Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ERBA ECL-105

OPERATING INSTRUCTIONS

Beginning of day
1. Ensure that the instrument is free from any damage

2. That the electrical and LIS (if applicable) connections are secure

3. Remove dust and or spills from the surface of instrument using water and dry completely.

4. Turn ON instrument and wait for temperature 37+/-0.5°C to be reached

End of day
1. Turn OFF instrument

2. Remove all used cuvettes and reagent containers.

3. Remove dust and or spills from the surface of instrument using water and dry completely.

You might also like