Extra Work

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Name of work Civil work

Name of Owner satyajeet machnisam,


Name of Engineer Mr Dhiraj Kerba Patil

Total
Sr. no Item No Length Width Depth Unit Quantity Rate Amount
quantity
1 Brick work 1 0.23 0.94 0.9 cum 0.19458
1 5.2 0.19 0.1 cum 0.0988
2 1.35 0.75 0.15 cum 0.30375
1 3 0.605 0.15 cum 0.27225
0.86938 5400 4694.652

2 Plaster 1 2.08 0.9 Sq m 1.872


2 2.2 0.3 Sq m 1.32
1 3 1.375 Sq m 4.125
2 1.35 1.675 Sq m 4.5225
1 0.3 0.6 Sq m 0.18
1 5.2 0.4 Sq m 2.08
14.0995 282 3976.059

4 Breaking 1 1.8 2.2 0.3 cum 1.188

Deduction 1 1.2 1.47 0.3 cum 0.5292


0.6588 505 332.694

5 Urinal fitting 3 No 3 3 6780 20340

6 Wash basin 1 No 1 1 3225 3225

7 window grieel reparing 1 LS 1 300 300


Total 32868.41

You might also like