component 4:educative community performs efficient accumulation and

evacuation of solid waste


The internal support brigades will be conformed by students,
c.4.1 organize internal
family parents and teachers of the elementary and high levels
support brigades.
respectively.
This activity will be previous survey and analysis of the
C.4.2 Establish solid information ,get by members of the environment club and
waste collection support brigades .The established schedule wil be statement
schule. to all teachers of the E.I. for its circulation in the classroom.

C.4.3 Implementation
of áreas inside the In each E.I’.classrrom will have an área destined to collection
classrooms destined and calssification of solid waste for that we will give them
for the management recycle bin properly identified for color and proyect´s name.
of solid waste.
COMPONENT 5:The “GUS” E.I. rely on a solid waste management integral plan

C.5.1. Elaboration
For the elaboration of solid waste management plan will count
of solid waste
on our allied¨s contribution as municipal school of the educative
management
institution. HELTH COMMUNITY OF THE EDUCATIVE
.integral plan.
INSTITUTION, MPD, MINAM, CEMENT FACTORY.

C.5.2.
Institutionalization of By Directorial Resolution the solid waste management plan will
solid waste integral be institucionalizad and incorporated in the educative work
plan trough a (learning sesison,didactic units,educative proyects)
directorial resolution.
Component 6: The “GUS” E.I.rely on efficient infrastructure and material for the
comprehensive management of solid waste.
With the oficial correspondence to M.D.P, north Pacasmayo
C.6.1. Request
Cements Factory, and to the ministry of agricultura with its
advise on solid
principal place in the San Pedro De LLoc city ,it will ask for
waste management
advice in the solid waste management.

C.6.2. Quote and


buy machines and After obtaining the quotations will proceed with the advice of the
support materials. specialist hired for its evaluation and subsequent purchase.
.

C.6.3.Located and
In coordination with the technical equipment the área to be used
adapt an área for
as storage center will be selected and measured.
accumulation and
With the área already selected, it will be proceed to evaluate
solid waste
aspects such as the construction materials.
evacuation.

C.6.4. Installation of After quote and buy need materials its procedure to their
material and support instalation in the collection center and distribution of the
equipment. personalized recycle bin to each an the classroom.
C.6.5. Agreement
with municipality for Having as one of our ally to the MDP, we will sign agreement
solid waste collection and one will be the establishment of a solid waste collection
schedule. Schedule.