Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

March 21, 2019 BUILDES and LAB

Safe Schools Kit


Araullo High School, UN Avenue corner Taft Avenue

PART A. Program
730AM to 800AM – Briefing
800AM to 900AM - Ocular inspection and as built plans
900AM to 1000AM - Interview and survey
1000AM to 1030AM - Documentation

PART B. Assignment of rooms


Group Tues Thurs Friday
1 EQ and FI room A EQ and FI lab C EQ and FI gym
2 FL and TY lab A FL and TY room D
3 CC and TY room B CC and TY lab D
4 FI and CC lab B FI and CC room E
5 EQ and CC room C FL and TY room E
*Five: EQ- earthquake, CC- climate change, FL- flood, TY- typhoon, FI- fire

Part C. Requirements
1) Study existing organizational chart of the community
2) Draw as-built plan (floor plan and elevation)

Part D. Expected outputs


1) Revised organizational chart
2) List of risk according to reference
3) List of disaster according to reference
4) Survey of respondents/stakeholders to obtain
information needed (use statistics)
5) Internal room disaster risk management plan
6) External room disaster risk management plan
7) Innovation on proposed signages/tools needed
8) Innovation on proposed rapid assessment tool
9) Others
10) Include LRF in the write up

You might also like