Curriculum Vitae: Professional Experience

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6











Curriculum Vitae

Name : Werghemmi
Surname : Mohamed
Date of birth : 01-02-1979
Nationality : Tunisian
Marital status : Married
Email : mohamed.werghemmi@gmail.com
Phone number : + 216 27 885 904 or +216 22 925848

Professional profile

I have experience in the management and deployment in GSM mobile


networks and Microwave Transmission projects for more than 10 years
including: installation, configurations, maintenance, acceptance,
integration, and Organisation of the work teams.

Languages: French, Arabic, English

Driving license
Passport valid to January 2022

Professional experience

1. Team leader
Target Telecom Tunisia
September 2016, until now

- Swap 2G&3G equipment from E// to Huawei


- Installation LTE 800 &1800 RRU, cable RET, CPRI, jumper..
- Configuration RET Values & troubleshooting (RTWP, VSWR, VLAN
Id.. ) using LMT software
- Installation & integration XPIC links huawei 2+0,2+2 (RTN950, 980,
XMC2 ODUs)
- Installation & integration Long Haul Huwaei in 6+0 XPIC configuration
(CSHL,RFU, Branching Unit
- Test XPD, E1 cross connection

2. Site Engineer
Huawei Tunisia project Ooredoo Tunisia
June 2016, August 2016
- Supervise subcontractor during installation
- Test ping with huawei NOC
- Swap from ALU 2G to Huawei 2G//3G//LTE equipment (BBU 3910)
- Smart QC report (EHS& WAH)
- Approve smart QC report done by the subcontractor
- Daily reporting

3. Team leader
ITS com Tunisia
March 2015 to Mai 2016

- Installation Nokia Flexi EDGE BTS with different configuration (ESMB,


FPRA, OVP, RF module 900, 1800
- update software , commissioning & integration of Flexi EDGE BTS
using 2G Flexi BTS Site Manager
- Internal & external wiring (synch cable, EAC cable, DC cables, CPRI,
Jumpers, E1 & FE/GE cable…
- Installation flexi Multiradio with feeder less & non feeder less
configuration (FSME “MS 2100”, FXDA “RF 900”, FXEA “RF 1800”,
FRGB “RF 2100”)
- Installation & power-on alls boards for NODEB NSN ( FRGP , FSME,
RF module , antennas , CPRI , Jumpers , Duplexer ..
- update software version (WN7.01104 899 00) to NodeB using 3G
BTS Site Manager
- commissioning step and integration the NodeB
- installation & power-on all boards for eNodeB LTE800&1800 ( FXED:
RFM1800, FRME:RFM800, FSMF:MS
- FXEA shared between 2G & LTE
- update software version (FL15A_ENB_0107_001198_000027) using
BTS site Manager
- Installation & commissioning 9500MPR (6.1 version) (ESV2, EVO
card, MPT-HQAM radio, power injector
- Installation & commissioning 3 links MPR (5.1) SDH (3.7m; 2.4m; 3m)
space diversity & frequency diversity using (branching, extended power,
MPT access card, optical fiber, RG cable
- Installation & commissioning Huawei RTN series and B2B links

4. Site supervisor
Alcatel-lucent project ORANGE Cameroun
December 2014, January 2015

- Supervise subcontractor during installation


- Commissioning and integration of 9500 MPR/MPT
- Upgrade software NE from V4.01 to V4.02 (R95M)
- Cross connection E1 & VLAN
- Routage between DDF BSC & DDF MPR
- Commissioning and integration 2G sites (SUMUX, MC_RRH)
- Commissioning and integration 2G sites (Evolium A9100)
- Commissioning 3G sites (d2U, d4U,RRH)
- Troubleshooting
- Test call with OMCR
5. Project coordinator
ITS com Tunisia project Ooredoo Tunisia
August 2014, November 2014

- Interface between the company and the customer


- Allocation of teams
- Supporting teams during the installation
- Resolve technical problems encountered by teams on the site
- Make acceptance with customer

6. Site Engineer
Huawei Algeria project Djezzy Algeria
February 2014, July 2014

- Swap antennas 2G to 3G band using triplexer & TMA (agisson)


- Commissioning & integration node B huawei BTS3900, BTS3900A,
DBS3900 (R14) outdoor and indoor cabinet
- Installation indoor and outdoor power supply huawei version
- Batteries swap
- Commissioning and integration huawei optix RTN905, 950, 980;
(v1.R8)
- VLAN & E1 cross connection
- VSWR test using anrutsi site master
- Make acceptance with customer
- Supervise the subcontractor during installation

7. Team leader
ITS com project Ooredoo Tunisia
November 2009 to January2014

- Installation of SDH alcatel-lucent 9600 LSY


-Installation & commissioning of different OMSN (1650-1660-1662)
- Installation and startup of link PDH HUWAEI, RTN-910 & RTN-950
- Cross connection, E1/Ethernet configuration
- Troubleshooting of alls version optix RTN 910-950-980
- Troubleshooting of alls version ODU SP; HP; XMC2
- Preventive maintenance and solve problems encountered
- Throughput & E1 Test
- Commissioning of different types of links (HSB, SD, XPIC)
- Installation and startup of link PDH Alcatel, 9400AWY in configuration
1+0 and 1+1(1320CT)
- Installation of Alcatel-lucent TC A925
- Installation of Alcatel-lucent BSC MX A 9130
- Installation of Alcatel-lucent BSC G2
- Installation of Alcatel-lucent IPMPLS Router 7750 SR-07
- Installation of rectifier SAFT G4 and connection of alarms system
(main alarm Rectifier failure…)
- Installation and commissioning of link PDH NEC, PASOLINKNEO (
DXC) in configuration 1+0 and 1+1 (PNMT)
- Installation huawei DBS 3900 2G & 3G with outdoor equipment RRU
- Commissioning BTS Alcatel-lucent indoor and outdoor (release B8,
B9, B10) (OFFLINE&ONLINE)
- Installation & commissioning for Nokia Flexi EDGE BTS
- Maintenance BTS and link of transmission
- Acceptance of sites with the customer

8. Commissioner
Alcatel-lucent project ORANGENIGER
April 2009, to October 2009

- Supervision of installation and alignment knowledge of Alcatel Lucent


equipments transmission MW: Away 1320CT, 9500MXC, 9500 MPR
- Installation & commissioning the external batteries cabinet outdoor
Power One in using software PCS Burn & Powcom
- Connecting alarms for power-one cabinet in the BTS (low Batt, High
temp, mains alarms...)
- Installation & commissioning the rack batteries Elteck in using
software Powersuite3.0
- Connecting Generator alarms in the BTS (OUTC)
- Test alarms for Generator (LISTER PETTER) low level fuel &
generator startup with OMC_R
- Installation & commissioning the 9500 MXC equipment
- Installation & commissioning the 9400 AWY family 32E1 V2.1.1
- Commissioning Indoor & outdoor Alcatel BTS (B9) & (B10)
- Acceptance of sites with the customer

9. Team leader
Alcatel-lucent project SOMTELSomalia
February, March 2009

- Survey and check installation of the Alcatel GSM & DCS site
- Installation and integration of BTS MBI 3 and MBI 5 GSM & DCS
(B10)
- Installation of rectifier SAFT G3 and connection of alarms system
(main alarm Rectifier failure…)
- sweep test with Anritsu site master
- Acceptance of sites with the customer

10. Team Leader


ITS com project Ooredoo Tunisia
June 2007 to January 2009

- Installation BTS Alcatel GSM/DCS G2, G3, G4 EVOLIUM, A9100,


A9110 -Anterior and external wiring, feeders (7/8, 5/4, ½), coax,
connector… -Installation of rectifier ELTEK, SAFT and connection of
alarms system.
-Integration of BTS, IDU and to rectifier
-Installation and commissioning of link PDH Alcatel, 9400AWY
(1320CT) -Installation and startup of link PDH Alcatel, 9400UX (Nectas)
-Maintenance BTS and link of transmission
-Acceptance of sites with the customer

11. Installator
Sascom Tunisia
July 2006 to Mai 2007

-Installation and startup of link PDH Alcatel, 9400AWY & 9400UX in


configuration 1+0 and 1+1 (Nectas & 1320CT)

-Installation and startup of link PDH NEC Paso Link, in configuration


1+0 and 1+1(PNMT)
-Installation EBCO (External Battery Cabinet Outdoor)

Education and training courses

1. High-level technician in telecommunication specialty transmission


ISET COM Tunis; Tunisia
[ 3 years ], [ September 1999 ];

The cellular network: GSM, GPRS, UMTS, principles, architectures,


standards, terminals, Commutation and services.

optical communications: Principle, Architecture and service


February 2002: Final project of study: Introduction of optic fiber in the
subscriber network
February 2001: Mini project: studies of zones
June 2001: Technician Training Course in Tunisia Telecom: bureau
d’etude
January 2001: working training course Tunisia Telecom: study
construction and repair of the telephone lines
Technical baccalaureate mention rather well: June 1999

Competences and knowledge

Network: X25, ATM, FR, GSM, GPRS UMTS, PMR, Internet…

Transmission: coaxe, fibre, FHN


Techniques of FDMA, TDMA, CDMA, WCDMA, ATM, PDH and SDH
Equipments: ALCATEL, NEC, NSN, Huawei, Saft, Eltek…
Materials: materials of power, Site master, and earth test.
Data processing: Operating system: (Windows 95/98/NT/2000/XP),
Office automations: MS Office (Word, Excel, FrontPage, power
point…), Data Base: (Access), Programming: (Pascal, C), software:
(OMT software, NECTAS 9400UX, BTS terminal release B8, B9
1320CT9400AWY, PNMT NEC PASOLINK…

You might also like