1.1.2.1 Loading shall be applied by a hydraulic jack of adequate capacity, abutting the pile
horizontally and reacting against the suitable system. The reaction may be provided by the
wall of the excavated pit when the test is being conducted below ground level or by a
neighbouring pile in which case thrust pieces shall be inserted on either end of the jack to
make up the gap.
1.1.3 Measuring System
1.1.3.1 Lateral load applied on the pile shall be measured by a calibrated pressure gauge
mounted on the jack, having a least count of 500 kg.
1.1.3.2 Deflection of the pile head shall be measured by dial gauges, fixed to datum bars and
having a least count of 0.01 mm. The datum bars shall be provided with rigid supports.
A) CAPACITY : 50 MT.
B) RAM DIA : 9.5 C.M
C) AREA OF RAM : 70.89 CM2.
LARSEN &TOUBRO LIMITED – ECC DIVISION PROCEDURE No- 03
A) RANGE : 0-50MM.
B) LEAST COUNT : 0.01MM.
C) CALIBRATION CERTIFICATE NO : TC/ MHR/ LV-06
REPORT ON PILE LOAD TEST CONDUCTED AT SP#3 FOR 7 MTPA EXPANSION, BSP, BHILAI.
This report covers the analysis, observation & result on lateral test of pile. This pile load test was
conducted at sp#3.
DATA
ANALYSIS:
Pressure gauge reading (kg/ Load intensity on soil (ton) Avg. Total settlement (mm)
cm2)
OBSERVATION:
RESULT:
Based on test result, it is observed that for a load of 17 MT (1.5 times of working load), the
settlement is observed 01.095mm. which is less than the permissible limit of 12 mm (as per IS 2911
part-IV).