The document reminds the recipient to complete all required construction and installation to achieve the Commercial Operation Date of the 2nd Group Gas Engine on schedule, noting that the common system is also required for commercial operation of Simple Cycle-1. The Fire Fighting System must be ready to use before Commercial Operation.
The document reminds the recipient to complete all required construction and installation to achieve the Commercial Operation Date of the 2nd Group Gas Engine on schedule, noting that the common system is also required for commercial operation of Simple Cycle-1. The Fire Fighting System must be ready to use before Commercial Operation.
The document reminds the recipient to complete all required construction and installation to achieve the Commercial Operation Date of the 2nd Group Gas Engine on schedule, noting that the common system is also required for commercial operation of Simple Cycle-1. The Fire Fighting System must be ready to use before Commercial Operation.