Professional Documents
Culture Documents
CEGP013091: APR - 18/TE/Insem. - 105 T.E. (Civil) Environmental Engineering - I (2015 Course) (Semester - II)
CEGP013091: APR - 18/TE/Insem. - 105 T.E. (Civil) Environmental Engineering - I (2015 Course) (Semester - II)
:
P506 [Total No. of Pages : 2
APR - 18/TE/Insem. - 105
6
8:5
T.E. (Civil)
0:4
ENVIRONMENTAL ENGINEERING - I
81
3/2 1
(2015 Course) (Semester - II)
9
01
8 1 30
Time : 1 Hour] .23 01 [Max. Marks : 30
Instructions to the candidates:
5/0
1) Solve Q1 or Q2, Q3 or Q4, Q5 or Q6.
P
6
and steam tables are allowed.
8:5
49
0:4
Q1) a) What sound pressure level will result from combining following four
81
91
SPLs : [5]
01
30
3/2
OR
CE
16
pollutants. [5] 6
.24
8:5
b) Enlist various equipments used for control of particulate matter pollution.
49
0:4
b) What are the important requirements of potable water? Also enlist various
factors which affect the rate of demand. [5]
.23
CE
16
OR
8.2
P.T.O.
b) Find out water demand of a town in the year 2041 by Incremental Increase
method from the following census data : [5]
Year 1961 1971 1981 1991 2001 2011
6
8:5
Population in thousands 65 68 72 79 89 97
0:4
Water is supplied at the rate of 135 lpcd.
81
3/2 1
9
01
8 1 30
.23 01
Q5) a) Enlist various units of water treatment plant. Also mention functions of
5/0
each treatment unit. [5]
8.2 G
P
sedimentation. [5]
16
OR
6
8:5
49
0:4
81
91
b) Two primary settling basins 26m in diameter with 2.1 m side water depth.
01
Single effluent weirs are located on the peripheries of the tank. For water
30
3/2
i) Detention period.
GP
81
.23
ii) Volume.
CE
16
6
.24
8:5
iv) Overflow rate.
49
0:4
v) Weir loading.
81
91
01
30
3/2
01
llll
5/0
GP
81
.23
CE
16
8.2
.24
49
TE/Insem. - 105 2