Professional Documents
Culture Documents
Ethiopian and Kenyan Leaders On An Official Vist To Asmara
Ethiopian and Kenyan Leaders On An Official Vist To Asmara
2019 年 3 月 3 日,肯尼亚总统肯雅塔、埃塞俄比亚总理阿比对
厄立特里亚进行正式访问。两位领导人分别乘专机抵达阿斯马拉。厄
立特里亚总统伊撒亚斯亲自到机场迎接。三位领导人对一系列地区事
宜进行了讨论。肯雅塔总统与当日返回肯尼亚。伊萨亚斯总统陪同阿
比总理参观了一系列反映厄特发展成就的项目,包括水坝、太阳能电
厂、奶牛场等。
visit.
Upon arrival at Asmara International Airport the two leaders were awarded
development sites in the southern region including Logo and Misilam dams,
dairy farms as well as the solar system that is under construction in the area
伊萨亚斯总统与阿比总理访问南苏丹
厄立特里亚总统与埃塞俄比亚总理于 2019 年 3 月 4 日对南苏丹
进行为期 2 天的工作访问。南苏丹总统亲自到机场迎接两位领导人。
三位领导人对地区局势进行了讨论,并发表了联合公报。公报称,
三国应致力于维护南苏丹的稳定与和平的局面,在地区和国际事务上,
三国应加强协调。三国的政府机构应共同致力于地区经济融合和共同
发展。
March. Upon arrival at the Juba International Airport, the two leaders were
accorded warm welcome by President Salva kiir and senior South Sudan
Government officials.
Presidant Isaias Afewerki, Prime Minister Dr. Abiy Ahmed and president
Sudan in all ways possible and to seek a way to coordinate the positions of
They also agreed to advance the cause of regional integration and to that
end agreed to task their foreign ministers and other relevant government
agencies in the three countries to work out the common projects that will
shared prosperity.
At the end of their visit President Isaias Afewerki and Prime Minster Dr.
Abiy Ahmed Thanked President Salva Kiir and though him the people of
South Sudan for the warm reception and hospitality accorded to them and
their delegation.
厄立特里亚外交部长欧斯曼与俄罗斯代表团举行座
谈
2019 年 2 月 28 日,在厄立特里亚首都阿斯马拉,由俄罗斯副总
理率领的俄罗斯代表团与厄立特里亚外交部长欧斯曼举行了会谈。
双方讨论了在加工制造业、能源、水利设施、医药健康领域的投
资机会和合作的潜力。俄罗斯驻厄立特里亚大使、厄立特里亚总统顾
问同时参加了会谈。俄罗斯副总理已是第二次访问厄立特里亚。俄罗
斯代表团分别与健康卫生部长、旅游部长和矿业部司长举行了会谈。
俄罗斯代表团还访问了科伦、马萨瓦和赛格尼特三市。
随团而来的俄罗斯青年足球队与厄立特里亚青年足球队举行了
友谊赛。
Mr. Sergey Bidonko is visiting Eritrea for the second time and that attests
to the growing relations between Russia and Eritrea and the region.
The Russian delegation also held similar meetings with the Minsters of
During its stay in Eritrea, The Russian delegation will be visit development
and tourism sites in Keren, Massawa and Segeneiti.
科伦取水点项目完工
近日,耗资 3100 万纳克法的科伦取水点项目完工。项目由科伦
市政府和其它股东协助实施。包括安装水管、掘井、修建储水设施、
修建取水站。政府官员称,项目完工后,水井数量 由 10 个增加到 24
益。
The project that was that was implemented in cooperation with the Keren
The administrator of the city, Mr. Zerzghi Dawit, said that sustainable
effort has been made to alleviate potable water problem in the city and
services, indicated that the project included two water wells, one reservoir,
as well as 11 km –long water pipelines.
Mr. Abraha said that the number of wells has increased from 10 to 24, the
number of reservoir from 2 to 4 and that 80% of the residents will become