PT.

HERIS TAN
Engineering & Contractor – Material Supplie
Komp. Ruko Tunas Regency Blok A6 No
Telp. (0778) 358 1217 Fax (0778) 358 1075 E-m

DRAFT INVOICE (STEEL WOR

Sub Contarctor : PT Heris Tanjaya Abadi Ship Name


Project No. : GD.25/18 Type
Project Name : BG. Marcopolo 268 SCR No.
Invoice No. : 099/HTA/INV/08/18 Type of survey
Invoice Date : 13 August 2018 Invoice Received

No Page
Description Qty Steel weight (Kg)
No.

Original Surcharge Surcharge


Weight (Kg) weight location

SP01 1 Removed,renewed and installed new rolling wire anchor supply by yard at location Main Deck FWD Port side
as per Project Instructed, material as follows :
Rolling wire anchor 1 unit

SP02 2 Removed,renewed and installed new smith bracket supply by yard Main Deck P/S side
as per Project Instructed, material as follows :
Smith Bracket 2 unit

SP03 3 Removed,renewed and installed Top bollard at location Main Deck FWD AFT P/S side
as per Project Instructed, material as follows :
Top Bollard 20 8.48 Kg

SP04 4 Removed,renewed and installed D'ring c/w safety at location Main Deck AFT FWD P/S side
as per Project Instructed, material as follows :
D'ring 24
Safety Plate of D'ring with fairing 24 .94 Kg 3 Kg 7%

SP05 5 Removed,re-cement and installed back manhole (22 pcs bolt and nut c/w ring) at location Main Deck AFT FW
as per Project Instructed, material as follows :
Removed cement manhole 26
Openned and installed manhole 26
Re-install Ring manhole 1

SP06 6 Removed, renewed and installed tyre fender c/w chain and shckle at location side shell AFT FWD P/S side
as per Project Instructed, material as follows :
Single Tyre fender c/w shackle and chain 20
Eye lug 16 1.13 Kg 4 Kg

SP07 7 Removed and re-install sideboard c/w support stanchion at location main deck stbd side
as per Project Instructed, material as follows :
Removed and refitted
Re-install side board 1 1300 Kg
Stanchion Stiffener side board 5 149.7 Kg
Support Stanchion H-beam 5 119.76 Kg

SP08 8 Removed and install new zinc anode 20 kg c/w safety zinc anode at location bottom AFT FWD P
as per Project Instructed, material as follows :
Zinc Anode 32 15 Kg
Safety Zinc Anode size : 3" x 130 mm 64

SP09 9 Cropped, renewed and installed Transom FPT plate at location FPT Stbd side
as per Project Instructed, material as follows :
Plate 1 70.69 Kg 10%
Plate 1 29.67 Kg 10%
Round bar Ø50 mm x 1270 mm 1 11.3 Kg 10%
SP10 10 Cropped, renewed and installed Pusher AFT Plate at location AFT stbd side
as per Project Instructed, material as follows :
Pusher Plate 1 90.43 Kg 10%
Pusher Plate 1 37.68 Kg 10%

SP11 11 Cropped, renewed and installed Corner Plate at location AFT bottom Stbd side
as per Project Instructed, material as follows :
Corner Plate 1 84.5 Kg 10%
Corner Plate 1 51.8 Kg 10%
Bottom Plate 1 58.7 Kg 10%

SP12 12 Build up by welding drainage hole bottom plate at location AFT FWD P/S side
as per Project Instructed, material as follows :
AFT P/S side
Build up by welding 2 phase 3 layer 4

AFT P/S side


Build up by welding 2 phase 3 layer 4

SP13 13 Cropped and renewed Angle Bar on side board for access lifting material at location sideboard main deck stbd
as per Project Instructed, material as follows :
Stiffener Angle Bar 5

SP14 14 Re-weld side board (Because the employee of PT Bandar Abadi make mistake, cutting the sideboard for access
at location main deck stbd side, as per Project Instructed, material as follows :
Build up by welding 3 phase x 2450 mm 1

SP15 15 Cropped, renewed and installed safety zinc anode at location bottom side shell AFT FWD P/S side
as per Project Instructed, material as follows :
Safety Zinc Anode Halfe Pipe 3" x 100 64

SP16 16 Installed and removed temporary eye lug upslip at location side shell FWD P/S side
as per Project Instructed, material as follows :
Eye lug upslip 2

Grand Total weight (Kg) : 445.32 Kg


Prepared by, Checked by.

Rama Eko Prayogo


PT HERRIS Commercial
TANJAYA ABADI Officer
ANJAYA ABADI
upplier - Ship Building & Repair / Piping
A6 No. 08 Tanjung Uncang - Batam
75 E-mail: heristanjayaabadi@gmail.com

WORK )

: BG. Marcopolo 268


: Barge
: 4421
:
:

Unit Price
Total Price (SGD) Total Amount (SGD) Remarks
harge (SGD)
ation

rt side

Rp 600,000.00 Rp 600,000.00 Rp 600,000.00

Rp 600,000.00 Rp 1,200,000.00 Rp 1,200,000.00

Rp 7,600.00 Rp 1,288,960.00 Rp 1,288,960.00


Rp 50,000.00 Rp 1,200,000.00 Negotiate
Rp 7,600.00 Rp 547,200.00 Rp 1,747,200.00 Curvature

FT FWD P/S side

Rp 50,000.00 Rp 1,300,000.00
Rp 114,000.00 Rp 2,964,000.00
50% Rp 190,000.00 Rp 95,000.00 Re-install
Rp 4,359,000.00
de

Rp 38,000.00 Rp 760,000.00
Rp 7,600.00 Rp 486,400.00 Rp 1,246,400.00

50% Rp 7,600.00 Rp 4,940,000.00 Re-install


50% Rp 7,600.00 Rp 2,844,300.00 Re-install
50% Rp 7,600.00 Rp 2,275,440.00 Re-install
Rp 10,059,740.00

FWD P/S side

Rp 66,500.00 Rp 2,128,000.00
Rp 237,500.00 Rp 7,600,000.00 Rp 9,728,000.00

Rp 7,600.00 Rp 590,968.40
Rp 7,600.00 Rp 248,041.20
Rp 110,000.00 Rp 153,670.00 Rp 992,679.60
Rp 7,600.00 Rp 756,022.67
Rp 7,600.00 Rp 315,004.80 Rp 1,071,027.47

7% Rp 7,600.00 Rp 755,869.40 Location + fairing


7% Rp 7,600.00 Rp 463,361.36 Location + fairing
7% Rp 7,600.00 Rp 525,083.24 Rp 1,744,314.00 Location + fairing

Rp 85,500.00 Rp 256,500.00

Rp 85,500.00 Rp 256,500.00 Rp 513,000.00

ck stbd side

50% Rp 110,000.00 Rp 275,000.00 Rp 275,000.00

access eye lug upslip),


:
Rp 104,500.00 Rp 256,025.00 Rp 256,025.00

Rp 237,500.00 Rp 7,600,000.00 Rp 7,600,000.00

Rp 650,000.00 Rp 1,300,000.00 Rp 1,300,000.00

Grand Total (SGD) : Rp 43,981,346.07