Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

LAPORAN KEUANGAN TATA GRAHA

NO TANGGAL URAIAN DEBET KREDIT SALDO


1 12/17/2018 Terima Dana 5,000,000 - 5,000,000
Pembelian Material - 767,000 4,233,000
2 12/18/2018 Pembelian kusen - 601,000 3,632,000
Bayar jasa tukang 2 hari - 500,000 3,132,000
3 12/19/2018 pembelan material - 215,000 2,917,000
4 12/21/2018 Pembelian Material - 156,000 2,761,000
Pembelian Material - 103,000 2,658,000
5 12/24/2018 Pembelian Material - 154,000 2,504,000
Pembelian Material - 260,000 2,244,000
6 12/26/2018 Pembelian Material - 86,000 2,158,000
7 12/27/2018 Pembelian Material - 99,000 2,059,000
8 12/28/2018 Pembelian Material - 274,000 1,785,000
BBM 2 liter - 20,000 1,765,000
Bayar jasa tukang 2 hari - 500,000 1,265,000
Pinjam Dana BPJS 1,000,000 - 2,265,000
9 12/29/2018 Pembelian Material - 1,898,000 367,000
Bayar jasa tukang 2 hari - 500,000 (133,000)
10 1/30/2018 bayar tukang 9 hr - 2,250,000 (2,383,000)
10 1/2/2019 Terima Dana 5,000,000 - 2,617,000
pengembalian piutang bpjs - 1,000,000 1,617,000
Pembelian Material - 857,000 760,000
11 1/3/2019 Pembelian Material - 482,000 278,000
pembayaran pintu - 1,000,000 (722,000)
Pembelian Material - 579,000 (1,301,000)
12 1/7/2019 Terima Dana 3,250,000 - 1,949,000
12 1/7/2019 Bayar jasa tukang 13 hari - 3,250,000 (1,301,000)
13 1/22/2019 Pembelian Material - 1,090,000 (2,391,000)
14 1/23/2019 Pembelian Material - 85,000 (2,476,000)
Pembelian Material - 1,931,000 (4,407,000)
paku - 40,000 (4,447,000)
15 1/28/2019 Pembelian Material - 134,000 (4,581,000)
16 1/29/2019 Pembelian Material 108,000 (4,473,000)
17 1/31/2019 Pembelian Material - 40,000 (4,513,000)
Pembelian Material - 251,000 (4,764,000)
18 1/9/2019 Terima Dana 2,900,000 - (1,864,000)
bayar tukang 12 hari - 3,000,000 (4,864,000)
19 1/17/2019 bayar tukang 2 hari - 500,000 (5,364,000)

You might also like