DRAWING NO.

SHEET REVISION TITLE


KEY PLAN
24000 163000
27300 30000 70000 35700
1750 16500
15000 21000

15000

T-017
-

42400
2750
POST SECURITY
81000

SLUDGE

20M x 20M
POND.2
M-003
-

31000

117400
SLUDGE

20M x 20M
POND.1

M-002

15000
M-001

-
-

44000
11250 15000 15000 35000 35000 11500

11250
ASPHALT ACCESS ROAD 6M WIDTH

BUNDWALL (CONCRETE)

T-008
T-8

36700
116500

50000

FENCE
T-005
T-5
T-009
T-9

BUNDWALL (CONCRETE)
BUNDWALL (CONCRETE)

128000
55000
54109
26000

T-006
T-6

428400
36300
23891

10000
FH-001

FH-001
-
32500 32500

25700
FENCE

T-004
T-4

FH-001
40000
ASPHALT ACCESS ROAD 6M WIDTH

ASPHALT ACCESS ROAD 6M WIDTH


T-003
T-3
FIRE EXTINGUISHER
213900

BUNDWALL (CONCRETE)

169000
BUNDWALL (CONCRETE)

40000
PUMP SHELTER
SHELTER

T-002
T-2
4.5M x 6.5M
4M x 5M
5000

40000
8250
-
P-008
-

2000
P-007

T-001
T-1
5250

50000

23300

4000
91000

11836
41000

MAIN GATE
N. 038,2230
E. 059,3798

FH-001
6M
SECURITY POST
15700

NEW METERING
CONTROL ROOM

LOCATION
THIS LOCATION

TABLE OF COORDINATE

CLIENT :
NOTES : PERTAMINA EP CONSULTANT / CONTRACTOR / FABRICATOR DRAWING STATUS P E R T A M I N A EP
ASSET 5 SURFACE FACILITIES
ASSET 5 SURFACE FACILITIES APPROVED SIGNED DATE FOR CONSTRUCTION (CONSULTANT/CONTRACTOR/FABRICATOR) :

FENDY SAPUTRO REMARK PT FORMA OCEAN INDONESIA


APPROVED SIGNED DATE DRAWN DRAFTER
PROJECT :PENGADAAN 1 UNIT CRUDE METERING SISTEM C/W PROVER
DI LOADING TERMINAL FIELD BUNYU
SIGIT P NUGROHO KOMARUZAMAN
CHECKED PROJECT ENGINEER TITLE:
SR. ENGINEER FND SHA
A 09-01-2018 ISSUED FOR REVIEW KMZ HSN FOUNDATION PLAN
IN MILIMETER
PROJECT M.HUSNI REV DATE DESCRIPTION DRW ENG CHK'D APPV
DOHAR J SIHOMBING PROJECT MANAGER
ENGINEERING AST. MANAGER MANAGER REVISIONS SCALE: 1:100 DWG NO: PEP-FOI-CV-011 03 OF 05 REV. : A
KEY PLAN
24000 163000
27300 30000 70000 35700
1750 16500
15000 21000

15000

T-017
-

42400
2750
POST SECURITY
81000

SLUDGE

20M x 20M
POND.2
M-003
-

31000

117400
SLUDGE

20M x 20M
POND.1

M-002

15000
M-001

-
-

44000
11250 15000 15000 35000 35000 11500

11250
ASPHALT ACCESS ROAD 6M WIDTH

BUNDWALL (CONCRETE)

T-008
T-8

36700
116500

50000

FENCE
T-005
T-5
T-009
T-9

BUNDWALL (CONCRETE)
BUNDWALL (CONCRETE)

128000
55000
54109
26000

T-006
T-6

428400
36300
23891

10000
FH-001

FH-001
-
32500 32500

25700
FENCE

T-004
T-4

FH-001
40000
ASPHALT ACCESS ROAD 6M WIDTH

ASPHALT ACCESS ROAD 6M WIDTH


T-003
T-3
FIRE EXTINGUISHER
213900

BUNDWALL (CONCRETE)

169000
BUNDWALL (CONCRETE)

40000
PUMP SHELTER
SHELTER

T-002
T-2
4.5M x 6.5M
4M x 5M
5000

40000
8250
-
P-008
-

2000
P-007

T-001
T-1
5250

50000

23300

4000
91000

11836
41000

MAIN GATE
N. 038,2230
E. 059,3798

FH-001
6M
SECURITY POST
15700

NEW METERING
CONTROL ROOM

LOCATION
THIS LOCATION

TABLE OF COORDINATE

CLIENT :
NOTES : PERTAMINA EP CONSULTANT / CONTRACTOR / FABRICATOR DRAWING STATUS P E R T A M I N A EP
ASSET 5 SURFACE FACILITIES
ASSET 5 SURFACE FACILITIES APPROVED SIGNED DATE FOR CONSTRUCTION (CONSULTANT/CONTRACTOR/FABRICATOR) :

FENDY SAPUTRO REMARK PT FORMA OCEAN INDONESIA


APPROVED SIGNED DATE DRAWN DRAFTER
PROJECT :PENGADAAN 1 UNIT CRUDE METERING SISTEM C/W PROVER
DI LOADING TERMINAL FIELD BUNYU
SIGIT P NUGROHO KOMARUZAMAN
CHECKED PROJECT ENGINEER TITLE:
SR. ENGINEER FND SHA
A 09-01-2018 ISSUED FOR REVIEW KMZ HSN FOUNDATION PLAN
IN MILIMETER
PROJECT M.HUSNI REV DATE DESCRIPTION DRW ENG CHK'D APPV
DOHAR J SIHOMBING PROJECT MANAGER
ENGINEERING AST. MANAGER MANAGER REVISIONS SCALE: 1:100 DWG NO: PEP-FOI-CV-011 04 OF 05 REV. : A
KEY PLAN
24000 163000
27300 30000 70000 35700
1750 16500
15000 21000

15000

T-017
-

42400
2750
POST SECURITY
81000

SLUDGE

20M x 20M
POND.2
M-003
-

31000

117400
SLUDGE

20M x 20M
POND.1

M-002

15000
M-001

-
-

44000
11250 15000 15000 35000 35000 11500

11250
ASPHALT ACCESS ROAD 6M WIDTH

BUNDWALL (CONCRETE)

T-008
T-8

36700
116500

50000

FENCE
T-005
T-5
T-009
T-9

BUNDWALL (CONCRETE)
BUNDWALL (CONCRETE)

128000
55000
54109
26000

T-006
T-6

428400
36300
23891

10000
FH-001

FH-001
-
32500 32500

25700
FENCE

T-004
T-4

FH-001
40000
ASPHALT ACCESS ROAD 6M WIDTH

ASPHALT ACCESS ROAD 6M WIDTH


T-003
T-3
FIRE EXTINGUISHER
213900

BUNDWALL (CONCRETE)

169000
BUNDWALL (CONCRETE)

40000
PUMP SHELTER
SHELTER

T-002
T-2
4.5M x 6.5M
4M x 5M
5000

40000
8250
-
P-008
-

2000
P-007

T-001
T-1
5250

50000

23300

4000
91000

11836
41000

MAIN GATE
N. 038,2230
E. 059,3798

FH-001
6M
SECURITY POST
15700

NEW METERING
CONTROL ROOM

LOCATION
THIS LOCATION

TABLE OF COORDINATE

CLIENT :
NOTES : PERTAMINA EP CONSULTANT / CONTRACTOR / FABRICATOR DRAWING STATUS P E R T A M I N A EP
ASSET 5 SURFACE FACILITIES
ASSET 5 SURFACE FACILITIES APPROVED SIGNED DATE FOR CONSTRUCTION (CONSULTANT/CONTRACTOR/FABRICATOR) :

FENDY SAPUTRO REMARK PT FORMA OCEAN INDONESIA


APPROVED SIGNED DATE DRAWN DRAFTER
PROJECT :PENGADAAN 1 UNIT CRUDE METERING SISTEM C/W PROVER
DI LOADING TERMINAL FIELD BUNYU
SIGIT P NUGROHO KOMARUZAMAN
CHECKED PROJECT ENGINEER TITLE:
SR. ENGINEER FND SHA
A 09-01-2018 ISSUED FOR REVIEW KMZ HSN FOUNDATION PLAN
IN MILIMETER
PROJECT M.HUSNI REV DATE DESCRIPTION DRW ENG CHK'D APPV
DOHAR J SIHOMBING PROJECT MANAGER
ENGINEERING AST. MANAGER MANAGER REVISIONS SCALE: 1:100 DWG NO: PEP-FOI-CV-011 05 OF 05 REV. : A