PLTU Cilacap 1x660MW Video Comment

1. Sequence 05:46
 Greenfield with sea background
 Site Grading
 Piling
 Construction of Foundation until Steel Structure and Chimney
 Installation Turbine – Generator
 Complete Coal Fired Steam Power Plant with Sunlight

2. Time 11:03 : Update new ISO Certificate and Achievements


3. Time 04:05 – 04:40 : Remove the Tiny oil Project Location, add PLTGU Palembang Timur,
PLTU Cilacap and PLTU Jeneponto
4. Time 04:59 : belonging to PT S2P
5. Time 09:24 : Add Photos of Installation Steam Turbine-Generator
6. Time 01:12 : PT S2P -> Sumber Segara Primadaya
7. Time 03:15 : Transmission is 500kv, 150kv and 20kv
8. Time 07:06 – 07.15 : Remove all commencement word
9. Time 09:25 : Change Turbine Bedplate to Steam Turbine