CURRICULUM VITAE

Name : ASIKIN EFFENDI


Passport No. : B 9412849 Expired date: 01 March 2023
Marital Status : Married
Permanent Address : Graha Raya Bintaro GR 24 No.26 Parigi Baru, Pd. Aren
Tangerang Selatan, Indonesia – 15228, Indonesia
Mobile phone : +6282281888880, +6281381888880,
Home : +622173442718
E- mail Address : asikin.effendi@gmail.com
kineff@yahoo.com
Current Position : Lead Project Engineer

Education and Training :


 Education
Bachelor (S1) Degree in Physics Engineering for Instrument & Control System
Specialist, NASIONAL UNIVERSITY, Jakarta INDONESIA
 Computer Skill
Familiars with Instrument Calculation Software, INSTRUCAL/PLUS Version 5.1
FIRSTVUE Fisher Product and Ms. office (Word and Excel)
 Training
- Tropical Basic Offshore safety induction & Emergency Training (T-BOESIET)
by PT. Samson Tiara, Merak - Indonesia 2004.
- Safety Training Certificates from STAR SAFETY, for Basic Fire & Safety And Health
& Safety Mana-gement for Manager, Balikpapan – Indonesia 2004
- The Tropical Basic Offshore safety induction & Emergency Training (T-BOSIET)
including TravelSafely by Boat Course Course Coding / Cert.
No. OFF - 36345 / 2005 OPITO Approve OPITO Reg. No. 225322 Conducted
by MEGAMAS Training Company SDN BHD - BRUNEI DARUS-SALAM, 2005
- HSE Familiarization for SSS / TAS Course Course Coding / Cert.
No. IMS - 20676 / 2005 OPITO Approved Conducted by MEGAMAS Training
Company SDN BHD – BRUNEI DARUSSALAM, 2005

Affiliations :
Member of PII (The Institution of Engineers, Indonesia) Reg. No. 0905.03.007685
Member of PIPI (Indonesian Professional Engineer Association) Reg. No. EI 12
Member of SKA (Main Expert Constuction Management) Reg. No. 096/I-2011/BSA-
PP F00008
Member of SKA (Main Expert Project Management) Reg. No. 097/I-2011/BSA-PP F00008

Summary Experience :

I have more than 29 years working experience especially in Project Engineer, Instrument
Control & Automation Engineer for the OPERATION MAINTENANCE, CONCEPTUAL,
DESIGN ENGINEERING, PURCHASE REQUISITION, CONSTRUCTION, TEST (FAT) &
(SAT), Operation Maintenance and Pre-commissioning (EPCC Project) for the
OFFSHORE, ONSHORE, FPSO, REFINERY, LNG, Fertilizer and Petrochemical, Facilities
for Greenfield and Brownfield the Oil and Gas industry. My experience are cover prepare
Page 2 of 13

Conceptual Design or Pre-Project Study, FEED document, Detailed Engineering and Site
Construction Supervision, and also I am involving development of shutdown and control
philosophy, P&IDs, Cause & Effect diagrams, HAZOP study, logic diagrams, configurations
DCS, PLC (Allen Bradley, Siemens), FGS (Fire & Gas Systems), and also configurations
for PCS, HIPPS, SIL, SIS, and also selection of Analyzers, field instruments, Specification,
Datasheet, TBE and estimate MTO for purchased or bid document. I am familiar to use
InstruCalc program for some instrument documents & drawings. I am also familiar with
various agency, industry code and international standards (ISA, API, ISO, IEC, UL, ATEX,
ANSI, ASME, ASTM, MESC, NACE, NEMA, BS, IEEE, MSS, NEC, NFPA etc).

Relevant Experiences :

 Feb, 2017 - Feb, 2018


PT. Mottmac Donald Indonesia
Assignment : Project Engineer / Sr. Instrument Engineer
Project : SPV Floating Water Intake Pontoon Engineering
Client : SOUTH PACIFIC VISCOSE Purwakarta - Indonesia

Responsibilities :
- Check & Review daily fabrication report, Project control report and Material control
report
- Prepare detail design engineering related to the Instrumentation & Control System, Site
Visit Report, Fire & Emergency Shutdown System and Instrument Specification &
Control Philosophy .
- Ensure and Supervision Installation & Construction for all Instruments Devices such as
SDV, Pressure Switch, Pressure Indicating Transmitter, Temperature Gauge,
Temperature Indicating Transmitter and Thermowell, Flow Indicating Transmitter, Local
Control Panel & Monitoring System, Pressure Gauges, Level Gauges, Level Control
Valve, Level Transmitter, Control Panel, and Selection Instrument Requirement.
- Set up and prepare Master Deliverable Register (MDR), Project Change Request
(PCR), Cost, Time & Resources (CTR) of Instrumentation work and Schedule.
- Prepare document of Sizing / Calculation Sheets and material selection for emergency
Shutdown Valve, Safety Valves, Orifice Plate & Flange, Restriction Orifice
- Review & ensure documents of Alarm Management Specification and Shutdown
Philosophy, Cause & Effect Matrix for ESD, Installation Cabling system from existing to
new Connection Package & Safety Requirement Specification (SRS) for all Instrument
safety loop, Analyzer, Safety & Relief Valves, Central Control Specification,
Automation System Architecture, Flare Ignition System.

 Aug, 2015 - Dec, 2016


PT. Shaftindo Energi
Assignment : Lead Project Engineer
Project : Suban-15 Flow Line and Well Site Facility

Client : CONOCOPHILIPS, Palembang – Indonesia

Responsibilities :
- The main responsibilities are project coordination during Design Engineering
drawings/documents, plant construction activities, plant procurement and Installation for
Page 3 of 13

Civil / Piping / electrical / Instrumentation and Engineering deliverable List, Construction


Schedule and Site progress Report, Manpower assignment, Fabrication
workshop/material deliverable to Site schedule and Readiness.
- Set up and prepare Master Deliverable Register (MDR), Project Change Request
(PCR), Cost, Time & Resources (CTR) of Instrumentation work and Schedule, Analysis
Emergency Shutdown System, Sizing / Selection and Calculation Sheets Control Valve,
Safety Valves, Orifice Plate & Flange, Restriction Orifice, etc.
- Set up coordination meeting with multidiscipline for problem solving
- Ensure and Review Technical Query, Civil / Piping / Electrical / Instruments Tag Item or
Field Devices for SDV/BDV, Regulator Valve, Pressure Switch, Pressure Indicating
Transmitter, Temperature Gauge, Temperature Indicating Transmitter and Thermowell,
Flow Indicating Transmitter, Pressure Gauges, Level Control Valve & Control Panel, and
Selection Instrument Requirement. Shop drawing Detail related to the Instrumentation
Construction
- Weekly report and develop documentation of Alarm Management Specification and
Shutdown Philosophy, Cause & Effect Matrix for ESD, Installation Cabling system from
existing to new Connection Package & Safety Requirement Specification (SRS) for all
Instrument safety loop, Analyzer, Safety & Relief Valves, Central Control Specification,
Automation System Architecture, Flare Ignition System.
- Prepare Requisition for Quotation / Field Material Request and Technical Bid Evaluation
for Instrument tag items
- Testing & Commissioning for function test, leakage test, Loop Test and trouble shooting
etc.
- I have knowledge of Calibration (Service for Pressure, Vacuum, Flow, Level &
Temperature) Transmitters, Converters, Controllers, Switches, Gauges, Valves (Control
Valve, On-Off valves, Solenoid valve)
- Commissioning and Servicing of all field Instrumentation device.
- Testing and commissioning all measuring Instruments, Such as Thermocouples, RTD,
Transmitters.

- Calibration, Servicing and maintenance of all types Pneumatic & Electronic Pressure,
Flow, Level, Temperature Transmitters, Records & Controllers (I/P, P/I, R/I, Regulators).
Worked at Various PLC are Allen Bradley, Siemens, Honeywell and trouble shooting.
- Worked at Ultrasonic Radiation & Capacitance type level measurement’s and Votex,
Flow meter, Turbine type, Mass flow meter, Magnetic flow meter etc.
- Calibration and Checking in Yokogawa & Knick-PH meter and Yokogawa-Conductivity
meter.
- I have hand Operation experience of operate Hart Communicator and Honeywell

 June, 2012 - March, 2015


PT. RekindworleyParsons
Assignment : Lead Instrument & Automation Engineer

Project : Engineering and Construction Management

Client : CHEVRON PACIFIC INDONESIA, Pekan Baru, Riau - Indonesia


Page 4 of 13

Responsibilities :

- Design & Review Front End Engineering Design and Detail Engineering Design related
to the Instrumentation, Analysis Study, Site Visit Report, Emergency Shutdown System.
- Set up and prepare Master Deliverable Register (MDR), Project Change Request
(PCR), Cost, Time & Resources (CTR) of Instrumentation work and Schedule, Sizing /
Calculation Sheets Control Valve, Safety Valves, Orifice Plate & Flange, Restriction
Orifice
- Ensure Technical Query, Datasheet for all Instruments Devices such as SDV/BDV,
Regulator Valve, Pressure Switch, Pressure Indicating Transmitter, Temperature
Gauge, Temperature Indicating Transmitter and Thermowell, Flow Indicating
Transmitter, Sand Monitoring System, Pressure Gauges, Level Control Valve &
Wellhead Control Panel, and Selection Instrument Requirement.
- Review & ensure documents of Alarm Management Specification and Shutdown
Philosophy, Cause & Effect Matrix for ESD, Installation Cabling system from existing to
new Connection Package & Safety Requirement Specification (SRS) for all Instrument
safety loop, Analyzer, Safety & Relief Valves, Central Control Specification,
Automation System Architecture, Flare Ignition System.
- Prepare Requisition for Quotation and Technical Bid Evaluation for Instrument Vendor
Packages & Skid
- I have work in Preventive Maintenance, Shutdown Jobs, Emergency Shutdown and
Trouble shooting
jobs
- I have knowledge of Calibration (Service for Pressure, Vacuum, Flow, Level &
Temperature) Transmitters, Converters, Controllers, Switches, Gauges, Valves (Control
Valve, On-Off valves, Solenoid valve)
- Commissioning and Servicing of all types of gauges, Switches, Control valves, Solenoid
valves and On-Off valves.
- Testing and commissioning all measuring Instruments, Such as Thermocouples, RTD,
Brix transmitters.
- Calibration, Servicing and maintenance of all types Pneumatic & Electronic Pressure,
Flow, Level, Temperature Transmitters, Records & Controllers (I/P, P/I, R/I, Regulators).
Worked at Various PLC are Allen Bradley, Siemens, Honeywell.
- Worked at Ultrasonic Radiation & Capacitance type level measurement’s and Votex,
Flow meter, Turbine type, Mass flow meter, Magnetic flow meter etc.
- Calibration and Checking in Yokogawa O2 Analyzers, Melter Tolerdo and Knick-PH
meter & Yokogawa-Conductivity meter.
- I have hand Operation experience of operate Hart Communicator Model 275, 375, 475
and Honeywell

 Sept, 2010 - June, 2012


PT. Amec Berca Indonesia
Assignment : Lead Instrument & Control Engineer

Project : Ruby Tie in project and Eastern Hub Mercury Removal – Water Project

Client : TOTAL E & P Indonesie on behalf PEARL OIL Ltd and Conoco
Philips
Page 5 of 13

Responsibilities :
- Prepare Instrument Basic Design Philosophy, Metering System, Fire & Gas Detector
System, WHCP Analysis Study, Site Visit Report, Weekly Report Montly Report,
Emergency Shutdown System, Instrument Loop Diagram, Instrument Block diagram,
Prepare Deliverable List Estimate and Schedule, Sizing / Calculation Sheets Control
Valve, Safety Valves, Orifice Plate & Flange, Restriction Orifice
- Prepare Datasheet for all Instruments Tag Item or Field Devices for SDV/BDV, Choke
Valve, Pressure Switch, Pressure Indicating Transmitter, Temperature Gauge,
Temperature Indicating Transmitter and Thermowell, Flow Indicating Transmitter, Sand
Monitoring System, Pressure Gauges, Level Control Valve & Wellhead Control Panel,
and Selection Instrument Requirement.
- Prepare document for Alarm Management and Shutdown Philosophy, Cause & Effect
Matrix for ESD, Installation Cabling system from existing to new Connection Package &
Instrument Specification for Earthing System, Analyzer, Safety & Relief Valves, Central
Control Specification, Automation System Architecture, Flare Ignition System,
Instrument Air Utility, Instrument Field Devices, GPA System and Ultrasonic Flow Meter
etc.
- Prepare Instrument Power consumption, Instrument O/I list and Instrument index.
- Prepare Requisition document for tag items such as Choke Valve, Pressure Safety
Valve, Pressure Indicating Transmitter and Flow Indicating Transmitter, Temperature
Indicating Transmitter and Thermowell, Sand Monitoring System, Orifice Plate & Flange,
Instrument Wellhead Control Panel, Pressure Gauges, Level Control Valve, Instrument
Control System (PCS & SSS), Instrument Tubing, and Instrument Cables.

 February, 2008 - June, 2010


ENI Oil Company Limited ( Mellitah Oil & Gas BV ) Tripoli, Libya
Assignment : Snr. Instrument & Control Engineer

Project : - A/100 Low Pressure Facilities and Arrival Manifold Modification, Bu


Attifel Project
- DCS, ESD troll System integration between new centralized control room &
Produced water re-injection plant project
- R/82 - A/100, 12” Crude Oil Pipeline Replacement EPIC Project
- Feasibility study for hydrocarbon metering replacement or modernization
( Rimal, OO, UU, KK, Bu-Attifel, Zuetina A103 and Bouri field )

Responsibilities :
- Review & Approve all related Instrument and Main Control system for PSD or ESD/FGS,
PCS or DCS and included interface package for Electrical and Instrument, Mechanical.
- Prepare and Comment documents Consumption List, Instrument Field Devices, Fire &
Gas Field Devices, GPA System and data Communication, Ultrasonic Flow Meter,
Instrument Design Criteria, Instrument Philosophy, Alarm Management Philosophy,
Safety Instrument System Function Design, Network IP Address allocations and
- Review and Prepare Comment the Complete Basic & Detail Design Engineering, Alarm
Set Point as per Alarm Management philosophy and All Package item included Hard
Page 6 of 13

Wire Cable from Another Connection Packages & Field, ESD/FGS Data Base (with
Input / Output Count).
- Review and Approved Instrument Data Sheets and drawings in liaison with the Agip
Standard-based, Operations and maintenance requirement, database and construction
procedures, including, DCS control schemes, Instrument functional diagrams, loop
diagrams, I/O assignments, etc.
The systems integration development, ensure safe, and technically sound decisions
related to area of responsibility during EPC phase..
- Check and Review Design, Instrument Air Capacity Verification, Instrument Earthing
System Requirement, Intrinsic Safety Calculation, DCS/ESD/FGS System Interlock
Logic Diagram, Instrument Loop Diagram, Trip & Alarm Schedule, Pneumatic
Instrument Layout, Electronic Instrument Layout, Calculation Sheets for Control Valve,
Orifice Plates, RO. Hydraulic.
- Review and Prepare Data Sheet and Selection All of Instrument Equipments such as
Electronic Instrument Transmitter (PT/PDT/LT/FT), Choke Valves, Self Regulating
Heater Cable, Fire Water System, Pressure Gauges, Pressure Switch, Temperature
Transmitter (TW & Wells), SDV/BDV Pneumatic Local Controllers, Filter Regulators,
Analyzer, and WHCP with PLC, HPU with PLC, HIPPS, SIL, Flow Computer, Flow
Meter System, etc.
- Review & Ensuring EPC Contractor’s Instrument & Control Engineering meets Project
Requirements, Standard, Specifications and performance Guarantees ESD/FGS
Inspection & Test Plans Document and Performing Cause & Effect Matrix Test of
Control, ESD/FGS Cause & Effect Diagram for Vendor Packages. Perform Cost
Estimate & Schedule etc.
- To Development of Basic Design Criteria and Operating Safety Requirement,
Procedure Field Instrument Installation Related to the Construction Standard
Requirement, Pre-Commissioning & Commissioning procedure, Requisition for
Quotation Documents, and Material Requisition, Vendor Equipment Evaluation, Vendor
Package Schedule and Technical Bid Analysis

 January, 2006 - January, 2008


Nippon Steel Engineering Corporation, Ltd
Assignment : Lead Instrument & Control Engineer

Client : HESS (Indonesia-Pangkah) Limited


British Petroleum West Java Ltd

Project : WHP-B and Ujung Pangkah CPP & AUP EPCC Contract Bidding Work
and BP West Java Rehabilitation Project
Bidding Work and Engineering preparation

Responsibilities :
- Prepare Technical bidding work Document of General Instrument Scope of Work and
Safety for Engineering and Construction.
Fire & Gas Detector System, Telecommunication System Philosophy, Instrument and
Shutdown System, Wellhead Control System, Instrument Loop Diagram, Material Take-
off, Instrument Block diagram and Instrument List.
Page 7 of 13

- Prepare Weekly Report, Monthly Report, Deliverable List and Schedule, Sizing /
Calculation Sheets for Control Valve, Safety Valves, Orifice Plates, RO, SDV/BDV &
Panel, and Selection Instrument Requirement.
- Project specification and Datasheet for All Instruments Tag Item or Field Devices,
(LG/LT/LS, PG/PT/PS, TG/TT/TS and FE/FT/FS, Control Valve & on/off pneumatic
Valve ), Alarm Management and Shutdown Philosophy, Cause & Effect Matrix for ESD
and Fire & Gas System, Drawings Detail Design Cable from Another Connection
Package & Field Junction Boxes System Arrangement., Instrument Specification for
Earthing System, Analyzer, Safety & Relief Valves, P&I Vendor Packages, Instrument
and Central Control Specification, Automation System Architecture, Flare Ignition
System, Instrument Air Utility, Instrument Field Devices, Fire & Gas Field Devices, GPA
System and, Ultrasonic Flow Meter etc.
- Prepare Automation Scope of Work, Automation Alarm Management & Shutdown
Philosophy, Instrument Basic Design, Instrument Function Design Spec, Instrument
Control Network Spec, Safety Instrument System Function Design, Automation Alarm
Management Project All Related with Automation System Cabinet, e.g. PSD or ESD,
PCS or DCS and FGS Specification, Wellhead Fabrication Drawings and Shop
Drawings, Shutdown System, Control System, Detail Design Instrument Engineering
Drawings, Instrument Loop Diagram, Material Take-off, Instrument Block Diagram,
I/O List & I/O Assignment for module, Interface Cable Between RTU to SCADA Master
or HMI, Segregate Signal (IS & Non IS) from Field Devices & Package Item.
- Vendor Equipment Evaluation and Technical Bid Evaluation.

 November, 2003 - December, 2005


RAMUNIA OIL & GAS SDN BHD, Malaysia
Assignment : Lead Instrument and Control Engineer

Project : East Belumut – A, Tinggi-A and Chermingat Platform of Newfield Peninsula


Malaysia Inc.
Lot 437. Telok Ramunia 81620 Pengerang, Johor Darul Tak’zim - Malaysia

Responsibilities :
- Review & Prepare Perform the Technical Evaluation (TBE) or Any Tender Document
Submitted by Vendor.
- Clarify Vendor Quotation Technically and Kick of Meeting under Procurement Section
Coordination.
- Monitoring and Control Instrument Material Status to Verify, Review and Approve the
Vendor Data / Drawings.
- Check of Other Discipline Document Which Relating to Instrument Standard
Requirement.
- Raise Purchase Requisition (PR) for New Material Request or Shortage Check and
Review for Detail Design Instrument Engineering Drawing, Instrument Loop Diagram,
Material Take-off, Instrument Block Diagram, Deliverable List Estimate and Schedule,
Sizing / Calculation and Selection Instrument Requirement.
- Review and Prepare All Related with Instrument Control System for PSD or ESD, SIS,
PCS or DCS and FGS Included interface with all Package for Piping, Mechanical,
Electrical and Instrument such as Gas Turbine, Fire Water Pump, HVAC with DCS,
PLC, LCP Pumps, Multiphase Flow meter, Flare Ignition System, Instrument Air Utility,
Page 8 of 13

MCC, Switchgear, Emergency Diesel Generator, Instrument Field Devices, Fire & Gas
Field Devices, GPA System and Telecommunication, Ultrasonic Flow Meter etc.
- Review & Verify the Incoming I/O from Field Devices & Package item to be Connected
to Control System Cabinet / Marshaling Cabinet for PSD, PCS and FGS Cabinet for
Design Capacity the Size of the Cabinets.
- Prepare Instrument & Control Scope of Work, Automation Alarm management
philosophy, Instrument & Control Basic Design, Automation Network Spec, Alarm Set
Point as per Alarm Management philosophy and MODBUS Address for Ethernet Cable
& RS485/232 Cable All Package item included Hard Wire Cable from Another
Connection Packages & Field, Automation Package Interface Spec, Safety Instrument
System Function Design, Automation Alarm Management Project Execution Plan,
Automation Database Guidelines, Automation I/O List, Automation Architecture, System
PCS, PSD & SCS Block Diagram, System F&G Block Diagram, Overall Interface
Diagrams, Network IP Address Allocations and Automation data
- Review All the Instrument Documents, Data, Drawings from Contractor for the Project
and ensure that the Project Document is Done as per the Project Specification
Requirement.
- Responsible for updating/developing fire & gas detectors schedule, datasheets, wiring
diagrams, I/O Schedule, cause & effect drawings, loop diagram, narratives, etc.
- Supervising the correct selection of materials and equipment, and quantifying, procuring
and monitoring the progress of materials and equipment through all stages of projects.
- Ensuring that materials requirements are identified and procured effectively and
efficiently within the given project time scale.
Responsibility includes preparation of material/ purchase requisition for
RFQ, Technical Requisition Package (TRP) for FGS System, technical bid evaluation
(TBE), vendor drawing review/approval (VDR) and technical support.
- Analyse problems, determine critical factors for investigation and provide expert advice
on design processes and construction methods.

 August, 2001 - October, 2003


MEDCOENERGI EXPLORATION & PRODUCTION
Assignment : Snr. Instrument Design Engineer

Project : Singa Gas Plant Development and Kaji Satellite / Matra Receiving, Kaji
Semoga, Kaji Station, Kaji Waste Treatment Centre and Kaji Pilot
Enhanced Oil Recovery (EOR) Instrument Air Compressor of Gunung
Megang Station

Responsibilities :
- Prepare General Instrument Specification, Fire & Gas Detector Specification,
Telecommunication & System Philosophy, Telecommunication and Scada System
Specification, Instrument and Design Criteria, Shutdown System Specification,
Instrument and Control Specification, Instrument Data sheet, Check and Review for the
Complete & Detail Design Instrument Engineering Drawing, Instrument Index, Cause
and Effect.
- Prepare Demolition procedure for Control System, Instrument loop Diagram, Material
Take-off, and Vendor Package Equipment Evaluation and Technical Bid Evaluation
Page 9 of 13

Deliverable List Estimate and Schedule, Sizing / Calculation and Selection Instrument
as per Company Specification Requirement.
- Ensure best practices associated with Fire & Gas Detection System
Projects including planning, coordinating, supervising, and evaluating technical work.
- Responsible for updating/developing fire & gas detectors schedule, datasheets, wiring
diagrams, I/O Schedule, cause & effect drawings, loop diagram, narratives, etc.
- Supervising the correct selection of materials and equipment, and quantifying, procuring

 April, 1999 - June, 2001


PT. PetroChina International JABUNG Ltd.
Assignment : Snr. Instrument Design Engineer

Project : NG ( North GERAGAI ) Separation Facilities De-bottlenecking ( AFE-


1401) Removal & Replacement First Stage Separator V-3400 to Second
Stage Production Separator V-3410 EPC & E of Skim / Surge Tank
–126 ( AFE-1733 )

Responsibilities :
- Prepare the Complete Detail Design Engineering for Instrumentation, Technical
Specification, Review P & ID, Instrument Equipment Data sheets, Perform Cost
Estimate and Schedule. Design, Calculation and Sizing of Instrument equipment such
as Control Valves, Flow Elements, RO, SDV/BDV valves, Regulators, PSV, etc
WHCP, HPU with PLC, HIPPS, SIL, Flow Computer, Flow meter System, etc.
- Development of Control System Philosophy and Operating Safety Requirement.
Sizing Calculation and Selection Instrument Requirement. Prepare Requisition for
Quotation Documents. Check and Review Detail Design Instrument Drawing and
Material Requisition .
- Check or review Project specification for package item & field devices.
- Check or review Datasheet for all instruments tag item or field devices.
- Check or review Alarm management and Shutdown philosophy.
- Check or review Cause & Effect Matrix for ESD and Fire & Gas System.
- Clarify detail design documents or drawing with other discipline engineers.
- Check drawings detail design before issued for client review and approval.
- Check or review Automation specification and total I/O requirement.
- Check or review of IO list, IO assignment and Module Assignment.
- Check alarm set point as per alarm management philosophy.
- Check MODBUS address for Ethernet cable & RS485 cable for packages
- Check or review interface cable between RTU to SCADA Master or HMI
- Prepare cable from another connection package & field Junction Boxes.
- To segregate Signal (I.S & Non I.S) from field devices & package item and
sizing of Control valves, Pressure relief valves and Orifice plates (RO, FE).
- Review of Marshalling and System Cabinet Technical Specification.
- Check and review design & sizing Marshaling cabinet for PSD/ESD, PCS/SCADA and
Fire & Gas.
- To assist weekly Progress meeting with Project Team & Project Management Team.

 April, 1997 - March, 1999


Page 10 of 13

CHEVRON PACIFIC INDONESIA (Assignment by PT. Istech Resources Asia)


Assignment : Sr. Instrument Maintenance Engineer

Project : Maintain & Supervise field instrument and Up dated / Verify Instrument
data collection and P & ID as built drawing
According to site condition for 32 ( thirty two ) Gathering stations and 10
( ten ) Gas Plant in SLN Area.

Responsibilities :
- Coordinate, maintain, improve and develop documentation and procedures for items
such as instrument procedures, instrument configuration changes and checkout,
common instrument troubleshooting procedures, instrument preventive maintenance
procedures, and instrument spare parts inventory to assure appropriate documentation
is maintained and available when needed.
For new instruments, review support needs imposed in terms of standard re-
configurations, preventive maintenance schedules, required interfaces, and
troubleshooting; review existing and planned documentation and engineering drawings,
especially from a support and maintenance perspective; and assist with commissioning
activities and integration of new instruments into observatory systems to support
operation of facility and visiting instruments.
- Review & Verify All of Instrument Field Devices and Incoming I/O from Field Devices
Item to be Connected to Control System Cabinet / Marshalling Cabinet for PSD, PCS
and FGS Cabinet in Control Room.
- To Follow and Assist the PSD, PCS and FGS during FAT, SAT & Commissioning
Included Package Equipments.

- To Ensure that Instrument Documents and Drawings are Informed and Implemented on
the Site and Checking, Loop Test and Performing Cause & Effect Matrix Test of
Control Loops, Leakage test and Punch List
- Prepare & Verify Field Instrument Equipment and Turbine Gas Control System
Package According to Site Condition was as Built.
- Collected Instrument Data Base on Worksheet from CPI Collected each Equipment List
and Part List Based on Engineering Data and Instruction Manual Book.
- Tagging Instrument Equipment number on site as JDE data (based on JDE Numbering
system).
- Develop and perform P & ID as built drawing according to Site Latest Condition
- Field Analysis & Evaluation Instrument and Control Systems

 January, 1995 - February, 1997


PT. TECHNIP COFLEXIP
Assignment : Snr. Instrument Design Engineer
Client : TOTAL INDONESIE, BALIK PAPAN EAST KALIMANTAN
Project : HANDIL API Barge Replacement
Project : CSU De-Bottlenecking Study
Project : Compression / Pumping Facilities on Well Service Barge
Project : TUNU South Oily Water Treatment
Project : SENIPAH Fire Heater Up grade

Responsibilities :
Page 11 of 13

- Prepare for the Complete Basic & Detail Design Engineering, Technical Specification,
Instrument Index, Instrument Equipment Data sheets, Perform Cost Estimate and
Schedule.
- Develop of Instrument & Control System Philosophy and Operating Safety
Requirement.
- Design, Calculation and Sizing of Instrument equipment such as, Control Valve, Flow
Elements, RO, SDV/BDV valves, PSV, etc
- Develop and Design WHCP accordance to HPU, HIPPS, SIL Standard connected to
Flow Computer, Flow meter System, etc
- Prepare Sequence of development document, Installation and Construction -Prepare
Requisition for Quotation Documents.
- Project uniformity and Conformance to Contractual Requirements Related to
Instrumentation and Process Control.

Client : UNOCAL INDONESIA COMPANY, BALIK PAPAN, EAST


KALIMANTAN
Project : YAKIN CPP2 Supplement Compressor
Project : SERANG Flare Boom
Project : PASIR Ridge Station Diesel Day Tank Replacement
Project : ATTAKA Gas Lift Metering

Responsibilities :
- Evaluation of Control System, Prepare Instrument Equipment Data Sheets,
- Prepare MVT, I/O List, I/O. Module Document. Check Line List to Number of P & ID
Drawing.
- Prepare Instrument Equipment Calculation and Instrument Technical Specification
Included Fire and Gas Detection, HPU with PLC, HIPPS, SIL, Flow Computer, Flow
meter System, etc.
- Prepare Sequence of development document and Installation and Construction
Instrument and Control Cable Schedule, Wiring Block Diagram, Instrument Cable
Routing, Loop - Diagram, Selection of Ignition Control System, Data Sheets, Site Visit
for Implementation of Terminal Ignition Control System, Review Flare Package Data
Vendor P & ID Drawing Study for Gas Lift Flow Metering
- Prepare & Field Analysis Instrument and Turbine Gas Control System design included
for Construction & Pre commissioning, Inspection & Punch List Project Report, Design
& Analysis Existing Integrated DCS and PLC in Control Room; Instrument Sizing
Calculation and Selection for Control Valves, Flow Elements, Pressure Relief Valves
etc.
- Develop P & ID to Existing Integrated and Implementation of Distribution Control
System.
- Detail Engineering Design Data for Instrumentation, Design Instrument Main Cable
Way and Preparation Instrument Data Sheets & MTO. Loop Test and Supervision Flow
Line of Oil from Wellhead through Separator, Development of the Process Control
Philosophy And operating Safety ( Shutdown System ) Requirement.

 September, 1992 - November, 1994


PT. KOKUSAI KEISO INTERNATIONAL
Assignment : Instrument Design Engineer
Page 12 of 13

Project : MEOG Project at Toyo Engineering Corporation 8 – 1


AKANEHAMA 2 – CHOME, NARASHINO – SHI Chiba 275 – 0024
Japan

Responsibilities :
- Prepared & Field Analysis Instrument and Control System for Construction & Pre
commissioning, Inspection & Punch List Project Report, Design & Analysis Existing
Integrated DCS and PLC in Control Room, Instrument Sizing Calculation and Selection
for Control Valves, Flow Elements, Pressure Relief Valves etc.
- Develop of P & ID to Existing Integrated and Implementation of Distribution Control
System.
- Detail Engineering Design Data for Instrumentation, Design Instrument Main Cable
Way and Preparation Instrument Data Sheets & MTO.
- Loop Test and Supervision Flow Line of Oil from Wellhead through Separator,-
- Develop of the Process Control Philosophy And operating Safety (Shutdown System )
Requirement.
- Check and modified Motor Control System, Wiring Diagram, Schematic Diagram,
- Cable Tray Layout; Interconnection Diagram; Cable Routing and Cable
List, MTO, Main Cable Way, Control Panel Enclosure, Electrical Power/Control
Cabling layout, Distribution Control Panel Arrangement, Standard Support
Detail and Power/Control Cable Schedule.
Detail Engineering Design Data for Instrumentation, Design Instrument Main Cable
Way and Preparation Instrument Data Sheets & Material take-off .
- Develop of the Process Control Philosophy and Operating Safety (Shutdown System )
Requirement.

 February, 1986 – June, 1992


PT. INDOKOMAS BUANA PERKASA ( Licensee of CEGELEC )
Assignment : Instrument / Electrical Engineer

Client : UNOCAL INDONESIA COMPANY


Project : EPCC Project and Contract Bidding Work

Responsibilities :
- Prepare Bidding documents and Detail Design Engineering Drawing and Estimation,
Basic Design Control System, Instrument Material Take-off, Instrument Location
Plan, Instrument
Main Cable Way, Man days and Man hours Estimation, Instrument tools &
Field Instrument Equipment arrangement, Engineering Planning and Scheduling

Client : TOTAL INDONESIE, East KALIMANTAN


Project : TNOR-105 & TNOR –107 PECIKO Field Development Project
Phase-1 for Revamping of SENIPAH Camp

Responsibilities :
- Prepare Documents and Engineering Design Instrumentation such as
Installation and Construction Termination Distributed Control System (DCS),
Instrument Technical Specification; Design Control Panel enclosure
including MTO Equipment Gas Dehydration Unit TOTAL Thailand,
Page 13 of 13

Calculate MTO of Instrument & Electrical Equipment; Trouble Shooting


Loop Diagram for TOTAL INDONESIE TNOR-107’ For GTS-1, L, M,N, NPU
and BADAK Field, Instrument Technical Specification Instrument Loop Test,
Instrument equipment Calibration, etc.

Client : PT. PERUSAHAAN LISTRIK NEGARA ( PERSERO )


Project : AP3 project, JDCC / DCC project, HITACHI / GRESIK Project,
TANJUNG PRIOK Project, Protocol ’89, Protocol ’90, Power Plant
Paiton, Protocol ’92 and Protocol ’95

Responsibilities :
- Prepare and Calculate MTO of Instrument & Electrical Equipment for
- Petrochemical GRESIK Surabaya, Single Line diagram, Interconnection Diagram,
Electrical Power / Control Cabling Layout, Design & Modify Schematic Diagram
for OHL 150 KV & 500 KV, Transformer 150/70 KV
- Prepare Design for Power Plant Control System and Communication (DCS & SCADA)
- Review & analysis Perform the Technical Evaluation Gas/Steam Turbine

 September, 1983 – December, 1985


PT. PERTAFENIKKI ENGINEERING ( JAPANESE GASOLINE CORPORATION /
JGC – JOINT OPERATION )
Assignment : Sr. Instrument Designer

Client : PERTAMINA
Project : ARUN LNG Expansion Project and MUSI Refinery Project Phase-1

Responsibilities :
- Checking and Review Drawing According to as Built on Site, Piping and Instrument
Diagram, Instrument Installation Detail, Cable Routing, Instrument Installation Air
Supply, Instrument Loop Diagram, Hook-up & Section Detail, Cable Ladder &
Trench layout, Instrument Material Take-off, Instrument Support Detail, Instrument
& Control Pre-Commissioning & Commissioning, Instrument and Control Calibration.

 March, 1981 – June, 1983


BECHTEL INTERNATIONAL INCORPORATED (Assignment by PT. Purna Bina
Indonesia)
Assignment : Instrument / Electrical Designer
Project : Train “C” and “D” BONTANG LNG Expansion Project,
East - KALIMANTAN

Responsibilities :
- Modification and as Built Drawing including Checking for Electrical Installation,
- Distribution Panel, Cable Tray Layout, Lightning Protection, Schematic Diagram,
- Electrical Cable Schedule, Connection cable, Wiring Diagram, Instrument
- Location Plan; round Well, Detail Drawing and Electrical / Instrument Material
- Take off, Instrument Loop Diagram, Hook-up & Section detail, Cable Ladder & Trench
- Layout, MTO and Instrument Cable Schedule