Date of Conduct Venue Credit Units Name of Provider Program Accreditation No. Title of Program

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

Program Date of Conduct

No. Name of Provider


Accreditation No.
Title of Program Venue Credit Units

to From

National Master
Plumbers Association NAMPAP in
of the Philippines, Inc. Transition: Moving The Manila Grand
1 (NAMPAP) 2009-001-001 Ahead Beyond 24-Apr-09 25-Apr-09 Opera Hotel 1.5
3rd Joint Vismin
Philippine Society of Regional
Plumbing Engineers, Conference &
2 Inc. (PSPE) 2009-002-002 Trade Exhibit 10-Jul-09 11-Jul-09 Iloilo City 7

Philippine Society of 3rd Luzon Regional


Plumbing Engineers, Conference & Trade Manila Grand Opera
3 Inc. (PSPE) 2009-002-003 Exhibit 13-Nov-09 14-Nov-09 Hotel, Sta. Cruz Manila 7

Philippine Society of 6th Founding


Plumbing Engineers, Anniversary and Manila Grand Opera
4 Inc. (PSPE) 2009-002-004 National Convention 26-Mar-10 27-Mar-10 Hotel, Sta. Cruz Manila 7

Philippine Society of 4th Visayas -


Plumbing Engineers, Mindanao Pearlmont Inn, Cagayan
5 Inc. (PSPE) 2009-002-005 Conference 23-Jul-10 24-Jul-10 de Oro City 7

Philippine Society of 4th Luzon Regional


Plumbing Engineers, Conference & Trade
6 Inc. (PSPE) 2009-002-006 Exhibit 26-Nov-10 27-Nov-10 Supreme Hotel, Baguio 7

7th Founding
Philippine Society of Anniversary /
Plumbing Engineers, National Convention Manila Grand Opera
7 Inc. (PSPE) 2009-002-007 & Trade Exhibit 1-Apr-11 2-Apr-11 Hotel, Sta. Cruz Manila 9
5th Joint Visayas -
Philippine Society of Mindanao
Plumbing Engineers, Conference & Trade Pearlmont Inn, Cagayan
8 Inc. (PSPE) 2009-002-008 Exhibit 21-Jul-11 22-Jul-11 de Oro City 8

Philippine Society of 5th Luzon Regional Barcie International


Plumbing Engineers, Conference & Trade Center, Catmon, Malolos
9 Inc. (PSPE) 2009-002-009 Exhibit 25-Nov-11 26-Nov-11 City, Bulacan 7

Philippine Society of 8th Founding


Plumbing Engineers, Inc. Anniversary & Manila Grand Opera
10 (PSPE) 2009-002-010 National Convention 30-Mar-12 31-Mar-12 Hotel, Sta. Cruz Manila 7
Philippine Society of 8th Founding
Plumbing Engineers, Inc. Anniversary & SMX Convention, Mall of
11 (PSPE) 2009-002-011 National Convention 6-Aug-12 8-Aug-12 Asia, Pasay City 5

9th Founding
Philippine Society of Anniversary, National
Plumbing Engineers, Inc. Convention and Manila Grand Opera
12 (PSPE) 2009-002-012 Trade Exhibit 19-Apr-13 20-Apr-13 Hotel, Sta. Cruz Manila 5.5

National Master
Plumbers Association Master Plumber on
of the Philippines, Inc. High Gear for Global
13 (NAMPAP) 2009-001-013 Challenge 8-Nov-13 9-Nov-13 Microtel, Davao City 6.5
10th Founding
Philippine Society of Anniversary, National
Plumbing Engineers, Convention & Trade Manila Grand Opera
14 Inc. (PSPE) 2009-002-014 Exhibit 4-Apr-14 5-Apr-14 Hotel, Sta. Cruz Manila 10.5

11th Founding
Anniversary /
National Convention
and Trade Exhibit,
Philippine Society of "Plumbing Engineers: Manila Grand Opera
Plumbing Engineers, Moving towards Hotel, Sta. Cruz,
15 Inc. (PSPE) 2009-002-015 Sustainable Green 10-Apr-15 11-Apr-15 Manila 10.5

National Master
Plumbers Association Facing the
of the Philippines, Inc. Challenges of Aloha Hotel, Roxas
16 (NAMPAP) 2009-001-016 Globalization 20-Nov-15 21-Nov-15 Blvd., Manila 7.5

National Master
Plumbers Association
of the Philippines, Inc. Starview Hotel, Naga
17 (NAMPAP) 2009-001-017 Luzon Conference 4/15/2016 4/16/2016 City 8

Fire Sprinkler System


MEPFS Engineers CPD Design, Estimates
18 Provider 2017-010-018 and FDAS 27-Aug-17 Quezon City 6

Fire Sprinkler System


MEPFS Engineers CPD Design, Estimates
19 Provider 2017-010-019 and FDAS 10-Sep-17 Imus City 6

Construction Project
MEPFS Engineers CPD Management and
20 Provider 2017-010-020 Estimates 23-Sep-17 Cebu City 6.5

Construction Project
MEPFS Engineers CPD Management and
21 Provider 2017-010-021 Estimates 1-Oct-17 Davao City 6.5
Design and Cold
Water Distribution
MEPFS Engineers CPD System in Buildings
22 Provider 2017-010-022 & Estimates 17-Sep-17 Quezon City 6.5
Design and Cold
Water Distribution
MEPFS Engineers CPD System in Buildings
23 Provider 2017-010-023 & Estimates 29-Sep-17 Davao City 6.5
Design and Cold
Water Distribution
MEPFS Engineers CPD System in Buildings
24 Provider 2017-010-024 & Estimates 1-Oct-17 Cebu City 6.5

Construction Project
MEPFS Engineers CPD Management and
25 Provider 2017-010-025 Estimates 26-Aug-17 Quezon City 6.5

Construction Project
MEPFS Engineers CPD Management and
26 Provider 2017-010-026 Estimates 2-Sep-17 Calamba City 6.5

Construction Project
MEPFS Engineers CPD Management and
27 Provider 2017-010-027 Estimates 9-Sep-17 Imus City 6.5
Philippine Society of 6th Visayas
Plumbing Engineers, Inc. Technical Waterfront Hotel, Cebu
28 (PSPE) 2009-002-028 Symposium 1-Jul-17 City 6
Comprehensive
Plumbing System 2nd Floor, Marsk Bldg.,
Design for Multi Aurora Blvd. Cor. Balete
29 Deeds Construct Plus Co. 2017-020-029 Level Structures 13-Jul-17 14-Jul-17 Drive , Quezon City 10
Comprehensive
Plumbing System 2nd Floor, Marsk Bldg.,
Design for Multi Aurora Blvd. Cor. Balete
30 Deeds Construct Plus Co. 2017-020-030 Level Structures 20-Jul-17 21-Jul-17 Drive , Quezon City 10
Comprehensive
Plumbing System 2nd Floor, Marsk Bldg.,
Design for Multi Aurora Blvd. Cor. Balete
31 Deeds Construct Plus Co. 2017-020-031 Level Structures 27-Jul-17 28-Jul-17 Drive , Quezon City 10

Philippine Society of
Plumbing Engineers, Inc. Luzon Regional Hotel Venezia ,
32 (PSPE)
National Master
2009-002-032 Conference 9-Dec-16 10-Dec-16 Legaspi Albay 8
Plumbers Association
of the Philippines, Inc. Visayas-Mindanao
33 (NAMPAP) 2009-001-033 Conference 18-Aug-17 19-Aug-17 Microtel, Davao City 7.5
6th Luzon Technical
Philippine Society of Symposium (under
Plumbing Engineers, Inc. the banner of Green SMX Convention, Mall
34 (PSPE) 2009-002-034 Philippines) 22-Sep-17 23-Sep-17 of Asia, Pasay City 6.5
Function Room, CBD
Construction Project Plaza Hotel, Ninoy
MEPFS Engineers Management and and Cory Avenue CBD-
35 CPD Provider 2017-010-035 Estimates 28-Oct-17 II Triangulo Naga City 9
Procurement and MEFS Training
Core Management in Center, 3/F Corner
MEPFS Engineers Construction Street Bldg., Palico IV,
36 CPD Provider 2017-010-036 Industry 18-Nov-17 Imus City 9
Function Room, CBD
Fire Sprinkler System Plaza Hotel, Ninoy and
MEPFS Engineers Design, Estimates Cory Avenue CBD-II
37 CPD Provider 2017-010-037 and FDAS 29-Oct-17 Triangulo Naga City 9

Plumbing Plan MEFS Training Center,


MEPFS Engineers CPD Reading and 3/F Corner Street Bldg.,
38 Provider 2017-010-038 Estimates 17-Dec-17 Palico IV, Imus City 9

Plumbing Plan MEFS Training Center,


MEPFS Engineers CPD Reading and 3/F Corner Street Bldg.,
39 Provider 2017-010-039 Estimates 21-Jan-17 Palico IV, Imus City 9

Plumbing Plan MEFS Training Center,


MEPFS Engineers CPD Reading and 3/F Corner Street Bldg.,
40 Provider 2017-010-040 Estimates 3-Dec-18 Palico IV, Imus City 9

Plumbing Plan MEFS Training Center,


MEPFS Engineers CPD Reading and 3/F Corner Street Bldg.,
41 Provider 2017-010-041 Estimates 14-Jan-18 Palico IV, Imus City 9

Plumbing Plan MEFS Training Center,


MEPFS Engineers CPD Reading and 3/F Corner Street Bldg.,
42 Provider 2017-010-042 Estimates 12-Nov-17 Palico IV, Imus City 9

Plumbing Plan MEFS Training Center,


MEPFS Engineers CPD Reading and 3/F Corner Street Bldg.,
43 Provider 2017-010-043 Estimates 7-Jan-18 Palico IV, Imus City 9
National Master Contiunuing
Plumbers Association Professional
of the Philippines, Inc. Development (CPD) CW Home Depot, Chino
44 (NAMPAP) 2009-001-044 Seminar 28-Jul-17 29-Jul-17 Roces St.,Makati City 12
National Master
Plumbers Association
of the Philippines, Inc.
45 (NAMPAP) 2009-001-045 Luzon Conference 28-Apr-17 Stone House Hotel 7

MEFS Training Center,


MEPFS Engineers CPD Pump Sizing and 3/F Corner Street Bldg.,
46 Provider 2017-010-046 Selection 26-Nov-17 Palico IV, Imus City 8

MEFS Training Center,


MEPFS Engineers CPD Pump Sizing and 3/F Corner Street Bldg.,
47 Provider 2017-010-047 Selection 28-Jan-18 Palico IV, Imus City 8

MEFS Training Center,


MEPFS Engineers CPD Pump Sizing and 3/F Corner Street Bldg.,
48 Provider 2017-010-048 Selection 26-Nov-17 Palico IV, Imus City 8

MEFS Training Center,


MEPFS Engineers CPD Pump Sizing and 3/F Corner Street Bldg.,
49 Provider 2017-010-049 Selection 26-Jan-17 Palico IV, Imus City 8

MEFS Training Center,


MEPFS Engineers CPD Pump Sizing and 3/F Corner Street Bldg.,
50 Provider 2017-010-050 Selection 17-Dec-17 Palico IV, Imus City 8

MEFS Training Center,


MEPFS Engineers CPD Pump Sizing and 3/F Corner Street Bldg.,
51 Provider 2017-010-051 Selection 21-Jan-18 Palico IV, Imus City 8

Plumbing Plan MEFS Training Center,


MEPFS Engineers CPD Reading and 3/F Corner Street Bldg.,
52 Provider 2017-010-052 Estimates 26-Nov-17 Palico IV, Imus City 9

Plumbing Plan MEFS Training Center,


MEPFS Engineers CPD Reading and 3/F Corner Street Bldg.,
53 Provider 2017-010-053 Estimates 28-Jan-18 Palico IV, Imus City 9

Philippine Society of
Plumbing Engineers, Inc. PSPE Seminar and 154 Roosevelt Ave., cor.
54 (PSPE) 2009-002-054 Workshop 18-Nov-17 SFDM, Quezon City 8

Philippine Society of
Plumbing Engineers, Inc. PSE Seminar and 154 Roosevelt Ave., cor.
55 (PSPE) 2009-002-055 Workshop 11-Nov-17 SFDM, Quezon City 8
National Master Plumbers
Association of the 82nd Anniversary
Philippines, Inc. and National Aloha Hotel, Roxas
56 (NAMPAP) 2009-001-056 Convention 17-Nov-17 18-Nov-17 Blvd., Manila 10.5

Function Room, Bohol


Construction Project Plaza Resort and
MEPFS Engineers CPD Management and Restaurant , Dauis ,
57 Provider 2017-010-057 Estimates 4-Nov-17 Bohol 10

MEFS Training Center,


MEPFS Engineers CPD Pump Sizing and 3/F Corner Street Bldg.,
58 Provider 2017-010-058 Selection 12-Nov-17 Palico IV, Imus City 8

MEFS Training Center,


MEPFS Engineers CPD Pump Sizing and 3/F Corner Street Bldg.,
59 Provider 2017-010-059 Selection 7-Jan-17 Palico IV, Imus City 8
Design and Cold
Water Distribution MEFS Training Center,
MEPFS Engineers CPD System in Buildings 3/F Corner Street Bldg.,
60 Provider 2017-010-060 & Estimates 13-Jan-18 Palico IV, Quezon City 6.5

Design and Cold


Water Distribution MEFS Training Center,
MEPFS Engineers CPD System in Buildings 3/F Corner Street Bldg.,
61 Provider 2017-010-061 & Estimates 10-Feb-18 Palico IV, Quezon City 6.5
Design and Cold
Water Distribution MEFS Training Center,
MEPFS Engineers CPD System in Buildings 3/F Corner Street Bldg.,
62 Provider 2017-010-062 & Estimates 11-Mar-18 Palico IV, Quezon City 6.5
Design and Cold Manila Grand Opera
Water Distribution Hotel, 925 Doroteo Jose
MEPFS Engineers CPD System in Buildings St. cor. Rizal Avenue,
63 Provider 2017-010-063 & Estimates 14-Apr-18 Sta. Cruz, Manila 6.5
Design and Cold
Water Distribution MEFS Training Center,
MEPFS Engineers CPD System in Buildings 3/F Corner Street Bldg.,
64 Provider 2017-010-064 & Estimates 12-May-18 Palico IV, Quezon City 6.5
Design and Cold
Water Distribution MEFS Training Center,
MEPFS Engineers CPD System in Buildings 3/F Corner Street Bldg.,
65 Provider 2017-010-065 & Estimates 9-Jun-18 Palico IV, Quezon City 6.5

PERT/ CPM for Function Room, Crown


MEPFS Engineers CPD Project Scheduling & Regency Residences,
66 Provider 2017-010-066 Monitoring 16-Dec-17 Guadalupe, Cebu City 9

Automatic Fire Function Room, Crown


MEPFS Engineers CPD Sprinkler System Regency Residences,
67 Provider 2017-010-067 Design 17-Dec-17 Guadalupe, Cebu City 8

Automatic Fire MEFS Training Center,


MEPFS Engineers CPD Sprinkler System 3/F Corner Street Bldg.,
68 Provider 2017-010-068 Design 2-Dec-17 Palico IV, Quezon City 9

Function Room, Crown


MEPFS Engineers CPD Medical Gas Piping Regency Residences,
69 Provider 2017-010-069 System Design 9-Dec-17 Guadalupe, Davao City 8

Rain Water Function Room, Crown


MEPFS Engineers CPD Harvesting for Multi- Regency Residences,
70 Provider 2017-010-070 Storied Buildings 1-Dec-17 Guadalupe, ILoilo City 8

Automatic Fire Function Room, Crown


MEPFS Engineers CPD Sprinkler System Regency Residences,
71 Provider 2017-010-071 Design 10-Dec-17 Guadalupe, Davao City 8

Philippine Society of 10th Luzon Regional


Plumbing Engineers, Inc. Conference & Trade Villa Caceres Hotel,
72 (PSPE) 2009-002-072 Exhibit 8-Dec-17 9-Dec-17 Naga City 9

PERT/ CPM for MEPFS Training Center,


MEPFS Engineers CPD Project Scheduling & 3/F Corner Street Bldg.,
73 Provider 2017-010-073 Monitoring 30-Nov-17 Palico IV, Imus City 8

How to Start And MEPFS Training Center,


MEPFS Engineers CPD Grown Construction 3/F Corner Street Bldg.,
74 Provider 2017-010-074 Business 5-Nov-17 Palico IV, Imus City 4

How to Start And MEPFS Training Center,


MEPFS Engineers CPD Grown Construction 3/F Corner Street Bldg.,
75 Provider 2017-010-075 Business 22-Oct-17 Palico IV, Imus City 9

How to Start And CBD Plaza Hotel, Ninoy


MEPFS Engineers CPD Grown Construction AND Cory Avenue CBD-II
76 Provider 2017-010-076 Business 29-Oct-17 Triangulo Naga City 9

Construction Project Highway 21 Hotel,


MEPFS Engineers CPD Management and General Luna St., Iloilo
77 Provider 2017-010-077 Estimates 30-Nov-17 City 6.5

Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
78 Provider 2017-010-078 Estimates 11-Nov-17 12-Nov-17 Palico IV, Imus City 14
Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
79 Provider 2017-010-079 Estimates 25-Nov-17 26-Nov-17 Palico IV, Imus City 14

How to Start And MEPFS Training Center,


MEPFS Engineers CPD Grown Construction 3/F Corner Street Bldg.,
80 Provider 2017-010-080 Business 19-Nov-17 Palico IV, Imus City 9

Comprehensive
Construction Project Function Room, My
MEPFS Engineers CPD Management and Hotel Davao, San Pedro
81 Provider 2017-010-081 Estimates 9-Dec-17 10-Dec-17 Street, Davao City 14

Comprehensive
Construction Project
MEPFS Engineers CPD Management and Ritz Tower De Leyte,
82 Provider 2017-010-082 Estimates 13-Jan-18 14-Jan-18 Real St. , Tacloban City 14

The VIP Hotel, Corner


Comprehensive
Construction Project Streets, Don Apolinar
MEPFS Engineers CPD Management and Velez St. , Cagayan De
83 Provider 2017-010-083 Estimates 20-Jan-18 21-Jan-18 Oro City 14

PERT/ CPM for MEPFS Training Center,


MEPFS Engineers CPD Project Scheduling & 3/F Corner Street Bldg.,
84 Provider 2017-010-084 Monitoring 13-Jan-18 14-Jan-18 Palico IV, Imus City 12

Function Room , Grand


Comprehensive
Construction Project Astoria Hotel, Mayor
MEPFS Engineers CPD Management and Cimaco Ave., Zone II,
85 Provider 2017-010-085 Estimates 2-Feb-18 3-Feb-18 Zamboanga City 14

Construction Project MEPFS Training Center,


MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
86 Provider 2017-010-086 Estimates 13-Jan-18 Palico IV, Imus City 6.5

Manila Grand Opera


Construction Project Hotel, 925 Doroteo Jose
MEPFS Engineers CPD Management and St. cor. Rizal Avenue,
87 Provider 2017-010-087 Estimates 11-Mar-18 Sta. Cruz, Manila 6.5

Construction Project MEPFS Training Center,


MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
88 Provider 2017-010-088 Estimates 12-May-18 Palico IV, Imus City 6.5

MEPFS Training Center,


MEPFS Engineers CPD Medical Gas Piping 3/F Corner Street Bldg.,
89 Provider 2017-010-089 System Design 27-Jan-18 Palico IV, Imus City 8.5

MEPFS Training Center,


MEPFS Engineers CPD Medical Gas Piping 3/F Corner Street Bldg.,
90 Provider 2017-010-090 System Design 24-Mar-18 Palico IV, Imus City 8.5

MEPFS Training Center,


MEPFS Engineers CPD Medical Gas Piping 3/F Corner Street Bldg.,
91 Provider 2017-010-091 System Design 26-May-18 Palico IV, Imus City 8.5

Automatic Fire MEPFS Training Center,


MEPFS Engineers CPD Sprinkler System 3/F Corner Street Bldg.,
92 Provider 2017-010-092 Design 24-Feb-18 Palico IV, Imus City 8.5
Automatic Fire MEPFS Training Center,
MEPFS Engineers CPD Sprinkler System 3/F Corner Street Bldg.,
93 Provider 2017-010-093 Design 28-Apr-18 Palico IV, Imus City 8.5

Automatic Fire MEPFS Training Center,


MEPFS Engineers CPD Sprinkler System 3/F Corner Street Bldg.,
94 Provider 2017-010-094 Design 24-Jun-18 Palico IV, Imus City 8.5

PERT/ CPM for MEPFS Training Center,


MEPFS Engineers CPD Project Scheduling & 3/F Corner Street Bldg.,
95 Provider 2017-010-095 Monitoring 6-Jan-18 Palico IV, Imus City 8

Construction Project Units 508-509, The Boni


Management and Tower, 602 Boni Avenue,
96 Deeds Construct Plus Co. 2017-003-096 Estimating 5-Jan-18 6-Jan-18 Mandaluyong City 16.75
Sustainable (Green)
Plumbing System
and Domestic Water
Distribution System
Design for Highrise NorthWinds Hotel,
97 Deeds Construct Plus Co. 2017-003-097 Buildings 13-Jan-18 Lahug, Cebu City 8
Sustainable (Green)
Plumbing System
and Domestic Water
Distribution System Units 508-509, The Boni
Design for Highrise Tower, 602 Boni Avenue,
98 Deeds Construct Plus Co. 2017-003-098 Buildings 19-Jan-18 Mandaluyong City 8
Sustainable (Green)
Plumbing System
and Domestic Water
Distribution System Units 508-509, The Boni
Design for Highrise Tower, 602 Boni Avenue,
99 Deeds Construct Plus Co. 2017-003-099 Buildings 29-Jan-18 Mandaluyong City 8

Automatic Fire Units 508-509, The Boni


Sprinkler System Tower, 602 Boni Avenue,
100 Deeds Construct Plus Co. 2017-003-100 Design 7-Jan-18 8-Jan-18 Mandaluyong City 13.75
Automatic Fire
Sprinkler System NorthWinds Hotel,
101 Deeds Construct Plus Co. 2017-003-101 Design 12-Jan-18 14-Jan-18 Lahug, Cebu City 13.75
Philippine Society of
Plumbing Engineers, Inc. 5th PSPE's Techno SMX Convention Center,
102 (PSPE) 2009-002-102 Forum 9-Jan-18 Mall of Asia , Manila 6.75
Philippine Society of
Plumbing Engineers, Inc. PSPE's Seminar & Azia Suites &
103 (PSPE) 2009-002-103 Workshop 13-Jan-18 Residences, Cebu City 8

Units 508-509, The Boni


PERT/ CPM and Tower, 602 Boni Avenue,
104 Deeds Construct Plus Co. 2017-003-104 Labor Cost Analysis 11-Jan-18 Mandaluyong City 8

Units 508-509, The Boni


PERT/ CPM and Tower, 602 Boni Avenue,
105 Deeds Construct Plus Co. 2017-003-105 Labor Cost Analysis 25-Jan-18 Mandaluyong City 8

Units 508-509, The Boni


PERT/ CPM and Tower, 602 Boni Avenue,
106 Deeds Construct Plus Co. 2017-003-106 Labor Cost Analysis 1-Feb-18 Mandaluyong City 8

Units 508-509, The Boni


PERT/ CPM and Tower, 602 Boni Avenue,
107 Deeds Construct Plus Co. 2017-003-107 Labor Cost Analysis 15-Feb-18 Mandaluyong City 8
Units 508-509, The Boni
PERT/ CPM and Tower, 602 Boni Avenue,
108 Deeds Construct Plus Co. 2017-003-108 Labor Cost Analysis 26-Feb-18 Mandaluyong City 8
Philippine Society of
Plumbing Engineers, Inc. PSPE Seminar and 154 Roosevelt Ave., cor.
109 (PSPE) 2009-002-104 Workshop 25-Nov-17 SFDM, Quezon City 8
Cebu Cpd Seminar "
Master Plumber on
RBRK Consultancy and High Gear for Global
110 Construction 2017-005-105 Challenge." 8-Dec-17 9-Dec-17 Castle Peak Hotel 13

Units 508-509, The Boni


PERT/ CPM and Tower, 602 Boni Avenue,
111 Deeds Construct Plus Co. 2017-003-106 Labor Cost Analysis 1-Feb-18 Mandaluyong City 8

Units 508-509, The Boni


PERT/ CPM and Tower, 602 Boni Avenue,
112 Deeds Construct Plus Co. 2017-003-107 Labor Cost Analysis 15-Feb-18 Mandaluyong City 8

Units 508-509, The Boni


PERT/ CPM and Tower, 602 Boni Avenue,
113 Deeds Construct Plus Co. 2017-003-108 Labor Cost Analysis 26-Feb-18 Mandaluyong City 8
Philippine Society of
Plumbing Engineers, Inc. PSPE Seminar and 154 Roosevelt Ave., cor.
114 (PSPE) 2009-002-104 Workshop 25-Nov-17 SFDM, Quezon City 8

Cebu Cpd Seminar "


Master Plumber on
RBRK Consultancy and High Gear for Global
115 Construction 2017-005-105 Challenge." 8-Dec-17 9-Dec-17 Castle Peak Hotel 13

116 26-Dec-17 31-Dec-17


2018 Master Plumbers
National
Association of the
Philippines, Inc. Function Hall, City Hall,
117 (NAMPAP) 2009-001-106 CPD Seminar 24-Feb-18 Calamba City, Laguna 8.5
Understanding
Sewage Treatment
Plant (STP) Stages-
3 Hours plus Storm
Drainage System /
Sewer, Waste and Units 508-509, The Boni
Vent System Design Tower, 602 Boni Avenue,
118 Deeds Construct Plus Co. 2017-003-107 for Medium and 18-Jan-18 Mandaluyong City 10
Understanding
Sewage Treatment
Plant (STP) Stages-
3 Hours plus Storm
Drainage System /
Sewer, Waste and Units 508-509, The Boni
Vent System Design Tower, 602 Boni Avenue,
119 Deeds Construct Plus Co. 2017-003-108 for Medium and 28-Jan-18 Mandaluyong City 10

National Master Plumbers Continuing


Association of the Professional Iloilo Science and
Philippines, Inc. Development - Technology University
120 (NAMPAP) 2009-001-109 Seminar 24-Mar-18 (ISTU)/ La Paz, Iloilo City 9
Sustainable (Green)
Plumbing System
and Domestic Water
Distribution System Units 508-509, The Boni
Design for Highrise Tower, 602 Boni Avenue,
121 Deeds Construct Plus Co. 2017-003-110 Buildings
Davao CPD Seminar: 2-Mar-18 Mandaluyong City 10
Master Plumbers
Increased Proficiency
for Stronger
RBRK Consultancy and Technological
122 Construction 2017-011-111 Adavancement 13-Jan-18 Davao City 17
Sustainable (Green)
Plumbing System
and Domestic Water
Distribution System Units 508-509, The Boni
Design for Highrise Tower, 602 Boni Avenue,
123 Deeds Construct Plus Co. 2017-003-112 Buildings 5-Feb-18 Mandaluyong City 10
Sustainable (Green)
Plumbing System
and Domestic Water
Distribution System Units 508-509, The Boni
Design for Highrise Tower, 602 Boni Avenue,
124 Deeds Construct Plus Co. 2017-003-113 Buildings 16-Feb-18 Mandaluyong City 10
Sustainable (Green)
Plumbing System
and Domestic Water
Distribution System Units 508-509, The Boni
Design for Highrise Tower, 602 Boni Avenue,
125 Deeds Construct Plus Co. 2017-003-114 Buildings 22-Feb-18 Mandaluyong City 10

Understanding
Sewage Treatment
Plant (STP) Stages-
3 Hours plus Storm
Drainage System /
Sewer, Waste and
Vent System Design Units 508-509, The Boni
for Medium and Tower, 602 Boni Avenue,
126 Deeds Construct Plus Co. 2017-003-115 Huge Structures 8-Feb-18 Mandaluyong City 10

Understanding
Sewage Treatment
Plant (STP) Stages-
3 Hours plus Storm
Drainage System /
Sewer, Waste and
Vent System Design Units 508-509, The Boni
for Medium and Tower, 602 Boni Avenue,
127 Deeds Construct Plus Co. 2017-003-116 Huge Structures 17-Feb-18 Mandaluyong City 10

Function Room,
Rain Water Manhattan Suite Inn,
MEPFS Engineers CPD Harvesting for Multi- South Road, Calindagan,
128 Provider 2017-010-118 Storied Buildings 17-Feb-18 Dumaguete City 9

Function Room, Hotel


Sustainable and Pier Cuatre, 3rd Avenue,
MEPFS Engineers CPD Green Building North Reclamation Area,
129 Provider 2017-010-119 Design 18-Mar-18 Cebu City 9

Comprehensive
Construction Project
MEPFS Engineers CPD Management and Hotel St. Ellis, Real St.,
130 Provider 2017-010-120 Estimates 3-Mar-18 4-Mar-18 Legaspi City 9
Function Room, Phela
Grande Convention
MEPFS Engineers CPD Pump Sizing and Center, General Santos
131 Provider 2017-010-121 Selection 4-Feb-18 City 8
Function Room, Phela
Automatic Fire Grande Convention
MEPFS Engineers CPD Sprinkler System Center, General Santos
132 Provider 2017-010-122 Design 3-Feb-18 City 8.5

PERT/ CPM for Function Room, My


MEPFS Engineers CPD Project Scheduling & Hotel Davao, San Pedro
133 Provider 2017-010-123 Monitoring 4-Mar-18 Street, Davao City 9
Function Room, Phela
PERT/ CPM for Grande Convention
MEPFS Engineers CPD Project Scheduling & Center, General Santos
134 Provider 2017-010-124 Monitoring 3-Feb-18 City 9

Function Room, My
MEPFS Engineers CPD Sustainable Rain Hotel Davao, San Pedro
135 Provider 2017-010-125 Water Harvesting 3-Mar-18 Street, Davao City 9

Function Room, Hotel


Pier Cuatre, 3rd Avenue,
MEPFS Engineers CPD Medical Gas Piping North Reclamation Area,
136 Provider 2017-010-126 System Design 18-Mar-18 Cebu City 8.5

MEPFS Training Center,


MEPFS Engineers CPD Medical Gas Piping Rags Bldg., Brgy. Parian,
137 Provider 2017-010-127 System Design 18-Feb-18 Calamba City 8.5
How to Prepare
Complete Plumbing MEPFS Training Center,
MEPFS Engineers CPD Plan and 3/F Corner Street Bldg.,
138 Provider 2017-010-128 Documentation 25-Feb-18 Palico IV, Quezon City 8

Function Room,
Construction Project Manhattan Suite Inn,
MEPFS Engineers CPD Management and South Road, Calindagan,
139 Provider 2017-010-129 Estimates 18-Feb-18 Dumaguete City 8.5
Procurement and Function Room, Phela
Core Management in Grande Convention
MEPFS Engineers CPD Construction Center, General Santos
140 Provider 2017-010-130 Industry 4-Feb-18 City 9
PERT/ CPM for Function Room, North
MEPFS Engineers CPD Project Scheduling & View Hotel, Airport Rd,
141 Provider 2017-010-131 Monitoring 25-Feb-18 Nalbo, Laoag City 9

Construction Project Function Room, North


MEPFS Engineers CPD Management and View Hotel, Airport Rd,
142 Provider 2017-010-132 Estimates 24-Feb-18 Nalbo, Laoag City 8.5

143 16-Feb-18 9
144 9-Feb-18 10-Feb-18 16
145 1-Mar-18 10
How to Prepare
Complete Plumbing MEPFS Training Center,
MEPFS Engineers CPD Plan and 3/F Corner Street Bldg.,
146 Provider 2017-010-136 Documentation 4-Mar-18 Palico IV, Quezon City 8

Financial & Function Room, Hotel


Operations Pier Cuatre, 3rd Avenue,
MEPFS Engineers CPD Management in North Reclamation Area,
147 Provider 2017-010-137 Construction Industry 17-Mar-18 Cebu City 8

Financial & Function Room, Hotel


Operations Pier Cuatre, 3rd Avenue,
MEPFS Engineers CPD Management in North Reclamation Area,
148 Provider 2017-010-137 Construction Industry 17-Mar-18 Cebu City 9
149 26-Jan-18 27-Jan-18 9
150 11-Feb-18 12-Feb-18 9
151 18-Feb-18 19-Feb-18 9
Understanding
Sewage Treatment
Plant (STP) Stages-
3 Hours plus Storm
Drainage System /
Sewer, Waste and
Vent System Design Units 508-509, The Boni
for Medium and Tower, 602 Boni Avenue,
152 Deeds Construct Plus Co. 2017-003-141 Huge Structures 12-Apr-18 Mandaluyong City 10

Understanding
Sewage Treatment
Plant (STP) Stages-
3 Hours plus Storm
Drainage System /
Sewer, Waste and
Vent System Design Units 508-509, The Boni
for Medium and Tower, 602 Boni Avenue,
153 Deeds Construct Plus Co. 2017-003-142 Huge Structures 16-Apr-18 Mandaluyong City 10

Construction Project Units 508-509, The Boni


Management and Tower, 602 Boni Avenue,
154 Deeds Construct Plus Co. 2017-003-143 Estimating 6-Apr-18 7-Apr-18 Mandaluyong City 18
Function Room , La
Sustainable Rain Carmela De Boracay,
Water Harvesting & Station 2, Balabag,
MEPFS Engineers CPD Urban Drainage Boracay Island, Malay,
155 Provider Deferred Systems Design 19-May-18 20-May-18 Aklan 18
National Master Plumbers Continuing
Association of the Professional
Philippines, Inc. Development - Grand Men Seng Hotel,
156 (NAMPAP) 2009-001-145 Seminar 26-May-18 Davao City 7
National Master Plumbers
Association of the Mariano Marcos State I
Philippines, Inc. University/ Batac, Ilocos
157 (NAMPAP) 2009-001-146 Luzon Conference 21-Apr-18 Norte 9.5
National Master Plumbers
Association of the
Philippines, Inc.
158 (NAMPAP) 2009-001-147 Luzon Conference 28-Apr-18 Stone House Hotel 7.5
Plummbing System
Design and Its
Alternative for a
Sustainable Building
Plus being more
attentive to
Reverberation Time The Pinaccle Hotel, Sta.
and Acoustics in Ana Ave., Poblacion
159 Deeds Construct Plus Co. 2017-002-148 Plumbing Sytems 19-Apr-18 District, Davao City 8
Plumbing System
Design and Its
Alternative for a
Sustainable Building
Plus being more
attentive to
Reverberation Time The Pinaccle Hotel, Sta.
and Acoustics in Ana Ave., Poblacion
160 Deeds Construct Plus Co. 2017-002-149 Plumbing Sytems 20-Apr-18 District, Davao City 8
Sustainable (Green)
Plumbing System
and Domestic Water
Distribution System Units 508-509, The Boni
Design for Highrise Tower, 602 Boni Avenue,
161 Deeds Construct Plus Co. 2017-003-150 Buildings 23-Apr-18 Mandaluyong City 10
Sustainable Rain
Water Harvesting &
MEPFS Engineers CPD Urban Drainage Function Room, Citystate
162 Provider 2017-010-151 Systems Design 5-May-18 6-May-18 Asturia, Palawan City 18
Units 508-509, The Boni
PERT/CPM and Tower, 602 Boni Avenue,
163 Deeds Construct Plus Co. 2017-003-152 Labor Cost Analysis 22-Apr-18 Mandaluyong City 8

PERT/CPM and NorthWinds Hotel,


164 Deeds Construct Plus Co. 2017-003-153 Labor Cost Analysis 28-Apr-18 Lahug, Cebu City 8

Sustainable Rain Function Room, Butuan


Water Harvesting & Grand Palace Hotel,
MEPFS Engineers CPD Urban Drainage Capitol Drive Corner
165 Provider 2017-010-154 Systems Design 12-May-18 13-May-18 Imadeja St. Butuan City 18

Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
166 Provider 2017-010-155 Estimates 28-Apr-18 29-Apr-18 Palico IV, Quezon City 17

Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
167 Provider 2017-010-156 Estimates 23-Jun-18 24-Jun-18 Palico IV, Quezon City 17
Proper Drainage,
Waste and Vent
(DVV) System Pipe
Sizing, Layout &
Actual Installation
puls Proper Hot &
Cold Waterline
System Pipe Sizing, Units 508-509, The Boni
Layout & Actual Tower, 602 Boni Avenue,
168 Deeds Construct Plus Co. 2017-003-157 Installation 9-Apr-18 Mandaluyong City 8
Proper Drainage,
Waste and Vent
(DVV) System Pipe
Sizing, Layout &
Actual Installation
puls Proper Hot &
Cold Waterline
System Pipe Sizing, Units 508-509, The Boni
Layout & Actual Tower, 602 Boni Avenue,
169 Deeds Construct Plus Co. 2017-003-158 Installation 19-Apr-18 Mandaluyong City 8

Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
170 Provider 2017-010-159 Estimates 17-Jun-18 Palico IV, Quezon City 9

Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
171 Provider 2017-010-160 Estimates 15-Jul-18 Palico IV, Quezon City 9

Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
172 Provider 2017-010-161 Estimates 12-Aug-18 Palico IV, Quezon City 9

Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
173 Provider 2017-010-162 Estimates 16-Sep-18 Palico IV, Quezon City 9

Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
174 Provider 2017-010-163 Estimates 14-Oct-18 Palico IV, Quezon City 9
Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
175 Provider 2017-010-164 Estimates 18-Nov-18 Palico IV, Quezon City 9

Comprehensive
Construction Project MEPFS Training Center,
MEPFS Engineers CPD Management and 3/F Corner Street Bldg.,
176 Provider 2017-010-165 Estimates 16-Dec-18 Palico IV, Quezon City 9

Units 508-509, The Boni


PERT/ CPM and Tower, 602 Boni Avenue,
177 Deeds Construct Plus Co. 2017-003-166 Labor Cost Analysis 15-Apr-18 Mandaluyong City 8
Sustainable (Green) Units 508-509, The Boni
178 Deeds Construct Plus Co. 2017-003-167 Plumbing System 8-Apr-18 Tower, 602 Boni Avenue, 10
Room 3B, 3/F Quedsa
Plaza Bldg., EDSA cor
MEPFS Engineers CPD Construction Project Quezon Avenue, Quezon
179 Provider 2017-010-168 Management 5-Jun-18 City 4
Philippine Society of PSPE's 7th Visayas
Plumbing Engineers, Inc. Technical Waterfront Hotel and
180 (PSPE) 2009-002-169 Symposium 30-Jun-18 Casino,Lahug Cebu City 6

Function Room,
Sustainable and Manhattan Suite Inn,
MEPFS Engineers CPD Green Building South Road, Calindagan,
181 Provider 2017-010-170 Design 16-Jun-18 Dumaguete City 9
Philippine Society of
Plumbing Engineers, Inc. PSPE's 1st Visayas Waterfront Hotel &
182 (PSPE) 2009-002-171 Technoforum 9-Jun-18 Casino, Lhug 7
National Master Plumbers
Association of the
Philippines, Inc. Grand Xing Imperial
183 (NAMPAP) 2009-001-172 Visayas Conference
PERT/CPM as an 16-Jun-18 Hotel, Iloilo City 8.5
Effective Tool Used
in Project
Management and Units 508-509, The Boni
Realistic Productivity Tower, 602 Boni Avenue,
184 Deeds Construct Plus Co. 2017-003-173 Rates / Labor Cost 2-Jun-18 Mandaluyong City 8
Rainwater System
Design and
Drainage, Waste &
Venting (DWV) Units 508-509, The Boni
System Design for Tower, 602 Boni Avenue,
185 Deeds Construct Plus Co. 2017-003-174 Huge Structures 3-Jun-18 Mandaluyong City 8

PERT/CPM as an
Effective Tool Used
in Project
Management and
Realistic Productivity Units 508-509, The Boni
Rates / Labor Cost Tower, 602 Boni Avenue,
186 Deeds Construct Plus Co. 2017-003-175 Derivation 10-Jun-18 Mandaluyong City 8
Domestic Water
Distribution System Units 508-509, The Boni
Design for High Rise Tower, 602 Boni Avenue,
187 Deeds Construct Plus Co. 2017-003-176 Buildings 9-Jun-18 Mandaluyong City 8
Rainwater System
Design and
Drainage, Waste &
Venting (DWV) Units 508-509, The Boni
System Design for Tower, 602 Boni Avenue,
188 Deeds Construct Plus Co. 2017-003-177 Huge Structures 16-Jun-18 Mandaluyong City 8
PERT/CPM as an
Effective Tool Used
in Project
Management and
Realistic Productivity Units 508-509, The Boni
Rates / Labor Cost Tower, 602 Boni Avenue,
189 Deeds Construct Plus Co. 2017-003-178 Derivation 17-Jun-18 Mandaluyong City 8

Manila CPD Seminar:


Master Plumbers
Increased Efficiency
for Stronger
RBRK Consultancy and Technological
190 Construction 2017-011-179 Advancement 27-Feb-18 Metro Manila Area 7
Desalination Plant:
building & Design of
Reverse Osmosis
RBRK Consultancy and Water Purification Andy Hotel, Fortuna St.
191 Construction 2017-011-180 System 26-Mar-18 Mandaue City 7
Function Room, CBD
Automatic Fire Plaza Hotel, Ninoy and
MEPFS Engineers CPD Sprinkler System Cory Avenue CBD-II
192 Provider 2017-004-181 Design 26-Aug-18 Triangulo Naga City 8.33
Sustainable Urban Function Room, Huat
Drainage Systems Chan Resto, Mc Arthur
Design and Highway, Sto. Cristo,
193 Upswing Learning Center 2017-047-182 Management 14-Jul-18 15-Jul-18 Tarlac City 18
CPD Seminar:
Expertise in
Plumbing Will
Increased Profiency
for Stronger
RBRK Consultancy and Technological
194 Construction 2017-005-183 Advancement 23-Jun-18 24-Jun-18 Metro Park Hotel 15
CPD Seminar:
Expertise in
Plumbing Will
Increased Profiency
for Stronger
RBRK Consultancy and Technological
195 Construction 2017-005-184 Advancement 24-Jul-18 Cuarto Hotel, Cebu City 15

Sustainable and Unit 3B, Quedsa Plaza,


Green Building Edsa cor Quezon
196 Upswing Learning Center 2018-047-185 Design 1-Jul-18 Avenue, Quezon City 10

Sustainable Urban
Drainage Systems Unit 3B, Quedsa Plaza,
Design and Edsa cor Quezon
197 Upswing Learning Center 2018-047-186 Management 7-Jul-18 Avenue, Quezon City 18
Revisiting PERT/
CPM and Derivation
of a Realistic
Construction Activity Atrium, Annex Bldg., Sm
Labor Cost/ City Davao, Bacoland,
198 Deeds Construct Plus Co. 2017-003-187 Productivity Rates 30-Jun-18 Matina, Davao City 4

PERT/CPM as an
Effective Tool Used
in Project
Management and
Realistic Productivity Units 508-509, The Boni
Rates / Labor Cost Tower, 602 Boni Avenue,
199 Deeds Construct Plus Co. 2017-003-188 Derivation 2-Sep-18 Mandaluyong City 8
Automatic Fire Unit 3B, Quedsa Plaza,
Sprinkler System Edsa cor Quezon
200 Upswing Learning Center 2018-047-189 Design 11-Aug-18 Avenue, Quezon City 8.33

Automatic Fire Unit 3B, Quedsa Plaza,


Sprinkler System Edsa cor Quezon
201 Upswing Learning Center 2018-047-190 Design 13-Oct-18 Avenue, Quezon City 8.33

Automatic Fire Unit 3B, Quedsa Plaza,


Sprinkler System Edsa cor Quezon
202 Upswing Learning Center 2018-047-191 Design 15-Dec-18 Avenue, Quezon City 8.33
Rainwater System
Design and Drainage,
Waste & Venting
(DWV) System Units 508-509, The Boni
Design for Huge Tower, 602 Boni Avenue,
203 Deeds Construct Plus Co. 2017-003-192 Structures 4-Aug-18 Mandaluyong City 8

PERT/CPM as an
Effective Tool Used
in Project
Management and
Realistic Productivity Units 508-509, The Boni
Rates / Labor Cost Tower, 602 Boni Avenue,
204 Deeds Construct Plus Co. 2017-003-193 Derivation 5-Aug-18 Mandaluyong City 8

Sustainable and Unit 3B, Quedsa Plaza,


Green Building Edsa cor Quezon
205 Upswing Learning Center 2018-047-194 Design 5-Aug-18 Avenue, Quezon City 10

DAP Conference Center


Sustainable and and Hotel, Tagaytay-
Green Building Calamba Road, Barangay
206 Upswing Learning Center 2018-047-195 Design 18-Aug-18 Sungay East, Tagaytay 10
Function Room, Valley
Sustainable and Hotel, Alimannao Hills,
Green Building Penablanca,
207 Upswing Learning Center 2018-047-196 Design 11-Aug-18 Tuguegarao, Cagayan 10

Domestic Water
Distribution System Units 508-509, The Boni
Design for High Rise Tower, 602 Boni Avenue,
208 Deeds Construct Plus Co. 2017-003-197 Buildings 29-Jul-18 Mandaluyong City 8

Domestic Water
Distribution System Units 508-509, The Boni
Design for High Rise Tower, 602 Boni Avenue,
209 Deeds Construct Plus Co. 2017-003-198 Buildings 21-Jul-18 Mandaluyong City 8
Rainwater System
Design and Drainage,
Waste & Venting
(DWV) System Units 508-509, The Boni
Design for Huge Tower, 602 Boni Avenue,
210 Deeds Construct Plus Co. 2017-003-199 Structures 22-Jul-18 Mandaluyong City 8
PERT/CPM as an
Effective Tool Used
in Project
Management and
Realistic Productivity Units 508-509, The Boni
Rates / Labor Cost Tower, 602 Boni Avenue,
211 Deeds Construct Plus Co. 2017-003-200 Derivation 28-Jul-18 Mandaluyong City 8

DAP Conference Center


MEPFSS CPD PROVIDER & Automatic Fire and Hotel, Tagaytay-
KNOWLEDGE Sprinkler System Calamba Road, Barangay
212 EHNANCEMENT CENTER 2017-004-201 Design 18-Aug-18 Sungay East, Tagaytay 8.33

Function Room, CBD


MEPFSS CPD PROVIDER & Plaza Hotel, Ninoy and
KNOWLEDGE Pump Sizing and Cory Avenue CBD-II
213 EHNANCEMENT CENTER 2017-004-202 Selection 25-Aug-18 Triangulo Naga City 8
Procurement and
Core Management in
Construction
214 Upswing Learning Center 2018-047-203 Industry 25-Aug-18 Quezon City 9

Function Room, Hotel


MEPFSS CPD PROVIDER & Automatic Fire Supreme Convention
KNOWLEDGE Sprinkler System Plaza, Magsaysay
215 EHNANCEMENT CENTER 2017-004-204 Design 1-Sep-18 Avenue, Baguio City 8.33

Function Room, Hotel


MEPFSS CPD PROVIDER & Supreme Convention
KNOWLEDGE Pump Sizing and Plaza, Magsaysay
216 EHNANCEMENT CENTER 2017-004-205 Selection 2-Sep-18 Avenue, Baguio City 8
Function Room, Hotel
Sustainable and Supreme Convention
Green Building Plaza, Magsaysay
217 Upswing Learning Center 2018-047-206 Design 2-Sep-18 Avenue, Baguio City 10

SECRETS REVELED- Units 508-509, The Boni


How to Design Green- Tower, 602 Boni Avenue,
218 Deeds Construct Plus Co. 2017-003-207 Domestic Water 29-Jul-18 Mandaluyong City 8

Sustainable Storm Unit 3B, Quedsa Plaza,


Water Management, Edsa cor Quezon
219 Upswing Learning Center 2018-047-208 Planning & Design 9-Sep-18 Avenue, Quezon City 9

Sustainable Storm Unit 3B, Quedsa Plaza,


Water Management, Edsa cor Quezon
220 Upswing Learning Center 2018-047-209 Planning & Design 23-Sep-18 Avenue, Quezon City 9
Function Room, Queen
Margarette Hotel,
Sustainable and Diversion Road,
Green Building Barangay Domoit,
221 Upswing Learning Center 2017-047-210 Design 16-Sep-18 Lucena City 10

Comprehensive Upswing Training Room,


Construction Project Quedsa Plaza, Edsa cor
Management and Quezon Avenue, Quezon
222 Upswing Learning Center 2018-047-211 Estimates 16-Sep-18 City 9
Unit 3B, Quedsa Plaza,
Pump Sizing and Edsa cor Quezon
223 Upswing Learning Center 2018-047-212 Selection 15-Sep-18 Avenue, Quezon City 9

PERT/ CPM for Unit 3B, Quedsa Plaza,


Project Scheduling & Edsa cor Quezon
224 Upswing Learning Center 2018-047-213 Monitoring 23-Sep-18 Avenue, Quezon City 9

Financial &
Operations MEPFS Training Center,
Management in 3/F Corner Street Bldg.,
225 Upswing Learning Center 2018-047-214 Construction Industry 22-Sep-18 Palico IV, Quezon City 9
Function Room, Vallley
Sustainable Storm Hotel, Alimannao Hills,
Water Management, Penblanca, Tuguegarao,
226 Upswing Learning Center 2018-047-215 Planning & Design 12-Aug-18 Cagayan 9
DAP Conference Center
and Hotel, Tagaytay-
Sustainable Storm Calamba Road,
Water Management, Barangay Sungay East,
227 Upswing Learning Center 2018-047-216 Planning & Design 19-Aug-18 Tagaytay 9

SECRETS REVELED- Units 508-509, The Boni


How to Design Green- Tower, 602 Boni Avenue,
228 Deeds Construct Plus Co. 2017-003-217 Domestic Water 11-Aug-18 Mandaluyong City 8
Environmental
Impact Assessment Unit 3B, Quedsa Plaza,
for Sustainable Edsa cor Quezon
229 Upswing Learning Center 2017-047-218 Construction 4-Aug-18 Avenue, Quezon City 9
Rainwater System
Design and
Drainage, Waste &
Venting (DWV) Units 508-509, The Boni
System Design for Tower, 602 Boni Avenue,
230 Deeds Construct Plus Co. 2017-003-219 Huge Structures 16-Sep-18 Mandaluyong City 8

PERT/CPM as an
Effective Tool Used
in Project
Management and
Realistic Productivity Units 508-509, The Boni
Rates / Labor Cost Tower, 602 Boni Avenue,
231 Deeds Construct Plus Co. 2017-003-220 Derivation 18-Aug-18 Mandaluyong City 8
Rainwater System
Design and
Drainage, Waste &
Venting (DWV) Units 508-509, The Boni
System Design for Tower, 602 Boni Avenue,
232 Deeds Construct Plus Co. 2017-003-221 Huge Structures 12-Aug-18 Mandaluyong City 8
Rainwater System
Design and
Drainage, Waste &
Venting (DWV) Units 508-509, The Boni
System Design for Tower, 602 Boni Avenue,
233 Deeds Construct Plus Co. 2017-003-222 Huge Structures 1-Sep-18 Mandaluyong City 8
Function Room, Hotel
Sustainable and Supreme Convention
Green Building Plaza, Magsaysay
234 Upswing Learning Center 2018-047-223 Design 2-Sep-18 Avenue, Baguio City 10
National Master Plumbers
Association of the
Philippines, Inc. Mindanao
235 (NAMPAP) 2009-001-224 Conference 18-Aug-18 Butuan Grand Hotel 9
Room 3B, 3/F Quedsa
Sustainable Storm Plaza Bldg., EDSA cor
Water Management, Quezon Avenue, Quezon
236 Upswing Learning Center 2018-047-225 Planning & Design 13-Aug-18 City 8
Room 3B, 3/F Quedsa
Sustainable Storm Plaza Bldg., EDSA cor
Water Management, Quezon Avenue, Quezon
237 Upswing Learning Center 2018-047-226 Planning & Design 15-Aug-18 City 8
SECRETS
REVELED- How to Units 508-509, The Boni
Design Green- Tower, 602 Boni Avenue,
238 Deeds Construct Plus Co. 2017-003-227 Domestic Water 15-Sep-18 Mandaluyong City 8
Function Room, Phela
Sustainable Storm Grande Convention
Water Management, Center, General Santos
239 Upswing Learning Center 2018-047-228 Planning & Design 28-Oct-18 City 9
Function Room, La
Piazza Hotel &
Sustainable Storm Convention Center,
Water Management, Tahao Road, Legazpi
240 Upswing Learning Center 2018-047-229 Planning & Design 30-Sep-18 City 9
Function Room, Bohol
Sustainable Storm Plaza Resort and
Water Management, Restaurant , Dauis ,
241 Upswing Learning Center 2018-047-230 Planning & Design 3-Nov-18 Bohol 4

Function Room, Crowne


Sustainable Storm Regency Residences, V.
Water Management, Rama Avenue,
242 Upswing Learning Center 2018-047-231 Planning & Design 4-Nov-18 Guadalupe Cebu City 9

Comprehensive Upswing Training Room,


Construction Project Quedsa Plaza, Edsa cor
Management and Quezon Avenue, Quezon
243 Upswing Learning Center 2018-047-232 Estimates 13-Oct-18 14-Oct-18 City 18

Comprehensive Upswing Training Room,


Construction Project Quedsa Plaza, Edsa cor
Management and Quezon Avenue, Quezon
244 Upswing Learning Center 2018-047-233 Estimates 15-Dec-18 16-Dec-18 City 18
Philippine Society of PSPE's 7th Luzon
Plumbing Engineers, Inc. Technical SMX Convention Center,
245 (PSPE) 2009-002-234 Symposium 21-Sep-18 22-Sep-18 Mall of Asia , Manila 7
SECRETS
REVELED- How to Units 508-509, The Boni
Design Green- Tower, 602 Boni Avenue,
246 Deeds Construct Plus Co. 2017-003-235 Domestic Water 19-Aug-18 Mandaluyong City 8

Comprehensive Upswing Training Room,


Construction Project Quedsa Plaza, Edsa cor
Management and Quezon Avenue, Quezon
247 Upswing Learning Center 2018-047-236 Estimates 18-Nov-18 City 9
Function Room, Pan
Sustainable Storm Resort and Events
Water Management, Place, Roman Super Hi-
248 Upswing Learning Center 2018-047-237 Planning & Design 14-Oct-18 way,Abucay, Bataan 9
National Master Plumbers Continuing
Association of the Professional
Philippines, Inc. Development - International Philippine
249 (NAMPAP) 2009-001-238 Seminar 12-Oct-18 19-Oct-18 School, Al Khobar, KSA 14.5
Function Roo, Queen
Environmental Margarette Hotel,
Impact Assessment Diversion Road,
for Sustainable Barangay Domoit,
250 Upswing Learning Center 2018-047-239 Construction 15-Sep-18 Lucena City 8
Philippine Society of PSPE's 7th SMX Convention Center,
Plumbing Engineers, Inc. Mindanao Technical SMX Premier, Lanang,
251 (PSPE) 2009-002-240 Symposium 7-Sep-18 8-Sep-18 Davao City 7
National Master
Plumbers Association of 83rd Anniversary
the Philippines, Inc. and National
252 (NAMPAP) 2009-001-241 Convention 16-Nov-18 17-Nov-18 Atrium Hotel 10.25
Philippine Society of PSPE's 7th Luzon
Plumbing Engineers Technical SMX Convention Center,
253 (PSPE), Inc. 2009-002-242 Symposium 10-Nov-18 Mall of Asia , Manila 7.5
Function Room, Crown
Comprehensive Regency Residences, V.
Construction Cost Rama Avenue,
254 Upswing Learning Center 2018-047-243 Estimates 3-Nov-18 Guadalupe Cebu City 4.5
Function Room, Pan
Comprehensive Resort and Events
Construction Cost Place, Roman Super Hi-
255 Upswing Learning Center 2018-047-244 Estimates 13-Oct-18 way,Abucay, Bataan 4.5
Function Room, Bohol
Comprehensive Plaza Resort and
Construction Cost Restaurant , Dauis ,
256 Upswing Learning Center 2018-047-245 Estimates 4-Nov-18 Bohol 4.5

PERT/CPM for Unit 3B, Quedsa Plaza,


Project Scheduling & Edsa cor Quezon
257 Upswing Learning Center 2018-047-246 Monitoring 7-Oct-18 Avenue, Quezon City 9

Sustainable Storm Function Room, VIP


Water Management, Hotel, Don A. Velez St.,
258 Upswing Learning Center 2018-047-247 Planning & Design 2-Dec-18 Cagayan De Oro City 9

Function Room,
Sustainable Storm Manhattan Suite Inn,
Water Management, South Road, Calindagan,
259 Upswing Learning Center 2018-047-248 Planning & Design 11-Nov-18 Dumaguete City 9

Sustainable Unit 3B, Quedsa Plaza,


Stormwater Basin Edsa cor Quezon
260 Upswing Learning Center 2018-047-249 and Pond Design 30-Nov-18 Avenue, Quezon City 9
Function Room, Phela
Comprehensive Grande Convention
Construction Cost Center, General Santos
261 Upswing Learning Center 2018-047-250 Estimates 27-Oct-18 City 4.5

Comprehensive Function Room, VIP


Construction Cost Hotel, Don A. Velez St.,
262 Upswing Learning Center 2018-047-251 Estimates 1-Dec-18 Cagayan De Oro City 4.5

PERT/ CPM as an
Effective Tool Used
in Project
Management and
Realistic Productivity Units 508-509, The Boni
Rates/ Labor Cost Tower, 602 Boni Avenue,
263 Deeds Construct Plus Co. 2017-003-252 Derivation 23-Sep-18 Mandaluyong City 7.5

Construction Project Units 508-509, The Boni


Management and Tower, 602 Boni Avenue,
264 Deeds Construct Plus Co. 2017-003-253 Estimating 20-Oct-18 Mandaluyong City 10

Construction Project Units 508-509, The Boni


Management and Tower, 602 Boni Avenue,
265 Deeds Construct Plus Co. 2017-003-254 Estimating 27-Oct-18 Mandaluyong City 10
Room 3B, 3/F Quedsa
Sustainable Storm Plaza Bldg., EDSA cor
Water Management, Quezon Avenue, Quezon
266 Upswing Learning Center 2018-047-255 Planning & Design 13-Aug-18 City 8
Room 3B, 3/F Quedsa
Sustainable Storm Plaza Bldg., EDSA cor
Water Management, Quezon Avenue, Quezon
267 Upswing Learning Center 2018-047-256 Planning & Design 15-Aug-18 City 8
Comprehensive Function Room, Ritz
Construction Cost Tower De Leyte, Real
268 Upswing Learning Center 2018-047-257 Estimates 24-Nov-18 Street, Tacloban City 4.5
Automatic Fire Upswing Training Room,
MEPFSS CPD Provider & Sprinkler System Quedsa Plaza, Edsa cor
Knowledge Enhancement Plan Reading and Quezon Avenue, Quezon
269 Center 2017-004-258 Estimates 25-Nov-18 City 4.25
Automatic Fire Upswing Training Room,
MEPFSS CPD Provider & Sprinkler System Quedsa Plaza, Edsa cor
Knowledge Enhancement Plan Reading and Quezon Avenue, Quezon
270 Center 2017-004-259 Estimates 16-Dec-18 City 4.25
Design of Drainage,
Waste, Vent (DWV) Upswing Training Room,
MEPFSS CPD Provider & System & STP/ Quedsa Plaza, Edsa cor
Knowledge Enhancement Septic Tank in Quezon Avenue, Quezon
271 Center 2017-004-260 Buildings 4-Nov-18 City 8
Upswing Training Room,
MEPFSS CPD Provider & Design of Cold Water Quedsa Plaza, Edsa cor
Knowledge Enhancement Distribution System Quezon Avenue, Quezon
272 Center 2017-004-261 in Buildings 3-Nov-18 City 9
Upswing Training Room,
MEPFSS CPD Provider & Plumbing Plan Quedsa Plaza, Edsa cor
Knowledge Enhancement Reading and Quezon Avenue, Quezon
273 Center 2017-004-262 Estimates 11-Nov-18 City 4.5
Function Room, Sierra
MEPFSS CPD Provider & Comprehensive Hotel, Piapi Beach
Knowledge Enhancement Construction Cost Basketball Court,
274 Center 2017-004-263 Estimates 10-Nov-18 Dumaguete City 4..5

MEPFSS CPD Provider & Comprehensive Function Room, The VIP


Knowledge Enhancement Construction Cost Hotel, A. Velez St.,
275 Center 2017-004-264 Estimates 1-Dec-18 Cagayan De Oro City 4.5
Upswing Training Room,
MEPFSS CPD Provider & Green Plumbing Quedsa Plaza, Edsa cor
Knowledge Enhancement Practice, Installation Quezon Avenue, Quezon
276 Center 2017-004-265 & Maintenance 18-Nov-18 City 4.75

Financial & Upswing Training Room,


Operations Quedsa Plaza, Edsa cor
Management in Quezon Avenue, Quezon
277 Upswing Learning Center 2018-047-266 Construction Industry 24-Nov-18 City 4.25
PSPE's 11th
Philippine Society of Regional Luzon
Plumbing Engineers Conference & Trade
278 (PSPE), Inc. 2009-002-267 Exhibit 7-Dec-18 8-Dec-18 Tarlac City 9
Upswing Training Room,
Comprehensive Quedsa Plaza, Edsa cor
Construction Cost Quezon Avenue, Quezon
279 Upswing Learning Center 2018-047-268 Estimates 9-Dec-18 City 4.5
Function Room, Huat
Comprehensive Chan Resto, Mc Arthur
Construction Cost Highway, Sto. Cristo,
280 Upswing Learning Center 2018-047-269 Estimates 2-Dec-18 Tarlac City 4.5
DAP Conference Center
Construction and Hotel, Tagaytay-
Equipment Calamba Road,
Management: Cost Barangay Sungay East,
281 Upswing Learning Center 2018-047-270 and Estimates 9-Dec-18 Tagaytay 3.4
Comprehensive Function Room, The
Construction Cost Mansion Iloilo, General
282 Upswing Learning Center 2018-047-271 Estimates 15-Dec-18 Luna St., Iloilo City 4.5
Sustainable Function Room, Ritz
Stormwater Basin Tower De Leyte, Real
283 Upswing Learning Center 2018-047-272 and Pond Design 25-Nov-18 Street, Tacloban City 8

Construction/ Function Room, Huat


Plumbing Equipment Chan Resto, Mc Arthur
Management: Cost Highway, Sto. Cristo,
284 Upswing Learning Center 2018-047-273 and Estimates 1-Dec-18 Tarlac City 3.4
Land Development
Planning: In Unit 3B, Quedsa Plaza,
Reference to Green Edsa cor Quezon
285 Upswing Learning Center 2018-047-274 Building Code 2-Dec-18 Avenue, Quezon City 4.25
Upswing Training Room,
Sustainable Quedsa Plaza, Edsa cor
Construction Project Quezon Avenue, Quezon
286 Upswing Learning Center 2018-047-275 Management 17-Nov-18 City 4.25
Sustainable Function Room, The
Stormwater Basin Mansion Iloilo, General
287 Upswing Learning Center 2018-047-276 and Pond Design 16-Dec-18 Luna St., Iloilo City 8
Procurement and Upswing Training Room,
Core Management in Quedsa Plaza, Edsa cor
Construction Quezon Avenue, Quezon
288 Upswing Learning Center 2018-047-277 Industry 8-Dec-18 City 4.5

You might also like