Schedule of Deviations from Specification

Sr. No.Specifications / Clause Description Deviation


1 2 3 4

Spec.Clause No.5.23.2 COUNTER BALANCE


1 Not Applicable
SPRINGS

The contacts shall rest on a Please note that our offered Isolator contacts
2 Spec.Clause No.5.28.4 brass block and with initial will rest on MS HDG Block only and not Brass
tension Block.

We will provide only Electrical Scheme


Interlocking between isolator Interlocking between Isolator & associated
3 General and associated Circuit Circuite Break .Mechanical Interlock between
Breaker Isolator & associated Circuite Breaker will be
in the scopeof M/s N_ARC Consulting only

Please note that As per IEC 62271-102,Clause


7.1. Power Frequency voltage withstand dry
Test of Main circuit is not applicable when the
insulation provided only by solid-core
insulators and air at ambient pressure if a
dimensions check between conductive parts
4 General Power Frequency according to IEC 62271-1(3),CLAUSE 7.1 is
Voltage(Dry & Wet) Tests : made.
In case if you require then Power Frequency
voltage withstand dry Test of Main circuit on
the offered Insulators (Insulator is not in
GRPS scope) will be conducted at
Govt.Approved Labs with extra charge to M/s
N_ARC Consulting account

We have not quoted a) Terminal Connectors,


5 - b) Supporting Structures and c) Inter pole
cable, cable glands and lugs

Please note that Hardwares to fix Base


6 - Channel to Support Structure to be procured
from Support Structure Manufacturer

for GR POWER SWITCHGEAR LTD.,

(M.N.SRINIVASA RAO)