Span 1: Showroom Sahiwal

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

INTEGRATED ENGINEERS

Project SHOWROOM SAHIWAL


INTERNATIONAL
Client MHM Made by Date Page
Location SHOWROOM SF B-1 SAA 15-Mar-19 3
CONTINUOUS BEAM ANALYSIS & DESIGN to EC2 (DD ENV 1992-1-1 : 1992) Checked Revision Job No
Originated from RCCe41.xls on CD © 1999 BCA for RCC MHM - B-3

SPAN 1 LEFT CENTRE RIGHT


ACTIONS M kNm 96.8 130.6 158.3
d 0.90 1.04 0.90
DESIGN d mm 465.3 490.3 465.3
As mm² 603 783 1029
As' mm² 0 0 0
TOP STEEL Layer 1 2 R 25 2 R 25 3 R 25
Layer 2 0 19 0 25 0 19
As prov mm² 982 As' prov 982 As prov 1473
BTM STEEL Layer 1 2 R 19 2 R 25 2 R 19
Layer 2 0 19 0 19 0 19
As' prov mm² 567 As prov 982 As' prov 567
DEFLECTION L/d 12.44 Allowed 54.39 ..
SHEAR Vsd kN 170.8 LINK Ø 192.8
VRd1 kN 64.6 10 69.8
VRd2 kN 628.1 NOMINAL 628.1
s req mm 178 282 154
LINKS R10 @ 175 for 1400 R10 @ 275 R10 @ 150 for 1800
legs No 2 2 2

CHECKS % As ok ok ok
Cover ok ok ok
min S ok ok ok
max S ok ok ok
Links ok ok ok
Main bars ok ok ok
max V ok ok
Deflection ok

SPAN 2 LEFT CENTRE RIGHT


ACTIONS M kNm 158.7 124.8 121.4
d 0.94 1.10 0.70
DESIGN d mm 482.5 510.5 491.5
As mm² 987 712 722
As' mm² 0 0 0
TOP STEEL Layer 1 3 R 25 2 R 19 3 R 19
Layer 2 0 0 0
As prov mm² 1473 As' prov 567 As prov 851
BTM STEEL Layer 1 2 R 19 3 R 19 2 R 19
Layer 2 0 0 0
As' prov mm² 567 As prov 851 As' prov 567
DEFLECTION L/d 11.95 Allowed 66.97 ..
SHEAR Vsd kN 191.0 LINK Ø 173.7
VRd1 kN 71.8 10 66.4
VRd2 kN 651.4 NOMINAL 663.5
s req mm 164 282 186
LINKS R10 @ 150 for 1650 R10 @ 275 R10 @ 175 for 1400
legs No 2 2 2

CHECKS % As ok ok ok
Cover ok ok ok
min S ok ok ok
max S ok ok ok
Links ok ok ok
Main bars ok ok ok
max V ok ok
Deflection ok
INTEGRATED ENGINEERS
Project SHOWROOM SAHIWAL INTERNATIONAL
Client MHM Made by Date Page
Location SHOWROOM SF B-1 SAA Mar-2019 4
CONTINUOUS BEAM ANALYSIS & DESIGN to EC2 (DD ENV 1992-1-1 : 1992) Checked Revision Job No
Originated from RCCe41.xls on CD © 1999 BCA for RCC MHM - B-3

SPAN 3 LEFT CENTRE RIGHT


ACTIONS M kNm 125.5 147.1 135.1
d 0.70 1.29 0.74
DESIGN d mm 491.5 510.0 491.5
As mm² 748 851 810
As' mm² 0 0 0
TOP STEEL Layer 1 3 R 19 2 R 20 3 R 19
Layer 2 0 0 0
As prov mm² 851 As' prov 628 As prov 851
BTM STEEL Layer 1 2 R 19 3 R 20 2 R 16
Layer 2 0 0 0
As' prov mm² 567 As prov 942 As' prov 402
DEFLECTION L/d 11.96 Allowed 70.12 ..
SHEAR Vsd kN 180.1 LINK Ø V 183.5
VRd1 kN 66.4 10 v 66.4
VRd2 kN 663.5 NOMINAL vc 663.5
s req mm 176 282 171
LINKS R10 @ 175 for 1575 R10 @ 275 R10 @ 150 for 1500
legs No 2 2 2

CHECKS % As ok ok ok
Cover ok ok ok
min S ok ok ok
max S ok ok ok
Links ok ok ok
Main bars ok ok ok
max V ok ok
Deflection ok

SPAN 4 LEFT CENTRE RIGHT


ACTIONS M kNm 133.3 149.9 108.9
d 0.70 1.19 1.00
DESIGN d mm 482.5 507.5 482.5
As mm² 816 874 657
As' mm² 0 1 0
TOP STEEL Layer 1 2 R 25 2 R 19 2 R 25
Layer 2 0 0 0
As prov mm² 982 As' prov 567 As prov 982
BTM STEEL Layer 1 2 R 19 2 R 25 2 R 19
Layer 2 0 0 0
As' prov mm² 567 As prov 982 As' prov 567
DEFLECTION L/d 12.02 Allowed 56.26 ..
SHEAR Vsd kN 184.6 LINK Ø 180.8
VRd1 kN 66.7 10 66.7
VRd2 kN 651.4 NOMINAL 651.4
s req mm 166 282 172
LINKS R10 @ 150 for 1650 R10 @ 275 R10 @ 150 for 1500
legs No 2 2 2

CHECKS % As ok ok ok
Cover ok ok ok
min S ok ok ok
max S FAILS ok ok
Links ok ok ok
Main bars ok ok ok
max V ok ok
Deflection ok

You might also like