ISYE 3104: Manufacturing Systems
Instructor: Spyros Reveliotis
Final Exam
April 30, 2013
S oLtuTionsAnswer the following questions (8 points each):
1. What are the primary two for taki i
reasons for taking a data-aggregating approac
at the aggregate planning phase? nie
) Th dpe cobeetbing He compels 4 the
pownny ree Hit wedl Lave teed
\ (ousidteing eau singh SUU ar a
Yaa entity,
2) By camridesiny demand f
Cocern He Cumulete demand attar poke
gente, wt contod belle He ever toe
eacasbh sine We mnie he areroohmahin
f° demand 4 seme SRUs iw Kae farivbry wi
undyr -evbmneiny Yan obhecd +
ecesty Hot3
2. A company performing its aggregate planning with respect to a par-
ticular product family has decided that it may use subcontracting but the
subcontracted quantity at any period should not exceed 20% of its internal
production during that period. Furthermore, the company has decided to
allow for no backlogs. Write a set of constraints for the LP formulation of
the corresponding aggregate planning problem that will express the above
conditions in this formulation.
Jn ths case, tn maktril balan tgeton
leconn :
Ye Try t he eS, = Dette
whith is equivedont to
ie Tee le ESE OF
Fl equein: ; att
le ee Inver heey cavuss fem en + “
2 f a. roduc i” putiod af
3) Sez Swheentes vted quer, Ks yee
A) De = Demand fo poet be Jo Lash age, since
We here omitted He vari, calling sy
We do nek Allw Jr back Gogg tm Hey Cane,
ont, Te, SFO, ve
Sally, we abe “need the Carkoirt
Vt So < orbs
; i adh -
Hak erfrua, Ke ceibing Yok we impor ov Subcen ")