ESTIMATION PF SET BY HILET'S FORMULA

PROJECT : PILING WORKS FOR PROPOSED HOTEL DEVELOPMENT "SUNWAY BIG


BOX VILLAGE" FOR PLOT F19 SUNWAY ISKANDAR AT PTD 200695,
MEDINI ZONE F, MEDINI ISKANDAR MALAYSIA, MUKIM PULAI, DAERAH
JOHOR BAHRU, JOHOR DARUL TAKZIM

TENDER PACKAGE : PILING WORKS

SET CALCULATION FOR : 250MM X 250MM RC PILE


: 300MM X 300MM RC PILE
: 400MM X 400MM RC PILE

HAMMER TYPE : HYDRAULIC HAMMER : BSP 11.0 TON

HILEY'S FORMULA

2
Pu = f*L = k*W*h (e *P+W)
*
S+c/2 P+W

PILE TYPE
DESCRIPTION UOM
250mm x 250mm RC Pile 300mm x 300mm RC Pile 400mm x 400mm RC Pile
PILE DATA
Pile size, D mm 250.00 300.00 400.00
Unit weight of pile KN/m 1.50 2.16 3.84
Pile penetration, I m 12.00 12.00 12.00
Pile weight, P1 KN 18.00 25.92 46.08
Working load, L KN 750.00 1,100.00 1,950.00
Safety factor, f 2.00 2.00 2.00
Ultimate driving resistance, Pu KN 1,500.00 2,200.00 3,900.00

HAMMER DATA
Weight of ram, W TON 11.00 11.00 11.00
Height of ram fall,h mm 165.00 250.00 500.00
Weight of driving cap, P2 KN 9.90 9.90 9.90
Total weight, P KN 27.90 35.82 55.98

ASSUMPTION DATA
Total temporary compression, c 14.00 14.00 14.00
Hammer coefficient, k 0.90 0.90 0.90
Coeffcient of restitution,e 0.40 0.40 0.40

SET(S) PER BLOW mm 2.04 1.93 2.10


SET(S) PER 10 BLOW mm 20.39 19.29 20.96
PROPOSED SET(S) PER 10 BLOW mm 20 20 20

* Note : The above calculation is based on the formula. The actual set will depend on the soil condition at site and other factors.
The decision on the final set shall be made by the Consultant.
ESTIMATION PF SET BY HILET'S FORMULA

PROJECT : PILING WORKS FOR PROPOSED HOTEL DEVELOPMENT "SUNWAY BIG


BOX VILLAGE" FOR PLOT F19 SUNWAY ISKANDAR AT PTD 200695,
MEDINI ZONE F, MEDINI ISKANDAR MALAYSIA, MUKIM PULAI, DAERAH
JOHOR BAHRU, JOHOR DARUL TAKZIM

TENDER PACKAGE : PILING WORKS

SET CALCULATION FOR : 250MM X 250MM RC PILE


: 300MM X 300MM RC PILE
: 400MM X 400MM RC PILE

HAMMER TYPE : HYDRAULIC HAMMER : BSP 9.0 TON

HILEY'S FORMULA

2
Pu = f*L = k*W*h (e *P+W)
*
S+c/2 P+W

PILE TYPE
DESCRIPTION UOM
250mm x 250mm RC Pile 300mm x 300mm RC Pile 400mm x 400mm RC Pile
PILE DATA
Pile size, D mm 250.00 300.00 400.00
Unit weight of pile KN/m 1.50 2.16 3.84
Pile penetration, I m 12.00 12.00 12.00
Pile weight, P1 KN 18.00 25.92 46.08
Working load, L KN 750.00 1,100.00 1,950.00
Safety factor, f 2.00 2.00 2.00
Ultimate driving resistance, Pu KN 1,500.00 2,200.00 3,900.00

HAMMER DATA
Weight of ram, W TON 9.00 9.00 9.00
Height of ram fall,h mm 210.00 320.00 645.00
Weight of driving cap, P2 KN 9.90 9.90 9.90
Total weight, P KN 27.90 35.82 55.98

ASSUMPTION DATA
Total temporary compression, c 14.00 14.00 14.00
Hammer coefficient, k 0.90 0.90 0.90
Coeffcient of restitution,e 0.40 0.40 0.40

SET(S) PER BLOW mm 2.09 1.96 2.08


SET(S) PER 10 BLOW mm 20.86 19.64 20.81
PROPOSED SET(S) PER 10 BLOW mm 20 20 20

* Note : The above calculation is based on the formula. The actual set will depend on the soil condition at site and other factors.
The decision on the final set shall be made by the Consultant.
ESTIMATION PF SET BY HILET'S FORMULA

PROJECT : PILING WORKS FOR PROPOSED HOTEL DEVELOPMENT "SUNWAY BIG

TENDER PACKAGE : PILING WORKS

SET CALCULATION FOR : 250MM X 250MM RC PILE


: 300MM X 300MM RC PILE
: 400MM X 400MM RC PILE

HAMMER TYPE : HYDRAULIC HAMMER : BSP 10.0 TON

HILEY'S FORMULA

2
Pu = f*L = k*W*h (e *P+W)
*
S+c/2 P+W

PILE TYPE
DESCRIPTION UOM
250mm x 250mm RC Pile 300mm x 300mm RC Pile 400mm x 400mm RC Pile
PILE DATA
Pile size, D mm 250.00 300.00 400.00
Unit weight of pile KN/m 1.50 2.16 3.84
Pile penetration, I m 12.00 12.00 12.00
Pile weight, P1 KN 18.00 25.92 46.08
Working load, L KN 750.00 1,100.00 1,950.00
Safety factor, f 2.00 2.00 2.00
Ultimate driving resistance, Pu KN 1,500.00 2,200.00 3,900.00

HAMMER DATA
Weight of ram, W TON 10.00 10.00 10.00
Height of ram fall,h mm 185.00 280.00 555.00
Weight of driving cap, P2 KN 9.90 9.90 9.90
Total weight, P KN 27.90 35.82 55.98

ASSUMPTION DATA
Total temporary compression, c 14.00 14.00 14.00
Hammer coefficient, k 0.90 0.90 0.90
Coeffcient of restitution,e 0.40 0.40 0.40

SET(S) PER BLOW mm 2.07 1.92 1.95


SET(S) PER 10 BLOW mm 20.66 19.17 19.47
PROPOSED SET(S) PER 10 BLOW mm 20 20 20

* Note : The above calculation is based on the formula. The actual set will depend on the soil condition at site and other factors.
The decision on the final set shall be made by the Consultant.
ESTIMATION PF SET BY HILET'S FORMULA

PROJECT : PILING WORKS FOR PROPOSED HOTEL DEVELOPMENT "SUNWAY BIG

TENDER PACKAGE : PILING WORKS

SET CALCULATION FOR : 250MM X 250MM RC PILE


: 300MM X 300MM RC PILE
: 400MM X 400MM RC PILE

HAMMER TYPE : HYDRAULIC HAMMER : IPH 7.5 TON

HILEY'S FORMULA

2
Pu = f*L = k*W*h (e *P+W)
*
S+c/2 P+W

PILE TYPE
DESCRIPTION UOM
250mm x 250mm RC Pile 300mm x 300mm RC Pile 400mm x 400mm RC Pile
PILE DATA
Pile size, D mm 250.00 300.00 400.00
Unit weight of pile KN/m 1.50 2.16 3.84
Pile penetration, I m 12.00 12.00 12.00
Pile weight, P1 KN 18.00 25.92 46.08
Working load, L KN 750.00 1,100.00 1,950.00
Safety factor, f 2.00 2.00 2.00
Ultimate driving resistance, Pu KN 1,500.00 2,200.00 3,900.00

HAMMER DATA
Weight of ram, W TON 7.50 7.50 7.50
Height of ram fall,h mm 245.00 385.00 780.00
Weight of driving cap, P2 KN 4.10 4.10 4.10
Total weight, P KN 22.10 30.02 50.18

ASSUMPTION DATA
Total temporary compression, c 14.00 14.00 14.00
Hammer coefficient, k 0.90 0.90 0.90
Coeffcient of restitution,e 0.40 0.40 0.40

SET(S) PER BLOW mm 1.92 1.98 1.95


SET(S) PER 10 BLOW mm 19.17 19.76 19.54
PROPOSED SET(S) PER 10 BLOW mm 20 20 20

* Note : The above calculation is based on the formula. The actual set will depend on the soil condition at site and other factors.
The decision on the final set shall be made by the Consultant.