Marina Bay Sands - Sky Park Cantilever
Marina Bay Sands - Sky Park Cantilever
Marina Bay Sands - Sky Park Cantilever
VC Cheong
51 Marina Bay Sands Integrated Resort 2007 - 2010
Marina Bay Sands
Merlion
Marina Bay
Esplanade
52
Skypark
Crystal
Pavilion
Promenade - Retail
53 Overall View
Marina Bay Sands
(MBS)
54 Project Organization
Scope Demarcation Between Offices
Singapore
London
Newcastle Brisbane
Sydney
Manila Melbourne
Shenzhen
56 Arup Offices Involved for Skypark Design
Design and Construction Stage
•Museum Steelwork
(schematic design)
ARUP
•Risk and Security
MELBOURNE
•
•
Coordination ARUP
with MSA BOSTON •Podium
Lead by AEDAS •Museum
ARUP ARUP
NEW YORK SINGAPORE
MSA AEDAS
CONCEPTUAL EXECUTIVE
ARCHITECT ARCHITECT
•Podium Steel Roof
MBS •Hotel Towers
ARUP CLIENT •Foundation
Coordination with MSA Site Supervision
Brisbane Lead by AEDAS
•Acoustic, Façade
and Fire
•Traffic ARUP
HK/SHZ ARUP
ARUP
SYDNEY
•Sky park LONDON
•Podium Concrete Structure
•Museum Steel works Arup HK in Singapore
(detail design) •Project Management
•Infrastructure •Podium coordination ARUP
•Geotechnical works Dynamics Studies on
NEWCASTLE SkyPark
Peer Review on
SkyPark Design
58
Design Challenges
60 Design Challenges
MJ
MJ MJ MJ Box Girder
antilever
65m C
Steel F Truss
rame w
ith
Truss
column Steel Frame with
s at 10m
c/c
columns at 10mc/c
4.65m/
10m
4.65m/
6.15m
6.15m
TOWER 1 TOWER 2 TOWER 3
Plan
175/ 225mm
thk.
composite
deck slab
Elev.
63 Cantilever Section
64 Fabrication & Erection of Steel Frames
65 Rendering of V & W Columns
Movement & Dynamics
66 Design Challenges
Maximum Anticipated Movement
Gravity : 150mm (Irreversible)
Wind: +/- 250mm (Reversible)
Seismic: +/- 600mm (Reversible)
67 Movement Joint
68 Movement Joints (Bearings)
Bending of Cantilever with Tower Sway Torsional Mode
2010.05.26
73
74
Measured Mode 1: Predicted Mode 1:
75 Key Findings
Viewing Platform
Maximum capacity of 600
people for general use.
Dancing activities are not
recommended
Indoor Restaurant
Limit to 345 people for
general dancing with
restricted access to all viewing
platform
76 Crowd Management
Construction Methods
77 Design Challenges
Heavy lifting to L55
Assembly at Level 1
93 Overview of SkyPark
94 Fabrication of Box Girders
95 Backspan with 10m deep section
Segment 5 (24th December 2009)
96 Lifting - In Action
Challenge Against Time
99 Design Challenges
100 Tight Construction Programme and Collaboration with Arup Offices
What Values have been brought to Arup?
Successful Cross Regional Collaboration Irrespective of Cultural Differences
Skills and Experience Sharing among Offices and Staff
Created Good Bonding and Networking Between Offices/Staff
Enhanced Arup’s Reputation and Business Opportunities
Enriched Arup’s Portfolio of World-class Iconic Projects
101