Boq Plant Wiremesh
Boq Plant Wiremesh
B PEKERJAAN TANAH
1 Galian Pile Cap + Pedestal 46.80 m3
2 Galian Tie Beam 210.60 m3
3 Urugan Tanah Kembali 192.90 m3
B PEKERJAAN PONDASI
1 Bore Pile ( Ø 30 cm )
Pembesian 2,469.08 kg
Cor Bore Pile (K-225) 288.00 m
2 Tie Beam ( 40 x 60 )
Urugan Pasir 4.32 m3
Lantai Kerja (K-100) 2.16 m3
Pemasangan Bekisting 138.40 m2
Pembesian 924.01 kg
Cor Tie Beam (K-300) 25.92 m3
3 Pile Cap (100 x 200) dan Pedestal (50 x 90)
Urugan Pasir 2.40 m3
Lantai Kerja (K-100) 1.20 m3
Pembesian 2,428.85 kg
Pemasangan Bekisting 243.50 m2
Cor Pile Cap dan Pedestal (K-300) 38.58 m3
D PEKERJAAN LANTAI
1 Urugan Pasir 72 m3
2 Lantai Kerja (K-100) 36 m3
3 Pembesian (wiremesh m7-150) 2773.67 kg
4 Pemasangan Bekisting 16.212 m2
5 Cor Plat Lantai (K-350) 108 m3
C PEKERJAAN STRUKTUR
Supply + install Angkur M22 L = 80 cm 96.00 pcs
1 Install Struktur 73,502.00 kg
2 Servis Struktur 73,502.00 kg
3 Baut 36,751.00 kg
4 Grouting 96.00 titik
D PEKERJAAN FINISHING
1 Roof BJLS 842.41 m2
2 Dinding Batako 91.50 m2
2 Dinding BJLS 600.24 m2
Volume Wiremesh M8 (7,5 mm) LT.1
0.006165
0.006165
0.006165
pemasukan 4270000 1868000
pengeluaran jumlah
kos 650000
baruno 100000
winny 100000
arief 50000
lemari 150000
sepatu 320000
hp ira 500000
depi 32000
skincare 200000
tas mama 150000
kado ibuk 150000
2402000