Physical & Financial Status of Targets Schemes 2018-19, PHE Division Shopian
Physical & Financial Status of Targets Schemes 2018-19, PHE Division Shopian
Cumm. No. of
Year of Balance Target No.
S. No Constituency Name of WSS. Programme AAA Cost Exp. upto Habs.
Start Cost of Habs.
10/018 Covered
1 Shopian Shopian Town LIC 2012-13 433.00 375.93 57.07 2 wards 2 wards
Mughalpora
2 Wachi NRDWP 2013-14 175.60 112.28 63.32 1 1
Turkwangam
Amshipora
6 Shopian NRDWP 2012-13 144.00 137.94 6.06 2 Nil
Shamshipora
i) i)Sinking
Procurement Action==100%
of Tubewell 30%
ii) L/F = 10%
ii) L/F of pipes = 85%
iii) Const. of SR = 100% Target 2018-19
iv) L/F Rising Main = 100%
i)i)Intake/RWM
Intake/RWM==85%100% Target 2018-19
ii) PST = 100% (damaged)
ii) PST = 100% (damaged)
iii)1.00
iii) 1.00Lac
LacGln.
Gln.SSFP
SSFP==100%,
100%,(damaged)
(damaged)
iv) L/F =
iv) L/F = 25%25%
Executive Engineer,
PHE. Divn. Shopian.