u.s.
Full supply discharge 50 cumec
d .s.
u.s. 101.5m
Full supply level
d .s. 101.0m
u.s. 2 m
Full supply depth
d .s. 2 m
u.s. 30 m
Bed width
d .s. 30 m
u.s. 99.5 m
Bed level
d .s. 98.0 m
Drop 1.5m
Side slope 1:1
Soil Good loam
1
Safe exit gradient
4.5
Design the floor with Khosla’s theory.
Solution
1. Length of the crest
Length of the crest shall be kept equal to the bed width of the channel.
Length of crest = 30 m
2. Crest level
For falls more than 15 cumec, trapezoidal crest is provided and the discharge is given by:
16
3
D
Q 2.26 Lt D
2
Bt
Assuming crest width (Bt) = 1 m we get:
16
D
3
50 2.26 30 D
2
1
or D 0.833 say 0.9 m
50
Velocity Approach Va 0.782 m sec. ( with 1:1 side slope)
30 2 2
Va 2
Velocity head (ha )
2 9.81
0.031 m
UpstreamT .E.L. u.s. F .S .L. ha 105.5 0.031 101.531
El of crest u.s.T .E.L. D 101.531 0.9 100.631 m
Adopt crest level 100.640 m
1
Hydraulic Structures –Sharda Type II Fall April 19, 2011
3. Shape of crest
Thickness at top ( Bt ) 0.55 D D1
where D 0.9 m and D1 height of crest above d .s. bed
100.64 98.0 2.64 m
Thickness at top ( Bt ) 0.55 0.9 2.64
Thickness at top ( Bt ) 1.03 say 1.05 m
Keep crest width 1.05 m with u.s. slope 1: 3 and d .s. slope 1: 8.
4. Approach
Radius of wing should be 6 times the head over the crest .
Radius of wings = 6×D = 6×0.9 = 5.40say 5.5 m.
Wing walls shall be madesegmental with 5.5 m radius subtending an angle of 60o at center and then
carried tangentially in to the berm.
5. Downstream wings
The downstream wing walls shall be kept vertical upto a distance of 5 D×H L = 5 0.9×1.50 = 5.80 m.
There after the wings shall be warped from vertical to1:1slopein remaining length of the floor.
6. Upstream protection
Brick pitching equal to u .s.water depth should be laid on the u .s.bed towards the crest at1:10slope.
Provide 20 cm drain holes in the entire length @3m c c to drain out the u .s.bed during the closure of
the channel.
7. Curtain walls
a. Downstream curtain wall
water depth
Depth = + 0.6 =1.6 m
4
Provide 0.4 m thick1.4 m deep toe wall (upto deepest floor) over 0.3m foundation concrete, comprising
total depth of 1.7 m.
b. Upstream curtain wall
water depth
Depth = + 0.6 = 0.67 0.6 1.27 msay1.3m.
3
Provide 0.4 m thick1m deep toe wall over 0.3m foundation concrete, comprising total depth of 1.3m.
8. Cistern
dc = q2 g
13
Depth of cistern = d c 3 ; Critical depth
2
Hydraulic Structures –Sharda Type II Fall April 19, 2011
3
Hydraulic Structures –Sharda Type II Fall April 19, 2011
4
Hydraulic Structures –Sharda Type II Fall April 19, 2011