Review For Approval Drawings/Documents
Review For Approval Drawings/Documents
Review For Approval Drawings/Documents
03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE
Technical Comment
1 Please recheck and update the service, operating temperature,
operating pressure and flow rate for each stream on heat and mass
balance. Check its consistency with others document also. Note that
clarifier only installed on Nunukan-2
2 Please make sure the discharge pressure of raw water transfer pump.
Head 100 m at 10 m3/h
Recheck the calculation of pump head.
3 Please Show CIP for RO cleaning on WTP-BWRO Package. Confirm
the water source for RO Cleaning
4 Please Recheck and revise the recycle line from RO unit. Is it flow back
to upstream RO catridge or HP RO Feed Pump as shown on PID?
Reviewed by : Checked by :
-1/1-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE
2
Please revise flag direction from raw water pond to open ditch
6
Please revise the term “M” (Middle) to “N” (Normal)
Reviewed by : Checked by :
-1/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
Comm’t Comm’t CONTRACTOR’S RESULT
PLN’S COMMENTS
No. No. RESPONSE
Technical Comment
Please recheck and revise raw water transfer pump head. Make
1 sure pump can transfer raw water from deep well up to water
Head 100 m at flow 10 m3/h
pond with the worst case where the water level during dry
season
Reviewed by : Checked by :
-2/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE
Technical Comment
1 Please make sure MMF Backwash Pump start stop function is
synchronize with MMF backwash requirement
2 Please make sure backwash tank can accommodate all reject
water from RO to avoid water release to environment
Reviewed by : Checked by :
-1/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
Comm’t Comm’t CONTRACTOR’S RESULT
PLN’S COMMENTS
No. No. RESPONSE
3 Please change NO and NC valve status for MMF. The drawing
shows two MMF operate simultaneously. Its hould be one
operating and one standby as its philosophy
4
Please recheck compressed air avaibility related to its
requirement for MMF valve (Pneumatic valve type)
Reviewed by : Checked by :
-2/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE
Reviewed by : Checked by :
-1/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
Comm’t Comm’t CONTRACTOR’S RESULT
PLN’S COMMENTS
No. No. RESPONSE
Technical Comment
1 Please recheck and revise the recycle line from RO unit. Is it
flow back to upstream RO catridge or HP RO Feed Pump
2
Please show chemical dosage as vendor recommendation
Reviewed by : Checked by :
-2/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE
Technical Comment
1 Please recheck and revise pipe material. Confirm with piping
engineer
2 Please recheck and revise instrument signal from LIA
00GBL31EJ301. There are two function show on instrument
signal, LLL to stop/HLL to start and HLL to stop/LLL to start
Reviewed by : Checked by :
-1/1-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE
Reviewed by : Checked by :
-1/1-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)