Matrix Excelcon Sdn Bhd

Project : Sendayan Metropark 2 (SMP2b)


Month : _____________ Prepared By: ________
Monthly Machinery Record (Excavator) - Shop Lot
Backfill & Level Grd Backfill & Level for Grd
Excavation of Footing Beam Slab
Date
Nos Hrs Units Hrs Units Hrs

10

11

12

13

14

15

16

17

18

19
20

21

22

23

24

25

26

27

28

29

30

31
Checked By: ______________________

General Works
Remarks
Description Hrs
Matrix Excelcon Sdn Bhd
Project : Sendayan Metropark 2 (SMP2b)
Month : __Mac________ Prepared By: ________
Monthly Machinery Record (Lorry) - Shop Lot
Backfill & Level Grd Backfill & Level for Grd
Excavation of Footing Beam Slab
Date
Nos Hrs Units Hrs Units Hrs

10

11

12

13

14

15

16

17

18

19
20

21

22

23

24

25

26

27

28

29

30

31
Checked By: ______________________

General Works
Remarks
Description Hrs / Trip

Clearing rubbish Blk E & Mockup back line 10 Trip JDL 6745
Transfer Extra soil box culvert to suriaman3 (4hrs), 6hrs JEL 9678
Transfer Timber from S3 to SMP2B (2hrs)

Transfer rubbish Blk L drainage to ARA Sendayan (4hrs), 8hrs NAN 6015
Transfer Extra soil box culvert to suriaman3 (4hrs)

WDD 4218
Ah Yip Lorry crane- 2hrs transfer timber from Suriaman 3

1hrs WDD 4218


Ah Yip Lorry crane- 1hrs transfer Y12 from Suriaman 3

Dustbin 3 trip 3 Trip LT Evergreen


Matrix Excelcon Sdn Bhd
Project : Sendayan Metropark 2 (SMP2b)
Month : _____________ Prepared By: ______________________________
Monthly Machinery Record (Backhoe) - Shop Lot
Support Drainage
Backfill & Level Grd Backfill & Level for Drainage Works Works / 6"x9"
Beam Grd Slab
Date Block

Units Hrs Units Hrs m/run Hrs MT Hrs

10

11

12

13

14

15

16

17

18

19
20

21

22

23

24

25

26

27

28

29

30

31
______________ Checked By: ________________________________

General Works
Remarks

Description Hrs

Clearing Rubbish Blk E, Mockup Unit back 8hrs


line(7hr), Support bricklaying blk K ( 0.5hr),
support bricklaying Blk E & TNB (0.5hr)
Clearing Rubbish Blk L drainage (3hrs),
Transfer extra soil box culvert (4hrs), 9hrs
Support plastering & transfer scaffolding
Blk E & M (2hrs)
Juwasan Maju Sdn Bhd
Project: _________________________________
Month : _________________ Prepared By: ______________________________ Checked By: ________________________________
Monthly Machinery Record (Mobile Crane ) - Shop Lot

Unloading Piling Unloading Steel Bar /


Hoisting Cut Off Pile Hoisting / Unloading Hoisting of Concrete
(Debit Concreting Works Hoisting Steel Bar Rearrange Steel Bar At Hoisting of Bricks Unloading of Tiling
(Debit Subcon) Formwork Plinth
Subcon) Yard
Date
Block / Block /
Units Hrs Units Hrs m3 Hrs Hrs Hrs MT Hrs Pallets Hrs Pallets Hrs Units Hrs
Activity Activity

10

11

12

13

14

15

16

17
18

19

20

21

22

23 136 8

24

25

26

27

28

29

30

31
_________________

Support Cement General Works


Rendering Works
Remarks

Units Hrs Description Hrs


Block K roof and 1F sand brick
Matrix Excelcon Sdn Bhd
Project : Sendayan Metropark 2 (SMP2b) Stage 1
Prepared By: ______________________________ Checked By: ______________________

Machinery Record for Excavation Footing- Shop Lot


Block Excavator, hrs Lorry, hrs Backhoe
Excavation Backfill & Level Remove Remove Surplus Soil Backfill & Level Backfill & Level
Grd beam Surplus Soil (off site), 10W (off site), 6W (internal) Grd beam Grd slab
L 79 30 4 (Nil) (Nil) 24 35 10
(8 lots) (585m3 G30)
M 62 12 10 40 (Nil) (Nil) 7 17
(6 lots) (480m3 G30)
E 153 18 72 214 (Nil) (Nil) 8.5 36
(11 lots) (987m3 G30)
K 88 18 16 77 (Nil) (Nil) (by excavator) 15
(7 lots) (533m3 G30)
J 122 44 30 108 64 (Nil) (by excavator) 53
(13 lots) (821m3 G30)
G 174 26 67 243 95 (Nil) (by excavator) 51
(13 lots) (830m3 G30)
H 154 15 44 221 248 (Nil) (by excavator)
(13 lots)
D 134 31 40 192 117 (Nil) (by excavator)
(14 lots)
TOTAL 966 194 283 1095 524 24 50.5 182
85 85 85 85 85 58
11.36 2.28 3.33 12.88 0.59 3.14
Matrix Excelcon Sdn Bhd
Project : Sendayan Metropark 2 (SMP2b) Stage 1
Prepared By: __________Razi________________ Checked By: ______________________

Monthly Machinery Record - Shop Lot


Item Description Month, hrs
Jan 16 Feb 16 Mar 16 Apr 16 May 16 Jun 16 Jul 16 Aug 16 Sep 16 Oct 16 Nov 16
A Machinery
1 Excavator
1.1 Excavation of footing 130 98 184 175 73 18 118 170
1.2 Backfill & level ground beam 18 24 18 28 34 26 21 25
1.3 Remove surplus soil 8 36 28 8 56 16 63 48 16
1.4 Excavation of sewerage pipe 6 74 14 22 23 8 7 4
1.5 Support hacking hard material 5 48 20 38 8 6 2
1.6 Unloading materials 1
1.7 Prepare concrete access 22 2 6 10 16
1.8 Lean concrete 5 3
1.9 General works 4 6 6 45 19 15 10 3 13

Total 179 149 366 247 213 180 0 54 207 255 60


2 Backhoe
2.1 Backfill & level ground beam 6 29 32.5
2.2 Backfill & level ground slab 8 32 27 11 53 41.5 7.5
2.3 Trimming front earth/platform 7.5 9 8.5
2.4 Drainage works 3 26.5 21 9.5 4 5
2.5 Support drainage works/6"x9" block 7 54.5 49.5 33 1 13 8 3
2.6 Excavation of sewerage pipe 32 30 49
2.7 Backhoe with breaker 8 125 80 48 8 57 16
2.8 Support hacking hard material 22 53 1 4
2.9 Support plasterring works
2.10 Support brickworks 1 1
2.11 Touch up access 2 10 2 6 4
2.12 Clear/Trimming backlane 7 14 10.5 7
2.13 Unloading materials 1 0.5
2.14 General works 5 6 2.5 17.5 5 6 1

Total 23 140 338 127.5 209.5 126 69.5 19.5 17.5 66 16


3 Lorry
3.1 10 wheel lorry clearing surplus soil 123 104 37 243 48 276 246 40
3.2 10 wheel lorry general works 31
3.3 6 wheel lorry clearing surplus soil 48 299 129 48
3.4 6 wheel lorry general works 2 15 5 6 8
3.5 Lorry crane transfer material 3.5 1.5

Total 0 0 125 119 76.5 249 0 104 576.5 375 88


4 Crane
4.1 20 ton crane unloading bricks 9 6 8
Total
Dec 16 Jan 17 Feb 17 Mar 17 (hrs)

966
194
279
158
127
1
56
8
121

0 0 0 0 1910

3 70.5
37 24 27 6 274
15 5 45
7 1 27 7 111
8 30 50 36 293
111
342
80
4 9 6 19
4 14.5 10 10 40.5
40 11.5 2 8 85.5
10 8 56.5
13 14.5
3 46

129 89 140 78 1588.5

4 1121
31
24 7 4 559
16 37 2 91
5

28 16 44 6 1807

25 8 56
0