Guard Training Institute Building Chaibasa

2.2 New Schemes

2.2.1 Construction of Residential and Non- Residential buildings in Chaibasa

2.2.2 Construction of Home Guard buildings

2.2.3 Land Acquisition for Home Guard buildings

2.2.4 Construction of residential and non-residential building Giridih

2.2.5 Land Acquisition for the construction of Home Guard buildings

4. TRIBAL SUB PLAN


A sum of Rs. 1102.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 1427.00 lakhs during Annual Plan 2008-09.

Home ( Police / Guards / Fire Services )


235

5. The Outlay approved for various schemes are given as under -

Home Guard

Annual Plan (2008-09)


(Rs. In lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Plan Schemes
Continuing Schemes
i) Central Training Institute, Dhurwa 200 200 0
ii) Purchase of residential and non residential 143 143 0
Building for the office of the district
commandent Ranchi from Jharkhanad State
Housing Board
iii) Home Guard Training Institute Building, 13 13 0
Chaibasa
New Schemes
iv) Construction of residential and non residential 216 216 0
building, Chaibasa
v) Construction of Home Guard Buildings 500 500 0
vi) Land Acquisition for the Office of the 30 30 0
Jharkhand Home Guard
vii) Construction of residential and non- 200 0 200
residential building Giridih
viii) Land Acquisition for the construction of 125 0 125
Home Guard buildings
Grand Total 1427 1102 325

6. SUMMARY TABLE
Annual Plan (2008-09)
Sl. (Rs. In lakh)
Type of Scheme
No. Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- --
B. State Share (CSS/CS) -- --
C. State Plan Schemes
i. Continuing Schemes 356 356
ii. New Schemes 1071 746 325
D. EAP ( if any) -- --
E. Other -- --
Grand Total 1427 1102 325

Home ( Police / Guards / Fire Services )


235

X. E. FIRE SERVICES

1. INTRODUCTION
Fire extinguishing related works are carried out by the Jharkhand Fire
Service. The trained fire workers do the rescue work for the protection
and safety of lives and goods with the available fire engines in towns and
remote village areas.

2. STATE PLAN SCHEMES


2.1 Continuing Schemes
2.1.1 Construction of Fire Stations, Stores, Offices & Residential Buildings
During the 11th Five Year Plan (2007-12), there is a proposal for
completing the constructions work relating to Fire Stations, Stores, Offices
and Residential Buildings at Daltonganj, Dhanbad, Ramgarh, Giridih,
Sindri, Jharia, Chatra, Deoghar, Koderma, Hazaribagh, Bokaro,
Lohardaga, Latehar, Gumla, Simdega, Garhwa, Chaibasa, Adityapur,
Saraikela, Mango, Bahragora, Dumka, Jamtara, Sahibganj, Pakur and
Godda.

2.2 New Schemes


2.2.1 Purchase of Aerial Ladder Platform
2.2.2 Purchase of Fire Engines and other modern equipments

3. TRIBAL SUB PLAN


A sum of Rs. 1450.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 2200.00 lakhs during Annual Plan 2008-09.

Home ( Police / Guards / Fire Services )


235

4. The Outlay approved for various schemes are given as under -

Fire Services
Annual Plan (2008-09)

Sl. (Rs. in lakh)


Type of Scheme Flow
No. Approved Flow to Flow to
to
Outlay TSP SCSP
OSP
A. State Plan Schemes
Continuing Schemes
i) Construction of Fire Stations, Stores, Offices & 1000 800 200
Residential Buildings
New Schemes
ii) Purchase of Aerial Ladder Platform 1000 500 500
iii) Purchase of Fire Engines and other modern 200 150 50
equipments
Grand Total 2200 1450 750
SUMMARY ( Fire Services )
Annual Plan (2008-09)

Sl. (Rs. in lakh)


Type of Scheme Flow
No. Approved Flow to Flow to
to
Outlay TSP SCSP
OSP
A. Earmarked -- --
B. State Share (CSS/CS) -- --
C. State Plan Schemes
i. Continuing Schemes 1000 800 200
ii. New Schemes 1200 650 550
D. EAP ( if any) -- --
E. Other -- --
Grand Total 2200 1450 750

Home ( Police / Guards / Fire Services )


235

X.F. PERSONNEL AND ADMINISTRATIVE REFORMS

1. INTRODUCTION
The Government of Jharkhand is committed to provide transparent and
clean Administration to the people. The Govt. has undertaken the major
revamping of the administrative machinery. Training being the most
crucial part of the personnel management, the Govt. will be providing
adequate funds for upgrading the facilities of the Shri Krishna Institute of
Public Administration, Ranchi to make it at par with similar institutes in
the country.
2. STATE PLAN SCHEMES
Continuing Scheme
2.1 Development of SKIPA, Ranchi
It is proposed to develop this into an Institute of Excellence. It is necessary
to improve the main building, auditorium, provide better hostel facilities
etc.
New Scheme
2.2 Management Development Institute
To establish a Management Development Institute in the premises of
Jharkhand Civil Services Officers, Institute, Ranchi.
3. TRIBAL SUB PLAN
A sum of Rs. 1000.00 has been earmarked for Tribal Sub Plan out of total
approved outlay of Rs. 1000.00 lakhs during Annual Plan 2008-09.

4. SUMMARY TABLE (Personnel and Administrative Reforms)


Annual Plan (2008-09)
(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. Earmarked
B. State Share (CSS/CS)
C. State Plan Schemes
(Infrastructure Dev. and Estb. Exp. Of SKIPA,
Ranchi )
i. Continuing Schemes 700 700 0
ii. New Schemes 300 300 0
D. EAP ( if any)
E. Other
Grand Total 1000 1000 0

Personnel And Administrative Reforms


235

X.G. INSTITUTIONAL FINANCE

1. INTRODUCTION
The main objectives of the department are to review and monitor the
credit flow in the Jharkhand region by the Commercial Banks, Regional
Rural Banks and other Financial Institutions specially in the rural areas
and, to act as a Nodal Agency for co-ordination between development
Departments / District Administrations of Jharkhand State and Financial
Institutions.
The department has three wings, namely Institutional Finance, Project
Cell and Programme Implementation, popularly known as Twenty Point
Programme Cell. It has also been the endeavour of the department to
annually enhance the State Credit Plan and achievement to accelerate the
growth of the economy. The target / achievement year wise of Ground
level credit is as follows :
(Rs. in Crore)
Year Target Achievement % of
(Rs in Cr.) (Rs in Cr.) Achievement
2003-04 3015.91 3112.22 103.19
2004-05 3931.05 3847.06 97.86
2005-06 5036.01 3535.21 90.06
2006-07 7555.42 5409.97 71.06
2007-08 10708.9 2480.55*

* upto 30th June, 2007

BANKING PROFILE OF STATE


(As on 31.06.2007)
Bank No of Branches
Rural Semi Urban Urba Total
n
Commercial Banks (Public 621 250 260 1131
Sector)
Private Banks (Private Sector) 0 05 33 38
Regional Rural Banks 350 31 7 388
District Cooperative Banks 102 31 9 142
Land Development Banks* 22 19 1 42
Total- 1095 336 310 1741

The credit deposit ratio of the State has marginally increased to 40.83%.
This has been mainly due to annual Credit flow rate marginally outpacing
the annual deposit rate. The poor credit consumption is attributed to
inadequate infrastructure base and poor support under different sectors of
the economy. In the financial year 2007-08, a concrete effort have been

Institutional Finance
235

made to sensitize the field officers of different development departments


and branch managers of different Financial Institutions to work for
accelerated advancement of loan in different sectors.
Year Credit Deposited C.D. Ratio
(Rs in Cr.) (Rs in Cr.) %
31st March 2005 8632.77 26903.47 32.09
31st March 2006 12036.35 32017.80 37.59
31 March 2007
st 15387.06 37687.80 40.83

2. STATE PLAN SCHEMES


2.1. Continuing scheme (under Tribal sub-plan)
2.1.1 Regional office, Ranchi
The responsibility assigned to this office is to ensure the
distribution of loan under the different State and Central Government
sponsored schemes through banks, their monitoring, co-ordination with
NABARD and other Financial Institutions, organize meetings of Banker
Committees etc.

2.1.2 Pariyojana Sangathan Prabhag


The basic objectives of the Pariyojana Sangathan are -
• To identify viable projects in the state, particularly centrally
sponsored schemes, centrally assisted schemes, externally aided
schemes etc.
• To prepare and get prepared project profile, investment study and
feasibility reports, to undertake techno-economic appraisal of
project on behalf of State Government & any other organization;
• To identify sources of fund for project financing from Central
Government, Aid-India Consortium, World Bank, Asian
Development Bank etc; and
• To undertake publication of Reports, pamphlets booklets etc.
This wing also arranges and monitors loans from different All India
Financial Institution to the State Government.

2.1.3 Rural Credit Wing


The Rural Credit Wing engages in preparation of State Annual Credit plan
particularly in rural areas and its monitoring in association with State
Level Bankers Committee. The strees is on increasing the flow of Ground
Level Credit in priority sector with emphasis on Agriculture and Allied
Sector.

2.1.4 20-Point Programme


The 20 Point Programme was announced in 1975 and later revised in 1986
and 2006 for the upliftment of the poor in Rural areas. Due to economic &
social importance of the 20 point programme, a separate programme
Implementation Deptt. was created which is amalgamated with

Institutional Finance
235

Institutional Finance Department. Duties & Responsibilities includes


implementation of the 20 point programme, target fixation under 20 point,
formulation and administrative control of 20 point programme, district /
block level publicity and, extension work therefore.

3. New scheme

3.1 Share Capital contribution of Grameen Bank


Recapitalisation: Government of India, Ministry of Finance , Department
of Financial Services had worked out the net-worth of the two Grameen
Banks operating in Jharkhand and found it to be negative; to fulfil the
provisions of RRB Act 1976 read with RBI Act 1934, for continuing
Banking business, capital infusion was necessary.

4. TRIBAL SUB PLAN


A sum of Rs. 150.00 lakhs has been earmarked for Tribal Sub Plan out of
total approved outlay of Rs. 150.00 lakhs during Annual Plan 2008-09.

5. The Outlay approved for various schemes are given as under -

Institutional Finance

Annual Plan (2008-09)


(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. State Plan Schemes
Continuing Schemes
i)
Regional Office , Ranchi 28 28
ii) Pariyojna Sangathan Prabhag 18 18
iii) Rural Credit Wing 8 8
iv) 20 Point Programme 46 46
New Schemes
v Share Capital contribution of
Grameen Bank 50 50
Grand Total 150 150

Institutional Finance
235

SUMMARY ( Institutional Finance)


Annual Plan (2008-09)
(Rs. in lakh)
Sl. No. Type of Scheme
Approved Flow to Flow to Flow to
Outlay TSP SCSP OSP
A. Earmarked -- --
B. State Share (CSS/CS) -- --
C. State Plan Schemes
i. Continuing Schemes 100 100
ii. New Schemes 50 50

D. EAP ( if any) -- --
E. Other -- --
Grand Total 150 150

Institutional Finance
235

X.H. LAW

1. INTRODUCTION
The State does not have adequate number of Court buildings, residential
quarters for judicial officers as well as staff. Keeping this in view,
provisions have been made for construction of good number of court
buildings, residential quarters wherever necessary.
During the 10th Plan, many such buildings have been constructed in
various districts of the State. During the 11th Plan, further addition will be
made. Proposed outlay has been included in the outlay of the Building
Construction Department.

Law
233

X.I. COMMERCIAL TAX

1. Introduction
For Strengthening and development of Revenue Analysis and
Enforcement Wing, the following schemes are proposed as under :
• Building Construction
• Establishment Cost
• Modernization of Building
• Computer
• Other Equipments
• Purchase of Motor Vehicles

A sum of Rs. 500.00 lakhs has been earmarked during Annual Plan
2008-09.
1. The Outlay approved for various schemes are given as under -

Commercial Taxes

Annual Plan (2008-09)


Sl. (Rs. in lakh)
Type of Scheme
No. Approved Flow Flow to Flow to
Outlay to TSP SCSP OSP
A. State Plan Schemes
New Schemes
i) Building Construction 200 200
ii) Establishment Expenditure 75 75
iii) Building Decoration 150 150
iv) Computer and Other 40 40
Equipment
v) Purchase of Motor Vehicle 35 35
Grand Total 500 500

Planning & Development (Incl. Statistics)


235

Revised Approved outlay Approved Annual Plan


Approved 11th Five Year
Sl. 2007-08 outlay 2008-09
Name of Department Plan Outlay (2007-12) by
No. Planning Commission
TSP
Oultay SCSP Outlay TSP SCSP Outlay TSP SCSP

1 2 3 4 5 6 7 8 9 10 11
III Special Areas Programmes
(a) Hill Areas
Development Programmes
(b) Others Special Area
Programme
i) One time ACA 1500.00
for Spl. Importance Sche. 1500.00 1500.00 750.00
ii) RSVY (
Planning Deptt.) 1750.00 750.00
iii) Backward 23000.00 3605.00
District Grant Fund - (
Panchayati Raj) 128388.00 70000.00 12100.00 34295.00 21000.00 15435.00 3430.00
iii) Grant Under
Article 275(1) 16340.00 10000.00 4000.00 2800.00 2429.00 2800.00 2670.00 0.00
iv) SCA to TSP 39100.00 33500.00 5700.00 5283.00 7750.00 5810.00 810.00
TOTAL (III) 185578.00 114250.00 16100.00 44295.00 32212.00 3605.00 33050.00 24665.00 4240.00
IV Irrigation & Flood Control
1. Major and Medium
Irrigation 222460.00 91350.00 24960.00 65364.00 16347.00 5163.00 40700.00 18540.00 14390.00
2. Minor Irrigation 95270.00 19998.00 9522.00 11300.00 6498.00 2736.00 10000.00 4164.00 1164.00
3. Command Area
Development Programmes 2235.00 200.00 20.00 200.00 40.00
4. AIBP Grant 14472.00 8050.00 5430.00 1580.00 7100.00 3800.00 2300.00
5. Flood Control
(Including Flood Protection
works) 3500.00 2400.00 700.00 700.00 0.00 2000.00 2000.00 0.00
TOTAL (IV) 337937.00 113748.00 34482.00 85614.00 28975.00 9499.00 60000.00 28504.00 17894.00
V Energy
1. Power 563462.00 194300.00 59675.00 65253.00 34000.00 11775.00 70000.00 27102.00 7685.00
2. Non-Conventional
Source of Energy
3. Integrated Rural
Energy Programme
TOTAL (V) 563462.00 194300.00 59675.00 65253.00 34000.00 11775.00 70000.00 27102.00 7685.00
VI Industry & Minerals
1. Village & Small
Industries 37885.00 23990.00 3530.00 6192.00 3938.00 600.00 5651.00 4351.00 600.00
2. Other Industries
(Other than VSI) 44086.00 17720.00 7390.00 7554.00 2910.00 308.00 9349.00 4662.00 750.00
3. Mineral
a) Mines 1475.00 927.00 278.00 208.00 0.00 1700.00 1308.00 207.00
b) Geology 3688.00 2545.00 607.00 607.00 3300.00 2526.00 343.00
TOTAL (VI) 87134.00 45182.00 10920.00 14631.00 7663.00 908.00 20000.00 12847.00 1900.00
VII Transport
1. Civil Aviation 35014.00 30000.00 407.00 203.00 0.00 10000.00 6500.00
2. Roads and Bridges 337050.00 147190.00 34118.00 30103.00 0.00 64000.00 28255.00 10550.00
3. Surface Transport 99210.00 50000.00 17000.00 10675.00 0.00 17000.00 6692.00

State Overview
235

TOTAL (VII) 471274.00 227190.00 0.00 51525.00 40981.00 0.00 91000.00 41447.00 10550.00
Science, Technology &
VIII Environment
1. Scientific Research 817.00 140.00 80.00 145.00 41.00 23.00 640.00 253.00 98.00
2. Information 29060.00 11429.00 2487.00 5297.00 974.00 384.00
Technology & E-Governance 10000.00 5964.00 840.00
3. Ecology & 61278.00
Environment 1000.00 1000.00
4. Forest & Wildlife 34462.00 5095.00 10400.00 6239.00 1097.00 10500.00 6534.00 1260.00
TOTAL (IX) 91155.00 46031.00 7662.00 15842.00 7254.00 1504.00 22140.00 13751.00 2198.00
IX General Economic Services
1. Secretariat Economic
Services
a) Planning
(Including Statistics) 21710.00 13670.00 4200.00 146.00 146.00 1100.00 1099.00 0.00
b) District Plan
(untied fund) 11800.00 5000.00 400.00
2. Tourism 15173.00 5870.00 2600.00 1156.00 0.00 16000.00 6362.00 1670.00
3. Census, Survey &
Statistics
4. Food & Civil Supplies 27882.00 8550.00 3620.00 5237.00 2240.00 922.00 5965.00 3475.00 630.00
5. Other General
Economic Services
(a) Weights &
Measures
(b) Others (to be
specified)
TOTAL (X) 64765.00 28090.00 7820.00 7983.00 3542.00 922.00 34865.00 15936.00 2700.00

State Overview

You might also like