Item No.

Description Unit Quantity

1 2 3.00 4.00

5 Supply and use of piezometer (4nos) in four corner of this project and take record
for ground water table during basement construction( mat to ground floor) along Pcs 4.00
with repoting as per General specifications.
6 Supply and installation of Inclino meter at the south & north side of plot as per
specification & direction of engineer in charge and take record up tp construct the
structural work upto ground floor.Data from record shall be submitted time to
time to the Engineer in charge. All complete the work as per Engineer in charge. Pcs 2.00

7 Supply and installation of Tilt meter at the East & West side of plot as per
specification & direction of engineer in charge and take record up tp construct the
structural work upto ground floor.Data from record shall be submitted time to
time to the Engineer in charge. All complete the work as per Engineer in charge. Pcs 4.00

8 Monitoring (Piezometer, Inclinometer and Tilt meter) Month


Unit Rate Total Amount
(BDT) (BDT)

5.00 6=4x5

150,000.00 600,000.00

200,000.00 400,000.00

80,000.00 320,000.00

100,000.00
Harirampur Piezometer BOQ

Iterm No. Item Description Unit Qty


1 VW Piezometer Piece 15
2 Cable (A) RFT
3 Cable (B) RFT
4 Cable (C) RFT
5 Casing Pipe (A) RFT
6 Casing Pipe (A) RFT
7 Casing Pipe (A) RFT