Professional Documents
Culture Documents
Primavera Project Planner P6 Homework No. 1:: Submitted To
Primavera Project Planner P6 Homework No. 1:: Submitted To
Primavera Project Planner P6 Homework No. 1:: Submitted To
HomeWork No. 1:
Introduction to Interface of Primavera P6
Submitted to:
Mr. Shahzad Ahmad
Submitted by:
Waqar Ashraf Dar
(MSPM_03_298181_032)
Bahria University, Lahore Campus
(BULC)
47-C Civic Center Johar Town, Lahore.
Page 2 of 5
1. Activities List
2. Resource Assignment
3. Work Breakdown structure
4. Assign Baseline for performance measure
5. Expense view
6. Work Products and related documents
7. Gantt Chart
8. List of Projects
Page 3 of 5
08. to list of projects
09. Enterprise project structure
10. Project tracking
11. Project Portfolios
12. Resource List
13. Roles Checking
14. Organization Breakdown Structure
15. Check Resource Codes
16. Add & Check Project Codes
Page 4 of 5
List Of Commands With Descriptions
Sr.
Command Name Descriptions
No.
Assign Baseline for performance Define and assign baselines for performance
4
measure measure
Page 5 of 5