This document contains sewerage design calculations for a 3-storey residential property in Penang, Malaysia. It details pipe sizing and gradient calculations between 4 manholes (MH1, MH2, MH3, MH4) and the property exit point. Parameters like pipe diameter, length, flow rate, velocity and depth are calculated. The pipe sizing of 150mm diameter is suitable with gradients between 0.45-0.76m and flows of 0.11 litres/second.
This document contains sewerage design calculations for a 3-storey residential property in Penang, Malaysia. It details pipe sizing and gradient calculations between 4 manholes (MH1, MH2, MH3, MH4) and the property exit point. Parameters like pipe diameter, length, flow rate, velocity and depth are calculated. The pipe sizing of 150mm diameter is suitable with gradients between 0.45-0.76m and flows of 0.11 litres/second.
This document contains sewerage design calculations for a 3-storey residential property in Penang, Malaysia. It details pipe sizing and gradient calculations between 4 manholes (MH1, MH2, MH3, MH4) and the property exit point. Parameters like pipe diameter, length, flow rate, velocity and depth are calculated. The pipe sizing of 150mm diameter is suitable with gradients between 0.45-0.76m and flows of 0.11 litres/second.
PROJECT :KERJA-KERJA TELAH DIJALANKAN UNTUK MENDIRIKAN RUMAH SESEBUAH 3 TINGKAT (1 UNIT) DI ATAS LOT 1373, MUKIM 12, DAERAH BARAT DAYA BAYAN LEPAS, PULAU PINANG UNTUK AHMAD MURSHID BIN MANSOR JOB NUMBER : DESIGNED BY : TEAMWORK CHECKED BY :Ir. Chan Teik Cheong
NOTE :KS = PIPE MATERIAL ROUGHNESS
= 1.5 (vc) = 3.0 (concrete) = 0.6 (plastic) From To Eq Cum Peak Flow Cum Pipe Grad Ks, m Gravity Vel Cap Length, G.L G.L I.L I.L Depth Depth Rem Manhole Manhole Pop P.E Flow (L/s) Flow f s Acc. 1st point 2nd point 1st point 2nd point 1st point 2nd point (PE) Factor (L/S) D,(mm) 1 In (mm) m²/s g,(m/s²) v,(m/s) Q,(L/S) (m) (m) (m) (m) (m) (m) (m) MH1 MH2 5 5 8.418 0.110 0.110 150 110 1.5 1E-06 9.812 0.84 14.85 5.50 6.900 6.900 6.450 6.400 0.450 0.500 O.K MH2 MH3 0 5 8.418 0.110 0.110 150 110 1.5 1E-06 9.812 0.84 14.85 10.50 6.900 6.900 6.400 6.305 0.500 0.595 O.K MH3 MH4 0 5 8.418 0.110 0.110 150 110 1.5 1E-06 9.812 0.84 14.85 17.50 6.900 6.900 6.305 6.145 0.595 0.755 O.K MH4 Ex, MH 0 5 8.418 0.110 0.110 150 110 1.5 1E-06 9.812 0.84 14.85 1.50 6.900 6.900 6.145 6.132 0.755 0.768 O.K
Effect of Bubble Behavior For A Stopper Rod With Multiple Side-Channel Injection On Bubble Size Distributions in Nozzle and Mold During Continuous Casting of Steel
Variable Descripción Valor Fórmula Unidades Mu: (µ) Rho: (ρ) Gamma: (γ) p sat p atm g L asp D Q A Epsilon: (ε) ε/D V Re Calculo De Potencia De La Bomba Ecuacion de Colebrook f