Professional Documents
Culture Documents
Fosroc Trafficguard UR100: Constructive Solutions
Fosroc Trafficguard UR100: Constructive Solutions
Surface Preparation
Technical Support
New concrete surfaces should have a minimum curing period
Fosroc offers a comprehensive technical support service to
of 28 days. Existing concrete surfaces must be prepared to
specifiers, end users and contractors. It is also able to offer
provide a clean, sound substrate. Surfaces should be clean
on-site technical assistance, an AutoCAD facility and
and dry with open capillaries, free from laitance, oil, grease,
dedicated specification assistance in locations all over the
curing compounds or other surface contaminants. All
world.
blowholes, and other surface undulations greater than 1
mm in depth, should be repaired using Nitomortar FC(B)*†.
Temperature of the substrate during application must be
between 5°C and 40°C.
Priming
Head Office
telephone: (+9714) 2039699 fax: (+9714) 2859649 email: agf@fosroc.com
Al Gurg Fosroc LLC
Regional offices
Post Box 657, Dubai Abu Dhabi, Al Gurg Fosroc telephone: 673 1779 fax: 673 1449 email: abudhabi@fosroc.com
United Arab Emirates Bahrain, YBA Kanoo telephone: 17738200 fax: 17732828 email: bahrain@fosroc.com
Kuwait, Boodai telephone: 4817618 fax: 4832124 email: kuwait@fosroc.com
www.fosroc.com
Oman, Al Amana telephone: 24815080 fax: 24817554 email: oman@fosroc.com
Qatar, Tadmur telephone: 4665501 fax: 4664147 email: qatar@fosroc.com
UAE/0374/10/I